Calorimetria EM a LAr di ATLAS EC Barrel EC CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 1

Transcript of EC Barrel - infn.it fileCSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 2. ID Name Duration...

Calorimetria EM a LAr di ATLAS

EC

Barrel EC

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 1

BarrelBarrel in truck position in pitInfrastructure installation finishedElectronics installation delayed by availability of componentsLV PS:

Delays from manufacturer (MDI)First two proto failed load test (failing SMD capacitor)

FEB: QPLL problem solved but still OTx problems6 month delay: half should be recovered by new production/testing scheduleAll barrel FEBs by August (EC FEBs by November)

Goal: install all electronics before moving to the IP?Cool down in IP:

Start of cool down on 22/11/05Barrel cold (will take 6 weeks) by end of December 2005LArg filling beginning of Jan ‘06Cryo ready for cold tests by mid JanThen cold forever…

Milano involvement:HV system commissioning

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 2

ID Name Duration Start Finish

454 Phase 2c: Barrel Calorimeter 592 days Wed 07-01-04 Fri 05-05-06455 Trucks & Infrastructure 68 days Wed 07-01-04 Fri 09-04-04489 Barrel Calorimeter assembly 222 days Thu 26-02-04 Fri 14-01-05573 Barrel Calorimeter Services, 1st fix on the Truck 320 days Mon 17-05-04 Fri 19-08-05574 Half Barrel services 107 days Mon 17-05-04 Tue 12-10-04575 Install brackets + cable trays on the cylinder 20 days Mon 17-05-04 Fri 11-06-04

576 Cable trays along phi, and along Z in saddle region 30 days Wed 16-06-04 Tue 27-07-04

577 CS pipes + test 10 days Wed 16-06-04 Tue 29-06-04

578 Tile cooling pipes 3 wks Mon 17-05-04 Fri 04-06-04

579 Lar cooling pipes (wait for manifolds) 2 wks Thu 01-07-04 Wed 14-07-04

580 Temporary Barrel Calorimeter cooling stations 4 wks Wed 15-09-04 Tue 12-10-04

581 LAr LV cables 4 days Wed 30-06-04 Mon 05-07-04

582 LAr distribution boxes (star boxes) 2 wks Tue 06-07-04 Mon 19-07-04

583 Trial move of the Barrel (1 m) 5 days Tue 22-03-05 Mon 28-03-05584 Pre-installation of supports for ID and Cryo services in sector 4.5 wks Wed 17-11-04 Fri 17-12-04585 Supports for ID and cryo services, top of barrel 2 wks Fri 01-04-05 Thu 14-04-05586 Inner detector pipes installation 4 mons Tue 01-02-05 Mon 23-05-05587 Calorimeter trays and pipes on the top of barrel 4 wks Mon 03-01-05 Fri 28-01-05588 TileCal local cables installation and pre-installation 4 wks Mon 31-01-05 Fri 25-02-05589 LARG pedestals & infrastructure (FEC etc.) 4 wks Tue 25-01-05 Mon 21-02-05590 Use 1 FEC with beam test equipment 4 wks Mon 07-03-05 Fri 01-04-05591 LARG Electronics boards, local cales and tests 16 wks Mon 02-05-05 Fri 19-08-05592 Diffusion pumps on Barrel in sector 13 2 wks Tue 01-02-05 Mon 14-02-05593 Dump lines on the barrel 2 wks Fri 15-04-05 Thu 28-04-05594 Cryo lines on the barrel (argon and four triple lines) 2 wks Wed 01-06-05 Tue 14-06-05595 FT and insulation vacuum lines on the barrel 1 wk Wed 01-06-05 Tue 07-06-05596 Flexible chain frames in sectors 11,15 and 9 3 wks Mon 02-05-05 Fri 20-05-05597 Cable trays supports on the barrel in Z=0 2 wks Mon 23-05-05 Fri 03-06-05598 Barrel Proximity Cryogenics, 1st fix 243 days Thu 27-05-04 Mon 16-05-05621 HS arches, rails 26 days Tue 02-08-05 Tue 06-09-05626 Barrel Calorimeter moved in 0 days Tue 30-08-05 Tue 30-08-05627 Services along Barrel Cal when in final position 80 days Wed 31-08-05 Tue 20-12-05726 Tile Barrel tests & commissioning 21 days Wed 09-11-05 Wed 07-12-05727 LAr Barrel tests & commissioning 122 days Wed 09-11-05 Fri 05-05-06728 Cryogenics commissioning 72 days Wed 09-11-05 Fri 24-02-06729 Larg delivery, test [37] 5 days Wed 09-11-05 Tue 15-11-05730 Purge inner vessel 2 days Wed 16-11-05 Thu 17-11-05731 Cool-down 33 days Fri 18-11-05 Wed 11-01-06732 Filling 2 days Thu 12-01-06 Fri 13-01-06733 Cryogenic tests 30 days Mon 16-01-06 Fri 24-02-06734 Barrel Side-A: HV and FE electronics commissioning and 20 days Mon 13-03-06 Fri 07-04-06735 Barrel Side-A: HV and FE electronics test from control ro 10 days Mon 13-03-06 Fri 24-03-06736 Barrel Side-A: HV and FE electronics bug fixing: Free ac 10 days Mon 27-03-06 Fri 07-04-06737 Barrel Side-C: HV and FE electronics commissioning and 20 days Mon 10-04-06 Fri 05-05-06738 Barrel Side-C: HV and FE electronics test from control ro 10 days Mon 10-04-06 Fri 21-04-06739 Barrel Side-C: HV and FE electronics bug fixing: Free ac 10 days Mon 24-04-06 Fri 05-05-06740 Solenoid functional test 20 days Thu 12-01-06 Wed 08-02-06741 Phase 2d: Racks, Pipes & Cables 298 days Mon 16-08-04 Wed 19-10-05

Phase 2c: Barrel Calorimeter

Barrel Calorimeter assemblyBarrel Calorimeter Services, 1st fix on the Truck

el serviceson the cylinderand along Z in saddle region

for manifolds)y Barrel Calorimeter cooling stations

(star boxes)22 Mar Trial move of the Barrel (1 m)

Pre-installation of supports for ID and Cryo services in sector 1301 Apr Supports for ID and cryo services, top of barrel

Feb Inner detector pipes installationCalorimeter trays and pipes on the top of barrel

Jan TileCal local cables installation and pre-installationan LARG pedestals & infrastructure (FEC etc.)

