(E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated 03 ...Oct-15-to... · stack attached to Gas...
Transcript of (E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated 03 ...Oct-15-to... · stack attached to Gas...
(E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated 03-07-2014)
(For the Period 1st
October’15 to 31st
March’16)
FOR
Gas based Captive Power Plant with installed steam & power
capacity of 880 TPH & 195 MW at Dahej Petrochemical Complex
M/s. ONGC Petro Additions Ltd.
Located at - Plot no. Z-1 & Z-83 Dahej SEZ Ltd.
Village-Ambheta, Taluka – Vagra
Dist – Bharuch (Gujarat )
HALF YERALY COMPLIANCE REPORT
TO ENVIRONMENTAL CLEARANCE CONDITIONS
(Period of October 15 to March 16)
Gas based Captive Power Plant with installed steam & power capacity of 880
TPH & 195 MW.
Status of Consent to Establish & Operate from GPCB: Consent to establish was granted by
GPCB vide reference letter CTE Order Ref. No. : GPCB/BRCH/NOC-3498/297116, Dated: 24-10-
2007 and amended letter CTE Order Ref. No. : GPCB/BRCH/NOC-3498/ID-30328/141778,
Dated: 26-03-2013 which was valid up to 14-03-2018.
Consent to establish (Amendment letter-II for setting up of an industrial Plant/activity) was
granted by GPCB, CTE Amendment No. : 73651 (Ref. No. GPCB/BRCH/CCA-154 (3)/ID-
30328/334040), Dated: 07-12-2015.
Status of consolidated consent and Authorization from GPCB: Consolidated Consent &
Authorization (CC&A) was granted by GPCB vide consent order No. : AWH-73652, Dated: 07-
12-2015, which was valid up to 07-07-2020.
CPP Project status :
As on 31.03.2016, the following is the Project status in the form of unit wise progress - Overall Project
Progress: 98.9 % against scheduled 100%.
Sr.
No UNIT EPC
DATE OF
COMMENCEMENT
(ACTUAL &/OR
PLANNED)
DATE OF
COMPLETION
(ACTUAL &/OR
PLANNED)
PROGRESS
STATUS (%) DETAILED PROGRESS REPORT
1.
STEAM
POWER
GENERATION
SYSTEM
[SPTG (2 STG +
2 UB) PHASE I
& (4 GTG + 4
HRSG) PHASE
II]
M/s BHEL
23.09.2010
/
15.04.2011
1st Unit : 15.02xd
.2013
Complete CPP :
15.12.2013
98.9 %
Basic/Detailed Engineering,
Ordering, & Manufacturing are
almost complete.
Overall Physical Progress of 97.6%
achieved against schedule of 100 %
and a backlog of2.4% mainly
attributed because of shortfall in
Engineering (0.1%), Procurement
(0.1%), Construction (0.3%)
& commissioning (46.5%)
contributing overall weighted value
of 0.01%,0.05%, 0.08% &
2.26%respectively Engineering All
drawings (except some O & M
manuals) submitted and approved.
Compliance to Conditions of Environmental Clearance :
Sr.
No.
Point Compliance status
A Specific conditions
i. Only permissible activities shall be carried out
with prior approval in the 1.05 ha of CRZ area.
OPaL assure that Only permissible activities will
be carried out with prior approval in the 1.05 ha
of CRZ area during operation phase if required,
presently 1.05 Ha area is kept as it is.
ii. All the conditions stipulated In the
environmental clearance No. J-
11011/316/2006-IA II (I) dated 21st November,
2007 accorded for the existing projects shall be
Implemented.
Compliance report for all the conditions
stipulated In the environmental clearance No. J-
11011/316/2006-IA II (I) dated 21st November,
2007 accorded for the existing projects is being
prepared and submitted separately.
iii. Adequate stack height shall be provided to gas
turbine generator, heat recovery steam
generators and boilers. exit velocity of flue
gases shall not be less than 22 m/sec. Low NOx
burners shall be provided to control NOx
emissions.
Details regarding provision of stack height to the
stack attached to Gas Turbine generator, heat
recovery steam generator and utility boilers are
enclosed as Annexure-I.
