39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 1 of 32

Minutesof the

39th Zonal PNM Meetingbetween

ECoR & ECoRSU

Venue: Sabha Griha, 1st floor,Rail Sadan,Chandrasekharpur,Bhubaneswar.

held on: 2nd & 3rd November, 2017

Page 3: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 2 of 32

MINUTES OF 39TH (1ST IN 2017) ZONAL PNM MEETING HELD BETWEEN EAST COAST RAILWAY HEADQUARTERS & EAST COAST RAILWAY SHRAMIK UNION (ECoRSU) AT EAST COAST RAILWAY ZONAL HQRS, RAIL SADAN, CHANDRASEKHARPUR, BHUBANESWAR HELD ON 2ND & 3RD

NOVEMBER, 2017.

MEMBERS PRESENT

OFFICIAL SIDE REPRESENTATIVES OF ECoRSU

Srl. No.

Name with designation(S/Shri/Smt.)

Srl. No.

Name with Designation

(S/Shri/Smt.)

1. Umesh Singh, GM 1. B.Damodara Rao, President

2. Manju Ray, PCPO 2. Ashok Kumar Padhi-II

3. A.K.Pandey, PCEE 3. V.S.Chakravarthy, Vice President

4. Laxmi Narayan, PCE 4. M.Ravi, Vice President

5. Samir Toppo, PCME 5. Santosh Kumar Mishra, Vice President

6. Debraj Panda, PCOM 6. P.K.Patasahani, General Secretary

7. S.K.Mohanty, PCMD 7. N.Dhana Raju, Addl. General Secretary

8. R.S.Mitra, PFA 8. Niranjan Mishra, Addl. General Secretary

9. I.S.Upadhyay, PCMM 9. Ashok Kumar Patra, Addl. General Secretary

10. Atul Pathak, IG-cum-CSC 10. G.Sri Rama Murty, Asstt. General Secretary

11. A. Patel, PCSTE 11. B.Someswara Rao, Asstt. General Secretary

12. R.S.Dubey, CAO/Con 12. M.Ramakrishna, Asstt. General Secretary

13. Prabhat, CPO/Admn. 13. E.Sudhir Kumar, Asstt. General Secretary

14. M.L.A Rao, CCM/Catering 14. B.V.Ramana, Asstt. General Secretary

15. S.C.Naik, Dy.CSO/Elect 15. Sunil Kumar, Asstt. General Secretary

16. M.Ganga Bhavani, Dy.CPO/IR & W 16. Sabyasachi Sarangi, Asstt. General Secretary

17. R.R.Panda, APO/Wel 17. K.Surya Prakash, Joint Finance Secretary

18. Smt. U.L.Nagarani, Lady delegate

19. Smt. P.Usha, Lady delegate

Page 4: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 3 of 32

N.B:-1. Please read the entire minutes.2. Implement decisions already taken concerning your item(s).3. Intimate progress of action taken at once on all the items (i.e;

open and closed items) concerning your department.

SECTION – “A”INTRODUCTION

1. Address of Smt. Manju Ray, CPO/ECoR/BBS:-

Mrs.Manju Ray, PCPO/ECoR formally welcomed Shri Umesh Singh, GM/ECoR, all PHODs/CHODs, Shri B.Damodara Rao, President/ECoRSU, Shri P.K.Patsahani, General Secy/ECoRSU and all Central Office Bearers and lady delegates of ECoRSU to the 39th

PNM meeting. She informed that all agenda items of the PNM meeting have been very cordially discussed and most of the items have been closed. She told that the COBs of ECoRSU have been elected recently through secret ballot election conducted by Administration as per orders of Hon’ble Court. She requested the COBs to introduce themselves before GM and they introduced accordingly. She requested Sri P.K.Patsahani, General Secy/ECoRSU to put forth his views before GM.

2. Address of Shri P.K.Patsahani /General Secretary/ECoRSU:-Shri P.K.Patsahani, General Secy/ECoRSU addressed GM, PCPO, all PHODs/CHODs and his colleague central office bearers and lady delegates in the PNM forum.

He expressed his gratefulness to the Administration for conduct of secret ballot election of ECoRSU by the Administration. He thanked all PHODs/CHODs for extending positive cooperation towards ECoRSU. He raised the following issues before the GM.

1. Issue of Safety Shoes for S&T staff employed in K-R & K-K lines.2. Shifting of PREM office from Rail Vihar to Rail Sadan.3. Requested for a referral hospital in Cuttack for the benefit of staff residing in

PRDP, KDJR & BC, etc.4. Visit of Specialist doctor from Central Hospital/MCS to Health Unit/CTC.5. Misutilisation of Track Maintainers and other field staff of Engineering

department in PWI /IOW/ADEN/DEN/Sr.DEN Offices.6. TA/OT of running staff has not been paid in WAT Division for long period.7. One post of Programmer (Group-B) of IT department Operation should be

restored back instead of being operated in GA department. 8. Non-sparing of some engineering staff in case of transfer.9. Permission for utilization of vacant quarter at Tikiri to staff of Rowli, Sikar

stations in WAT Division.10. He requested for opening of rear gate of Rail Vihar, Railway Colony during lunch

time.11. He requested for making a road under bridge by renovating the pathway in BBS

station or constructing a foot over bridge from east to west for the benefit of

Page 5: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 4 of 32

staff residing in East & West Colony.12. He complained that electrical bill is not prepared monthly. He requested for

making arrangement of preparing electric bill on monthly basis and a copy thereof may be given to the employee.

13. He requested for fixing HQ of Commercial Inspectors/staff earmarked for Barang-KUR section (excluding BBS) at BBS.

3. Address of Shri B.Damodar Rao /President/ECoRSU:-Shri B.Damodar Rao, President/ECoRSU addressed the GM, PCPO, all PHODs/CHODs, General Secy/ECoRSU and all central office bearers of ECoRSU including lady delegates attending the meeting. He thanked administration for conduct of secret ballot election of ECoRSU. He observed that the present PNM meeting is being held after a gap of 14 months. He requested all PHODs/CHODs for giving guidance to the newly elected body of ECoRSU. He also told that all PHODs/CHODs were very constructive and positive in their attitude during the deliberations. He raised the issueof provision of air-conditioning in Kalyan Mandapam at VSKP before GM.

4. Address of Shri Umesh Singh, GM/ECoR/BBS:-Shri Umesh Singh, General Manager/ECoR addressed Shri B.Damodara Rao, President/ECoRSU, Shri P.K.Patsahani, General Secretary, ECoRSU, all Central Office Bearers of ECoRSU, lady delegates and all PHODs/CHODs in the PNM meeting. He congratulated all central office bearers of ECoRSU on their election and expected constructive attitude from all members of ECoRSU. He told that during the last 6 months, ECoR has loaded about 88.39 MT which is 3% more than last year. In passenger traffic, it is 47.25 million as against 46.81 million during the corresponding period last year. In apportioned earning and operating ratio, ECoR’s performance is better as compared to last year. He told that East Coast Railway is a growing Railway and at present, a lot of development work is going on. Some incidents have also taken place. A bridge has collapsed between TIG-RGDA section and repair work is going on and by December, 2017 this work will be completed. Moreover, a new bridge is under construction in RGDA-TIG Section and by March, 2018, the work will be completed. In the meantime, Hon’ble MOSR had visited ECoR and Hon’ble MR also inaugurated a few important projects on this Railway, Wi-fi facility has been provided in all A-I & A-2 stations of ECoR. He told that the issue raised by ECoRSU will be looked into. He requested PCMD to look into the matter of health facility at CTC and PCEE to look into OTA matter of running staff at WAT. He advised PCSTE, PCE and PCCM to look into the issues concerned to their departments raised by P.K.Patsahani, GS/ECoRSU in this address regarding supply of safety shoes to S&T staff working on K-K/K-R line, misutilization of field staff in non-technical posts in different offices of Engineering department and fixing HQ of Commercial Inspectors/staff earmarked for Barang-KUR section (excluding BBS) at BBS.

