Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build &...
Transcript of Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build &...
![Page 1: Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build & strengthen collaborative partnerships, vision (Step 1) • Integrate conservation, natural](https://reader033.fdocuments.us/reader033/viewer/2022050123/5f52ccb16cc93c32555ba4f1/html5/thumbnails/1.jpg)
| Leading the Nation in Transportation Excellence | www.mass.gov/massdot
MaPPS: New environmental / safety
screening system (under development)
SHRP2 Expediting Project Delivery (C19) • Expedite project delivery through:
- Enhanced early environmental
coordination
- More streamlined permitting
- Facilitated by Geospatial Data
Collaboration w/in planning process
- Every Day Counts 2
Eco-Logical & the MassDOT Project
Planning System (MaPPS)
![Page 2: Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build & strengthen collaborative partnerships, vision (Step 1) • Integrate conservation, natural](https://reader033.fdocuments.us/reader033/viewer/2022050123/5f52ccb16cc93c32555ba4f1/html5/thumbnails/2.jpg)
| Leading the Nation in Transportation Excellence | www.mass.gov/massdot
MaPPS
• Planning: Online Project Initiation
• Analysis: Automated
environmental, safety and
vulnerability screening
• Reporting: Design and analysis
recommendations for scopes of
work & construction estimates
• Coordination: Planning phase
agency review/comment
capability
Eco-Logical & the MassDOT Project
Planning System (MaPPS)
![Page 3: Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build & strengthen collaborative partnerships, vision (Step 1) • Integrate conservation, natural](https://reader033.fdocuments.us/reader033/viewer/2022050123/5f52ccb16cc93c32555ba4f1/html5/thumbnails/3.jpg)
| Leading the Nation in Transportation Excellence | www.mass.gov/massdot
Eco-Logical & MaPPS
• Build & strengthen collaborative partnerships, vision (Step 1)
• Integrate conservation, natural resources, watershed,
species recovery & wildlife action plans (Step2)
• Create REF: conservation strategy + transportation plan
(Step 3)
• Establish & prioritize ecological actions (Step 5)
• Deliver conservation & transportation projects (Step 8)
• Update REF (Step 9)
Incorporation of Eco-Logical Steps
into Business Processes
![Page 4: Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build & strengthen collaborative partnerships, vision (Step 1) • Integrate conservation, natural](https://reader033.fdocuments.us/reader033/viewer/2022050123/5f52ccb16cc93c32555ba4f1/html5/thumbnails/4.jpg)
| Leading the Nation in Transportation Excellence | www.mass.gov/massdot
Regional Ecosystem / Environmental
Analysis Framework
• State conservation plan – BioMap2
• Conservation priority modeling – Conservation Assessment &
Prioritization System
• Ecological connectivity priority
modeling – Critical Linkages
• Site specific conservation data – Diadromous fish restoration
– Coldwater Fisheries
– Wildlife mortality hotspots
– Restoration opportunities
BioMap2
CAPS – Index of Ecological Integrity
![Page 5: Eco-Logical & the MassDOT Project Planning System (MaPPS) · Eco-Logical & MaPPS • Build & strengthen collaborative partnerships, vision (Step 1) • Integrate conservation, natural](https://reader033.fdocuments.us/reader033/viewer/2022050123/5f52ccb16cc93c32555ba4f1/html5/thumbnails/5.jpg)
| Leading the Nation in Transportation Excellence | www.mass.gov/massdot
Questions / More Information:
Today 11:00am - 11:30am
The Development of a Planning-phase Environmental
and Vulnerability Screening Tool and Interagency
Geospatial Data Collaboration Application in
Massachusetts
Tim Dexter
Wetlands and Water Resources
Environmental Services
(857) 368-8794