Ecknaathh_Bala_Folio for WOHA

10

description

 

Transcript of Ecknaathh_Bala_Folio for WOHA

  • Contents

    1_ Projects Undertaken at The University of Melbourne Romance of Machines Project maya Frozen Symphony Unearthing 2_ Projects Undertaken at the AA, London Monster of Hooke

    3_ Projects Undertaken at Hassell (YearOut) Flinders Street Station MSLE Point Nepean GPAC 360 Collins Fox residence DHS Franklin St Medibank

    PORTFOLIO

  • ST

    PEDESTESTRIAN & VE-HICULAR ACCESS

    GRANT LANE EXIT

    LA TROBE

    ST PRIMA

    RY ACCE

    SS

    HIGH RISE

    HOTEL

    LOWRISE

    RESIDENTI

    AL

    HIGHRISE

    OFFICE

    OPEN CARPARK

    LOW RISE

    RESIDENTI

    AL

    DESIGNATED GARBAGE PICK UP POINT AND GOODS LOADING BAY

    A LOVE AFFAIR WITH MACHINES ROMANCETHIS PROJECT COMMENCED WITH THE NOTION OF SPEED BEING THE DRIVING FORCE BEHIND THE BARLOWS INTERESTS, BUSINESS AND LIFESTYLE. HOWEVER, SPEED WAS JUST A REPETITIVE CLIMAX AND A RESULT OF A CONSTANT ROMANCE WITH MACHINES. FROM AVIATION TO AUTOMOBILES THE BARLOWS INTERESTS BECAME AN OBSESSIVE TESTAMENT AND EPITOMISED AN UNDYING LOVE FOR THEIR MACHINES.

    THE BUILDING EXPLORES THE IDEA OF ROMANCE WITH REGARDS TO SPACE AND INTIMACY. PRIVATE AND PUBLIC SPACES ARE DEFINED BY THE SITE CREATING TWO DISTINCT VOLUMES IN WHICH THE ROMANCE OF MACHINES CAN BE EXPERIENCED AND ENHANCED. THE PUBLIC DOMAIN EXPLORES OPEN SPACES CREATING PIAZZAS IN THE AIR AND PLATFORMS FOR SOCIAL INTERACTION. THE PRIVATE DOMAIN IS THE SHOWROOM WHICH IS NESTLED BETWEEN THE HIGH RISES OF LATROBE ST CREATING A SECLUDED ENCLOSURE ELEVATED FROM THE GROUND REINFORCING THE IDEA OF INTIMACY THROUGH PRIVACY. ITS FORM HAS ORGANIC ORIGINS RESEMBLING CHAMBERS AND ORGANS OF THE BODY. THE CHAMBER LIKE SPACE EVOKES A SENSE OF ENDANGERMENT AND MYSTERY MOSTLY ASSOCIATED WITH THE ATTRIBUTES OF ROMANCE AND PRIVATE NICHES IN WHICH CARS IN THE SHOWROOM WOULD BE EXPERIENCED. ITS MONUMENTAL ELEVATION MAKES IT ALMOST SACRED. REFLECTING ITS IMAGE DOWN BELOW TO THE WATER FEATURE AND BEYOND INTO THE CAR PARK. THE CIVIC ARENA BELOW IT IS AN OPEN URBAN SPACE SURROUNDING A POND WHICH ENHANCES THE SACRIDITY OF SPACE . THE BUILDING BECOMES AN IMAGE AND A SIGN, A LIVING EXAMPLE OF THE ROMANCE AND INTIMATE RELATIONS THAT ONE HAS WITH THEIR MACHINES.

    SURROUNDING THE BUILDING IS A METAL SKIN WRAPPING THE BUILDING IN A PROTECTIVE SHELL LIKE ARMOUR CREATING THAT SENSE OF PRIVACY IN A VERY OPEN LOCATION IN THE HEART OF THE CITY HEART OF THE CITY. THE BUILDING REFLECTS THE VERY

    SITE PLAN

    1:500A01

    ECKNAATHH BALA 328892 ADS4 FIRE

    N

    The final architectural studio for my degree would be my response and architectural narrative of, client A.G and A.A Barlow. Both of whom have eccentric adventurous persona. The brief states the clients intentions for a car showroom, service centre, a 300 lot car park and other amenities to be located on a site within the grid of the Melbourne CBD. From our initial diseciton of the brief we had narrowed 5 words which would effectively reflect their lifestyle, personality and complexity from which one word would be chosen to direct our exploration to the final outcome. The noun speed Initially spoke volumes of the Barlows association with automobiles and their hunger for adventure and lifestyle. But after careful investigation it was extrapolated that speed is a climax or result of an affair with machines. The romance of machines, holistically engages with the idea of Barlows deep affection and relationship that they have with machines. It is a focal point of their business, lifestyle and cul-ture. The notion of ones romance with their machine in particular automobiles is not alien to human culture but something that is apparent and very real.

    The design is centred upon the initial massing diagrams and conceptual models and the idea of space being a vital aspect of romance in an architectural sense. The idea of space was developed from the initial conceptual model of Barlows heart and a car motor being intrinsically infused, becoming his driving passion. This was extrapolated further from my of study of cities and their spaces with regards to urban design and also the context of the site, the CBD and the Grid and how that is applicable to romance. Public and Private space juxtapose in many respects but similarly explore the notion of romance which become the two opposing masses in the design.

    The final outcome reflects the idea of a sanctuary for the love of machines. The external skin which is almost a tease from exterior views as it reveals partial imagery of the building, luring the visitors in through curiosity but also acts as a envelope and veil that provides privacy for the showroom levels which is the most sacred private space modelled upon the idea of the chamber which came from the idea of the heart and intimate space. The primary entrance at La Trobe St. Is an open public space below the elevated showroom with a reflection pool that becomes a space for visitors to fall in love with the building itself and not just what Is contained within it. The service centre and other amenities such as the cafe and administration quarters are on separate open aired platforms/levels that form the public realm of the site. The Skin surrounding the public realm has lesser perforations and is spaced out further for more light and views segmenting the romantic views out from the CBD from the rear of the site.