The meeting ended with vote of thanks.

Page 6: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 5 of 32

SECTION BNEW ITEMS

Srl.No.

Item No. SUBJECT MATTER

01. 39U-01-2017 NON-EFFECTING 2ND MACP TO THE EMPLOYEES WHO TOOK VR IN LARSGESS SCHEME

PCPO The LARGESS scheme will be effected to employees who are in GP Rs.1800/- and who completed 20 years of service. Hence every employee who took VR on these grounds should be given 2nd MACP, as the employee concerned is not in a position to claim the same because of his son’s appointment and post retirement tensions. Hence it is urged to implement strictly to effect his 2nd MACP in the settlement itself.

REMARKS OF ADMINISTRATIONAll eligible staff should get MACP. Divisions will be instructed to process MACP in time.

DECISIONAll eligible staff should get MACP. Divisions will be instructed to process MACP in time.

(CLOSED)

02. 39U-02-2017 SERVING OF WARNING CALL BOOK FOR STOPPING OF CRACK TRAIN WORKING TOWARDS TIG AND KUR

PCOM This Union had opposed the Crack working by Crew and Guard of WAT Division towards TIG and KUR in the past years. It has come to the notice of this Union that the administration is trying toreintroduce crack working in the above sections. As per the rule the Goods Crew is not to be booked for a long beat of above 200 kms, by passing relief point of crew lobby at RGDA/PSA.

REMARKS OF ADMINISTRATIONBooking of Guards will be done for crack special without violating the rules as well as interest of staff.

DECISIONDiscussed. Position will be reviewed when crew position will improve.

(CLOSED)

Page 7: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 6 of 32

03. 39U-03-2017 PROVISION OF SEPARATE POOL OF QTRS FOR TRACK MACHINE STAFF IN ALL THE THREE DIVISIONAL HEADQUARTERS

PCE More than 600 staff are working in Track machines and their nature of duty is also throughout the division i.e without confined to one station. Hence they are suffering to keep their families anywhere at one station. As such their wards are suffering a lot for education and other social needs. Hence it is urged to keep separate pool for the track machine staff at Divisional Head quarters only wherever not existing.

REMARKS OF ADMINISTRATIONTrack Machine staff are allowed to apply for Railway quarter at their place of posting in divisions. Normally there is no branch pooling in the Engineering pool of divisions (that is separately for P.Way, works, Bridge, Track Machine, etc). However, at present 41 nos of staff are allotted Railway quarters at nominated stations in divisions (KUR =20 & WAT = 21 nos). Most of the staff of TM Organization (about 90%) are headquartered at BBS. Accordingly based on willingness survey of staff the lease accommodation facility has been sanctioned for 150 nos at HQ/BBS. Out of 150 presently 33 staff are availing the same. Further balanced lease can be provided as per demand. There is no lease cause pending at HQ. Due to non utilization of the 150 nos lease sanction, 100 nos have been proposed for surrender.

DECISION150 nos of lease accommodation has been sanctioned for TMO, out of which about 33 nos. are only being utilized. The balance lease sanctioned for TMO may be distributed to the 03 divisions as per the applications for quarter allotment, pending at these places, of TMO staff.

(CLOSED)

04. 39U-04-2017 UTILISATION OF TECHNICAL STAFF IN ELS/WATPCEE Under constraint the ECoRSU would like to invite your kind

intervention to set right correct utilization of Technical staff at ELS. It has come to the notice of this Union that large no. of technical staff who are supposed to work in Loco at ELS are being mis-utilized for non-loco jobs like stationary, paper work, ministerial duties etc since last 15 years continuously, causing heavy work load on the existing Loco staff at ELS. The existing staff have become unrest and deprived. So this Union urges upon the administration to utilize the Loco Staff in Loco Works only. So that there will not be heavy burden and

Page 8: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 7 of 32

dissatisfaction among the staff who are working in Loco side. If the administration is interested the Loco Staff to work in Non-loco works, the system of rotation among the staff may please be introduced.

REMARKS OF ADMINISTRATIONWAT DIVISION

(a) As per item No. 30204 of ACTM Vol-III under sub heading :Distribution of workload in the shed” , guidelines for establishment of “Technical Section”, “Drawing office”, “Computer section” and S2 (Specification updating section) i.e. Stores section has been given.

(b) Therefore, only limited staff in the above sections, who are conversant with Electrical loco equipment are being utilized in following indirect loco works only, which cannot been done by non loco staff (Ministerial staff).(i) Loco equipment arising/failures data entry.(ii) Entry of equipment Reliability action plan progress. (iii) Entry of 3-phase RAP, new loco defects, off POH

defects in elcos.(iv) Entry of warranty in CLW’s portal. (v) Entry of failure data in HQ’s portal.(vi) Maintenance of loco equipment data in

registers/computers. (vii) Entry of equipment cardex. (viii) Assisting in preparation of Technical reports like

MCDO/PCDO/Hand outs. (ix) Assistance in preparation of reports to POH

shops/warranty letters to firms. (x) Preparation of Material inspection letters. (xi) Compiling of Loco material position periodically. (xii) Compiling of scrap items position for disposal(xiii) Assisting in preparation of correspondence with other

sheds for material assistance. (xiv) Preparation of road permits. (xv) Compilation of monthly reports in Technical/stores

matters. (xvi) Assisting supervisors for day to day shed works.

(c) The above works are as important as direct works on loco for smooth functioning of every Electrical Loco shed.

(d) Hence, utilization of limited staff for indirect loco works as support system for smooth functioning of shed is necessary and is not wastage of manpower.

(e) Also, it is planned to propose outsource the activity of staff

Page 9: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 8 of 32

being utilized in office as well as in various sections on shop floor.

Technical staff are therefore required to be utilized in Technical section, Stores section, specification section etc in office to prepare compliance to HQ, RDSO letters, warranty cases, reliability action plan, technical correspondence etc. Rotation of staff is not possible since all the shed staff may not be suitable for these jobs.

DECISIONIt has been reported by ECoRSU that 68 technical persons are working in non-technical jobs. It was assured that utilization of Technical staff in office/non-technical jobs will be reviewed by CELE within a month.

(CLOSED)

05. 39U-05-2017 CONSTRUCTION OF TYPE-III AND TYPE –IV QUARTERS FOR ELIGIBLE GR. ‘C’ EMPLOYEES

PCESDGM

Due to shortage of Type-III & Type-IV Quarters at VSKP a good number of Non Gazetted staff are not getting the same. ECoRSU demands for construction of more Type-III & Type-IV Quarters exclusively for NG staff at VSKP which will facilitate to get the said Quarters to the NG staff only. Similarly for other locations in the Zone sufficient quarters may please be constructed according to the staff strength.

REMARKS OF ADMINISTRATIONThe division will be asked to look into the issue and include the issue in next works programme, if deemed fit.