07 Mar Use 1 FEC with beam test equipment02 May LARG Electronics boards, local cales and tests

Feb Diffusion pumps on Barrel in sector 1315 Apr Dump lines on the barrel

01 Jun Cryo lines on the barrel (argon and four triple lines)01 Jun FT and insulation vacuum lines on the barrel

02 May Flexible chain frames in sectors 11,15 and 923 May Cable trays supports on the barrel in Z=0

Barrel Proximity Cryogenics, 1st fix26 days HS arches, rails

30 Aug Barrel Calorimeter moved in80 days Services along Barrel Cal when in final position

09 Nov Tile Barrel tests & commissioning122 days LAr Barrel tests & commissioning72 days Cryogenics commissioning

09 Nov Larg delivery, test [37]16 Nov Purge inner vessel18 Nov Cool-down

12 Jan Filling16 Jan Cryogenic tests

20 days Barrel Side-A: HV and FE electronics commissioning and bug fixing.13 Mar Barrel Side-A: HV and FE electronics test from control room: No access to FE

27 Mar Barrel Side-A: HV and FE electronics bug fixing: Free access to all FE-crate20 days Barrel Side-C: HV and FE electronics commissioning and bug fixing.

10 Apr Barrel Side-C: HV and FE electronics test from control room: No access t24 Apr Barrel Side-C: HV and FE electronics bug fixing: Free access to all FE-c

12 Jan Solenoid functional testPhase 2d: Racks, Pipes & Cables

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A2005 2006 2007

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 3

Endcap Calorimeters

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 4

Endcap C Endcap A

Endcap C: Cold TestEnd-Cap C Temperature Variation from Cool-down to Warm-up

80.0090.00

100.00110.00120.00130.00140.00150.00160.00170.00180.00190.00200.00210.00220.00230.00240.00250.00260.00270.00280.00290.00300.00

22-N

ov-04

29-N

ov-04

06-D

ec-04

13-D

ec-04

20-D

ec-04

27-D

ec-04

03-Ja

n-05

10-Ja

n-05

17-Ja

n-05

24-Ja

n-05

31-Ja

n-05

07-F

eb-05

14-F

eb-05

21-F

eb-05

28-F

eb-05

07-M

ar-05

14-M

ar-05

21-M

ar-05

28-M

ar-05

04-A

pr-05

11-A

pr-05

18-A

pr-05

25-A

pr-05

02-M

ay-05

09-M

ay-05

16-M

ay-05Date

Tem

pera

ture

(K)

Minimum detector temperature read on cryo systemMaximum detector temperature read on cryo system

Last updated 09-05-2005

Cool-down Warm-up

Normal working temperature

(9 weeks) (7 weeks)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 5

Endcap C: cold test resultsCold test successfully performedElectromagnetic (EMEC):

6/31872 (0.19‰) dead channels: 5 EMEC (3 strips, 2 back) + 1 PS16 HV problems (1408 lines):

13 sectors can be biased only on half of the semi-gaps (can be corrected SW: no acceptance loss)2 sectors shorted together along η1 sector problems on both sides (∆ηx∆φ=0.2x0.2) at η=2.3 (0.2%): could be operated at ~500V (half nominal voltage)

Hadronic Endcap (HEC):2/3072 dead channels (0.65‰)

Forward (FCAL):11 shorts (0.19%)

Cryostat warm now: Start decabling and leave cryogenic system to Endcap A cold test

Milano involvement:HV testsTime Domain Reflectometer (TDR) measurements: characterization of calibration lines (March ’05)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 6