    ROMANCE OF MACHINESCBD, MELBOURNE

    ARCHITECTURE STUDIO 4

  • LEVEL 3

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST32 GALLARDO CAFE33 CAFE KITCHEN 34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC36 WASH AREA37 MINI GOLF COURSE48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 4

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST38 LAMBORGHINI STORAGE CENTRE 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 5

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC

    LEVEL 6

    53 BAR10 FIRE ESCAPE EAST

    48

    4848

    48

    48

    7

    6

    49

    37

    19

    1032

    33

    34

    35

    6

    736

    19

    10

    38 48

    48

    48

    50

    49

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE51 BISTRO52 THEATRE KITCHEN

    3 HYDRAULIC CAR ELEVATOR

    3

    48

    4848

    48

    48

    49

    51

    52

    19

    10

    3

    10

    53

    LEVEL 6 ABOVE GROUND

    1:200A09

    LEVEL 3 ABOVE GROUND

    1:200A06

    LEVEL 4 ABOVE GROUND

    1:200A07

    LEVEL 5 ABOVE GROUND

    1:200A08

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AAAA AAAA

    BBBBBBBB

    NLEVEL 3

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST32 GALLARDO CAFE33 CAFE KITCHEN 34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC36 WASH AREA37 MINI GOLF COURSE48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 4

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST38 LAMBORGHINI STORAGE CENTRE 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 5

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC

    LEVEL 6

    53 BAR10 FIRE ESCAPE EAST

    48

    4848

    48

    48

    7

    6

    49

    37

    19

    1032

    33

    34

    35

    6

    736

    19

    10

    38 48

    48

    48

    50

    49

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE51 BISTRO52 THEATRE KITCHEN

    3 HYDRAULIC CAR ELEVATOR

    3

    48

    4848

    48

    48

    49

    51

    52

    19

    10

    3

    10

    53

    LEVEL 6 ABOVE GROUND

    1:200A09

    LEVEL 3 ABOVE GROUND

    1:200A06

    LEVEL 4 ABOVE GROUND

    1:200A07

    LEVEL 5 ABOVE GROUND

    1:200A08

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AAAA AAAA

    BBBBBBBB

    N

    11000764071808400 144407230

    5530

    5050

    8070 11084161466700

    6800

    1620

    0528

    4600

    LOBBY

    12 LOBBY13 RECEPTION14 LOUNGE15 INFORMATION GALLERIA3 HYDRAULIC CAR ELEVATOR 10 FIRE EXIT EAST16 FIRE HYDRANT &HOSE REEL17 LOADING BAY STORAGE18 LOADING BAY 19 CENTRAL STAIRWELL & LIFT

    GROUND LEVEL

    1 MAIN ENTRY2 REFLECTION POOL3 HYDRAULIC CAR ELEVATOR4 BASEMENT ELEVATORS 5 FIRE ESCAPE WEST 6 MALE WC7 FEMALE WC8 HYDRAULIC PUMP ROOM9 CARPARK MANAGERS OFFICE 10 FIRE ESCAPE EAST11 CARPARK EXIT GANTRY

    LEVEL 1

    19 CENTRAL STAIRWELL & LIFT20 SERVICE CENTRE 21 SERIVCE CENTRE MANAGERS OFFICE3 HYDRAULIC CAR ELEVATOR (PRIVATE)10 FIRE EXIT EAST16 FIRE HYDRANT &HOSE REEL17 FIRE ESCAPE ROUTE22 HYDRAULIC CAR JACKS

    LEVEL 2

    19 CENTRAL STAIRWELL & LIFT23 ADMINISTRATION QUATERS 24 STAFF (MALE WC, SHOWERS CHANGE ROOMS)25 STAFF (FEMALE WC, SHOWERS CHANGE ROOMS)10 FIRE EXIT EAST26 STAFF LOUNGE27 STAFF KITCHENETTE 28 STAFF LUNCH ROOM29 WAITING AREA30 STAFF LOCKERS20 SERVICE CENTRE17 FIRE ESCAPE ROUTE31 BOARDROOM48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    1

    2

    2

    3

    4

    56

    78

    9

    10

    8

    11

    12

    13

    14

    15

    3

    3 10

    16

    17

    18

    19MACKENZIE ST PEDESTRIAN ENTRY

    CAR PARK ENTRY

    PRIVATE CAR ENTRY

    19

    20

    21

    3

    10

    16

    17

    17

    17

    22

    1923

    24

    25

    2626

    27

    28

    29

    20

    30

    17

    17

    31

    50

    27

    50 24,25

    4848

    4848

    33

    LEVEL 2 ABOVE GROUND

    1:200A05

    LEVEL 1 ABOVE GROUND

    1:200A04

    LOBBY LEVEL ABOVE GROUND

    1:200A03

    LEVEL GROUIND

    1:200A02

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    N11000764071808400 144407230

    5530

    5050

    8070 11084161466700

    6800

    1620

    0528

    4600

    LOBBY

    12 LOBBY13 RECEPTION14 LOUNGE15 INFORMATION GALLERIA3 HYDRAULIC CAR ELEVATOR 10 FIRE EXIT EAST16 FIRE HYDRANT &HOSE REEL17 LOADING BAY STORAGE18 LOADING BAY 19 CENTRAL STAIRWELL & LIFT

    GROUND LEVEL

    1 MAIN ENTRY2 REFLECTION POOL3 HYDRAULIC CAR ELEVATOR4 BASEMENT ELEVATORS 5 FIRE ESCAPE WEST 6 MALE WC7 FEMALE WC8 HYDRAULIC PUMP ROOM9 CARPARK MANAGERS OFFICE 10 FIRE ESCAPE EAST11 CARPARK EXIT GANTRY

    LEVEL 1

    19 CENTRAL STAIRWELL & LIFT20 SERVICE CENTRE 21 SERIVCE CENTRE MANAGERS OFFICE3 HYDRAULIC CAR ELEVATOR (PRIVATE)10 FIRE EXIT EAST16 FIRE HYDRANT &HOSE REEL17 FIRE ESCAPE ROUTE22 HYDRAULIC CAR JACKS

    LEVEL 2

    19 CENTRAL STAIRWELL & LIFT23 ADMINISTRATION QUATERS 24 STAFF (MALE WC, SHOWERS CHANGE ROOMS)25 STAFF (FEMALE WC, SHOWERS CHANGE ROOMS)10 FIRE EXIT EAST26 STAFF LOUNGE27 STAFF KITCHENETTE 28 STAFF LUNCH ROOM29 WAITING AREA30 STAFF LOCKERS20 SERVICE CENTRE17 FIRE ESCAPE ROUTE31 BOARDROOM48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    1