DECISION Sr.DPO & Sr.DEN (Co-ord) will consolidate the availability of Type-III & Type-IV Qtrs for NG staff at divisional headquarters vis-à-vis the waiting list for such accommodation and accordingly propose for new quarters in the works programme, in phased manner.

(CLOSED)

06. 39U-06-2017 PROVISION OF REST ROOM FOR CREW WITH BASIC AMENTIES AT SPUR NO. 9/DB SIDING/ LINGARAJ SIDING AT TLHR & PROVISION OF JEEP UNDER SMR/BDPK & MRDL

PCOMPCMEPCEE

A) Despite repeated discussions in various forum and in spite of assurance by the administration for provision of crew rest room with basic amenities at Spour No.9/DB siding/Lingaraj siding, but no action is found to be initiated in this regard. B) As in practice the Crew T.O and relief are arranged at BDPK &

Page 10: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 9 of 32

MRDL, but as there is no train communication, they are facing to detain at both the stations, which causes inconvenience to them and as well as loss of man power. If they would have returned back to Head Quarter they might have been booked the Train. As such this Union suggests that one Motor vehicle may kindly be kept under SMR/BDPK & MRDL for their use, which may save the loss of Railway revenue and the staff concerned will be free from the inconvenienceHence this Union urges to take an appropriate action for compliance without further delay.

REMARKS OF ADMINISTRATIONA. MCL authorities have been advised to provide rest room at

Spur No. 9 & DB siding and suitable resting facilities at Lingaraj siding.

B. Additional 02 vehicles have been provided for MRDL & BDPK pilot movement.

DECISIONPCOM assured that he will pursue with MCL authorities for provision of suitable resting facilities at Lingaraj siding. Additional 02 vehicles have already been provided for MRDL & BDPK pilot movement.

(CLOSED)

07. 39U-07-2017 EXTENDING FACILITY FOR ON DUTY AFTER LEAVE FOR THREE DAYS INSTEAD OF ONE DAY AT 06.00 A.M IN SPITE OF 00.00 HOURS

PCOMPCMEPCEE

As in practice if any Running Staff goes on leave for one day he has to report on duty at 00.00 Hours which created much inconvenience to the staff concerned, for which the matter was discussed by this Union in a forum and the administration had issued an order that instead of 00.00 Hours, he may be given on duty at 06.00 A.M, after availing one day leave, which is in force now. Keeping in view of smooth functioning of the works, the said instructions may kindly be extended to 3 days leave.

REMARKS OF ADMINISTRATIONThis is a policy matter which shall be decided after due deliberation.

DECISIONThe facility of reporting on duty at 6 am after availing one day leave is extended to 02 days leave on experimental basis for 03 months. The continuation of this facility will depend on review after 03 months.

(CLOSED)

Page 11: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 10 of 32

08. 39U-08-2017 REMEDIAL MEASURE TO SORT-OUT THE FAULTY DRAINAGE SYSTEM OF OMFED FACTORY ATTACHED TO RAIL AWAS COLONY/BBS.

PCE This issue has been discussed in details in the earlier ZPNM but the decisions has not yet been materialized. A solution to the effect is highly essential as the polluted water of the OMFED factory/C.S.Pur causing hardship for the residents of Rail Awas & MCS Railway Colonies.

REMARKS OF ADMINISTRATIONAs per letter of GM (project)/OMFED, the New Effluent Treatment Plant (RTP) erection is under progress and it will be functioning from April’ 2018 by which the bad smell will be eliminated from Railwayarea.

DECISIONAs per letter of GM (project)/OMFED, the New Effluent Treatment Plant (RTP) erection is under progress and it will be functioning from April’ 2018 by which the bad smell will be eliminated from Railway area.

(CLOSED)

09. 39U-09-2017 REGULAR SUPPLY OF ELECTRICAL CONSUMPTION BILL OF RAILWAY STAFF QTRS; IN RAILWAY SETTLEMENT IN KHURDA ROAD.

PCEE It is quite interesting to represent here that the following matter was discussed earlier and also a certain outcome is resulted, but unfortunately no action is taken by Divisional authority for implementation. So again the same matter is raised before you for early action.Earlier the Electrical consumption is being noted every six months while Railway staff was doing the work, but subsequently the Noting of Meter consumption is outsourced. Since then the procedure continuing at present is quite unsatisfactory, as they are coming to note the meter reading as and when they feel, which results the Bill Clerks are deducting huge amount at a time through the Salary of Railway employees, which creates much unpleasantness and hardship to the employees. Therefore this Union demands either the earlier practice may be introduced or the outsource agency may be instructed to arrange regular meter reading monthly.

Page 12: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 11 of 32

REMARKS OF ADMINISTRATIONEntire division has been covered under contract for monthly meter reading and providing electricity bill to the occupant on monthly basis. Stringent penalty clause & termination of contract clause is included in the contract in case of non-compliance of terms and conditions. Moreover, Sr.DEE/G/KUR vide office letter No. ECoR/EL/G/458/20 dated 25.10.2017 has been strictly advised to ensure monthly supply of electric bill to the occupants of Railway staff quarters by the contractor and further ensure that same is deducted from monthly salary bill of employee after verification by concerned SSE.

DECISIONDiscussed and it was decided that supervisor concerned will ensure that electricity bills are sent on monthly basis before 05th of the month to the Personnel Department. A copy of monthly bill can be provided to the employee at the time of meter reading, starting from December 2017.

(CLOSED)

10. 39U-10-2017 REVIEW OF DISPARITY IN IMPLEMENTATION OF THE TRAINING PERIOD PRIOR TO POSTING AS TECH-III IN MECHANICAL DEPARTMENT/KUR DIVISION

PCME It is most important to represent here that this Union demanded the following matter in various forum for fruitful result, but no action was taken yet. So the same matter is again raised before you by expecting any fruitful result.A mass compliant has come to this Union that, there was huge disparity in implementation of Training Period for absorption the staff as Tech-III(C&W) in Mechanical department at Khurda Road. The matter was already referred by this Union under Letter No.SU/DC/22/16/107 dtd. 28.07.2016. Therefore this Union urges to accord natural justice to the staff as justified.

REMARKS OF ADMINISTRATIONIn terms of Estt. Srl. No. RBE – 34/2008 (TRG-2/2008), TRG-6/2008, (TRG-4/2008) course completed Act apprenticeship in fitter grade (in Rly. Establishment) candidates are exempted from on job training of 06 months for promotion to the post of Tech-III in C&W wing of Mechanical department. Whereas, the candidates those who have not holding course completed act. Apprenticeship, have to undergo 06 months on job training for the promotion. The disparity of training period for promotion to the post of Tech-III in C&W wing of Mechanical department is as per extant rules.

Page 13: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 12 of 32

DECISIONDiscussed and closed.

(CLOSED)

11. 39U-11-2017 CONDUCTION OF SELECTION TO THE POST OF JE(WORKS) & JE(PWAY) IN ENGINEERING DEPARTMENT UNDER DPQ IN KUR DIVISION

PCE It is very sad to represent that this Union repeatedly discussed the following matter in various forum, but no outcome is achieved yet. So again the same matter raised before you for immediate action.

As the present situation most of the Track man in Civil Engineering department who were appointed through RRC/RRB are highly educated, thus they eagerly waiting for their future carrier. The process of filling up of the JE posts in Works wing & P.way wing were used to conduct through LDCE (20%) & DPQ (20%), which is pending for long period. Thus these staff are being deprived. Therefore this Union demands an immediate action may be taken to expedite the process of DPQ & LDCE in Engineering department for the post of JEs.