ID Name Duration Start Finish

852 Phase 3b: Endcap Calorimeter C 238 days Tue 06-09-05 Mon 14-08-06853 End-cap Calorimeter C mechanical assembly 43 days Tue 06-09-05 Fri 04-11-05854 Start Tile Extended C Assembly 0 days Tue 06-09-05 Tue 06-09-05855 Tile assembly infra & Lower materials I 3 days Wed 07-09-05 Fri 09-09-05860 Lower EB bottom part (18 modules) 2 days Mon 12-09-05 Tue 13-09-05861 Module assembly (up to 24 mod) 3 days Wed 14-09-05 Fri 16-09-05862 Cradle disassembly 4 days Mon 19-09-05 Thu 22-09-05868 Start LAr End-cap C installation 0 days Thu 22-09-05 Thu 22-09-05869 LAr EC-C installation 9 days Fri 23-09-05 Wed 05-10-05870 LAr supports installation 1 day Fri 23-09-05 Fri 23-09-05871 Lower LAr EC-C cry on supports from surface 1 day Mon 26-09-05 Mon 26-09-05872 Align the cryostat 2 days Tue 27-09-05 Wed 28-09-05873 Basic tests of LAr EC-C 5 days Thu 29-09-05 Wed 05-10-05874 Scaffolding assembly 1 day Thu 06-10-05 Thu 06-10-05875 Lower materials II (10 mod) 1 day Fri 07-10-05 Fri 07-10-05876 Module assembly (up to 34 mod) 4 days Fri 07-10-05 Wed 12-10-05877 Lower materials III (10 mod) 1 day Thu 13-10-05 Thu 13-10-05878 Modules assembly (up to 44 mod) 4 days Thu 13-10-05 Tue 18-10-05879 Lower materials IV (10 mod) 1 day Wed 19-10-05 Wed 19-10-05880 Modules assembly (up to 54 mod) 4 days Wed 19-10-05 Mon 24-10-05881 Lower materials V (10 mod) 4 days Tue 25-10-05 Fri 28-10-05882 Modules assembly (up to 64 mod) 4 days Tue 25-10-05 Fri 28-10-05883 Align LAr EC-C Cryostat and Tile EB-C, Z=12m 3 days Mon 31-10-05 Wed 02-11-05884 Scaffolding disassembly 1 day Thu 03-11-05 Thu 03-11-05885 Materials up 1 day Fri 04-11-05 Fri 04-11-05890 Move into access position for connection of services 1 day Fri 04-11-05 Fri 04-11-05891 ECC services 1st fix on the Truck 10 days Mon 07-11-05 Fri 18-11-05892 ECC services 2nd fix inside Toroid 185 days Mon 21-11-05 Mon 14-08-06893 Move Cal End-cap C inside for connection of services 2 days Mon 21-11-05 Tue 22-11-05894 Pipes & cables for Endcap Calorimeter C 43 days Mon 21-11-05 Thu 26-01-06911 Tile Extended C Proximity Services 74 days Tue 22-11-05 Tue 14-03-06965 LAr End-cap C Services, 2nd fix in final position 183 days Wed 23-11-05 Mon 14-08-06966 LAr End-cap C FE-Crates 113 days Wed 23-11-05 Mon 08-05-06980 LAr End-cap C tests & commissioning 112 days Fri 10-03-06 Mon 14-08-06981 EC-C cryo commissioning 82 days Fri 10-03-06 Mon 03-07-06982 Larg delivery, test 5 days Fri 10-03-06 Thu 16-03-06983 Purge inner vessel 2 days Wed 15-03-06 Thu 16-03-06984 Cool-down 45 days Fri 17-03-06 Thu 18-05-06985 Filling 2 days Fri 19-05-06 Mon 22-05-06986 Cryogenic tests 30 days Tue 23-05-06 Mon 03-07-06987 EC-C: HV and FE electronics commissioning and 20 days Tue 18-07-06 Mon 14-08-06988 EC-C: HV and FE electronics test from control r 10 days Tue 18-07-06 Mon 31-07-06989 EC-C: HV and FE electronics bug fixing: Free a 10 days Tue 01-08-06 Mon 14-08-06

238 days Phase 3b: Endcap Calorimeter C43 days End-cap Calorimeter C mechanical assembly06 Sep Start Tile Extended C Assembly3 days Tile assembly infra & Lower materials I

2 days Lower EB bottom part (18 modules)3 days Module assembly (up to 24 mod)4 days Cradle disassembly22 Sep Start LAr End-cap C installation9 days LAr EC-C installation

1 day LAr supports installation1 day Lower LAr EC-C cry on supports from surface

2 days Align the cryostat5 days Basic tests of LAr EC-C

1 day Scaffolding assembly1 day Lower materials II (10 mod)

4 days Module assembly (up to 34 mod)1 day Lower materials III (10 mod)

4 days Modules assembly (up to 44 mod)1 day Lower materials IV (10 mod)

4 days Modules assembly (up to 54 mod)4 days Lower materials V (10 mod)4 days Modules assembly (up to 64 mod)3 days Align LAr EC-C Cryostat and Tile EB-C, Z=12m

1 day Scaffolding disassembly1 day Materials up04 Nov Move into access position for connection of services07 Nov ECC services 1st fix on the Truck

185 days ECC services 2nd fix inside Toroid21 Nov Move Cal End-cap C inside for connection of services

43 days Pipes & cables for Endcap Calorimeter C74 days Tile Extended C Proximity Services

183 days LAr End-cap C Services, 2nd fix in final position113 days LAr End-cap C FE-Crates

112 days LAr End-cap C tests & commissioning82 days EC-C cryo commissioning

10 Mar Larg delivery, test15 Mar Purge inner vessel17 Mar Cool-down

19 May Filling23 May Cryogenic tests

20 days EC-C: HV and FE electronics commissioning and bug f18 Jul EC-C: HV and FE electronics test from control room: No a01 Aug EC-C: HV and FE electronics bug fixing: Free access to

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A2005 2006 2007

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 7

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 8

Endcap ACold cover closed Feb 9FCAL inserted, cabled and testedWelding of cold cover, purging of cold vessel, leak test, covers closedCryostat displaced to cold teststationECA ready for cool downCabling started last weekStart of cool down: June 13Cool down: 9 weeksStart of cold test: August 15Cold test period: 6 weeksMilano involvement:

HV set-up and testsTDR measurements

ID Name Duration Start Finish

1202 Phase 3d: Endcap Calorimeter A 231 days Thu 03-11-05 Mon 02-10-061203 End-cap Calorimeter A assembly 45 days Thu 03-11-05 Fri 13-01-061204 Start Tile Extended A installation 0 days Thu 03-11-05 Thu 03-11-051205 Tile assembly infra & Lower materials I 3 days Fri 04-11-05 Tue 08-11-051210 Lower EB bottom part (18 modules) 2 days Wed 09-11-05 Thu 10-11-051211 Module assembly (up to 24 mod) 3 days Fri 11-11-05 Tue 15-11-051212 Cradle disassembly 4 days Wed 16-11-05 Mon 21-11-051218 LAr EC-A installation 9 days Tue 22-11-05 Fri 02-12-051219 LAr supports installation 1 day Tue 22-11-05 Tue 22-11-051220 Lower LAr EC-A cry on supports from surface 1 day Wed 23-11-05 Wed 23-11-051221 Align the cryostat 2 days Thu 24-11-05 Fri 25-11-051222 Basic tests of LAr EC-A 5 days Mon 28-11-05 Fri 02-12-051223 Scaffolding assembly 1 day Mon 05-12-05 Mon 05-12-051224 Lower materials II (10 mod) 1 day Mon 05-12-05 Mon 05-12-051225 Module assembly (up to 32 mod) 4 days Tue 06-12-05 Fri 09-12-051226 Lower materials III (10 mod) 1 day Mon 12-12-05 Mon 12-12-051227 Modules assembly (up to 44 mod) 4 days Mon 12-12-05 Thu 15-12-051228 Lower materials IV (10 mod) 1 day Fri 16-12-05 Fri 16-12-051229 Modules assembly (up to 54 mod) 4 days Fri 16-12-05 Wed 21-12-051230 Lower materials V (10 mod) 4 days Thu 22-12-05 Wed 04-01-061231 Modules assembly (up to 64 mod) 4 days Thu 22-12-05 Wed 04-01-061232 Align LAr EC-A Cryostat and Tile EB-A, Z=12m 3 days Thu 05-01-06 Mon 09-01-061233 Scaffolding disassembly 1 day Tue 10-01-06 Tue 10-01-061234 Materials up 3 days Wed 11-01-06 Fri 13-01-061239 ECA services, 1st fix on the Truck 21 days Mon 16-01-06 Mon 13-02-061244 Field map preparation & measurements 13 days Mon 13-02-06 Wed 01-03-061253 ECA services, 2nd fix inside the Toroid 177 days Fri 27-01-06 Mon 02-10-061254 Pipes & cables for Endcap Calorimeter A 31 days Fri 27-01-06 Fri 10-03-061266 Tile Extended A Proximity Services 42 days Thu 02-03-06 Fri 28-04-061276 Tile Extended A tests & commissioning 21 days Mon 01-05-06 Mon 29-05-061277 LAr End-cap A Proximity Services 54 days Wed 01-03-06 Tue 16-05-061278 EC-A proximity cryogenics 54 days Wed 01-03-06 Tue 16-05-061296 Cryo cabling EC-A 20 days Thu 02-03-06 Wed 29-03-061299 EC-A Cables 10 days Thu 02-03-06 Wed 15-03-061303 EC-A vacuum 17 days Thu 02-03-06 Fri 24-03-061312 EC-A FT vacuum 26 days Thu 02-03-06 Thu 06-04-061320 LAr End-cap A FE crates 113 days Tue 28-02-06 Thu 03-08-061334 LAr End-cap A tests & commissioning 99 days Wed 17-05-06 Mon 02-10-061335 EC-A cryo commissioning 79 days Wed 17-05-06 Mon 04-09-061336 Purge inner vessel 2 days Wed 17-05-06 Thu 18-05-061337 Cool-down 45 days Fri 19-05-06 Thu 20-07-061338 Filling 2 days Fri 21-07-06 Mon 24-07-061339 Cryogenic tests 30 days Tue 25-07-06 Mon 04-09-061340 EC-A: HV and FE electronics commissioning and bu 20 days Tue 05-09-06 Mon 02-10-06

231 days Phase 3d: Endcap Calorimeter A45 days End-cap Calorimeter A assembly03 Nov Start Tile Extended A installation3 days Tile assembly infra & Lower materials I

2 days Lower EB bottom part (18 modules)3 days Module assembly (up to 24 mod)4 days Cradle disassembly9 days LAr EC-A installation

1 day LAr supports installation1 day Lower LAr EC-A cry on supports from surface

2 days Align the cryostat5 days Basic tests of LAr EC-A

1 day Scaffolding assembly1 day Lower materials II (10 mod)

4 days Module assembly (up to 32 mod)1 day Lower materials III (10 mod)

4 days Modules assembly (up to 44 mod)1 day Lower materials IV (10 mod)

4 days Modules assembly (up to 54 mod)4 days Lower materials V (10 mod)4 days Modules assembly (up to 64 mod)

3 days Align LAr EC-A Cryostat and Tile EB-A, Z=12m1 day Scaffolding disassembly

3 days Materials up21 days ECA services, 1st fix on the Truck

13 days Field map preparation & measurements177 days ECA services, 2nd fix inside the Toroid31 days Pipes & cables for Endcap Calorimeter A

42 days Tile Extended A Proximity Services01 May Tile Extended A tests & commissioning

54 days LAr End-cap A Proximity Services54 days EC-A proximity cryogenics20 days Cryo cabling EC-A10 days EC-A Cables17 days EC-A vacuum26 days EC-A FT vacuum

113 days LAr End-cap A FE crates99 days LAr End-cap A tests & commissioning79 days EC-A cryo commissioning

17 May Purge inner vessel19 May Cool-down

21 Jul Filling25 Jul Cryogenic tests

20 days EC-A: HV and FE electronics commissioning an

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A2005 2006 2007

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 9

HV system statusMilano is responsible of the HV control SW:

Stable version since a while used for all tests up to now (CBT, Barrel/EC cold tests,…)

Next step: integration with the rest of the DCS system

Integration in the ATLAS DCS hierarchical systemFSM: main tool for the FSM: main tool for the implementation of the full control implementation of the full control hierarchy in ATLAS, hierarchy in ATLAS, handle the handle the states and transitions of the states and transitions of the different parts of the detector.different parts of the detector.

