    OUR NATION AND SOCIETY K-2

    LETS GO CAMPING

    SCHOOLONLINEABCSTREET

    APPLETOWN,GEORGIA 12345

    MAY 8,2015

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    2/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    OR NATIONAL AND SOCIETY

    MISSION TO LETS GO CAMPING PROJECT

    (The part that is missing is: the Budget to schedule the project.)

    The SchoolOnline, an national initiative to develop online digital learning sources (i.e. learning objects (Ertner et al. 2014).

    in specific curricular areas for primary and secondary has authorized Jackson Consulting Companys payroll group. The project plan

    will be developed by the Project Steering committee. The purpose of this learning activity for k-12 learners is to identify and

    understand the difference between their own needs and wants and to think abou the needs and wants of others. The project

    includes Project objectives and scope, resources, project control which two teams: one proposing and researching the content for

    design briefs and the other do the development work. Also, creating educational learning objects. The learning object will be

    developing students understanding of values, sustainability, dimensions of well-being. And they will also have the understanding of

    how people contribute to the needs and well-being of the community. Also, how we all contribute to the community in productive

    and fair ways. Project Managers- Gordon Anderson, Review Panel, Writing, Design and Development Team. The Organization

    Structure of the Our nation and Society Project: (Ertner et al. 2014).

    Project Steering Committee:

    Four people on this committee

    Review Panel (Subject Matter Experts,

    School Education experts)

    Jeff Parker, Penny Johnston, Tracey Ward

    and Scott

    Project Manager:

    Gordon

    Writing Team:

    Three People

    Design Team

    Four People

    Development Team

    Four People

    Design Briefs Design Specifications Learning Objectives

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    3/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    The purpose will provide resources that support student to: a) develop understanding about contemporary society as a

    springboard for understanding self and others and for examining the contributions needed to bring about preferred futures. b)

    Investigate interconnecting social, cultural, ecological and economic systems, political and ethical issues, and alternative worldviews.

    c) Develop values, understandings, skills, dispositions and behavior associated with civic decision making and with the principles of

    the democratic process, sustainable futures, and social justice. The scope of the project is to design and develop high-quality online

    digital content organized around one or more of the following themes: a) geographical, economic, environmental, ethical,

    etiological, and political systems, and/or issues. b) The way we are now. c) What we want for the future. It should be noted that all

    above be covered in the total body of content developed in the project, but that not all elements need to be present in each

    individual learning object. Requirements for technology purpose used simple animations, text and audio. All of the learning objects

    will be needed to be develops in Flash for a particular set of end-user specifications. It is also critical to have the interface design

    considerations which are clean interface, large drag and drop areas, large font texts, audio instructions and colorful, fun graphics

    (Ertner et al. 2014).

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    4/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Initial Flowchart for Lets go Camping

    Home exterior:

    (audio & interpreterinstructions)

    Bedroom

    (selects items for bag)

    Kitchen

    (select items for bag)

    Shed

    (select items for bag)

    Packing bag

    (items added to bag)

    Lets go camping

    (Click button when choices are

    made)

    Set up camp

    (Animation)

    Play camp Scene

    (Animation of implications of choices over

    hours/nights/days.)

    Change Items

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    5/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    The Project Manager, Gordon is hereby authorized to interface with management as required, negotiate for resources,

    delegate responsibilities within the framework of the project, and to communicate with all organizations and management, as

    required, to ensure successful and timely completion of the project. All specs and specifications for the designs go through Gordon.

    The Project Manager is responsible for developing the project plan, monitoring the schedule, cost, and scope of the project during

    implementation, and maintaining control over the project by measuring performance and taking corrective action.(Ertner et al.

    2014).