    2

    2

    3

    4

    56

    78

    9

    10

    8

    11

    12

    13

    14

    15

    3

    3 10

    16

    17

    18

    19MACKENZIE ST PEDESTRIAN ENTRY

    CAR PARK ENTRY

    PRIVATE CAR ENTRY

    19

    20

    21

    3

    10

    16

    17

    17

    17

    22

    1923

    24

    25

    2626

    27

    28

    29

    20

    30

    17

    17

    31

    50

    27

    50 24,25

    4848

    4848

    33

    LEVEL 2 ABOVE GROUND

    1:200A05

    LEVEL 1 ABOVE GROUND

    1:200A04

    LOBBY LEVEL ABOVE GROUND

    1:200A03

    LEVEL GROUIND

    1:200A02

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    N

    LEVEL 3

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST32 GALLARDO CAFE33 CAFE KITCHEN 34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC36 WASH AREA37 MINI GOLF COURSE48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 4

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST38 LAMBORGHINI STORAGE CENTRE 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 5

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC

    LEVEL 6

    53 BAR10 FIRE ESCAPE EAST

    48

    4848

    48

    48

    7

    6

    49

    37

    19

    1032

    33

    34

    35

    6

    736

    19

    10

    38 48

    48

    48

    50

    49

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE51 BISTRO52 THEATRE KITCHEN

    3 HYDRAULIC CAR ELEVATOR

    3

    48

    4848

    48

    48

    49

    51

    52

    19

    10

    3

    10

    53

    LEVEL 6 ABOVE GROUND

    1:200A09

    LEVEL 3 ABOVE GROUND

    1:200A06

    LEVEL 4 ABOVE GROUND

    1:200A07

    LEVEL 5 ABOVE GROUND

    1:200A08

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AAAA AAAA

    BBBBBBBB

    N

    LEVEL 3

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST32 GALLARDO CAFE33 CAFE KITCHEN 34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC36 WASH AREA37 MINI GOLF COURSE48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 4

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST38 LAMBORGHINI STORAGE CENTRE 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 5

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC

    LEVEL 6

    53 BAR10 FIRE ESCAPE EAST

    48

    4848

    48

    48

    7

    6

    49

    37

    19

    1032

    33

    34

    35

    6

    736

    19

    10

    38 48

    48

    48

    50

    49

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE51 BISTRO52 THEATRE KITCHEN

    3 HYDRAULIC CAR ELEVATOR

    3

    48

    4848

    48

    48

    49

    51

    52

    19

    10

    3

    10

    53

    LEVEL 6 ABOVE GROUND

    1:200A09

    LEVEL 3 ABOVE GROUND

    1:200A06

    LEVEL 4 ABOVE GROUND

    1:200A07

    LEVEL 5 ABOVE GROUND

    1:200A08

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AAAA AAAA

    BBBBBBBB

    N

    LEVEL 3

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST32 GALLARDO CAFE33 CAFE KITCHEN 34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC36 WASH AREA37 MINI GOLF COURSE48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 4

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST38 LAMBORGHINI STORAGE CENTRE 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 5

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC

    LEVEL 6

    53 BAR10 FIRE ESCAPE EAST

    48

    4848

    48

    48

    7

    6

    49

    37

    19

    1032

    33

    34

    35

    6

    736

    19

    10

    38 48

    48

    48

    50

    49

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE51 BISTRO52 THEATRE KITCHEN

    3 HYDRAULIC CAR ELEVATOR

    3

    48

    4848

    48

    48

    49

    51

    52

    19

    10

    3

    10

    53

    LEVEL 6 ABOVE GROUND

    1:200A09

    LEVEL 3 ABOVE GROUND

    1:200A06

    LEVEL 4 ABOVE GROUND

    1:200A07

    LEVEL 5 ABOVE GROUND

    1:200A08

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AAAA AAAA

    BBBBBBBB

    N

    LEVEL 3

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST32 GALLARDO CAFE33 CAFE KITCHEN 34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC36 WASH AREA37 MINI GOLF COURSE48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 4

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST38 LAMBORGHINI STORAGE CENTRE 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE

    LEVEL 5

    19 CENTRAL STAIRWELL & LIFT10 FIRE ESCAPE EAST34 PANTRY35 SERVICE SHAFT6 MALE WC7 FEMALE WC

    LEVEL 6

    53 BAR10 FIRE ESCAPE EAST

    48

    4848

    48

    48

    7

    6

    49

    37

    19

    1032

    33

    34

    35

    6

    736

    19

    10

    38 48

    48

    48

    50

    49

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR

    3 HYDRAULIC CAR ELEVATOR 48 SHOWROOM DISPLAY SPACE49 SALES DESK50 OFFICE SPACE51 BISTRO52 THEATRE KITCHEN

    3 HYDRAULIC CAR ELEVATOR

    3

    48

    4848

    48

    48

    49

    51

    52

    19

    10

    3

    10

    53

    LEVEL 6 ABOVE GROUND

    1:200A09

    LEVEL 3 ABOVE GROUND

    1:200A06

    LEVEL 4 ABOVE GROUND

    1:200A07

    LEVEL 5 ABOVE GROUND

    1:200A08

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    AAAA AAAA

    BBBBBBBB

    N

    BASEMENT LEVEL 5

    5 FIRE EXIT WEST4 BASEMENT LIFTS45 CARPARK PAYSTATION46 ATRIUM SPACE

    BASEMENT LEVEL 6

    5 FIRE EXIT WEST4 BASEMENT LIFTS45 CARPARK PAYSTATION46 ATRIUM SPACE

    BASEMENT LEVEL 7

    5 FIRE EXIT WEST4 BASEMENT LIFTS45 CARPARK PAYSTATION46 ATRIUM SPACE47 PLANTROOM

    5

    4

    4

    4

    47

    45

    45

    46

    45

    46

    5

    5

    LEVEL 5 BELOW GROUND

    1:200A1 7

    LEVEL 6 BELOW GROUND

    1:200A1 8

    LEVEL 7 BELOW GROUND

    1:200A1 9

    SECTION AA

    1:200A20

    SECTION BB

    1:200A21

    1 2

    3

    14 18

    20

    19 29 30 17

    48

    48

    48

    48 50

    44

    47

    45

    52

    5310

    10

    10

    10

    32 37

    48

    48

    48

    46

    4548

    3

    2

    45

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    N

    BASEMENT LEVEL 5

    5 FIRE EXIT WEST4 BASEMENT LIFTS45 CARPARK PAYSTATION46 ATRIUM SPACE

    BASEMENT LEVEL 6

    5 FIRE EXIT WEST4 BASEMENT LIFTS45 CARPARK PAYSTATION46 ATRIUM SPACE

    BASEMENT LEVEL 7

    5 FIRE EXIT WEST4 BASEMENT LIFTS45 CARPARK PAYSTATION46 ATRIUM SPACE47 PLANTROOM

    5

    4

    4

    4

    47

    45

    45

    46

    45

    46

    5

    5

    LEVEL 5 BELOW GROUND

    1:200A1 7

    LEVEL 6 BELOW GROUND

    1:200A1 8

    LEVEL 7 BELOW GROUND

    1:200A1 9

    SECTION AA

    1:200A20

    SECTION BB

    1:200A21

    1 2

    3

    14 18

    20

    19 29 30 17

    48

    48

    48

    48 50

    44

    47

    45

    52

    5310

    10

    10

    10

    32 37

    48

    48

    48

    46

    4548

    3

    2

    45

    AA AA

    BBBB

    AA AA

    BBBB

    AA AA

    BBBB

    N

  • FR

    OZ

    EN

    SY

    MP

    HO

    NY .