IsegIseg SW: Firmware and OPC SW: Firmware and OPC serverserver

Unstable so far (v2.x, v3.x)Unstable so far (v2.x, v3.x)New version (v4.0) under test New version (v4.0) under test now, should fix bugs and now, should fix bugs and instabilities instabilities

Will test new SW during ECA Will test new SW during ECA cold test starting in Junecold test starting in June

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 10

OperatorIF

DataViewer

AlarmIF

DCS_IS

DIPMagnetCERN

LHCDSS DAQ IS

DAQ MRSDAQ RC

CIC

Global Control Station(GCS)

Tile Pixel SCT TRT LArMDT TGC RPC (CSC)

LCS

HECLV

LCS

Temp

LCS

HV

OPC

LCS

FECrates

HV/LV

PC

Purity

PVSS

CAN

DDC

Local Control Stations (LCS)

Subdetector Control Stations (SCS)

Iseg HV modules

ConditionDB

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 11

Iseg HV modulesHW responsibility: CERN, KTH, WüppertalModules still unstableDuring barrel cold test (August 2004) about half of the modules failed in going to 2kV:

Problem traced to a bad batch of 10 nF/3 kV filter capacitorscapacitors

Capacitors replaced on all modulesDuring Endcap C cold test (February ‘05) still several failures at V>2300 Volts:

Failure of the voltage regulatorTask force in action to investigate the problem and interact with the company:

Three Milano people involvedMeeting at CERN last week (also with Iseg people)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 12

Iseg HV modulesTests performed in Milano, CERN, IsegWe built 8 load boxes (32 channels each) to do a systematic qualifying test of all modules at CERN:

1.5 µF and 150 kΩ in series on each channel to mimic a typical calorimeter HV channelLong duration testsBoxes at CERN since last week

Iseg examined defective modules:opto-coupler failure in the regulation circuitryopto-coupler replaced (3 kV→7 kV) on 30 modulesBut origin of fault not fully understood

New modules at CERN since May 9:Modules under test w/ and w/o load boxes at maximum voltage (2500 V)So far so good

Unforeseen and very urgent activity

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 13

CBT: list of data collectedLow energy & linearity study:

e- + π (no inner detector) E=1->9 GeV eta=0.2, 0.25, 0.35, 0.45, 0.55, 0.65 magnetic field ON for some runs1/2/3 Al plate(s) in front of LARG: eta=0.4

LARG HV scan:e- 250 GeV eta=0.55 2000, 1500, 1000, 500, 250, 125 & 0 Volts on one side of the drift gape+ 100 GeV eta=0.5 2000, 50, 100, 150, 200, 400 & 700 Volts on both sides of the drift gap Phi-scan of sector 4 with dead electrodes: e- 180 GeV, eta=0.7

Fine eta scan 180 GeV with scintillator between LAr & Tiles e+ & π 180 GeVFine eta scan 250 GeV e- & π 250 GeVMagnet scan at eta=0.45, π 250 GeV25ns data (basically no physics data)

protons 350 GeV:data with physics code in DSP:

Material study with all subdetectors (e-, e+) E=1->9 GeVE=20, 50 100, 150, 180 GeVeta=0.35, 0.4, 0.45, 0.5, 0.55, material between pixel & SCT, SCT & TRT, B-field ON/OFF

Special studies for TRT, pions in magnetic field + lead absorber π 20, 50, 100 GeV – B-field varied

Vary B-field µ 150 GeV eta=0.45e+ 20, 50, 100 GeV eta=0.45

Study with muon chamber in front of LARG:e+ 180 GeV eta=0.1,0.2,0.3,0.4,0.5,0.7,0.6

Photon run with tracker in:e+ 180 GeV (e+ ~= 150 GeV, γ ~= 30GeV)

Photon run with only LARG & TRT:e+ 180 GeV (photon energies varied using B-field MBPL-H & V Eγ between 10 and 130 GeV)

Non pointing photons - only LARG:Incoming e+ 180 GeV -> Eγ=50 GeVnominal eta=0.3 - displacement -20cm, 20, 40 and 60 cm

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 14

single DAC calibration

wavesCBT: analysis

Slow start-up of the analysisDelay runs collected in August-SeptemberSeveral software problems in switching from stand-alone framework to AthenaSeveral problems with DBLack of manpowerEnd of February DB is finally full:

Delay runsMaster Waveform

Calculation of optimal filtering coefficients can start

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 15

master waveform

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 16

Signal reconstruction and CBTRTM OFC (Milano Method) ready for all EMB module (all samplings) in DBNeed to select the right OFC set (0,24) from TDCTDC needs to be calibratedPhase information from TDC is corrected with time offsets (found via iteration on data):

Global: single value, related to general setupFEB: 1 value/FEB (16)Gain dependence

TDC corrections finally available for all run periodsResults for hi-pT electrons

Energy scale still to be fixedOther corrections to be implemented: dead material, out-of-cone, leakage

σE /<E> =0.97%E=250 GeV

Expect:~0.7%

<E>= 182 GeV

σ/ <E>=0.87%E=180 GeV

CBT analysisPedestal, ramps, delay & timing analysis finished and available in DBOFC: sets available and being tested: NTUPLE & ESD production using OFC starting First look at uniformity

σ=0.4%Other studies:

linearity (material studies) photon & muon runspions

Soon ready for combining track & calo for particle ID studies

±0.4%

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 17

Endcap ServicesDesign phase completed in Milano

Official drawings under finalization

Milano is responsible for the installation of the Endcapservices (ECC and ECA).Procurement of material starting (BNL, CERN)To minimize costs some materials will be shipped to Milano where they will be preassembled and testedWill bring in Milano mock-up/structure now in B180

help in the preparation of the various pieces

Complicate service designAll pieces are different from each other

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 18

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 19

ELMB LV PS Optical box

HEC PS

Endcap services13 electronic crates 4 differenti topologie di servizi:

FCAL, EMEC, HEC/EMEC-special, Crates-feet

Operazioni:PS: montaggio, cavi, schermiinstallazione water manifolds cooling FEB e PScavi LV, cavi di triggerinstallazione delle box delle ELMBInstallazione optical-boxesinstallazione parziale fibre TTCcavi di triggertest water lines