REMARKS OF ADMINISTRATIONThere are no vacancies in JE (P.Way) including resultant vacancy of higher grade as such it is not possible to conduct selection against DPQ and LDCE.

Sanction On Roll VacancySSE(P.Way) 101 88 13JE (P.Way) 52 65 -13(excess)

TOTAL = 153 153 00

DECISIONDivision will be asked to furnish the mode of filling up of JE (P. way) vacancies. If there are shortfalls in DPQ, it will be made good in vacancies accruing in future, on priority basis.

(CLOSED)

12. 39U-12-2017 FILLING UP OF DPQ VACANCIES OF JE,MCM, TECH-I, TECH-II & TECH-III POSTS IN MICROWAVE CADRE UNDER SR.DSTE/WAT

PCPOPCSTE

A good number of vacancies of JE, MCM, Tech-I, Tech-II & Tech-III posts of Microwave cadre under Sr.DSTE/WAT are lying vacant since long. In spite of repeated request by the staff the selections under DPQ has not yet been conducted by the administration.

Page 14: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 13 of 32

ECoRSU is demanding for early selection process to fill up the DPQ vacancies in the said Microwave cadre presently under the administrative control of Sr.DSTE/WAT.

REMARKS OF ADMINISTRATIONThe DPQ selection was conducted recently and posting orders were issued for filling up vacant posts in Microwave cadre vide DRM(P) WAT’s Office order WPV/162/S&T/MV dated 03.04.17 and Estt. S&T 335/2017, dated 03.04.17.

DECISIONThe DPQ selection was conducted recently and posting orders were issued for filling up vacant posts in Microwave cadre vide DRM(P) WAT’s Office order WPV/162/S&T/MV dated 03.04.17 and Estt. S&T 335/2017, dated 03.04.17.

(CLOSED)

13. 39U-13-2017 IMPLEMENTATION OF CPO/BBS’S CIRCULAR NO.ECOR /PERS/04/AVC/RHCT/LAB/WAT/16 DATED 06.09.2012 REGARDING SELECTION/PROMOTION OF REST HOUSE CARETAKERS TO THE POST OF JE.CLERK-CUM-TYPIST AGAINST DPQ VACANCIES

PCPO Though the AVC to the Rest House Caretakers has been circulated to all concerned the said policy has not yet been implemented in divisions/Units. ECoRSU urges upon for early implementation of the said policy and the concerned staff shall be called for at the time of conduction of selection to the pots of Jr. Clerk-cum-Typist in divisions/Unions.

REMARKS OF ADMINISTRATION(i)This is being followed in this SBP division. (ii) In WAT division no Jr. Clerk selection against DPQ was conducted since 2007 in Civil Engineering Department. However, instructions circulated vide CPO/BBS’s letter No. ECoR/Pers/04/AVC/RHCT/LAB/WAT/16, dated 06.09.2012 will be considered as and when selection for Jr. Clerk in Engineering department is processed. (iii) This will be ensured in KUR division.

DECISION The relevant rule will be reiterated to all the divisions.

(CLOSED)

Page 15: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 14 of 32

14. 39U-14-2017 REFERRAL OF STAFF TO HIGHER INSTITUTION DURING PME TO OTHER DIVISIONS/ZONES FOR OPINION TO BE TREATED AS ON DUTY

PCMDPCPO

Staff referred to higher institution during PME to other divisions/Zones for opinion are treated by the administration as RMC for which staff has to avail leave from their own account which is not as per rule. Normally it should be on duty as the Railway administration is sending them for further opinion of other Doctors. ECoRSU, therefore, urges upon to treat the said period of runningstaff as on duty.

REMARKS OF ADMINISTRATIONStaff who are booked for PME are examined for their medical fitness as per the laid down standards of IRMM. There who do not come up to the laid down standards are due to some diseases condition they suffer from. Therefore they are kept in RMC and offered treatment at Railway hospital, for those ailments where on in-house specialty is available; these cases are referred to other hospitals having the said specialty or to the higher centers. Treatments as well as opinion regarding fitness go side by side.

DECISIONDiscussed and closed.

(CLOSED)

15. 39U-15-2017 RECKONING OF RUNNING ALLOWANCES AS PAY FOR MEDICAL ATTENDANT AND TREATMENT AS PER RAILWAY BOARD GUIDELINES.

PCPO As per Railway Board guidelines 30% of the basic pay of Running Staff shall be reckoned as Pay for certain privileges including Medical treatment but the same has not been followed by the Divisional Hospital at Sambalpur. For example the Running Staff during hospitalization, cabin is not allowed to the staff in G.P Rs.4200/- though they are eligible after reckoning of 30% basic pay. Further they are also deprived of such facility to get private accommodation in referral cases in corporate Hospitals. ECoRSU urges upon for issuance of necessary guide lines to Divisional Railway Hospital/SBP.

REMARKS OF ADMINISTRATIONRelevant guidelines will be reiterated.

DECISIONRelevant guidelines will be reiterated.

(CLOSED)

Page 16: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 15 of 32

16. 39U-16-2017 FILLING UP OF VACANCIES IN CONSTRUCTION UNIT OVER THE ZONE UNDER CAO/CON/ECoR

PCPOCAO/Con

Due to shortage of staff strength in construction organization over the Zone under the administrative control of CAO/Con, the existing staff are working with full of stress to manage the works. After retirement of staff on superannuation those posts are not filled up causing hardship to run the section. ECORSU urges upon the administration to fill up those vacancies early through option from various departments and if not available, staff may be recruited through RRB to fill up those posts.

REMARKS OF ADMINISTRATIONIn so far as the filling up vacancies in Construction organization is concerned through DRQ, the following indents have been placed on RRBsDeptt. Post Total Remarks

Engg.

SSE(Works) 05 For construction organizationSSE (D&D) 01

SSE(P.Way) 01SSE(Bridge) 01JE (Works) 19JE (D&D) 05

S&T SSE(Signal) 01JE (Signal) 01

Elect.SSE/TRD/Elect 09 For RE & Construction

organizationJE (TRD)/Elect/TRD/Elect 30 For RE & Construction

organizationBesides, options were called from all divisions. Some Railway staff seeking IROT have also been posted directly to Construction Organization on transfer from other Railway.

DECISIONSame remarks. Discussed and closed.

(CLOSED)

17. 39U-17-2017 FILLING UP OF LARGE NUMBER POSTS OF GUARD, TP, ASM IN OPTG DEPARTMENT OF SBP DIVISION

PCPO SBP division is running with shortage ASM/SM. Guard & Token porter causing hardship to the existing staff to manage the works. They have to work 12 hours shift besides train running with last vehicles inviting safety hazards. On the other hand in the name of curtailment of expenditures staff are not granted leave to prevent generation of OT.

Page 17: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 16 of 32

REMARKS OF ADMINISTRATION30 Station Master and 52 Goods Guard candidates selected through GDCE have been allotted to SBP division. Further, 4 SM and 19 Goods Guard candidates selected through GDCE are to be posted in SBP division after completion of prescribed training.

Indents for 162 Goods Guard and 35 ASMs were placed on RRB/BBS for SBP division. And the panels against these indents will be supplied by RRB shortly.

5 Token Porters were allotted to SBP division during May’ 2017. Recently, the vacancy assessment for TPs have been done by SBP division and 36 posts for TPs are indented for SBP division.

DECISIONSame remarks. Discussed and closed.

