EDS 3 Release 5

16
http://nodal.ercot.com 1 Lead from the front Texas Nodal EDS 3 Release 5 Monday / Friday Market Updates May 08, 2008

description

EDS 3 Release 5. Monday / Friday Market Updates. May 08, 2008. Agenda. Antitrust Admonition Submissions Update Submissions Metrics This Week’s Activities Updates / Questions / Reminders Second 6.3 Pre-test Review LFC Update Q&A / Open Forum Roll Call. Antitrust Admonition. - PowerPoint PPT Presentation

Transcript of EDS 3 Release 5

http://nodal.ercot.com 1Lead from the front

Texas Nodal

EDS 3 Release 5

Monday / Friday Market Updates

May 08, 2008

http://nodal.ercot.com 2Lead from the front

Texas Nodal

Agenda

• Antitrust Admonition• Submissions Update

– Submissions Metrics– This Week’s Activities

• Updates / Questions / Reminders• Second 6.3 Pre-test Review• LFC Update• Q&A / Open Forum• Roll Call

http://nodal.ercot.com 3Lead from the front

Texas Nodal

Antitrust Admonition

ANTITRUST ADMONITION

ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws.

http://nodal.ercot.com 4Lead from the front

Texas Nodal

Submissions Metrics

5/3/2008 5/4/2008 5/5/2008 5/6/2008

86% 83% 9  86% 86%  9 91% 91% 13  100% 88%  11

COPTPOIDO OS COP

TPOIDO OS COP

TPOIDO OS COP

TPOIDO OS

5/7/2008 5/8/2008 5/9/2008

92% 100%  18 92% 90%  12 89% 87% 5 

COPTPOIDO OS COP

TPOIDO OS COP

TPOIDO OS

- Metrics process has been more fully automated- More fully takes into account status of resources- Please closely review metrics posting for this week- If you would like a breakdown of you QSE’s resources and metrics send an email to [email protected] to request.

http://nodal.ercot.com 5Lead from the front

Texas Nodal

Submission Times for week of 05/12/08

• Activities for Week of 05/12/08– Submit the following prior to the trade date:

Note that offer curves cannot be submitted after market close (10am) until the adjustment period opens (1800) on the day ahead.

• COP• TPO• Output Schedule (open to all resources)• INC/DEC (DSR resources only)

– Submit RT COP adjustments during business hours– Submit RT OS adjustments during business hours

– 6.3 Pre-Test Logistics for 5/12/08 covered in slide 8

http://nodal.ercot.com 6Lead from the front

Texas Nodal

Updates / Questions / Reminders

• FIP / FOP for week of 5/12/08:– FIP: 10.83 – FOP: 22.57

• REMINDER: FIP/FOP Integration to be deployed to EDS end of May– Values will update daily– MP’s must implement process for retrieving prices daily

• EDS Environment Outages– Outages:

• Notification Issue: – When a QSE mistakenly uses the wrong certificate Sub-QSE’s (e.g. sub-QSE), it

will send notifications to both, and not just the certificate being used– Under Review – Fix TBD

• 5/5 7:30-8:00AM Reports unavailable – Planned maintenance did not restart some server properly

• 5/5 9:00-9:30AM MIS, Market Manager unavailable – Web Server process stalled – restarted services, root cause under review

• 5/6 4:30-7:10AM MIS, Market Manager unavailable – Server out of memory – restarted services – root cause is failed deployment from previous evening

• 5/8 11:30AM – 12:00PM MMS unavailable – Restarted services – Root Cause Hardware Exception (under investigation).

http://nodal.ercot.com 7Lead from the front

Texas Nodal

Updates / Questions / Reminders

• Resource Updates– On 5/15, ERCOT will be loading in all RARF’s– This is exclusively the new RARF’s submitted on 5/1– Important – If no current 5/1 RARF is on file, those resources will

not be included in the 15th load• Resources will not be loaded until RARF is accepted by ERCOT• Currently 70% of RARF’s have been received.• Of that 70% only 20% have been accepted due to issues with RARF data

– Please get with your RES entities to determine status on your portfolio

http://nodal.ercot.com 8Lead from the front

Texas Nodal

LFC 6.3 pre-Test

• ERCOT has reviewed the major data issues for second 6.3 Pre-test– Spreadsheets were sent to each QSE with summary of any issues discovered– Please review and make necessary adjustments for the 5/12 test

• Last Open Loop Test– 5/12 from 7-9am – On these dates:

• QSE’s will submit a “deconstructed” zonal, portfolio-level offer as a resource specific, nodal TPO• QSE TPO’s will be submitted into the RT market in the adjustment period

– Please ensure: • Appropriate staff are available to support submissions• ICCP data is of good quality• Note: consistently we have lost valid real-time data during these tests• This is imperative to ensure a meaningful exercise on these dates