    7

    5

    PHO

    TOG

    RA

    PHY

    STU

    DIO

    AIR

    201

    2

    AR

    CH

    ITEC

    TU

    RA

    L C

    ON

    SCIO

    USN

    ESS

    6

    8

    FR

    OZ

    EN

    SY

    MP

    HO

    NY .

    7

    5

    PHOTOGRAPHY

    6

    8

    FROZEN SYMPHONYCITY OF WYNDHAM

    ARCHITECTURE STUDIO 3

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    Our third year architecture studio required us to engage with the interface grasshopper and as a result to generate an EOI as why we would should be chosen to design an installation on the princess freeway in Weribee. By proving that using parametric tools such as grasshopper can achieve multiple iterations and design considerations with regard to optimal design outcomes was our main criteria. My approach was to address this brief with a hypothetical situation and to question how advanced digital technology and tools coupled with innovative materials can create an ever changing identity for a city.

    Wyndham can be perceived as an organism; which is formed by an intricate agglomeration of interdependent systems. These systems are evolving and restructuring, encoding Wyndhams true identity, that is one of continual development.

    The proposition of an ice installation will be an annual event in the Wyndham Citys yearly calendar. The installation will materialize and capture the evolving identity of Wyndham will be an annual event in the City. Its purpose is to reveal a relatable identity for the people and the municipality giving its own distinct code and pattern in a 3 dimensional form. Ice becomes a media for exploring and Wyndham Citys yearly calendar decoding the intricacy of Wyndhams systems. It will generate a unique experience that can be seen from passing vehicles through a multimedia interface, extending Wyndham and capturing the evolving identity beyond its rural scales.

    The form which is generated by a rule based algorithm, organizes the Archimedian solids which are interdependent components that will become the prominent form in representing the systems comprised within Wyndhams network. The idea is not to create a new identity, but rather reveal an existing image of Wyndham City hidden within its intricate complex network of systems that make up its collective identity. Something unique only to the region. Its divergent and emergent traits will promote the dynamism and growth of Wyndham as an emerging municipality, one which strongly reflects the attributes of the city. Its documented gradual deformation and dissipation will become an event to be reflected upon.

    SITE PLAN

    SITE C

    INBOUND

    GEELON

    G TRAFFI

    C

    SITE A

    INBOUND MELBOURNE, W

    ERRIBEE

    SITE B

    IN BOU

    ND WY

    NDHAM

    CITY

    OUT-

    OUT BOUND MELB

    OURNE

    SPACE FO

    R FUTUR

    E GROW

    TH

    SAPCE FOR FUT

    URE GROWTH

    N

    SITE .PLANPROJECT WYNDHAM CITY GATEWAY

    LOCATION WESTERN EXCHANGE, WERRIBEE

    SITE PLAN 1:2000

    SITE PLAN

    INBOUND - WYNDHAM CITY / MELBOURNE TRAFFIC VIEW

    65 66

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION DETAILS

    RIVETED CONNECTIONS

    MOULD PART A

    ETFE INFLATED INTERIOR BUFFER

    FILL CAP

    HOLLOW SPACE, WATER INFILL

    CONSTRUCTION.DETAILS

    SECTION THROUGH STEEL MOULD!%',$."$$)"+"&+'*+$()+*+!*()+*."$$**%$"&+.'(!**!"&+)"')."$$!-"&2+$*current material till a biodegradable safe material can be found that dissipates after the casting has been completed. The ETFE will have *#$+$*+$)%+'*,((')++!*!(&)+!'$$'."&+)"')!"&+)"')'+!%',$."$$$0)."+!)1"& ,&"+*&coiled that will be activated on site. These units will remain till the ICE has completely melted.

    SECTION THROUGH MOULD

    CONSTRUCTION DETAILS

    COMPONENT A

    STEEL RIVET CONNECTION

    COMPONENT A

    WELDED JOINT

    CONNECTION OF STEEL MOULDS

    CONNECTION BETWEEN COMPONENTS ')#"& ."+! *+$ "-* !" ! 2/""$"+0 "& +)%*' "+* (($"+"'& & )*'$,+"'& +' *+),+,)$ '&&+"'&* 0 *+,0"& "))+technology, they have employed rivets to their joints and connections through the aircraft. These rivets are double layered and are air tight. Meaning to say that there is no escape of pressure and water outgress. With this in mind a pressure valve would be situated ++!"$$(++!+'('!'%('&&+$$'."& ()**,)+')$*)'%+!/(&"& 2,""&*,()''$+%()+,)*

    JOINERY OF STEEL COMPONENTS

    69 70

    CONSTRUCTION DETAILS

    RIVETED CONNECTIONS

    MOULD PART A

    ETFE INFLATED INTERIOR BUFFER

    FILL CAP

    HOLLOW SPACE, WATER INFILL

    CONSTRUCTION.DETAILS

    SECTION THROUGH STEEL MOULD!%',$."$$)"+"&+'*+$()+*+!*()+*."$$**%$"&+.'(!**!"&+)"')."$$!-"&2+$*current material till a biodegradable safe material can be found that dissipates after the casting has been completed. The ETFE will have *#$+$*+$)%+'*,((')++!*!(&)+!'$$'."&+)"')!"&+)"')'+!%',$."$$$0)."+!)1"& ,&"+*&coiled that will be activated on site. These units will remain till the ICE has completely melted.