(CLOSED)

18. 39U-18-2017 PROVISION OF ADDITIONAL CREW LOBBY AT JJKR FOR SMOOTH FUNCTIONING FOR SIGNING ON & SIGNING OFFFOR THE JKPR CREW & GUARD

PCOMPCME

About 300 Nos. Crew & Guard are working at JKPR. As there is no facility like medical, education, Railway accommodation & Local Market for purchasing of essential items are available at the JKPR, so most of the Crew & Guard are staying at JJKR. But whereaswhen Train ordering is done, the said Crew & Guards are to move through Railway provided Road vehicle to JKPR (i.e the Crew Lobby). So, if an additional Crew Lobby is provided at JJKR then the movement to SKND siding or to section by Road, and then again movement to JKPR for on duty & off duty will be avoided. Hence it is urged to facilitate by providing an additional Crew Lobby at JJKR for smooth functioning for signing on & signing off for those working Crew & Guard at the JKPR.

REMARKS OF ADMINISTRATIONOperation of two CMSs for the same Crew & Guard base is not practicable at different stations as it shall require double establishment and lead to problems in staff management. Quarter facilities at JKPR are going to be developed. For staff convenience, two more vehicles have been provided at JKPR.

Page 18: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 17 of 32

DECISIONECoRSU complained that crew normally residing at JJKR are normally brought by road vehicle to JKPR to work trains to Sukinda siding. This crew works the train to BHC, PRDP, KUR, TLHR and return on pilot by available coaching train to JJKR. They are being forced to come to JKPR by road vehicle to sign off. This leads to wastage of crew. This practice should be stopped and crew can manually sign off at JJKR and entry in CMS at JKPR may be done by Crew Controller.

(CLOSED)

19. 39U-19-2017 GROSS IRREGULARITIES BY UTILISING THE FIELD STAFF AT THE OFFICE OF HIGHER AUTHORITIES i.e PARTICULAR STAFF ARE CONTINUING IN OFFICE WORK FOR LONG YEARS, WITHOUT ANY TRANSFER; AFFECTING THE PURPOSE FOR WHICH THE RAILWAY POSTED THE STAFF FOR FIELD WORKS AS WELL AS VIOLATING THE RAILWAY PROCEDURE AND GUIDE LINES

PCE Especially in Engineering department there are 300 & above Nos. of staff from field units are working for long years at the office of higher authorities like, Sr.DEN(Co-ord) office, DEN office, ADEN office and PWI, IOW units etc; without any transfer i.e enjoying the facilities like the clerical groups. But, whereas due to such irregularities the staff/employees those are working at field which devoting they are hard labour for smooth functioning of Train Traffic are transferring to other units according to the requirement of organization. However the Railway Boards, order for non utilization of field staff at higher authorities residence is a vital factor for improvisation of our system, but the utilization of field staff at office for long years with giving all facilities to them is just a open irregularities i.e observed at Engineering office in our Railway organization. Hence this Union strongly defend such action and urges for immediate release of such field staff or supervisors those are utilized for office work at different Engineering offices to their work at field as allotted/posted to them by the Railway. As the Railway organization is very systematically and by order posted every employees according to the Railway requirement. B) There is no systematic implementation by exchanging the clerical staff from Office of Higher authorities of Engineering department to the Field Unit offices control by their Sub-ordinates and vice versa.Hence this Union strongly urges for immediate implementation of such transfer system as mentioned above, which definitely improve our working system as well as the Railway organization.

Page 19: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 18 of 32

REMARKS OF ADMINISTRATION

A) No staff from field unit is working at the residence of any official of Engineering Department. The available strength of staff is very less compared to its requirement. Further, due to construction of some new lines and doubling in the division, there are more requirement of staff for day to day activities.

Therefore, some limited field staff are engaged in various offices against the existing vacancies as supporting staff for maintaining and organizing safely works. These staff are not given any additional facilities and are instrumental in handling safety works by division as well as field offices.

B) Transfer of clerical staff are being made on rotation basis as per extant guidelines.

DECISIONECoRSU emphasized that many field staff are still working in PWI, IOW, BRI, ADEN, DEN & Sr.DEN’s Offices in all divisions. PCE assured that corrective action will be taken after due verification within 03 months.

(CLOSED)

20. 39U-20-2017 FILLING UP OF HEALTH INSPECTOR VACANCIES OVER E.Co.RAILWAY

PCMDPCPO

The Importance of Health Inspector is known for to maintain the cleanliness of our Railway premises and such cleanliness is much stressed by the order of “Swwach Bharat Abhiyan”. But whereas the existing vacancy of Health Inspector in our Zone is creating a lot of difficulties to maintain the cleanliness of our Railway premises. For example the actual strength of Health Inspector at KUR Division is 18, but the existing sanctioned cadre is 27. So, it should be imaginable how our Railway premises cleanliness is maintained. Hence this Union strongly urges to fill up the sanction cadre i.e 27 Nos immediately to facilitate the cleanliness of our Railway premises, as well as to make the success of “Swwach Bharat Abhiyan”.

REMARKS OF ADMINISTRATIONIn so far as the filling up Health & Malaria Inspectors in ECoR is concerned, indents for the post of Health & Malaria Inspectors placed on RRBs against DRQ is as under: -SBP-03, KUR-08 & WAT-02.

Page 20: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 19 of 32

Besides, process is on for filling the vacancies though contractual staff till RRB indents materialize.

DECISIONSame remarks. Discussed and closed.

(CLOSED)

21. 39U-21-2017 ENSURE THE PAYMENT OF REMUNERATION FOR EXTRA HOURS PERFORMED BEYOND DUTY ROSTER HOURS BY S&T & TRD STAFF

PCPOPCSTEPCEE

The field staff of S&T and TRD are coming under continuous classification of HOER, but they used to attend the duties as entrusted by their Supervisors and performed the duties after the duty roster hours, but they are not getting remuneration as admissible in terms of the HOER guide lines. Therefore this Union demands that necessary steps may be taken for arranging the payment to the staff concerned for the extra hours performed beyond duty hours.

REMARKS OF ADMINISTRATIONAll the Signal units In-Charge have been advised by Sr. DSTEs to implement the duty roster, supply of roster copy & OT register to each and every stations where the S&T staff are working & also ensure that timely payment of the OT allowance for the duty performed beyond roster hours.

The TRD staff are normally given CRs for the extra hours performed beyond duty roster hours. However during break downs they are being paid OT for the extra hours of duty performed.

DECISIONECoRSU has suggested for splitting of TRD field staff. Final decisionwill be taken by PCEE.As far as S&T staff are concerned, PCSTE will advise Sr.DSTEs to maintain OT Register at SSE level. Concerned S&T staff shall proceed for duty beyond roster hour after getting the order of S&T control.

(CLOSED)

Page 21: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 20 of 32

22. 39U-22-2017 EXTENDING RAIL NET FACILITY TO THE SENIOR SCALE SUPERVISORS WHO ARE PROVIDED WITH RAILWAY QUARTER AND RAILWAY TELEPHONE IN KUR DIVISION

PCSTE Most of the Supervisors of various departments are under excluded classifications of HOER, being their services are essential, they are provided with Railway Qtr; with Railway Telephone. As such this Union urges to extend the Rail Net facility to the Railway Telephone provided at their residence, in view of smooth functioning of official works and promptly.

REMARKS OF ADMINISTRATIONNo Railway Board guide line exits to provide rail net facility at the residence of Sr. Supervisors.DECISION Proposal for issue of internet dongle for specific case may be processed.