    (FYI: this was another part that was missing from their project)

    The project plan will be submitted and approved in accordance with the milestone schedule below. Upon approval of the

    project plan resources will be assigned to the project and work will commence within 5 business days. Gordon, the Project Sponsor

    must approve any schedule changes which may impact milestones. A detailed schedule will be included in the project plan. The high

    level milestone schedule is:

    July 1, 2015Project Plan Complete and Approved by Project Steering Committee and (SME) Review Panel

    July 15, 215Payroll Design Completed based on the Writing/Design and Development Team all gets One month each to work ontheir assignments. Once a week all three teams will meet up attend the Workshop for the week, which will be held on Fridays.

    Oct 21, 2015Revise and final closing of the project before trial

    Oct 22-Oct 2, 2015Testing Completed by students from grade k-2

    Oct 5Oct 9, 2015Beta Testing Completed

    Oct 12- Oct 16, 2015Implementation Completed

    Oct 23, 2015One, Payroll Cycle Complete and Project Completion

    The budget for the Payroll project is $441,840. It is to be funded through the FY2015 SchoolONline Technology Budget.

    20 Staff: Paid 28.00 per hour/work 8 hours a day for 83 days = $371,840

    Technology materials: 70,000

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    6/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    SCHOOLONLINE ACCEPTANCE

    Approved by the Project Sponsor:

    __________________________________________ Date: ___________________

    Johnny Appleseed

    SchoolOnline Project Manager

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    7/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Resources:

    Portny, S. E., Mantel, S. J., Meredith, J. R., Shafer, S. M., Sutton, M. M., & Kramer, B. E. (2008). Project management: Planning,

    scheduling, and controlling projects. Hoboken, NJ: John Wiley & Sons, Inc.

    Statement of project scope, including a summary of what will and will not be included in the scope of this project:

    The particular approach they will be taken is pedagogical approach to maintain on the project mission. The preferred

    pedagogies are provide multiple representations of reality and the complexity of the real world. Present authentic tasks that encourage

    conceptualization. It was determine that the learning objectives should be pretty flexible where it allows the student or small group

    could use it without direct instruction from the teacher. The main key, for keeping learning object small which would give them the

    limited of choices. Due to the timeline where SchoolONline will establish the design work which will take three months to maintain

    everyone on the same page. Workshop sessions will bring the writers and the development every two weeks to clarify expectations

    between the team members. This will be run by Gordon who is the PM as well, since everything must go through Gordon anyways.

    The scope of the project is to design and develop high -quality online digital content organized around on or more of the following

    themes: a) geographical, economic environmental, ethical, etiological, and political systems, and/or issues. b) The way we are now. c)

    What we want for the future. It should be note that all above be covered in the total body of content developed in the project but that

    not all elements need to be present in each individuals learning object. Requirements for technology purpose used simple animations,

    text and audio. All of the learning objects will be need to be develops in Flash for a particular set of end-user specifications. (Ertner

    et al. 2014).

    Project Purpose (revised from SOW)

    Theres been a few slight changes from the SOW, which is the title is to be changes from Mission to Mars to Lets Go Camping. Due

    to the fact it has the impact of identifying the needs for survival and the things we want that occur within a reality situation. The

    budget had to change due to an oversight, allowing the writers to write the program in three month period, plus adding

    Project Objectives (revised from SOW)

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    8/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    The purpose will provide resources that support student to: a) develop understanding about contemporary society as a springboard for understanding self

    and others and for examining the contributions needed to bring about preferred futures. b) Investigate interconnecting social, cultural,

    ecological and economic systems, political and ethical issues, and alternative worldviews. c) Develop values, understandings, skills, dispositions and behaviorassociated with civic decision making and with principles of the democratic process, sustainable futures, and social justice.(Ertner et al. 2014).

    Assumptions (revised from SOW)

    Stakeholder list and descriptions (For each key stakeholder or stakeholder group, briefly explain their role in the project, and whyand when they should be included or consulted during the project.) (Ertner et al. 2014).