LOW NOx burners are provided for control of
NOx emission.
iv. Ambient air quality data shall be collected as
per NAAQES standards notified by the Ministry
vide G.S.R. No. 826(E) dated 16th November,
2009. The company shall upload the results of
monitored data on Its website and shall update
the same periodically. It shall simultaneously be
sent to the Regional office of MoEF, the
respective Zonal office of CPCB and Gujarat
Pollution Control Board (GPCB).
Ambient air quality monitoring stations are set up as per GPCB NOC Order dated 23.10.2007 for Parameters like PM10, PM2.5, SO2, NOx, HCl, Cl2, NH3, Hydrocarbon and H2S. NAAQES standards notified by the Ministry vied G.S.R. No. 826(E) dated 16th Nov., 2009, in consultation with GPCB. Continuous monitoring of AAQ has started from
1st December, 2012 (at two fixed location outside
core zone and at two variable locations inside
core zone) and the results of Ambient air quality
monitoring are regularly uploaded on website of
Opal.
The data is also simultaneously being sent to the
Regional office of MoEF, Zonal office of CPCB and
Gujarat Pollution Control Board (GPCB).
The Ambient air quality monitoring reports are
enclosed as Annexure-II.
v. In plant control measures for checking fugitive
emissions from all the vulnerable sources shall
be provided. Fugitive emissions shall be
controlled by providing closed storage, closed
handling & conveyance of chemicals/materials,
multi cyclone separator and water sprinkling
system. Dust suppression system including
water sprinkling system shall be provided at
loading and unloading areas to control dust
emissions. Fugitive emissions in the work zone
environment, product, raw materials storage
area etc. shall be regularly monitored. The
emissions shall conform to the limits stipulated
by the GPCB.
In plant control measure for checking fugitive emission from all the vulnerable sources are implemented. All the raw material and products are handled in closed pipelines wherever required. There is not any dust emission as there is no usage of any solid fuel like coal. Implementation of environmental monitoring program for the whole petrochemical complex including CPP is formulated and implemented. The details of monitoring program and reports of the monitoring are enclosed herewith as Annexure-II. OPaL assures to conform the emission limits
stipulated by GPCB.
vi. The gaseous emissions from DG set shall be
dispersed through adequate stack height as per
CPCB standards. Well-designed acoustic
enclosures for the DG sets and noise emitting
equipment’s to achieve the desirable Insertion
loss viz. 25dB (A) shall be provided.
Provision of adequate stack height is made as per CPCB standards (Stack height = height of the roof + 0.2*(KVA)1/2 ) for the D.G. sets. Provision of Acoustic enclosures are made to achieve the desirable insertion loss viz 25 dB(A).
vii. Total fresh water requirement from GIDC/DSL
water supply shall not exceed 98,400m 3/day.
Total fresh water is not exceeding 98,400
m3/day.
viii. As proposed, Industrial effluent generation
shall not exceed 35,520m3/day. Industrial
effluent shall be treated In ETP. Treated
effluent {14400m 3/day) shall be recycled for
cooling tower make up water and treated
effluent (17520m1/day) shall be reused as DM
plant feed. High TDS effluent stream (3600
m3/day) shall be discharged into Gulf of
Cambay through close pipeline of GIDC after
conforming to the standards prescribed for
the effluent discharge and obtaining permission
from the GPCB. No process effluent shall be
discharged Inland and around the project site.
The industrial wastewater generation is not exceeding 35,520 m3/day. The Waste water Treatment Plant (ECTS) for the Complex is designed to ensure that maximum amount of treated effluent is recycled within the complex. The Effluent Collection and Treatment System (ECTS) also include RO Based Tertiary Treatment section to further process. The treated Effluent is recycled as make-up water to Cooling Towers (around 14400 m3/day) and as DM water (around 17520 m3/day). The effluent considered for discharge to Sea from the complex is not exceeding 3600 m3/day and is meeting the prescribed Quality standards. Domestic effluent is treated in a Separate Package Unit within the Effluent Collection and Treatment System (ECTS) and the treated domestic effluent is recycled back as horticulture water within the premises.
ix. High TDS effluent stream shall be passed
through guard pond. Online pH meter, flow
meter and TOC analyzer shall be installed.
High TDS effluent is passed through the guard
pond and online pH meter, flow meter and TOC
analyzer is provided.
x. Process effluent/any wastewater shall not be
allowed to mix with storm water. Storm water
drain shall be passed through guard pond.
