ecrs

4
Machine/Equipment: Process Name: Optim Sr. no. Activity Clock Time 1 2 3 Lowering of the scissor lift 4 5 6 Loading raw material on the scissor lift 7 Cutting the straps of the raw material 8 9 Processing of timber at the optimizer 10 11 12 13 14 Total Time (seconds) operator Communicate raw material needed information to the forklift operator Programming the optimizer according to the given cutlist Noting down the length and quantity on the display board input Placing of pallets at the optimizer output end to stack the processed timber pallets timber which are being stacked on the pallet Noting down size and quantity on the stacked timber using spray paint. the processed timber to the next station i.e. Band saw/Rip saw

description

g

Transcript of ecrs

Page 1: ecrs

Machine/Equipment: Optimizer

Process Name: Optimized wood cutting

Sr. no. Activity Clock Time Task Time Elim

inat

e

Com

bin

e

Rea

rran

ge

1 Handover of the cutlist to the optimizer operator

23 Lowering of the scissor lift

4

56 Loading raw material on the scissor lift7 Cutting the straps of the raw material8 Pushing the raw material to the optimizer input9 Processing of timber at the optimizer

1011 Stacking the processed timber on the pallets

12

13

14

Total Time (seconds) 0 Total Time (seconds)

Communicate raw material needed information to the forklift operator

Programming the optimizer according to the given cutlist

Noting down the length and quantity on the display board

Placing of pallets at the optimizer output end to stack the processed timber

Random measurement of length of processed timber which are being stacked on the pallet

Noting down size and quantity on the stacked timber using spray paint.

Signalling the forklift driver to move the processed timber to the next station i.e. Band saw/Rip saw

Page 2: ecrs

Optimizer Date: 19/10/2015 ProposedOptimized wood cutting Name of observer: Sumit/Harsh

Sim

plif

y

Opportunity for Improvement

* Usage of open mic system

*

* Usage of open mic system

Total Time (seconds) 0

New Task Time

Having a scale marked on the output stacker unit of the optimizer

Page 3: ecrs
Page 4: ecrs