    Project Steering committee/review PanelScott Allen, Penny Johnson, Jeff Parker, Tracey Ward

    Setting policies and procedures for addressing resources priorities and conflicts

    Creating and maintaining labor and financial information systems Providing facilities and equipment to support the performance of project work. Defining the limits of managers decision-making authority. Writing team completes 32 drafts, narrow down to the top two per person

    Project manager: Gordon

    Describe objectives, schedule and resource budgets. Ensuring a clear, feasible project plan for how everyone will reach performance target. Review all sign off coming and going according to plan. If any drastic changes Creating and sustaining a focused and committed team. Selecting or creating a teams operating practices and procedures.

    Managing the accomplishment of objectives, within the tiem and budget targets. Monitoring performance against plans and dealing any problems that arise Controlling project changes. Report on project activities Keeping clients informed and committed Contributing to team members performance appraisals

    Writing Team: SchoolONline(Time frame-One Month)Prepare (Design briefs)

    32 draft briefs to determine with the ideas the Review Panel to determine the develop further. After revision and determine which draft will beused continue to prepare with the contents.

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    9/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Design Team: SchoolONline(Time frame-One Month)Designs specifications- learning objectives used simple animation, text and audio.FYI: SchoolsONline: Avoid using full-color graphics and video due to increase of file size

    All learning objectives will be needed to be developed in Flash for particular set of end=user specifications

    Development Team: SchoolONline(Time frame-One Month)Learning Objectives: initial flowchart for Lets Go Camping

    Home exterior

    (audio instructions)

    Kitchen(Select items for bag)

    Bedroom(Select items for bag)

    Shed(Select items for bag)

    Packing bag

    (items added to bag)

    Lets go Camping

    (click button when choices are made)

    Set up Camp

    (animation)

    Play camp scene

    (Animation of implications of choices over hours/nights and days)

    Change items

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    10/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Additionally, include a brief rationale statement in which you identify the case study on which your project is based, and a summaryof any assumptions you made or information you filled in for the case study to complete this document.

    The case study the project is based on is Designing Learning Objects for Primary Learners. There was a lot of revision that had to be done

    due to the project is for primary learners. At the same time we had to keep the file small based on the objectives and SchoolsONline did notwant to use full color graphic video due to it will increase the file size. So there were some limitations of what the team wanted to use. Also

    since the Writing, and Development Team had the project for three months we want to keep the remainder of the team involved so we could

    all maintain on the same page. So throughout this time there will be workshop sessions, to prevent any issues that may arise and preventing

    from starting back to square one. This allows the communication among the team where everyone could be involved and revise as we go

    establishing the program.

    Resources:

    Portny, S. E., Mantel, S. J., Meredith, J. R., Shafer, S. M., Sutton, M. M., & Kramer, B. E. (2008). Project management: Planning,

    scheduling, and controlling projects. Hoboken, NJ: John Wiley & Sons, Inc.

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    11/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Effort/Duration

    Table:

    Phase, Activity,

    Or Task:

    Resource: 4

    people

    Project Steering

    Committee

    Effort

    Resource:

    4 people

    Review

    Panel Team

    Effort:

    Resources:

    1 people

    Project

    Manager

    Effort:

    Resource: 3 people

    Proposing/Research

    /Writing Team-

    Design Briefs

    Effort

    Resource:

    4 people

    Design Team-

    Design

    SpecificationsEffort:

    Resources:

    4 people

    Development

    Team- (Scarlet

    Media)Learning

    Objectives

    Effort:

    Resource:

    Client

    Reviewer:

    Student

    Trail

    Duration:

    Determine

    specific

    Objectives for

    software

    4 hours =16

    hours

    4 hours=16

    hours

    2 hours 4 hours=16

    hours

    50 hours

    Create Briefs 4 hours=16

    hours

    4 hours 64 hours (8 days/ 8

    hours)=192 hours

    212

    hours

    Discusscontent for

    briefs

    32 hours (8hours/ 4

    days)=128 hours

    4 hours=16hours

    2 hours 146hours

    Determine

    Specs for

    technology

    16 hours(8

    hours/2

    days)=64 hours

    4 hours (2

    hours/2

    days)