(CLOSED)

23. 39U-23-2017 EXTRACT OF ITEM NO. 34U-20-2015 OF 34TH ZONAL PNM AND IN RESPECT OF “ENSURE PROVISION OF 4 WHEELER/ANY OTHER VEHICLE FOR TRANSPORTATION OF FIELD STAFF OF TRD IN CASE OF BREAK DOWN/MAINTENANCE IN THE SECTION”

PCEE In course of the discussion in the 34th Zonal PNM it was agreed to issue necessary suitable instruction to the division for compliance, but the earlier practice is still continuing which creates much inconvenience to the staff concerned and unsafe. As such this Union demands that suitable instructions may please be issued to the divisions without further delay for compliance.

REMARKS OF ADMINISTRATIONThe TRD staff have to move to site of Breakdown/Maintenance along with materials. Therefore, generally they will move by Tower cars.

When they are to resort for ladder working in yards, where the movement of Tower Wagon is restricted and at Break down site, they move by Road vehicles provided with nominated depots.

DECISIONECoRSU stated that the practice of carrying Railway staff by Truck for attending breakdown should be avoided and road vehicles should be hired as per power given in the new SOP in which Supervisor has been given power to hire vehicle.

(CLOSED)

Page 22: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 21 of 32

24. 39U-24-2017 PROVISION OF AIR CONDITION FACILITY AT RUNNING ROOM OF PURI, BBS & KUR TO FACILITATE THE WORKING EMPLOYEES

PCEE The coastal belt like PURI, BBS & KUR need much importance for provision of AC facilities at Running Room, as per Railway Board guide line. The employees those are availing Running Room to wait for their further duty are facing a lot of difficulties without AC provision at Running Room. So looking in to the importance according to the job allotted the AC provision in Running Room is most vital. Hence this Union strongly urges for facilities like AC should be provided at Running Room PURI, BBS & KUR.

REMARKS OF ADMINISTRATIONThe details of Air Conditioners provided in Running Rooms at PUI, BBS & KUR are given below:

(i) PUI-15 Nos.(ii) BBS-06 Nos. (Except Bed rooms)(iii) KUR-Nil

A work costing Rs. 5.13 Cr is being proposed in PWD 2018-19 for air-conditioning of all running rooms over East Coast Railway. The work shall be taken up once the sanction is obtained in PWP 2018-19.

DECISIONSame remarks. Discussed and closed.

(CLOSED)

25. 39U-25-2017 PROMOTIONAL BENEFIT FOR ALPS TO LOCO PILOT (GOODS & PASSENGER) OF WAT DIVISION (I.E AS PER THE VACANCY EXIST)

PCMEPCEE

It is vital to represent a fact that, the eligible ALPs of WAT division are devoid to get the benefits of promotion to Loco Pilots (Goods & Passenger). The Assistant Loco Pilots of WAT division are working sincerely up to the satisfaction of administration since long. But, in spite of 421 Nos & 23 Nos of vacancies in Loco Pilot (Goods) & Loco Pilot (Passengers) of WAT Division respectively exist, none of the eligible Assistant Loco Pilots of WAT division are promoted yet. Whereas, under KUR Division the similar promotion effect it completed twice, in last 2 ½ years, but no steps is initiated yet under WAT division. Also 200 Nos of ALPs are undergoing their respective trainings and to be joined within two months to fulfill the vacancies.Hence this Union strongly urges for immediate effect of the promotional benefit to the ALPs of WAT division.

Page 23: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 22 of 32

REMARKS OF ADMINISTRATIONDivision is processing for promotion of about 125 ALPs. Balance will have to be maintained between number of LP and ALPs.

DECISIONDiscussed and closed.

(CLOSED)

26. 39U-26-2017 IMPROVEMENT IN CREW REST ROOM WITH BASIC AMENITIES AT SPUR 3 & 4, 5 & 6 & 7 & 8 IN TLHR COLLIERY

PCOMPCEE

Despite repeated discussion on the subject in various forums it is pitiable to mention that no action was initiated by the administration as a result of which the working staff (Running Staff) are facing much hardship. Hence this Union urges to provide basic amenities at SPUR No.3, 4, 5, 6, & 7, 8 at TLHR colliery without further delay.

REMARKS OF ADMINISTRATIONMCL authorities have been apprised regarding the difficulties of running staff arising out of non-availability of proper amenities in the rest rooms at spur No. 3 & 4, 5 & 6 and 7 & 8 at TLHR colliery.

DECISIONPCOM assured that the matter will be pursued with CMD/MCL.

(CLOSED)

27. 39U-27-2017 INDISCRIMINATE CURTAILMENT OF TA OF TRACK MACHINE STAFF

PCE The Track machine staff are usually working for a spell of 21 days. But sometimes they are being utilized for more than that spell period that is 21 days. The additional days’ TA is being curtailedindiscriminately, for which they are eligible to get according to the Railway rules. This Union urges to arrange the payment for the days worked extra without any curtailment in TA.

REMARKS OF ADMINISTRATIONThere is no such curtailment of TA beyond 21 days. Even TA has been given to staff for 23 days in 30 days month and 24 days in 31 days month for staff working for those days (excluding 7 days rest.)

DECISIONProposal for consolidated TA is not agreed to.

(CLOSED)

Page 24: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 23 of 32

28. 39U-28-2017 HALF DAY (SUNDAY PATTERNED HOLIDAY) HOLIDAY FOR STAFF OF RESERVATION/PRS OVER EAST COAST RAILWAY

PCCM There is a long standing demand from reservation staff of ECoR that they may be allowed to avail, Sunday type working pattern (i.e 8 hours to 14 Hrs instead of 22.00 hrs) on few regional holidays like Holi, dussurah, Diwali, Pongal, Ugadi etc vide Ref: RESV/3/PT-VI/RM dtd. 15.03.2016.Other Zones like SER, ER, SR, SCR, avails these holidays since long time back, ECoRSU urges upon for an early decision at par with other Zonal Railway PRS Counters.

REMARKS OF ADMINISTRATIONIt has been ascertained from Eastern & South Eastern Railway that all PRS offices over Kolkotta and Howrah area only are closed in one shift on the occasion of Durga Puja, Lakshmi Puja & Kali puja/Diwali for which orders are issued by CCM(PM)/Eastern Railway along with Press Notification for information of general public. Similar arrangements are not made for other PRS office at other locations on the Divisions.

ECoRSU may furnish copies of orders, if any, issued for the closing of shifts during Durga Puja, Lakshmi Puja & Kali puja/Diwali at other non-metro locations of ER, SER, SR & SCR so that a decision can be taken on the above issue.

DECISIONStatistically it will be examined, how many tickets are sold on Durga Puja, Lakshmi Puja & Kali puja/Diwali in the 2nd shift at the PRS on East Coast Railway. Decision will be taken on the basis of above.

(CLOSED)

Page 25: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 24 of 32

SECTION ‘C’REVIEW ITEMS

Srl.No.

Item No. SUBJECT MATTER

29. 38U-11-2016 SUPPLY OF SAFETY SHOES TO FIELD STAFF OF S&T DEPARTMENT AT KK/KR LINE.

PCSTEPCMM

The filed staffs of S&T department are working on Track and also on hilly terrain of KK and KR lines which are full of dangerous creatures. Moreover these staff will attend failures also in night time. Hence it is requested to arrange immediate supply of safety shoes to all the field staff.

