Machine/Equipment: Optimizer
Process Name: Optimized wood cutting
Sr. no. Activity Clock Time Task Time Elim
inat
e
Com
bin
e
Rea
rran
ge
1 Handover of the cutlist to the optimizer operator
23 Lowering of the scissor lift
4
56 Loading raw material on the scissor lift7 Cutting the straps of the raw material8 Pushing the raw material to the optimizer input9 Processing of timber at the optimizer
1011 Stacking the processed timber on the pallets
12
13
14
Total Time (seconds) 0 Total Time (seconds)
Communicate raw material needed information to the forklift operator
Programming the optimizer according to the given cutlist
Noting down the length and quantity on the display board
Placing of pallets at the optimizer output end to stack the processed timber
Random measurement of length of processed timber which are being stacked on the pallet
Noting down size and quantity on the stacked timber using spray paint.
Signalling the forklift driver to move the processed timber to the next station i.e. Band saw/Rip saw
Optimizer Date: 19/10/2015 ProposedOptimized wood cutting Name of observer: Sumit/Harsh
Sim
plif
y
Opportunity for Improvement
* Usage of open mic system
*
* Usage of open mic system
Total Time (seconds) 0
New Task Time
Having a scale marked on the output stacker unit of the optimizer