    16 hours(8

    hours/2

    days)=64

    hours

    132

    hours

    Develop full

    design

    48 hours ( 8

    hours/6

    days)

    480 hours (8

    hours/60

    days)=1920

    hours

    1968

    hours

    Workshop with

    the

    Development

    Team

    120 hours (2

    hours/60

    days)=480

    hours

    60 hours(1

    hour/60

    days)

    120 hours (2

    hours/60 days)=360

    hours

    900

    hours

    Final Trial of

    the

    Software/DVD

    1 hour (with

    ten

    students)

    1 hour

    Total: 208 hours 528 hours 120 hours 552 hours 64 hours 1936 hours 1 hour 3409

    hours

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    12/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Project Schedule: September October November December

    Determine Specific

    Objectives for

    Software

    Create Briefs

    Discuss content

    for Briefs

    Determine Specs

    for Technology

    Develop full

    Design

    Workshop with

    the DevelopmentTeam

    Final Trail for

    DVD/Software

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    13/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Cost Estimation WorksheetActivity Duration Project (4)

    people

    SteeringCommittee

    57.00/hour

    Review

    Panel

    (4 People)44.00/hour

    Project

    Manager

    (1 person)45.00/hour

    Writing

    Team

    (3 people)50.00/hour

    Design

    Team

    (4 people)100.00/hour

    Development

    Team:

    (4 people)Scarlet

    media:

    60.00/hour

    Client

    Reviewer:

    (5students)

    Free DVD

    Misc.

    Cost

    Total

    Cost

    Determine

    specific

    objectives for

    software

    50 hours 16 hour=

    612.00

    16 hour=

    704.00

    2 hours =

    90.00

    16 hours=

    960.00

    194,308

    Create Briefs 212

    hours

    16 hours=

    704.00

    4 hours =

    180.00

    64 hours=

    3200.00

    4084.00

    DiscussContent for

    briefs

    146hours

    128 hours=7296.00

    16 hours=704.00

    2 hours=90.00

    8090.00

    Determine

    specs for

    technology

    132

    hours

    64.00

    hours=

    3648.00

    4 hours=

    180.00

    64 hours

    6400.00

    10228.00

    Develop full

    design

    768

    hours

    48 hours=

    2160.00

    1620 hours=

    97,200.00

    99,360.00

    Workshop

    with the

    developmentteam

    1350

    hours

    480 hours=

    27,360.00

    480 hours=

    21,120.00

    60 hours=

    2700

    360 hours=

    18,000.00

    69,180.00

    Final Trial of

    the

    software/DVD

    1 hour 0 0

    Technology

    Licenses

    1 item 1000.00 1000.00

    Total: 2659

    hours

    38,916.00 23,232.00 5400.00 21,200.00 6400.00 98,160.00 0.00 1000.00 194,308

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    14/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Responsibility/AccountabilityPhase Person Jeff Penny Tracey Gordon SchoolsONline Scarlet Media

    Determine specific Objectives forThe software

    AP IP IP ISP p p

    Create Briefs I I I ISP A

    Discuss content for Briefs IP IP IP IS A

    Determine specs for

    Technology materials

    IA I I ISP I I

    Develop full Design ISP AP

    Workshop with the Development

    Team

    ARP RP RP SPR RP RP

    Final Trail of the DVD/Software R AR AR SPR R R

    P= Participate A= Accountable R = Review I=Input Required S=Sign-Off Required

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    15/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Project Communication PlannerWho

    (Receiver)

    What Information When

    (How Often)

    How

    (form/Medium)

