EC6982 South Acton CPZ Consultation 4pp v3 · 1 Council Tax Exemption Consultation EC6982 PrintOut...
Transcript of EC6982 South Acton CPZ Consultation 4pp v3 · 1 Council Tax Exemption Consultation EC6982 PrintOut...
1 Council Tax Exemption Consultation
EC69
82 P
rintO
ut D
esig
n &
Pro
duct
ion
20 May 2016
£
EC6982 South Acton CPZ Consultation 4pp_v3.indd 1-2 21/03/2016 21:58
3 Council Tax Exemption Consultation 4 Council Tax Exemption Consultation
CO
NS
ULTA
TION
DR
AW
ING
SO
UTH
AC
TON
CO
NTR
OLLE
D P
AR
KIN
G ZO
NE
(CP
Z)
© C
rown copyright and database rights
2014 Ordnance Survey LA
0100019807
Controlled Parking Zone (CPZ) ‐ FAQ
We have tried to answer some commonly asked ques ons about how Controlled Parking Zones work, as well some ques ons that may arise specically to your zone. If you have any addi onal queries, or require clarica on on any of the informa on provided within this consulta on document, you may contact us using the details provided on the next page.
Zone Entry Zone Exit
What about yellow lines?
Double yellow lines are usually placed around junc�ons and operate 24 hours a day ‐ ’No Wai ng at Any me’. Any Single yellow lines in the zone will operate during the same �mes as the CPZ. No signs are required for the single yellow lines; road users are advised to refer to the zone entry sign for the opera�ng �mes of single yellow lines.
When will the CPZ operate?
The opera�onal �mes of the zone are dependent on the results of this consulta�on. Residents are asked to iden�fy what they feel are the main cause of parking pressures in the area. From the responses received, we are able to determine the most suitable opera�ng hours to tackle the cause.
Can the parking controls be changed once they have been introduced?
Once the CPZ is implemented, we will monitor its opera�on for the rst few months. During this �me, we welcome residents to raise any concerns they may have or requests for restric�ons to be changed. Certain restric�ons may then be altered if necessary and/or feasible.
Are CPZs just a way for the Council to generate income?
This is a common misconcep�on. By law, any money raised from implemen�ng a CPZ must be reinvested in transport related improvements throughout the borough. This includes general highway maintenance and road resurfacing.
Permit Holders
Please note, the mes shown on these signs are for example only. The opera ng mes of the zone will be determined by this consulta on. !
Where will zone operate?
Please refer to the enclosed plan. The roads highlighted in yellow will form the zone. The parking bays highlighted in red will be allocated for zone permit holders.
How will I know if I am in the zone?
Zone Entry and Exit signs will be erected around the area to inform road users of when they are entering and exi�ng the zone. Parking bays within the CPZ will be accompanied by Permit Holders signs.
EC6982 South Acton CPZ Consultation 4pp_v3.indd 3-4 21/03/2016 21:58
Consulta�on Ques�onnaire South Acton Area Controlled Parking Zone
Please ll in this ques�onnaire and return in in the prepaid envelope provided
Name:
Address:
Postcode:
If you are responding on behalf of a business, please write your business name here:
1. Are you eligible for a parking permit?
Yes No
2. What do you think is the main cause of the parking pressure in your area?
Please specify below:
Commuters
Shopping Centre / High Street
School / College etc
Business / Industrial Centre
From your response, we will be able to determine the most effec�ve opera�ng �mes for the CPZ. For example, if you feel the main cause of parking pressure is commuters, it may be that 2 hours of opera�on will be sufficient to alleviate this. Whereas being in close proximity to a shopping centre may require a CPZ that operates all day.
Other (please specify)
There is no parking pressure
1645
EC6982 South Acton CPZ Consultation 4pp_v3.indd 5 21/03/2016 21:58
EC69
82 P
rintO
ut D
esig
n &
Pro
duct
ion
We need your comments by 20 May 2016.
EC6982 South Acton CPZ Consultation 4pp_v3.indd 6 21/03/2016 21:58