• REMINDER: ERCOT to provide QSEs with settlement impact resulting from OOME and Local Balancing had units followed SCEB BP

• The impacts from the first test on 4/28 will be distributed to those QSE’s that are affected today

Please refer to details provided during the 3/14 workshop: http://www.ercot.com/calendar/2008/03/20080314-EDS3-6.html

http://nodal.ercot.com 9Lead from the front

Texas Nodal

Target Dates for 6.3 Tests

• Week of June 16th – 2 hour test

– Will proceed with 2 hour test with or w/o

CIM

• Week of July 7th – 8 hour test

• Week of July 28th – 48 hour test

http://nodal.ercot.com 10Lead from the front

Texas Nodal

30%

40%

50%

60%

70%

80%

90%

100%

Hour Ending

Convergence

Nodal SE Convergence: 5-5

Began Contacting MPs

http://nodal.ercot.com 11Lead from the front

Texas Nodal

-100

-50

0

50

100

150

3:1

4:2

1 P

M

3:1

7:4

9 P

M

3:2

0:1

1 P

M

3:2

7:5

5 P

M

3:3

0:4

9 P

M

3:3

7:4

3 P

M

3:4

8:0

9 P

M

3:5

5:4

1 P

M

4:1

0:1

9 P

M

4:2

2:3

7 P

M

4:3

7:3

9 P

M

4:4

6:0

9 P

M

4:5

7:1

7 P

M

5:0

2:4

1 P

M

5:1

0:0

7 P

M

5:1

4:3

1 P

M

5:2

1:1

3 P

M

5:2

4:1

3 P

M

5:3

2:0

1 P

M

5:4

3:2

9 P

M

5:5

8:2

9 P

M

6:1

3:2

9 P

M

6:2

8:2

9 P

M

6:4

3:2

9 P

M

6:5

8:2

9 P

M

7:1

3:2

9 P

M

7:2

8:2

9 P

M

7:4

3:2

9 P

M

7:5

8:2

9 P

M

8:1

3:2

9 P

M

8:2

8:2

9 P

M

8:4

3:2

9 P

M

8:5

8:2

9 P

M

9:1

3:2

9 P

M

9:2

8:2

9 P

M

9:4

3:2

9 P

M

9:5

8:2

9 P

M

10

:13

:29

PM

10

:28

:29

PM

10

:43

:29

PM

10

:58

:29

PM

11

:13

:29

PM

11

:28

:29

PM

Maximum MW mismatch at bus Maximum MVAR mismatch at bus

MW set to 15 & MVar at 30, spikes removed from graph (5/5)

http://nodal.ercot.com 12Lead from the front

Texas Nodal

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

Sced Timestamp

MW

SUM_HEL

SUM_HSL

SUM_HASL

SUM_HDL

GTBD

SUM_LDL

SUM_LASL

SUM_LSL

SUM_LEL

Limits during test period 5-5, 4pm – 6pm

Limits Improved from first pre-test but a number of units continued to have questionable values

http://nodal.ercot.com 13Lead from the front

Texas Nodal

Reference LMPs Vs GTBD (5/5)

Price remained flat from 1730-1750 while GTBD changed due to the generation that was changing over this period were price takers

Other nuances attributable to generation with no EOC, changes in OS, and telemetered limits MCPE for this period remained slightly lower than the Reference LMP

35,600

35,700

35,800

35,900

36,000

36,100

36,200

SCED Timestamp

$57.00000

$58.00000

$59.00000

$60.00000

$61.00000

$62.00000

$63.00000

$64.00000

$65.00000

$66.00000

GTBD REFERENCE_LMP

http://nodal.ercot.com 14Lead from the front

Texas Nodal

LMP Graphics from 5/5

http://nodal.ercot.com 15Lead from the front

Texas Nodal

LFC Phase II Testing

• Results for week of 5/05– LFC 6.2 test

• Suez• BTU • Luminant• APX In-Process• Tenaska In-Process

– LFC 6.2 pre-test• Constellation• BEC

• Scheduled Tests: week of 5/12– LFC 6.2 test

• San Miguel Monday 1:00 PM• BTU Wed. 9:00 AM• APX Wednesday 1:00 PM• APX Thursday 9:00 AM

– LFC 6.2 pre-test• CPS Tuesday 1:00 PM• Reliant Wednesday 9:00 AM• BEC Wednesday 11:00 AM

• Remember to submit test forms 2 business days before Test• The Date & Time Format for the test file is MM/DD/YYYY HH:MM• Submit to [email protected]

http://nodal.ercot.com 16Lead from the front

Texas Nodal

Q&A

Q&A / Open Forum