ID Name Duration Start Finish

852 Phase 3b: Endcap Calorimeter C 238 days Tue 06-09-05 Mon 14-08-06853 End-cap Calorimeter C mechanical assembly 43 days Tue 06-09-05 Fri 04-11-05854 Start Tile Extended C Assembly 0 days Tue 06-09-05 Tue 06-09-05855 Tile assembly infra & Lower materials I 3 days Wed 07-09-05 Fri 09-09-05860 Lower EB bottom part (18 modules) 2 days Mon 12-09-05 Tue 13-09-05861 Module assembly (up to 24 mod) 3 days Wed 14-09-05 Fri 16-09-05862 Cradle disassembly 4 days Mon 19-09-05 Thu 22-09-05868 Start LAr End-cap C installation 0 days Thu 22-09-05 Thu 22-09-05869 LAr EC-C installation 9 days Fri 23-09-05 Wed 05-10-05870 LAr supports installation 1 day Fri 23-09-05 Fri 23-09-05871 Lower LAr EC-C cry on supports from surface 1 day Mon 26-09-05 Mon 26-09-05872 Align the cryostat 2 days Tue 27-09-05 Wed 28-09-05873 Basic tests of LAr EC-C 5 days Thu 29-09-05 Wed 05-10-05874 Scaffolding assembly 1 day Thu 06-10-05 Thu 06-10-05875 Lower materials II (10 mod) 1 day Fri 07-10-05 Fri 07-10-05876 Module assembly (up to 34 mod) 4 days Fri 07-10-05 Wed 12-10-05877 Lower materials III (10 mod) 1 day Thu 13-10-05 Thu 13-10-05878 Modules assembly (up to 44 mod) 4 days Thu 13-10-05 Tue 18-10-05879 Lower materials IV (10 mod) 1 day Wed 19-10-05 Wed 19-10-05880 Modules assembly (up to 54 mod) 4 days Wed 19-10-05 Mon 24-10-05881 Lower materials V (10 mod) 4 days Tue 25-10-05 Fri 28-10-05882 Modules assembly (up to 64 mod) 4 days Tue 25-10-05 Fri 28-10-05883 Align LAr EC-C Cryostat and Tile EB-C, Z=12m 3 days Mon 31-10-05 Wed 02-11-05884 Scaffolding disassembly 1 day Thu 03-11-05 Thu 03-11-05885 Materials up 1 day Fri 04-11-05 Fri 04-11-05890 Move into access position for connection of services 1 day Fri 04-11-05 Fri 04-11-05891 ECC services 1st fix on the Truck 10 days Mon 07-11-05 Fri 18-11-05892 ECC services 2nd fix inside Toroid 185 days Mon 21-11-05 Mon 14-08-06893 Move Cal End-cap C inside for connection of services 2 days Mon 21-11-05 Tue 22-11-05894 Pipes & cables for Endcap Calorimeter C 43 days Mon 21-11-05 Thu 26-01-06911 Tile Extended C Proximity Services 74 days Tue 22-11-05 Tue 14-03-06965 LAr End-cap C Services, 2nd fix in final position 183 days Wed 23-11-05 Mon 14-08-06966 LAr End-cap C FE-Crates 113 days Wed 23-11-05 Mon 08-05-06967 EC-C: inst. of FE-Crates + infrastructure 42 days Wed 23-11-05 Fri 27-01-06968 Reinstallation of pedestals 4 days Wed 23-11-05 Mon 28-11-05969 Infrastructure mechanics 6 days Tue 29-11-05 Tue 06-12-05970 Pressure test of water cooling 4 days Wed 07-12-05 Mon 12-12-05971 1. EC-C Quadrant: infrastructure completion 7 days Tue 13-12-05 Wed 21-12-05972 2. EC-C Quadrant: infrastructure completion 7 days Thu 22-12-05 Mon 09-01-06973 3. EC-C Quadrant: infrastructure completion 7 days Tue 10-01-06 Wed 18-01-06974 4. EC-C Quadrant: infrastructure completion 7 days Thu 19-01-06 Fri 27-01-06975 EC-C: FE-Crate: equipping, connecting (+HV), te 92 days Thu 22-12-05 Mon 08-05-06976 1. EC-C Quadrant: FE-Crate equipping, connec 23 days Thu 22-12-05 Tue 31-01-06977 2. EC-C Quadrant: FE-Crate equipping, connec 23 days Wed 01-02-06 Fri 03-03-06978 3. EC-C Quadrant: FE-Crate equipping, connec 23 days Mon 06-03-06 Wed 05-04-06979 4. EC-C Quadrant: FE-Crate equipping, connec 23 days Thu 06-04-06 Mon 08-05-06980 LAr End-cap C tests & commissioning 112 days Fri 10-03-06 Mon 14-08-06

238 days Phase 3b: Endcap Calorimeter C43 days End-cap Calorimeter C mechanical assembly06 Sep Start Tile Extended C Assembly3 days Tile assembly infra & Lower materials I

2 days Lower EB bottom part (18 modules)3 days Module assembly (up to 24 mod)4 days Cradle disassembly22 Sep Start LAr End-cap C installation9 days LAr EC-C installation

1 day LAr supports installation1 day Lower LAr EC-C cry on supports from surface

2 days Align the cryostat5 days Basic tests of LAr EC-C

1 day Scaffolding assembly1 day Lower materials II (10 mod)

4 days Module assembly (up to 34 mod)1 day Lower materials III (10 mod)

4 days Modules assembly (up to 44 mod)1 day Lower materials IV (10 mod)

4 days Modules assembly (up to 54 mod)4 days Lower materials V (10 mod)4 days Modules assembly (up to 64 mod)3 days Align LAr EC-C Cryostat and Tile EB-C, Z=12m

1 day Scaffolding disassembly1 day Materials up04 Nov Move into access position for connection of services07 Nov ECC services 1st fix on the Truck

185 days ECC services 2nd fix inside Toroid21 Nov Move Cal End-cap C inside for connection of services

43 days Pipes & cables for Endcap Calorimeter C74 days Tile Extended C Proximity Services

183 days LAr End-cap C Services, 2nd fix in final position113 days LAr End-cap C FE-Crates42 days EC-C: inst. of FE-Crates + infrastructure

23 Nov Reinstallation of pedestals29 Nov Infrastructure mechanics07 Dec Pressure test of water cooling13 Dec 1. EC-C Quadrant: infrastructure completion