    SECTION THROUGH MOULD

    CONSTRUCTION DETAILS

    COMPONENT A

    STEEL RIVET CONNECTION

    COMPONENT A

    WELDED JOINT

    CONNECTION OF STEEL MOULDS

    CONNECTION BETWEEN COMPONENTS ')#"& ."+! *+$ "-* !" ! 2/""$"+0 "& +)%*' "+* (($"+"'& & )*'$,+"'& +' *+),+,)$ '&&+"'&* 0 *+,0"& "))+technology, they have employed rivets to their joints and connections through the aircraft. These rivets are double layered and are air tight. Meaning to say that there is no escape of pressure and water outgress. With this in mind a pressure valve would be situated ++!"$$(++!+'('!'%('&&+$$'."& ()**,)+')$*)'%+!/(&"& 2,""&*,()''$+%()+,)*

    JOINERY OF STEEL COMPONENTS

    69 70

    SITE PLAN

    SITE C

    INBOUND

    GEELON

    G TRAFFI

    C

    SITE A

    INBOUND MELBOURNE, W

    ERRIBEE

    SITE B

    IN BOU

    ND WY

    NDHAM

    CITY

    OUT-

    OUT BOUND MELB

    OURNE

    SPACE FO

    R FUTUR

    E GROW

    TH

    SAPCE FOR FUT

    URE GROWTH

    N

    SITE .PLANPROJECT WYNDHAM CITY GATEWAY

    LOCATION WESTERN EXCHANGE, WERRIBEE

    SITE PLAN 1:2000

    SITE PLAN

    INBOUND - WYNDHAM CITY / MELBOURNE TRAFFIC VIEW

    65 66

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION LOGIC

    DIGITAL MODELING POST PREFABRICATION TRANSPORTATION

    CONSTRUCTION PROCESS

    ASSEMBLY OF STEEL MOULDS

    FILLING MOULDS WITH WATER COMPLETED ICE INSTALLATION

    FURTHER DEVELOPMENT %!&"*#"$'$&$ ##"+"!#!"!+resolved simple agglomerative patterns, but could not attempt to take on more challenging forms. Such forms that could be easily generated )& %$#&! !! & "$ &" " ' "$ " #*With the packing of these forms, manual packing is not a feasible and & ,!$"%%&&(!& $ !"$& "was applied as a basic parametric solution to the form of the Gateway. By applying a marriage of systems and construction logic, and rule based algorithm was developed that enabled the formation of the components in 3dimensional form. The Algorithm gave way to holes, !%!" #*+$!&"!&)"$%

    CONSTRUCTION PROCESS"!%&$'&"!"&!%&&"!" !%)&&,!%&+ "%!,%$(!&" &$%'##$)" )#$"' & $& &$% "$! &" %! %#,&"!%The fabricated moulds will then be transported to the site. The moulds measure 2.5m in diameter, meaning that transportation should not be an issue as trucks width is 3.6 m. After transportation cranes and cherry pickers will be hired to aid the installation of these moulds which will be done manually with riveted joints. After %% ! & !%&&"!)&$ &$'%) , & "'% '#Cooler coils installed within each mould will be the cooling element for ice formation. After a period of time the moulds will be removed by faces, leaving the ice within it as the Installation.

    RULE BASED ALGORITHMThe design had to b

    .FORM RULE BASED

    71 72

    CONSTRUCTION DETAILS

    RIVETED CONNECTIONS

    MOULD PART A

    ETFE INFLATED INTERIOR BUFFER

    FILL CAP

    HOLLOW SPACE, WATER INFILL

    CONSTRUCTION.DETAILS

    SECTION THROUGH STEEL MOULD!%',$."$$)"+"&+'*+$()+*+!*()+*."$$**%$"&+.'(!**!"&+)"')."$$!-"&2+$*current material till a biodegradable safe material can be found that dissipates after the casting has been completed. The ETFE will have *#$+$*+$)%+'*,((')++!*!(&)+!'$$'."&+)"')!"&+)"')'+!%',$."$$$0)."+!)1"& ,&"+*&coiled that will be activated on site. These units will remain till the ICE has completely melted.

    SECTION THROUGH MOULD

    CONSTRUCTION DETAILS

    COMPONENT A

    STEEL RIVET CONNECTION

    COMPONENT A

    WELDED JOINT

    CONNECTION OF STEEL MOULDS

    CONNECTION BETWEEN COMPONENTS ')#"& ."+! *+$ "-* !" ! 2/""$"+0 "& +)%*' "+* (($"+"'& & )*'$,+"'& +' *+),+,)$ '&&+"'&* 0 *+,0"& "))+technology, they have employed rivets to their joints and connections through the aircraft. These rivets are double layered and are air tight. Meaning to say that there is no escape of pressure and water outgress. With this in mind a pressure valve would be situated ++!"$$(++!+'('!'%('&&+$$'."& ()**,)+')$*)'%+!/(&"& 2,""&*,()''$+%()+,)*

    JOINERY OF STEEL COMPONENTS

    69 70

    CONSTRUCTION DETAILS

    RIVETED CONNECTIONS

    MOULD PART A

    ETFE INFLATED INTERIOR BUFFER

    FILL CAP

    HOLLOW SPACE, WATER INFILL

    CONSTRUCTION.DETAILS

    SECTION THROUGH STEEL MOULD!%',$."$$)"+"&+'*+$()+*+!*()+*."$$**%$"&+.'(!**!"&+)"')."$$!-"&2+$*current material till a biodegradable safe material can be found that dissipates after the casting has been completed. The ETFE will have *#$+$*+$)%+'*,((')++!*!(&)+!'$$'."&+)"')!"&+)"')'+!%',$."$$$0)."+!)1"& ,&"+*&coiled that will be activated on site. These units will remain till the ICE has completely melted.

    SECTION THROUGH MOULD

    CONSTRUCTION DETAILS

    COMPONENT A

    STEEL RIVET CONNECTION

    COMPONENT A

    WELDED JOINT

    CONNECTION OF STEEL MOULDS

    CONNECTION BETWEEN COMPONENTS ')#"& ."+! *+$ "-* !" ! 2/""$"+0 "& +)%*' "+* (($"+"'& & )*'$,+"'& +' *+),+,)$ '&&+"'&* 0 *+,0"& "))+technology, they have employed rivets to their joints and connections through the aircraft. These rivets are double layered and are air tight. Meaning to say that there is no escape of pressure and water outgress. With this in mind a pressure valve would be situated ++!"$$(++!+'('!'%('&&+$$'."& ()**,)+')$*)'%+!/(&"& 2,""&*,()''$+%()+,)*

    JOINERY OF STEEL COMPONENTS

    69 70

  • DISCOVERY SPACE 1

    OFFICE

    RECEPTION

    STORAGE

    ENTRANCE

    EXIT

    B

    B

    A

    A

    DISCOVERY SPACE 3

    DISCOVERY SPACE 1

    DISABLED TOILETS

    FEMALE TOILETS

    MALE TOILETS

    B

    B

    A

    A

    MALE TOILETS

    FEMALE TOILETS

    B

    B

    A

    A

    B

    B

    A

    A

    B1 L1 L2 L3

    unearthing

    N

    HERRING ISLAND

    SITE PLAN

    A journey through the geological landscape and exploring the evolution of the island.