Process effluent discharge and storm water drains are provided separately to avoid mixing of the wastewater with storm water. Oil catcher is provided for storm water drain pipe and the storm water is passed through the guard pond.
xi. Monitoring of surface water quantity and
quality shall also be regularly conducted and
records maintained. The monitored data shall
be submitted to the Ministry regularly. Further,
monitoring points shall be located between the
plant and drainage in the direction of flow of
ground water and records maintained.
Monitoring for heavy metals in ground water
shall be undertaken.
Source of Surface water is GIDC water supply
which is being metered.
Surface water quality and ground water quality is
being monitored at fixed monitoring points with
required parameters considering heavy metals
content on regular basis. Report of analysis is
enclosed herewith as Annexure-II.
xii. The company shall obtain Authorization for
collection, storage and disposal of hazardous
waste under the Hazardous Waste
(Management, Handling and Trans-Boundary
Movement} Rules, 2008 and amended as on
date for management of Hazardous wastes
and prior Permission from GPCB shall be
obtained for disposal of solid / hazardous
waste in the TSDF. Measures shall be taken for
firefighting facilities in case of emergency.
OPaL has obtain Authorization for collection,
storage and disposal of hazardous waste under
the Hazardous Waste (Management, Handling
and Trans-Boundary Movement} Rules, 2008.
The copy of CC&A is enclosed herewith as
Annexure-IX.
OPaL has obtained TSDF membership from
SEPPL, Surat for disposal of Solid/ hazardous
waste and same is enclosed as Annexure-III.
Disaster management plan with firefighting
facilities is considered for OPaL’s petrochemical
complex and details of the same are enclosed as
Annexure- IV.
xiii. The unit shall make the arrangement for
protection of possible fire hazards during
manufacturing process in material handling.
Firefighting system shall be as per the norms.
OPaL has made arrangement for
Protection of possible fire hazards during manufacturing process in material handling.
Firefighting system as per the norms. Details are given in Disaster management plan which is enclosed as Annexure- IV.
xiv. A well designed rain water harvesting system
shall be put in place within six months, which
shall comprise of rain water collection from the
built up and open area In the plant premises.
Rain water harvesting measures is provided for
roof top rainwater harvesting from buildings.
Rain Water from the Process unit areas is
Pumped to the Effluent Collection and Treatment
System (ECTS) and is treated in a dedicated
Contaminated Rain Water Treatment section.
The Treated water is reused as Cooling Tower
Make-up.
xv. ESR schemes identified based on need
assessment shall be implemented in
consultation with the village Panchayat and the
District Administration starting from the
development of project itself. Company shall
provide separate budget for community
development activates and income generating
programmes.
OPaL has initiated various community
development activities and income generating
programs within the Bharuch district under the
Enterprise Social Responsibility Scheme with the
provision of separate budget. Details for the
same are enclosed as Annexure-V.
xvi. An Environmental Cell comprising of at least
one expert. In environmental
science/engineering, occupational health and
social scientist, shall be created preferably at
the project site itself and shall be headed
by an officer of appropriate superiority and
qualification. It shall be ensured that the Head
of the Cell shall directly report to the head of
the organization who would be
accountable for implementation of
environmental regulations and social impact
improvement/mitigation measures.
An Environmental Cell comprising of required personnel /expert has been formed and implemented. The necessary duties and responsibilities are assigned to all members of all level of the Environmental Cell.
xvii. Training shall be Imparted to all employees on
safety and health aspects of chemicals
handling. Pre-employment and routine
periodical medical examinations for all
employees shall be undertaken on regular
basis. Training to all employees on handling of
chemicals shall be imparted. Occupational
health Surveillance of the workers shall be done
on a regular basis and records maintained as
per the Factories Act.
A separate Occupational Health Center is
developed to carry out the different activities of
occupational health services.
Presently Pre-employment and routine periodical medical examinations for employees are being carried out. Also our vendors are strictly complying for construction phase. We shall comply with this condition on commissioning of plant.
In order to take care of the health of the people
working at the site and provide optimal physical
and mental health to all its employees and
workers, OPaL in line with their Occupational
Health Services policy makes it mandatory to all
the Contractors.
OPaL assures to carry out Occupational health
Surveillance of the workers on a regular basis
and records are maintained as per the Factories
Act.