22 Dec 2. EC-C Quadrant: infrastructure completion10 Jan 3. EC-C Quadrant: infrastructure completion

19 Jan 4. EC-C Quadrant: infrastructure completion92 days EC-C: FE-Crate: equipping, connecting (+HV), testing

22 Dec 1. EC-C Quadrant: FE-Crate equipping, connecting (+HV), testing01 Feb 2. EC-C Quadrant: FE-Crate equipping, connecting (+HV), testing

06 Mar 3. EC-C Quadrant: FE-Crate equipping, connecting (+HV), testing06 Apr 4. EC-C Quadrant: FE-Crate equipping, connecting (+HV), testing

112 days LAr End-cap C tests & commissioning

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A2005 2006 2007

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 20

Barrel Services

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 21

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 22

LArabs

LArf EE

Es+

=

CalibrationCalibrate em objectsOn DC2 samples

Geant 4Calibration hits: energy lost in dead materials (upstream, downstream, absorbers)

Study various basic quantities:

intrinsic response of the accordionLateral containmentLongitudinal leakageEnergy lost between PS and strips...

Goal is to parametrize these quantities as a function of a minimal set of observables Get to an em calibration scheme

Higgs analysis

Mass (GeV)100 105 110 115 120 125 130 135 140

Mass (GeV)100 105 110 115 120 125 130 135 140

)B

Sig

nif

ican

ce (

S/

0

1

2

3

4

5

6

7

8TDR

DC1 (vertex from ID)

DC1 (vertex from calo)

)-2 cm-1 s34 (10-1L = 100 fb

)-2 cm-1 s33 (2 * 10-1L = 30 fb

Signal significance: updated DC1 analysis

Complete analysis on inclusive channel H→γγ (LO) on DC1 samples

ATLAS note under submission

Also performed analysis on VBF channel:

Low luminosity so farHiggs signal significance increases combining the two analysis:

10% improvementNext steps:

Started validation of DC2 samplesNLO analysis

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 23

)-1 L dt (fb∫10 20 30 40 50 60)-1 L dt (fb∫10 20 30 40 50 60

)B

Sig

nif

ican

ce (

S/

0

1

2

3

4

5

6

7

)-1 s-2 cm33Inclusive Analysis (L = 2*10

)-1 s-2 cm33VBF Analysis (L = 10

= 120 GeVHSignal Significance: M

ETmiss, τ reconstruction

Study of Z→ττ→lep+hadControl sample for reconstruction of τ’s and for calibration of ET

miss

during commissioning:σ(MZ) ∝ σ(ET

miss)33k evts (Rome data)

Digitized with noise in calorimeterAnalysed from AOD and CBNT ROOT ntuple

ETmiss reconstructed from all calo

cells in |η|<5 (H1-style weights)Also from topoclusters

Muons contribution (Moore muons) Cryostat correctionAnalysis cuts:

PT(lep), PT(t) > 15 GeV∆φ<2.7

Next:Tune cutsReconstruct also leptonbackground

he_plTTmassphiEntries 3908Mean 90.99RMS 8.49Underflow 187Overflow 4Constant 576.1Mean 90.5Sigma 4.804

0 20 40 60 80 100 120 140 160 180 200

: Z

tau

tau

10.

0.1

0

100

200

300

400

500

600

700

he_plTTmassphiEntries 3908Mean 90.99RMS 8.49Underflow 187Overflow 4Constant 576.1Mean 90.5Sigma 4.804

lep-had plTTmassphi

he_recTTmasphiEntries 3328Mean 92.3RMS 20.09Underflow 1440Overflow 14Constant 81.96Mean 90.11Sigma 17.06

0 20 40 60 80 100 120 140 160 180 2000

20

40

60

80

100

he_recTTmasphiEntries 3328Mean 92.3RMS 20.09Underflow 1440Overflow 14Constant 81.96Mean 90.11Sigma 17.06

lep-had recTTmasphi

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 24

Milestones→ OK (March 05)30/06/2004

Software per la ricostruzione del segnalecon il metodo di Milano pronto al Test Beam combinato, compresa l`analisidelle linee di calibrazione e dei delay runs.

31/07/2004 Acquisizione misure con il Time Domain Reflectometer sul Barrel freddo e analisipreliminare

31/12/2004 Studio dell`uniformità del modulo 0 EM Barrel esposto al Test Beam combinato.

31/08/05Installazione SW e inizio tests HV in USA15

31/08/05Inizio misure HV sul Barrel nell`IPCompletamento misure HV e TDR di ECA (in B180) Analisi dei dati del test beam in via difinalizzazione

31/10/05Inizio integrazione dei servizi su EC-C in UX15

→ OK

→ NO

→ scrittura software iniziata

→ settembre

→ settembre cold test, ottobre warm-up

→ novembre

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 25

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 26

Richieste finanziarie

Commissioning and InstallationHigh Voltage activity:

ECC cold test in B180 (fatto, partesi è dovuta fare nel 2005)ECA cold test in B180 (June-September)Inizio attivita’ nel pit: test HV sulbarrel nell’IP, ECC (e ECA?) nel pitIntegrazione col DCS di AtlasAttivita’ extra: HV task force, interazioni con Iseg (CERN, Dresda), endurance test dei modulicon i load boxes al CERN

TDR measurements:ECC cold test in B180 (fatto)ECA cold test in B180 (August/September)

Installazione Servizi ECC:preparazione al CERN e installazione serviziTeam di 3 tecnici e supervisionedel team al CERN da ottobre a dicembre

Ad oggi: 1.5 muHV e TDR su ECC

A luglio: 4 mu2 mu HV: ECA, load box, Iseg.5 mu: servizi ECC, disegni, mock-up

Ad agosto/settembre: 5.5 mu1.5 mu: finalizzazione HV e TDR ECA

A fine anno: 10 mu2 mu HV: test HV barrel, ECC e ECA nel pit, integrazione DCS2.5 mu: servizi ECC nel pit