    PLANS

    Exit

    SOUTH ELEVATION

    2515 20

    vegetation

    proposed pathway

    secondary path

    primary path

    bbq shed

    landing site

    SCALE 1:500

    5 100

    N

    NORTH ELEVATION WEST ELEVATION

    Princes Bridge

    Yarra cuto

    VISITOR FLOW DIAGRAM

    DISCOVERY CENTRE FOR PARKS VICTORIAPARTIThe layers of the strata are relative to time and the evolution of the island in both human and non-human processes, carrying heavy inuence in the design process and nal outcome of the EchelonThe presence of fossilised nautili, intermittent within Silurian marine sandstone, is a precedent for the formof the Echelon.

    The island has undergone many changes throughout its evolutionary history from its beginning, as a basaltic ood plain to its current reshaped form as Herring Island. The current landscape of the island does not portrayits past in much detail. The propsition to create the Echelon would present an opportunity to uncover thegeological landscape through its documentation and depiction of the islands natural history and its locality in relation to the islands evolution in a chronological sequence.

    The exploration of the Echelon will enable visitors to unearth a deeper understanding into the layers of the island

    SOIL PROFILES

    EVOLUTION OF THE ISLAND

    GEO

    LOG

    Y

    NAUTILI, SIGNIFICANCE TO ISLANDS GEOLOGY THE DISCOVERY CENTRE AS A SYMBOLIC SCULPTURAL FORM

    53 4SCALE 1:100 1 20

    53 4

    SCALE 1:100

    1 20

    DISCOVERY SPACE 2

    DISCOVERY SPACE 4

    STAGE

    SEATING

    ATRIUMATRIUMATRIUM

    PATHWAY

    PATHWAYPATHWAY

    PATHWAYPATHWAY PATHWAY

    PATHWAY

    10m @

    1:20

    MARI

    BYRN

    ONG

    RIVE

    R

    RL +

    0.00

    EXIS

    TING

    PATH

    RL +

    1.00

    SCULPTURE LAWNRL + 2.00

    RL + 2.00

    WATER POND

    WL + 5.000

    WBL +4.600

    PAVED LANERL + 5.00

    WAT

    ER P

    ON

    D

    WL

    + 7.

    00

    WBL

    +6.

    60

    WATE

    R PO

    ND

    WL +

    9.00

    WBL

    +8.60

    WAT

    ER P

    OND

    WL +

    5.00

    WBL

    +4.

    60

    WAT

    ER P

    OND

    WL +

    8.00

    WBL

    +7.

    60

    HANG

    ING

    POOL

    WL +

    12.0

    0W

    BL +

    11.6

    0

    UPPER P

    ALTFORM

    RL + 12.0

    0

    ENTR

    Y LE

    VEL

    RL +

    12.

    00

    02:1

    @

    m01

    10m @ 1:20

    10m @ 1:20

    10m @

    1:20

    10m @

    1:20

    10m @

    1:20

    02:1

    @

    m01

    10m

    @ 1:2

    0

    RFL +17

    .08

    FFL + 13

    .60

    PBL+ 12

    .00

    RFL +17

    .08

    FFL + 13

    .60

    PBL+ 12

    .00

    RFL +17

    .08

    FFL +13.

    60

    PBL +5

    .00

    RFL +17

    .08

    FFL +13.

    60

    PBL +5

    .00

    TFL +12.

    96

    PBL +11

    .96

    TFL +12.

    96

    PBL +12

    .00

    TFL +12.

    96

    PBL +11

    .96

    TFL +12.

    96

    PBL +12

    .00

    12

    13

    1110

    98

    76

    54

    3

    21

    1 2 3

    +1.5

    0

    +2.00

    +2.50

    +4.00

    +3.5

    0

    +6.00

    +7.00

    +9.00

    +10.00

    +12.00

    +12.50

    +8.00

    +3.00

    +4.0

    0

    +3.0

    0

    +5.0

    0

    +6.00

    +7.00

    +9.00

    +10.00

    +11.00

    +11.50

    +12.00

    +2.0

    0

    +1.50

    +2.00+3.00

    +4.00

    +5.00

    +6.00

    +7.00

    +9.00

    +10.00

    +10.00

    +11.00

    +11.00

    +11.50

    +12.00

    +11.96

    +11.50+11.46

    +11.46

    +10.96

    +10.96

    +10.00

    +9.96

    +9.00+8.96

    +8.96

    +5.96

    +6.96

    +6.96

    +7.00

    +5.96

    +6.00

    +5.00

    +4.96

    +4.96

    +4.00

    +3.96+3.96

    +3.00

    +2.96

    +2.00

    +2.00

    +2.50

    +2.50 +2.46

    +3.00

    +3.00

    +3.50

    +4.00

    +4.00

    +5.00

    +5.00

    +6.00

    +6.00

    +7.00+6.96

    +6.96+7.00

    +8.00

    +9.00+8.96

    +8.96 +9.00

    +10.00+9.96

    +10.96 +11.00

    +12.00

    +12.00

    +12.00

    +12.50

    +11.96

    +11.96

    +11.96

    +12.46

    +7.96

    +5.96

    +4.96

    +5.96+4.96

    +3.96

    +3.96

    +3.46+3.46

    +3.50

    +2.96+2.96

    +2.46

    +1.96

    +1.96

    +2.96

    +1.96

    +1.96

    +2.00

    +1.46

    +1.46

    +1.50

    SCULPTURE LAWN

    TERRAC

    E

    LEVEL

    RL + 12.9

    6

    PAVILIO

    N

    ROOF

    HEIGHT

    RL + 17.0

    8

    DISCOVERY SPACE 1

    OFFICE

    RECEPTION

    STORAGE

    ENTRANCE

    EXIT

    B

    B

    A

    A

    DISCOVERY SPACE 3

    DISCOVERY SPACE 1

    DISABLED TOILETS

    FEMALE TOILETS

    MALE TOILETS

    B

    B

    A

    A

    MALE TOILETS

    FEMALE TOILETS

    B

    B

    A

    A

    B

    B

    A

    A

    B1 L1 L2 L3

    unearthing

    N

    HERRING ISLAND

    SITE PLAN

    A journey through the geological landscape and exploring the evolution of the island.