REMARKS OF ADMINISTRATIONSTORES DEPARTMENTStores Department make supply of stock items based on intimated sanctioned requirement i.e. AAC by the users. In this case, no sanctioned requirements of the items have been intimated to Stores Department.

However, the details for the supply of safety shoes to different stocking depots are furnished below: -(1)ELS/VSKP- 300 pairs against PO. No. 07.15.3291.1.34637 dated 31.07.15—Fully supplied. (2) This item has been made stock item in all depots, and procurement is being made against tender No. 07.16.3291 opened on 11.05.16 which is under finalization.

CRW/MCS—1674 pairsELS/ANGL—390 pairsELS/VSKP—575 pairsDLS/VSKP—1220 pairs.

Consuming department should send either stocking proposals as per their requirement or send Non-stock demand for further procurement.

LAST MINUTESThe issue will be examined.

PRESENT POSITIONSTORES DEPARTMENTPO No. 07.16.3291.1.04923 dated 31.07.17 placed on M/s. Sucheta Enterprise/Kanpur,

Page 26: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 25 of 32

DP – 06.10.17.ELS/VSKP – 575 pairs – received on 21.09.17 under accountal. DLS/VSKP – 1220 pairs received on 25.09.17 and 1215 pairs issued to consignee.

SIGNAL & TELCOM DEPARTMENTTotal requirement of Safety shoes for S&T field staff working in KK & KR line is 239. It is a stock item. 65 pairs of safety shoes collected from MCS/Workshop have been distributed. Shoes for remaining staff will be distributed after receipt from store.

DECISIONIndents for required number of safety shoes may be placed by consuming departments and fund provision should also be made.

30. 38U-15-2016 CREATION OF POSTS FOR STORES HQ & DLS/VSKP AGAINST EXTRA WORKLOAD INCREASED DUE TO MAINTENANCE OF EMD LOCO.

PCPOPCMEPCMMPFA

The above issue was one of the Z-PNM items of ECoRSU. During discussion of the item, CME /BBS agreed to provide 70% of funds for creation of the posts & balance money value will be provided by Stores Deptt. The posts have been proposed to be utilized for increased workload of maintenance of EMD Loco (new asset). It was recorded in the PNM forum that at present the posts will be creased against work charged estimate in view of urgency. Thereafter, no progress of the matter has come to the light. ECoRSU urges upon for early creation of the posts for smooth running of increased workload at DLS/VSKP & Stores HQ.

REMARKS OF ADMINISTRATIONSTORES DEPARTMENTThe proposal for creation of posts for Stores HQ & DLS/VSKP against extra workload is under examination, by Finance department.

LAST MINUTESSame remarks.

PRESENT POSITIONThe proposal for creation of 469 no. of posts of Stores department at HQ and DLS/VSKP is being examined at HQ.

Page 27: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 26 of 32

DECISIONDiscussed and closed.

(CLOSED)

31. 38U-17-2016 CONSTRUCTION OF FOUR WHEELER GARAGE FOR THE STAFF AROUND RAIL SADAN BUILDINGS DRM/CWM’S OFFICES AT KUR,WAT,MCS & SBP.

PCESDGM

Ref: Zonal PNM item No. 35U-11-2015 discussed on 29th & 30th

October,2015.

ECoRSU would like to intimate once again that the subject matter has been discussed in the 35th Zonal PNM Meeting with ECoRSU, wherein a decision arrived that the works will be proposed in Law Book 2016-17 for sanction under GM’s power.

CE(Planning)/BBS informed this Union vide letter No. W.1/CE-PLG/PNM items/3147 Dated: 05.5.2016 that no fund has been given by RB for sanction of new works under PH-52 & 64 for LAW BOOK 2016-17.

ECoRSU, urges upon for allocation of funds under GM’s power for the above works wherever there is more demand and essential for construction of 4 wheeler garage.

REMARKS OF ADMINISTRATIONMCS WORKSHOPFour wheeler garage area at CWM/MCS office is available.

ENGINEERING DEPARTMENTThe work could not be sanctioned during 2016-17 due to paucity of fund. The work shall be proposed in Law Book 2017-18 under GM’s power.

WAT DIVISIONSuch planning is not available at present to provide such facility. Till date no such representation from local recognized Union is received. After receiving the representation providing Wheeler Garage facility will be proposed under PH-52.

LAST MINUTESClubbed with item No. 18.

Page 28: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 27 of 32

PRESENT POSITIONIn Rail Sadan building complex there is space constraint and only multi-level parking may be an ideal solution.

SBP Division: Four wheeler Garage is already available at SBP Divisional office for officers. No land is available in SBP division complex for construction of garage for staff due to modification of circulating area of SBP stations.

WAT Division: There is no space available in the premises of DRM office complex for construction of garage. MCS Workshop:Four wheeler garage is available for CWM/MCS office complex.

KUR Division: For construction of 4/2 wheeler parking shed at Rail Sadan, provision has been kept in law book 2017-18 vide item No. 764 under PH-52.

DECISIONThe work for construction of 2/4 wheelers parking has been proposed in the works programme for the year 2017-18 for Rail Sadan. Proposal for constructing parking shed in one of the divisional office,“ULTA CHHATA” as done in SWRly which has dual benefit of rain water harvesting as well as solar power will be examined.

(CLOSED)

32. 38U-18-2016 CONSTRUCTION OF ANNEX BUILDING AT BACK SIDE OF RAIL SADAN, HAVING BASEMENT & GROUND FLOOR AS PARKING SPACE OF VEHICLES AND PROVISION OF SPACE IN THE SAID BUILDING FOR BANKS, CO-OPERATIVE SOCIETY (URBAN BANK), RECORD ROOMS OF VARIOUS OFFICES AS WELL AS SHIFTING OF STAFF CANTEEN TO THAT BUILDING.

PCESDGM

ECoRSU feels that there is a need for construction of Annex Building in the back side of Rail Sadan providing basement & ground floor as parking space for two wheeler/4 wheeler vehicles and to accommodate Banks, Urban Bank, Record Rooms of various offices as well as shifting of Staff Canteen to that Buildings which will help to keep neat & clean of the offices running in Rail Sadan.

REMARKS OF ADMINISTRATION1) Banks and Urban Banks have since been allotted space as per

the requirement.

Page 29: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 28 of 32

2) Likewise, Staff Canteen is in operation in North block and the earmarked space has also been designed accordingly suiting to requirement.

3) At present, there is no need for office space for any new office, as all the existing offices have been made operational either at Rail Sadan or at Rail Vihar.

4) Besides there is some space constraint for construction of garage.

LAST MINUTESItem 17 & 18 clubbed. Engineering department will examine the proposals in consultation with SDGM and finalize the proposals.

PRESENT POSITIONThere is no need of Annex building as banks, staff canteen and officers have been well accommodated in the existing building.

Further, for construction of 4/2 wheeler parking shed at Rail Sadan, provision has been kept in law book 2017-18 vide item No. 764 under PH-52.

DECISIONThe PREM office may be shifted along with CAO/Con office to Rail Sadan. Till such time PREM offices may continue at Rail Vihar.

(CLOSED)

33. 38U-22-2016 CREATION OF ONE POST OF LAB. ASSISTANT IN DIVISIONAL HOSPITAL, SAMBALPUR

PCMDPCPO

Three posts of Safaiwallas have been surrendered long back for creation of one post of Lab. Asstt. In DRH/SBP which is still pending at HQrs. ECoRSU, urges upon for early operation of the said post of Lab. Asstt. At SBP.