Company has displayed HSE policy all over the
site at conspicuous location for information.
xviii. Green belt shall be developed In 50 ha land out
of the total plant area. Selection of plant
species shall be as per the CPCB guidelines.
A Green Belt of 50.0 m wide all along the complex is provided. The contract for green belt development has been awarded to M/s. Gujarat State Forest Development Corporation for green belt development and maintenance activity.
xix. All the recommendations mentioned in the
rapid risk assessment report, disaster
management plan and safety guidelines shall
be Implemented.
All Recommendations made in the rapid risk
assessment report, disaster management plan
and safety guidelines are complied with.
xx. Provision shall be made for the housing for the
construction labour within the site with all
necessary Infrastructure and facilities such as
fuel for cooking, mobile toilets, safe drinking
water, medical health care, creche etc. The
housing may be In the form of temporary
structure to be removed after the completion
of the project. All the construction wastes shall
be managed so that there is no Impact on the
surrounding environment.
For the construction all necessary Infrastructure
and facilities such as fuel for cooking, mobile
toilets, safe drinking water, medical health care,
creche etc. are provided.
Local labours are hired for construction work.
The construction wastes were managed properly
to avoid any impact on the surrounding
environment.
B General Conditions
i. The project authorities shall strictly adhere to
the stipulations made by the Gujarat Pollution
Control Board.
OPaL assures to comply with this condition.
ii. No further expansion. or modifications in the
plant shall be carried out without prior
approval of the Ministry of Environment and
Forests. In case of deviations or alterations In
the project proposal from those submitted to
this Ministry for clearance, a fresh reference
shall be made to the Ministry to assess the
adequacy of conditions Imposed and to add
additional environmental protection measures
required, if any..
OPaL assures to comply with this condition.
iii. The locations of ambient air quality monitoring
stations shall be decided In consultation with
the State Pollution Control Board (SPCB) and it
shall be ensured that at least one stations is
Installed in the upwind and downwind direction
as well as where maximum ground level
concentrations are anticipated.
Ambient Air quality monitoring station locations are decided in consultation with GPCB with one in the upwind and downwind direction for monitoring of the ambient air quality. Monitoring Plan with location details are enclosed as Annexure-II
iv. The overall noise levels In and around the
plant area shall be kept well within the
standards by providing noise control measures
Including acoustic hoods, silencers, enclosures
etc. on all sources of noise generation. The
ambient noise levels shall conform to the
standards prescribed under Environment
(Protection) Act,1986 Rules,1989 viz. 75 dBA
(day time) and 70 dBA (night time).
Noise control measures like acoustic hoods, silencers, enclosures etc. has been considered in design specification of relevant section of the engineering design and has been provided accordingly for all possible sources of noise generations to meet standards prescribed under EP, Act 1986 requirement.
v. Training shall be Imparted to all employees on
safety and health aspects of chemicals
handling. Pre-employment and routine
periodical medical examinations for all
employees shall be undertaken on regular
basis. Training to all employees on handling of
chemicals shall be imparted.
OPaL assures to comply with this condition throughout the operation phase of the plant. Pre-employment and routine periodical medical examination plan for all employee is being carried out on regular basis
Training to all employees on handling of
chemicals is being/will be imparted on regular
basis.
vi. Usage of Personnel Protection Equipment’s
(P.PEs) by all employees/ workers shall be
ensured.
All employees of the unit are provided with necessary PPEs on their joining. Damaged PPEs are also replaced as per requirement on regular basis as and when required.
OPaL is providing the training for Usage of
Personnel Protection Equipment’s (P.PEs) to all
employees/ workers.
vii. The company shall also comply with all the
environmental protection measures and
safeguards proposed In the documents
submitted to the Ministry. The
recommendations made In the EIA, EMP in
respect of environmental management, risk
mitigation measures and Public Hearing relating
to the project shall be Implemented.
OPaL assures to comply with the condition.
OPaL has implemented the recommendations
made in the EIA, EMP in respect of
environmental management, risk mitigation
measures and Public Hearing relating to the
project.
viii. The company shall undertake all relevant
measures for improving the socio-economic
conditions of the surrounding area. CSR
activities shall be undertaken by Involving local
villages and administration.
