EC/EC process measurement in TGV experiment

16
P. Cermak Rez near Prague, December 2005 EC/EC process measurement in TGV experiment For TGV collaboration: JINR Dubna, Russia CTU Prague, Czech Republic CSNSM Orsay, France RRC - Kurchatov Institute Moscow, Russia CU Bratislava, Slovakia P. Čermák IEAP CTU in Prague

description

For TGV collaboration: JINR Dubna, Russia CTU Prague, Czech Republic CSNSM Orsay, France RRC - Kurchatov Institute Moscow, Russia CU Bratislava, Slovakia. EC/EC process measurement in TGV experiment. P. Č erm á k IEAP CTU in Prague. Outline. TGV I TGV II - PowerPoint PPT Presentation

Transcript of EC/EC process measurement in TGV experiment

Page 1: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

EC/EC process measurement in TGV

experiment

For TGV collaboration:

JINR Dubna, RussiaCTU Prague, Czech Republic

CSNSM Orsay, FranceRRC - Kurchatov Institute Moscow, Russia

CU Bratislava, Slovakia

P. ČermákIEAP CTU in Prague

Page 2: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

Outline

● TGV I TGV II● TGV II measurements overview● Data processing ● Example● Summary

Page 3: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV

• Telescope Germanium Vertical (stack of 16 (32) HPGe detectors)

• aims at the study of double beta processes of 48Ca and 106Cd (double beta decay, double electron capture)

• started in 1996

• located in Modane Underground Laboratory (France)

Page 4: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV I

yT 193.33.1

22/1 10)2.4(

● 16 HPGe detectors of planar type, diameter 40mm, thickness 6mm

● 8x 48Ca foils

● 8x Ca-natural foils

~ 1.35 x 1022 of 48Ca atoms (1.08 g)

)%90(105.1 2102/1 CLyT

Page 5: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV I

open cryostat assembled cryostat, PAs

Page 6: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV II

• to improve 48Ca result obtained

by TGV I

• to investigate processes in 106Cd

(to focus on EC/EC

channel)

),(22 10646

10648 raysXPdCde e

purpose:

2EC/EC:

keVEkeVkeV XECEC 2519:ROI,2778Q /

Page 7: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV II spectrometer

Dewar

cryostatPbCu

borated polyethylene

PA

SM

1m

Page 8: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

Detector part of the TGV II

32 HPGe planar detectors 60 mm x 6 mm with sensitive volume: 20.4 cm2 x 6 mm Total sensitive volume: 400 cm3

Total mass of detectors: 3 kg Total area of samples : 330 cm2

Total mass of sample(s) : 10 25 g E-resolution : 3 4 keV @ 60Co LE-threshold : down to 10 keV Double beta emitters: - samples of 48Ca:

CaF2 + CH2 ( 75 mg / cm2 ) - samples of 106Cd:

106Cd (~ 50 µm )

U+Th<0.1 ppb

Page 9: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV II

pedestal open cryostat

Page 10: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

TGV II

assembled cryostat, PAs

Page 11: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

Run overview

• 12/03 – 2/04… background, empty cryostat, 1363 hours• 3/04 – 5/04… 13x 106Cd + 3x Cd-nat., 1768 hours

113mCd,

14 years,

Q=590 keV

Page 12: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

● 5/04 – 6/04… 12x 106Cd + 4x Cd-nat., 328 hours● 6/04 – 10/04… 12x 106Cd + 4x Cd-nat., 2033 hours● 11/04 – 1/05… 16x Cd-nat., 903 hours● 2/05 – …… 12x 106Cd + 4x Cd-nat., new sources:

106Cd ... 75.00% 112Cd ... 6.18%108Cd ... 0.80% 113Cd ... 2.77%110Cd ... 4.47% 114Cd ... 6.18%111Cd ... 3.55% 116Cd ... 1.05%

Run overview (2)

Page 13: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

Data processing

1. What we look for: X-rays @21keV from 106Pd

Page 14: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

Data processing (2)2. What we have: X-rays @23keV from 106Cd

106Cd, 3736 hours

Page 15: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

3. Zoom to 20keV region (after background reduction)

3736 hours, 106Cd

Energy windows: (16-19) keV(19-22) keV(28-31) keV

5533 hours, 106Cd

Page 16: EC/EC process measurement in TGV experiment

P. Cermak Rez near Prague, December 2005

Summary

• Full configuration operation (32 channels)

• Background, calibration, admixtures in sources

• Basic background measurements done (empty cryostat, natural Cd)

• From February 2005 long-term measurement with 106Cd

• Negotiation on 106Cd lease extension

First direct measurement of EC/EC process in 106Cd (~ 6 x 1019 years)