    PLANS

    Exit

    SOUTH ELEVATION

    2515 20

    vegetation

    proposed pathway

    secondary path

    primary path

    bbq shed

    landing site

    SCALE 1:500

    5 100

    N

    NORTH ELEVATION WEST ELEVATION

    Princes Bridge

    Yarra cuto

    VISITOR FLOW DIAGRAM

    DISCOVERY CENTRE FOR PARKS VICTORIAPARTIThe layers of the strata are relative to time and the evolution of the island in both human and non-human processes, carrying heavy inuence in the design process and nal outcome of the EchelonThe presence of fossilised nautili, intermittent within Silurian marine sandstone, is a precedent for the formof the Echelon.

    The island has undergone many changes throughout its evolutionary history from its beginning, as a basaltic ood plain to its current reshaped form as Herring Island. The current landscape of the island does not portrayits past in much detail. The propsition to create the Echelon would present an opportunity to uncover thegeological landscape through its documentation and depiction of the islands natural history and its locality in relation to the islands evolution in a chronological sequence.

    The exploration of the Echelon will enable visitors to unearth a deeper understanding into the layers of the island

    SOIL PROFILES

    EVOLUTION OF THE ISLAND

    GEO

    LOG

    Y

    NAUTILI, SIGNIFICANCE TO ISLANDS GEOLOGY THE DISCOVERY CENTRE AS A SYMBOLIC SCULPTURAL FORM

    53 4SCALE 1:100 1 20

    53 4

    SCALE 1:100

    1 20

    DISCOVERY SPACE 2

    DISCOVERY SPACE 4

    STAGE

    SEATING

    ATRIUMATRIUMATRIUM

    PATHWAY

    PATHWAYPATHWAY

    PATHWAYPATHWAY PATHWAY

    PATHWAY

    4.5 Million Population of Metropolitan Melbourne

    100,000 CarsAvg. number of cars added to the roads of Melbourne No Cars, exception certain Vehicles*

    $7,000 (min)Families save money for more essential needs

    50 HospitalsCurrent Hospitals

    40To reach required ratio

    31 BillionSaved Annual Running Costs

    2013 2014 2012 2011

    15,000Data as indicated by ABS census 2013

    300 Routes

    4.4 MillionData as indicated by ABS census 2013

    0.97 0.97 Car to Pop. Ratio

    $ 55% 500 Trams245 km of Track,28 Routes

    16 Lines 28 Routes

    Project Maya was the Final intervention for a 2nd year Landscape studio that primarily focused on grading, slopes and how the landscape can be manipulated, through various techniques to achieve an aesthetic appearance and compositional form. The Farnsworth House the architectural master piece that was used as the pavilion for which the intervention would be associated with on site. The brief required a landscape intervention that used the techniques of cut, fill, cut & fill and water retention as a means of creating a response to the site and the pavilion.The landscape was remoulded from its linear constriction to a organic formation in the landscape. The intention was to create a notion of transparency, illusion and integration. These ideas directly relate to the Farnsworth House and how it asserts a sense of transparency and integration of the landscape and its surroundings through its fenestrations. This idea was extrapolated to one word being illusion. The notion of the landscape being able to elude its visitors and create a surreal experience was my focus for this project. The pathways and ramps deflect from each other in a distortion of the landscape. Ramps descend beneath pools of water and ponds of retained rain water create a mirage of reflection and constant movement.

    Unearthing was the first Architecture studio project. The site is located at Herring island, or what was used to be known as Como island. The brief required a discovery center that would contain several exhibition spaces that would be open to the public. These exhibition spaces would exhibit the islands history, geology and current usages as an art park. The notion of layering and strata was my key focus in the design and program of the building. By studying the strata at Herring Island and the types arrangement of soil profiles aided my massing conceptualization of the spaces which gave rise to the form of the building. The circulation highlights the layering of the programs and functions of the building. The east and western facades would be cladded in ceramic tiles and would have thermal mass properties creating a cool and controlled temperate climate within the building. The spaces were large voids that would correlate with the monumentality of its exterior within.

    Our task for the AA SummerMake Course at Hooke Park was to create/design a musical instrument. Three teams of 5 had to design a musical instrument with the intentions of playing it in symphony of each other. The site was a sloped open valley over looking the Dorset country side and bordered by 40ft pine trees creating an intriguing acoustic space.

    The intent of this course is to prompt and nurture design without drawing but through resolution of construction as you progress through constructions. By making numerous iterations and prototypes we came to a final outcome of a tower like structure. Ats its peak it would have a turbine that will harness the power of the wind to move the internal gears that will create an inconsistent and ever changing roaring sound. The design is centred upon sound which would be driven and derived from string and percussion. Studying the futurists inventions and their revolutionary sound-box, the intoner, gave us insight as to how to generate sound in an acoustically sound enclosure which can be amplified through a diaphragm and external cone. We then took this technology and expanded upon experience and how the entire design could be an instrument it self. The image on the right shows the 5m high structure which is siting on poles has a semi enclosed space beneath the gear box where sound would be amplified out. Coupled with the echoing and reverberation the sound is screechy and quirky, it sounds like a creature. Upon first glance the cladding feature which became a decorative element give a false impression of a creature with numerous legs walking along the forest floor at Hooke Park.

    The 20 Minute City was a competition led by the University of Melbourne during its festival of ideas week. The brief focused on Melbourne and urged entrants to envision the city in 2050, tackling issues such as population growth, housing, employment, transportation, infrastructure, energy etc. Our proposal was based on extensive research and statistics about Melbournes current infrastructure and future growth patterns. We wanted to put forth a manifesto for the city in the way we should approach the next 40 years of growth. We proposed the removal of cars and focused on public transport network, with cars of the road, the average Australian would be saving $7000 and more every year, annual savings of around $31 billion. Money that would be put toward the health, education and public needs. We envisaged a decentralisation of the CBD by creating satellite nodes, activity hubs in already well established suburbs that would be connected by high-speed rail and a new transport network, creating a 20 minute city. A City where all the essential needs will be accessible within a 20 minute time frame by either walking or public transport.

    Landscape Studio 3

    Architecture Studio 1

    SummerMake Studio, AA, London

    Festival of Ideas Competiiton Winner,

    PROJECT MAYA

    UNEARTHING

    MONSTER OF HOOKE

    A 20 MINUTE CITY

  • A laser cut model, which has a contoured/layered form modeled exhibiting the complex volume that is contained within the structure. The skin of the building acts as a shading device as well as a veil, as seen in the model photos of the different lighting and shadow conditions created by the ellaborate skin pattern.