Richiesta: 5 mu aggiuntivimissioni estere

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 27

Missioni InterneL’assegnazione di 14 k€ copre la ordinaria amministrazione e non tieneconto dei seguenti eventi:

Liquid Argon week a Gargnano (12-16/09) organizzato da MilanoAtlas Physics Workshop a Roma (6-11/06)

Richiesta: 16 k€ aggiuntivi missioniinterne

8 k€ per circa 8 persone a Gargnano8 k€ per 5 persone a Roma

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 28

Back-up slides

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 30

Parameter analysis:

Comparison with direct LC measurements (1)

(Middle)cellη0 10 20 30 40 50 60

(G

Hz)

0.11

0.12

0.13

0.14

0.15

0.16

0.17

0.18

0.19

0.2

Medium gain

Measured at cold (Lydia)

Extracted from MWs (RTM) (%)0ω∆

-0.1 -0.08 -0.06 -0.04 -0.02 0 0.02 0.04 0.06 0.08 0.10

10

20

30

40

50

60meas0ω+extr

meas0ω-extr

0ω2

Omega0diffEntries 892Mean 0.01013RMS 0.02138

meas0ω+extr

meas0ω-extr

0ω2

Systematic (mean) Systematic (mean) ~~ 1%1%RMS RMS ~~ 2%2%

Medium gain

ηextr = ηmeas+ 0.5 for clarity

Agreement with LC measured at cold is very good Agreement with LC measured at cold is very good Reminder: 1% variation on LC leads to ~ 0.1% on peak reconstructReminder: 1% variation on LC leads to ~ 0.1% on peak reconstructionion……

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 31

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 32

Parameter analysis:

Calibration board parameters

H)µ (CB

L8 9 10 11 12 13

0

10

20

30

40

50

60

70

80

)step

(1 - fcaliτ 2CBR

= CBL )step

(1 - fcaliτ 2CBR

= CBL

Medium gain

)Ω (CB

r0 0.5 1 1.5 2 2.5 3

0

10

20

30

40

50

60

70

80

)step

(1 - fstep

f2CBR

= CBr )step

(1 - fstep

f2CBR

= CBr

Medium gain

LCB ≈ 8.8 µH

LCB ≈ 11.5 µHRCB ≈ 2 Ω

TDR measurements

Length spread in each family3σ=1.5 ns (30cm).

black TDR profile (TB ft=1,short line)green Z0=50Ω (Hspice simulation)red Z=Z0 ± 2Ω (Hspice simulation)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 33

TDR measurements

cold pin carrier

terminazione MB

delay cavi di calibrazione

baseplanevacuum cable

warm cablewarm pin carrier

Blue: ionization signalRed: calibration signal

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 34

Ricostruzione del segnale:Ricostruzione del segnale:

Strategia di calibrazione (2)Strategia di calibrazione (2)Segnale di ionizzazione triangolare:

Segnale di calibrazione “exponenziale”:

Segnale di calibrazione:

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 35

Funzione di trasferimento della catena di readout:

Segnale di ionizzazione:

Ricostruzione del segnale:Ricostruzione del segnale:

Strategia di calibrazioneStrategia di calibrazione (3)(3)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 36

Correzione per il punto di iniezione: LC

Per completare l’equalizzazione delle celle, il guadagno di readoutcalcolato con il segnale di calibrazione…

… va applicato a un segnale di ionizzazione che è stato corretto!

Correzione per le diverse forme di corrente iniettata: Td, fstep, τcali

Il segnale di ionizzazione triangolare generato nel gap di LAr è “normalizzato” quando corrisponde a un segnale di

calibrazione unitario iniettato a livello della MB…

Le correzioni al segnale di ionizzazione sono implementate nella procedura di ricostruzione del segnale campionato…

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 37

A

τ

Ricostruzione del segnale:Ricostruzione del segnale:

“Optimal Filtering”“Optimal Filtering”

L’ampiezza del segnale e il delay sono calcolati come combinazioni lineari dei campionamenti S1,…..,SNI coefficienti ai e bi vengono calcolati a partire da:

Forma “normalizzata” del segnaleAutocorrelazione del noise

( )k k k kS A g g nτ ′= − +

( ) ( ) ( )( ) ( ) ( )

f t Ag t n t

A g t g t n t

τ

τ

= − +

′≅ − +Ampiezza

del segnale

delaySegnale

“normalizzato”noise

Il segnale è campionato ogni∆t = 25 ns:

Ricostruzione del segnale:Ricostruzione del segnale:

il metodo “Milano”il metodo “Milano”1. Obiettivo della procedura è l’estrazione di tutti i parametri

utili alla predizione del segnale di ionizzazione dall’impulso di calibrazione

τcali fit esponenziale sulla coda del segnale

fstep minimizazione χ2 coda step response

LC minimizazione χ2 coda cosine response

LC analisi in frequenza FFT segnale

2. Il guadagno elettronico di ogni canale viene direttamente misurato attraverso una procedura di fit lineare (Master Waveform) ! OFC [ µA/ADC ]

3. Il segnale di ionizzazione “normalizzato” viene predetto direttamente con una convoluzione numerica, senza l’utilizzo diretto di dati da segnali di fisica.

concordano allo 0.5%

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 38

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 39

Ricostruzione del segnale:Ricostruzione del segnale:32 32 sampsamp. test. test--beam delay runsbeam delay runs

t (ns)

y(t) = m(t) x DAC + DAC0

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 40

Ricostruzione del segnale:Ricostruzione del segnale:

Parametri dell’impulso di calibrazioneParametri dell’impulso di calibrazione

P15

Middle

FT0

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 41

Ricostruzione del segnale:Ricostruzione del segnale:

Parametro Parametro ωω00 = 1/= 1/√√LCLC

Misura diretta

FFT del segnale di calibrazione:black raw transformred exp. correctionblue shaper correction