    Who Creates & Publishes

    Project Steering Committee

    Review Panel Team

    Project Manager

    Development Team

    Determine specific

    Objectives for

    The software

    4 hours /2 days Form Project Steering

    committee

    Review Panel Team

    Project Manager

    Proposing/Research/Writing

    Team

    Create Briefs 8 hours/8 days Form/Medium Review Panel Team

    Project Steering Committee

    Review Panel Team

    Project Manager

    Discuss content for Briefs 8 hours/4 days Form/Medium Review Panel Team

    Project Steering TeamProject Manager

    Design Team

    Determine specs forTechnology materials

    8 hours/2 days Form Design Team

    Project Manager

    Development Team

    Develop full Design 8 hours/ 6 days Form/Medium Development Team

    Review Panel Team

    Project Manager

    Proposing/Research/Writing

    Team

    Workshop with the

    Development

    Team

    2 hours/ 60 days Medium Review Panel Team

    Project Steering TeamReview Panel Team

    Client Reviewer Students

    Trail

    Final Trail of theDVD/Software

    One day- 1 hour Form/Medium Review Panel Team

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    16/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Worksheet: Sign-Off Form (Project Phase)

    I have reviewed the following deliverables as of the date identify below. The objectives and briefs specific for the software and age appropriate students Based on the spec for the full design was successful The workshop was a success.

    I have found these deliverables to meet with my approval, with the following exceptions:

    In order to determine the specs for the technology, so revision in order to meet the objectives and briefs. The workshop was a success except a few minors that needs to be address, with the team participating during this session

    needs to mandated to prevent future delay within the process.

    I hereby give my approval to proceed with the evolution of these deliverables to the next state of development in order to meet the

    project objectives in a timely fashion.

    I understand that any changes (additions, deletions, or modifications) to the fundamental structure, underlying design, or the specificfeatures of these deliverables might result in

    Of the completion date for these deliverables Additional resource requirements Addititioanl costs

    ______Gordon Anderson_________________________________ (Signature) Date:___May 20, 2015_______________Gordon Anderson, PM

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    17/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Worksheet: Project Sign-Off (Entire Project)

    Project Name: Lets Go Camping Upgrade

    I have reviewed the following finished deliverables as of the date identify below: Specific objectives align with the briefs Tehcnology Specs with full design development

    I have found these finished deliverables to meet with my approval, with the following exceptions: During the final Trial the project steering committee and review committee are to give their input based on their observations.

    For each of the divlerables that are named above as exceptions, we will proceed as follows with the following remedies within

    the time frames specified:

    During the final trial allow the two committees at least one hour to determine their inputs.

    __Gordon Anderson_____________ (Signature) Date: ___June 20, 2015_______Gordon Anderson, PM

  • 7/26/2019 EDUC 6145 Project Management in Education and Training

    18/19

    Our National and Society

    Lets go Camping SchoolONlinehttp://SchoolONline.com

    Resources:Greer, M. (2010). The Project management Minimalist: Just Enough PM to Rock Your Projects![E-book]. Retrieved from:https://class.waldenu.edu/webapps/blackboard/content/listContent.jsp?course_id=_8624934_1&content_id=_25624458_1

    Portny, S. E., Mantel, S. J., Meredith, J. R., Shafer, S. M., Sutton, M. M., & Kramer, B. E. (2008).Project management: Planning,scheduling, and controlling projects. Hoboken, NJ: John Wiley & Sons, Inc.

    Time,F (n/a). Chron-How much does a Project Manager make Hourly. Retrieved from http://work.chron.com/much-project-manager-make-hourly-7628.html

    https://class.waldenu.edu/webapps/blackboard/content/listContent.jsp?course_id=_8624934_1&content_id=_25624458_1https://class.waldenu.edu/webapps/blackboard/content/listContent.jsp?course_id=_8624934_1&content_id=_25624458_1https://class.waldenu.edu/webapps/blackboard/content/listContent.jsp?course_id=_8624934_1&content_id=_25624458_1