REMARKS OF ADMINISTRATIONMEDICAL DEPARTMENTThere was ban on creation of post. The proposal for creation of 01 post of Lab.Supdt. at Sambalpur is under process.

PERSONNEL DEPARTMENTGM has advised to arrange LR from KUR, if not CH.

LAST MINUTESThe issue will be examined once again.

Page 30: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 29 of 32

PRESENT POSITIONOne post of Lab. Superintendent has already been created and a contractual Lab. Superintendent has been engaged.

DECISIONOne post of Lab. Superintendent has already been created and a contractual Lab. Superintendent has been engaged.

(CLOSED)

34. 36U-08-2015 EXTENDING MILEAGE FOR THE SHUTTLING DUTIES.PCOMPCEEPCME

In WAT division, the shuttling TO’s are being served to the crews to work the trains to GPL, VSPS, NTPC, etc. But due to operational exigencies the crews are being compelled to do longer hours of duty in shuttling duties for more than 8 hours with the mileage of 120km only(15km/hr). For extra hours of duty performed, they are not getting any extra mileage. So, the crews are demanding relief and trains are badly detaining for arranging relief on account of administration.So this Union requests the administration to identify the guaranteed mileage of 150km (15km/hr for 10hours of duty) to the crews working shuttling TO’s in the above sections to avoid detention of trains for arranging relief.

REMARKS OF ADMINISTRATIONOPERATING DEPARTMENTAs per para 3.12 of Railway Board’s letter No. E(P&A)II-80/RS-10, dated 17.07.1981, crew working in WMY/SCMN-KPL-WMY/SCMN & WMY/SCMN-VZM-WMY/SCMN sections of WAT division gets 120 KM as minimum Guaranteed Kilo-meterage (MGK). They are also getting over-time allowances for working more than 08 hours in these sections including MGK of 120 Km. In KUR division for ANGL/TLHR-BDPK-TLHR/ANGL section where 10 hours shuttling duty is in vogue crew gets 120 km as MGK.

LAST MINUTESOPERATING DEPARTMENTThe proposal is under consideration of Zonal Review Committee.

PRESENT POSITIONWMY/SCMN 0 MGPV(GPL)- WMY/SCMN (76 KM) & WMY/SCMN-VSPS-WMY/SCMN(82 KM) sections are notified under short sections for Minimum Guranteed Kilometerage (MGK) i.e. 120 KM each vide CPO/ECoR/BBS’s Memorandum No. ECoR/Pers/R/Running/

Page 31: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 30 of 32

Allowance-21, dated 27.07.2016.

WMY/SCMN-NTPC-SCMN/WMY has been notified under Industrial/Coal pilot to enable the running staff to earn trip allowance. As the trip timing is fixed at 6 hours, they are entitled for 120 Km as trip allowance. 50 KM of bonus is allowed if the trip is completed within the 6 hour vide CPO/ECoR/BBS’s memorandum No. EcoR/Pers/R/Running/Allowance/21 dated 05.11.2015.

DECISIONThe existing instructions will be implemented.

(CLOSED)

35. 36U-15-2015 NOTIFYING OF BCHL-DWZ SECTION FOR SHUTTLING MILEAGE.

PCOMPCEE

Due to night restriction of goods trains in KK line, the down trains movement is being controlled between BCHL & DWZ. So the running staff are not getting minimum guaranteed kilometers after getting relief in the above section of 35 Km.So this union requests the administration to notify the BCHL-DWZ section as shuttling route to get minimum guaranteed mileage to running staff in view of extreme working conditions in that section.

REMARKS OF ADMINISTRATIONThe proposal to declare BCHL-DWZ as short section will be examined after receiving remarks from WAT division.

LAST MINUTESOPERATING DEPARTMENTThe proposal is under consideration of Zonal Review Committee.

PRESENT POSITIONBCHL-DWZ-BCHL (68.6 Km) section is notified under short section for Minimum Guaranteed Kilometerage (MGK) i.e. 120 KM vide CPO/ECoR/BBS’s Memorandum No. ECoR/Pers/R/Running/Allowance-21, dated 27.07.2016.

DECISIONBCHL-DWZ-BCHL (68.6 Km) section is notified under short section for Minimum Guaranteed Kilometerage (MGK) i.e. 120 KM vide CPO/ECoR/BBS’s Memorandum No. ECoR/Pers/R/Running/Allowance-21, dated 27.07.2016.

(CLOSED)

Page 32: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 31 of 32

36. 36U-16-2015 UTILISATION OF BCHL CREWS AT JDB & KRPUPCOMPCEE

At present the LP cadre at BCHL is 129 and ALP cadre is 136 members . The average running time of goods trains between BCHL & JDB is 8 to 12 hours.The average running time of goods trains between JDB & KRPU is 5 to 6 hours.The average running time of goods trains between KRPU & ARK is 5 to 6 hours.If the administration introduces the crew lobby at JDB by shifting 70 crews from BCHL - JDB, they will work the trains of JDB – BCHL and JDB – ARK directly without taking relief at KRPU. 25 crews may be kept at BCHL to answer the RYD & KRDL shuttling TO s. Likewise 25 AC/DC crews may be kept at KRPU to work DMNJ,JYP short trips of both AC/DC trains. So that the WAT crew need not come to KRPU and they will work in VSKP-ARK-VSKP section.There is no need of extra sanction of posts and 10 posts can be surrendered and with that matching surrender value of posts, the quarters at JDB can be constructed for running staff and running at ARK can be improved for availing rest to 30 crews and guards. Simultaneously the BCHL dormitory nearer to the station may be modified as running room for JDB crews. The guard cadre at BCHL to be reviewed accordingly. In the light of the above the running staff welfare will be improved by providing good conditioned quarters to all 25 crews at BCHL to reside with their families. Casualty of JDB & KRPU crews will be reduced as they will be away from Malaria prone area. In future the JDB crew point will become major head quarter after opening the lines between JDB and Delhi Rajra which is under survey.So this union requests the administration to consider our views duly considering the welfare of the running staff at BCHL.

REMARKS OF ADMINISTRATIONDetailed study has to be conducted to understand the advantages. AOM(Plg)/WAT is nominated for conducting the detailed study and submit the report.

LAST MINUTESOPERATING DEPARTMENTA detailed report submitted by AOM(Plg)/WAT regarding opening of new crew base at KRPU & JDB has been sent to Sr.DEE(OP)/WAT on 08.06.2016 vide Sr.DOM/WAT’s Note No. WTP/57/MGK, dated 08.06.2016 for remarks.

Page 33: ECoR & ECoRSU - · PDF fileof provision of air-conditioning in Kalyan Mandapam at VSKP before GM. 4. Address of ShriUmesh Singh, GM/ECoR/BBS:- ... and at present, a lot of development

39th (1st in 2017) ZPNM_SU 2ND & 3RD NOV, 2017- MINUTES Page 32 of 32

PRESENT POSITIONSr. DEE(OP)/WAT has been requested to propose 06 rooms at JDB to accommodate 12 Guards under PH-52 & staff amenity works in Law Book 2017-18 on out of turn basis on 09.08.2017.

DECISIONThe matter will be discussed with division to augment accommodation facility for running staff at BCHL on urgent basis. Alternatively, shifting of some crew from BCHL to JDB can be considered.

(CLOSED)

SECTION – “D”SUMMARY

Total No. of items Items closed Balance itemsNew Agenda items 28 28 0Review Agenda Items 08 07 01

Total 36 35 01

*****