Details of CSR initiatives and activities by OPaL are enclosed in Annexure-V.
ix. The company shall undertake eco-
developmental measures including community
well fare measures In the project area for the
overall Improvement of the environment.
OPaL has undertaken eco-development
measures including community well fare
measures in the project area for overall
improvement of the environment.
x. A separate Environmental Management Cell
equipped with full-fledged laboratory facilities
shall be set up to carry out the Environmental
Management and Monitoring functions.
Separate environment management cell equipped with full fledged laboratory facilities is considered to be set up.
xi. The company shall earmark sufficient funds
towards capital cost and recurring cost per
annum to implement the conditions stipulated
by the Ministry of Environment and Forests as
well as the State Government along with
the implementation schedule for all the
conditions stipulated herein. The funds so
earmarked for environment management/
pollution control measures shall not be
diverted for any other purpose.
Funds under a separate budget head have been
earmarked for environmental protection. These
funds are exclusively for environment
management/ pollution control measures and
are not utilized for any other purpose.
xii. A copy of the clearance letter shall be sent
by the project proponent to concerned
Panchayat, Zila Parisad/Municipal Corporation,
Urban local Body and the local NGO, If any,
from who suggestions/ representations ,if any,
were received while processing the proposal.
The acknowledged copy of submitted EC letter
copy to Panchayat, Zila Parisad/Municipal
Corporation, Urban local Body is enclosed as
Annexure- VI.
xiii. The project proponent shall also submit six
monthly reports on the status of compliance of
the stipulated Environmental Clearance
conditions including results of monitored data
(both in hard copies as well as by e-mail) to the
respective Regional Office of MoEF, the
respective Zonal Office of CPCB and the Gujarat
Pollution Control Board. A copy of
Environmental Clearance and six monthly
compliance status reports shall be posted on
the website of the company.
OPaL is complying with this condition and
submitting six monthly reports on the status of
compliance of the stipulated Environmental
Clearance conditions to the concern authorities.
The copy of Environmental Clearance and six
monthly compliance status reports is being
posted on the website of the company.
xiv. The environmental statement for each
financial year ending 31st March in Form-V
as is mandated shall be submitted to the
concerned State Pollution Control Board as
prescribed under the Environment (Protection)
Rules,1986, as amended subsequently, shall
also be put on the website of the company
along with the status of compliance of
environmental clearance conditions and shall
also be sent to the respective Regional Offices
of MoEF by email
OPaL is submitting the Environmental statement
in Form –V for each financial year to respective
authorities and is uploading on the website along
with status of compliance of environmental
clearance conditions.
xv. The project proponent shall Inform the
public that the project has been accorded
environmental clearance by the Ministry and
copies of the clearance letter are available with
the SPCB/Committee and may also be seen at
Website of the Ministry at www.moef.nic.in
This· shall be advertised within seven days
from the date of Issue of the clearance letter, at
least In two local newspapers that are widely
circulated In the region of which one shall be in
the vernacular language of the locality
concerned and a copy of the same shall be
forwarded to the concerned Regional Office of
the Ministry.
OPaL has complied with this condition and a copy
of public notes for obtained EC in two local
newspapers is enclosed as Annexure-VII.
xvi. The project authorities shall inform the
Regional Office as well as the Ministry, the date
of financial closure and final approval of the
project by the concerned authorities and the
date of start of the project.
The date of financial closures - the project is still under commissioning and Overall Project Progress: 98.9 % against scheduled 100%.
Final approval of the project by the concerned authorities - Consolidated Consent & Authorization (CC&A) was granted by GPCB vide consent order No. : AWH-73652, Dated: 07-12-2015
The date of commencing the land
development work.- 05/05/2008
List of Annexure
No. of
Annexure
Name of Annexure
I. Details of Steam and power generation and flue gas stack emission
II. Ambient Air Quality Monitoring Reports, meteorological data along with noise
monitoring and ground water testing reports measured during the period.
III. Copy of TSDF membership
IV. Copy of Disaster management plan with firefighting facilities for OPAL.
V. Details of CSR activities.
VI. The acknowledged copy of submitted EC letter copy to Panchayat, Zila
Parisad/Municipal Corporation, Urban local Body
VII. A copy of public notes for obtained EC in two local newspapers
VIII. Copy of Consent to Established
IX. Copy of Consolidate Consent to Operate