    Material and weathering effects was amoung many tests that were conducted as part of material studies. It was interesting to see the effects of weather and time, this became a driving force behind the conceptual exploration for that particular studio. Ice was used as a medium for mmodel making. Plastic resin was used as mould for the ice tests. Model making became a tool of exploration and testing.

    During my year out at HASSELL I have had the opportunity to make and engage with various kinds of model making. The pink foam models, were a few of many model made for the conceptual stage for a perfomance arts centre. Model making informed the final form and massing. I have learnt that model making can be used as an efective tool in the design process, whether it be form exploration or massing studies, detail studies, material studeis or even scale studies. One such model was the urban RainForrest, which was an interesting explorative model of a forrest within a forecourt of a building.

    Architecture Studio 4

    Architecture Studio 3

    HASSELL

    Romance of Machines Model

    Frozen Symphony Material Studies

    Model Making At HASSELL

    MATERIAL EFFECTS

    STUDIOAIR 2012 ARCHITECTURAL CONSCIOUSNESS

    WEATHERING EFFECTS

    MATERIAL EFFECTS

    STUDIOAIR 2012 ARCHITECTURAL CONSCIOUSNESS

    MATERIALITY AND THE EFFECTS OF AIR

    After fabricating a Perspex prototype y for experimentation, it was subjected to the heat as a substitute for acid rain and weathering effects that simulate the disintegration of materials under chemicals in the air. The heat simulates a rapid acceleration of this effect. This is particularly interesting in showing the effects of time. The prototype is deformed displaying very intriguing form and complex material composition. As seen in the vector drawings on the opposite page. The strength of the material also reflects the nature of the degradation and the way in which it reacts and rearranges its structural composition. This informed further design process in the selection of materials for the final proposal.

    The next Prototype was casted from the moulds in the fabricated material. Wax was used to fill the moulds. The wax was brittle and delicate, fragile and heat sensitive. The addition of heat began to rapidly dissipate the form of the prototype back into its liquid form. With an open expanse area, direct sunlight can warp and deform material and even the temperature in the air can cause deformation. These experiments are interesting in how weathering effects which have been simulated in accelerating these effects with regards to time. It demonstrates what effects the possible design outcomes may have.

    1

    2

    DEFORMED FORMFABRICATED FORM

    49 50

    MATERIAL EFFECTS

    STUDIOAIR 2012 ARCHITECTURAL CONSCIOUSNESS

    WEATHERING EFFECTS

    MATERIAL EFFECTS

    STUDIOAIR 2012 ARCHITECTURAL CONSCIOUSNESS

    MATERIALITY AND THE EFFECTS OF AIR

    After fabricating a Perspex prototype y for experimentation, it was subjected to the heat as a substitute for acid rain and weathering effects that simulate the disintegration of materials under chemicals in the air. The heat simulates a rapid acceleration of this effect. This is particularly interesting in showing the effects of time. The prototype is deformed displaying very intriguing form and complex material composition. As seen in the vector drawings on the opposite page. The strength of the material also reflects the nature of the degradation and the way in which it reacts and rearranges its structural composition. This informed further design process in the selection of materials for the final proposal.

    The next Prototype was casted from the moulds in the fabricated material. Wax was used to fill the moulds. The wax was brittle and delicate, fragile and heat sensitive. The addition of heat began to rapidly dissipate the form of the prototype back into its liquid form. With an open expanse area, direct sunlight can warp and deform material and even the temperature in the air can cause deformation. These experiments are interesting in how weathering effects which have been simulated in accelerating these effects with regards to time. It demonstrates what effects the possible design outcomes may have.

    1

    2

    DEFORMED FORMFABRICATED FORM

    49 50

  • FLINDERS ST STATIONINTERNATIONAL DESIGN COMPETITION

    PHASE 2 SUBMISSION

    HASSELLHERZOG & DE MEURON

    VISUALISATIONS DONE BY HASSELL

    The State Government of Victoria had staged an international design competition, seeking innovative design proposals that would reinvigorate the historic Flinders Street Station, improve its transport function and unlock the urban design and development potential of the precinct. The station is one of Australias most important heritage sites and one of the nations busiest train stations. These factors create a complex mix of demands and priorities on the site and its wider precinct. The competition therefore requires a design response that balances boldness of vision with a careful attention to the many opportunities and challenges of the station.

    A rejuvenated Flinders Street Station and precinct will act as an urban catalyst, playing a critical strategic role in enhancing essential transport services and integrating an appropriate mix of uses for a growing city. It will also play a vital role in strengthening connections between the city and the station, and beyond to the Yarra River and its expanding arts and sports precincts to the south and south-east.The design competition aims to set an international benchmark in heritage conservation, adaptive re-use, sustainable urbanism and high-quality architecture and urban design, adding to a legacy of award winning public buildings and spaces in Melbourne.

    To summarise our proposal, the proposed new concourse is a reaction of the horizontality with respect to the fabric of the old station and historic administration building. Creating new civic spaces and increased amenity to the transport function, whislt creating opportunity to extend the arts precinct with the establishment of the Oceanic and aboriginal Art Gallery.

  • Within the compounds of The University of Melbourne Parkville Campus is the faculty of MSLE, which is located on Tin Alley and Royal Parade. This project was a strategic brief to ascertain the feasibility of relocating the faculties regional campuses at Parkville. The project was constrained by 2 existing buildings, a 70s refurbished, 30s newly refurbished non heritage building and also the Systems Garden, a 180 year old botanical garden. With extensive analysis and research conducted, various massing and physical model studies were done to explore the possibilities of the projects principle objectives. The outcome resulted in partial demolishment, reuse of existing space and new build. With a focus on the effective utilisation of labs, workspace and office the proposed building is configured to respond to these spatial necessities

    Located in the City of Geelong, the performing arts centre will be a focal point for the arts in Geelong.This project was at a conceptual design stage. Having joined this project halfway through the stage of design process, there was fixed program being the two existing theatres and given the topography of the site reconfiguration of these spaces was not viable. Hence we conducted extensive model making and mass studies to ascertain a suitable envelope that will encapsulate the form whislt being respectful to its surrounding context. The final design was based and informed on model studies.

    The project was centred upon the idea of revitalising the Docklands area of Melbourne by introducing a environmental building a leader in its own right that would resemble and represent the image of the client Medibank. The building would have an actively green facade with a big emphasis on sustainable work practices. 720 Bourke St, was in construction and design phase when I had joined the project. I was actively involved in the documentation process and had been given the opportunity to engage with several aspects of the design and construction process. This was a very insightful and fruitful experience.

    Melbourne School of Land and Environment

    Geelong Performing Ars Centre

    Mediank

    MSLE

    GPAC

    720 Bourke St