Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED...

5
104 OFFICE 101 RECEPTION 102 RETAIL 105 TOILET 106 TOILET 103 LOCKERS 107 SHOWER 109 UTILITY ROOM 108 MECHANICAL 110 TRAINING ROOM F.D. F.D. F.D. F.D. N.I.C. N.I.C. N.I.C. N.I.C. N.I.C. F.D. F.D. F.D. F.D.

Transcript of Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED...

Page 1: Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED COMMERCIAL INTERIOR TENANT IMPROVEMENT Description Date SPACE INTENTIONALLY LEFT BLANK FOR

104

OFFICE

101

RECEPTION

102

RETAIL

105

TOILET

106

TOILET

103

LOCKERS

107

SHOWER

109

UTILITY ROOM

108

MECHANICAL

110

TRAINING

ROOM

F.D.

F.D.

F.D.

F.D.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

F.D.

F.D.

F.D.

F.D.

Sheet Title

Sheet No.

Drawing Issue

Civil Engineer

Ea

t T

he

F

ro

g F

itn

es

s

Architect

PR

OP

OS

ED

C

OM

ME

RC

IA

L IN

TE

RIO

R T

EN

AN

T IM

PR

OV

EM

EN

T

Date

Description

SPACE INTENTIONALLY LEFT BLANK FOR CITY

APPROVAL / STAMPS

82

8 D

AV

IS

S

T. S

UIT

E 3

00

EV

AN

ST

ON

, IL

6

02

01

OF

FIC

E: 8

47

.4

92

.1

99

2 | F

AX

: 3

12

.4

53

.0

69

9

Checked By: SWB

Structural Engineer

Landscape Architect

Interior Architect

MEP Engineer

Developer

Kolbrook

Job No.

1653.001

Consultant

Job No.

-

Drawn By: ZT

05/21/2020FOR CLIENT / ETF-CORP. REVIEW

IL

LIN

OIS

D

ES

IG

N R

EG

IS

TR

AT

IO

N #

18

4.0

06

08

5

29

9 S

. IL

R

ou

te

8

3

Elm

hu

rst, IL

6

01

26

Exp: 11/30/2020

Seal

Signed: 06/26/2020

07/13/2020FOR PERMIT

M2

MECHANICAL PLANS

Page 2: Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED COMMERCIAL INTERIOR TENANT IMPROVEMENT Description Date SPACE INTENTIONALLY LEFT BLANK FOR

TR

AAA A

A

A

A

A

C2

C1 C1

C1

C2

C1

C3

C3

C1 C1

C1 C1

C1C1

C1 C1 C1C1

C1 C1 C1C1

C1 C1 C1C1

C1 C1 C1C1

C1 C1 C1C1

C2 C2

C2 C2

C2 C2

CP-01

CP-01

CP-01

C3

C3

S S

S S

S S

S S

S S

V

V

C3

C3

104

OFFICE

AA

101

RECEPTION

102

RETAIL

105

TOILET

106

TOILET

103

LOCKERS

S

S

WP

C3

D

107

SHOWER

109

UTILITY ROOM

108

MECHANICAL

110

TRAINING

ROOM

E

E

F

E

E

F

F

C3

C3

C3

C3C3

C3

C1

C1

CP-03

CP-03

AA

AAA

A A A

A

A

F

F

F

F

F

F

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

VACANCY SENSOR SWITCH WIRINGDIAGRAM

LIGHTING FIXTURE SCHEDULE GENERAL NOTES:

CEILING MOUNTED OCCUPANCY SENSORWIRING DIAGRAM

ELECTRICAL LIGHTING PLAN KEYED WORK NOTES:

SCALE:

LIGHTING PLAN

1/4" = 1'-0"

1

ELECTRICAL

LIGHTING PLAN

E2

Sheet Title

Sheet No.

Drawing Issue

Civil Engineer

Ea

t T

he

F

ro

g F

itn

es

s

Architect

PR

OP

OS

ED

C

OM

ME

RC

IA

L IN

TE

RIO

R T

EN

AN

T IM

PR

OV

EM

EN

T

Date

Description

SPACE INTENTIONALLY LEFT BLANK FOR CITY

APPROVAL / STAMPS

82

8 D

AV

IS

S

T. S

UIT

E 3

00

EV

AN

ST

ON

, IL

6

02

01

OF

FIC

E: 8

47

.4

92

.1

99

2 | F

AX

: 3

12

.4

53

.0

69

9

Checked By: SWB

Structural Engineer

Landscape Architect

Interior Architect

MEP Engineer

Developer

Kolbrook

Job No.

1653.001

Consultant

Job No.

-

Drawn By: ZT

05/21/2020FOR CLIENT / ETF-CORP. REVIEW

IL

LIN

OIS

D

ES

IG

N R

EG

IS

TR

AT

IO

N #

18

4.0

06

08

5

29

9 S

. IL

R

ou

te

8

3

Elm

hu

rst, IL

6

01

26

Exp: 11/30/2020

Seal

Signed: 06/26/2020

07/13/2020FOR PERMIT

Page 3: Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED COMMERCIAL INTERIOR TENANT IMPROVEMENT Description Date SPACE INTENTIONALLY LEFT BLANK FOR

STATION 1

STATION 3

STATION 4

STATION 5

STATION 6

STATION 8

STATION 9

STATION 10

STATION 11

STATION 12

TRX BAY 1TRX BAY 2TRX BAY 3

TRX BAY 4TRX BAY 5TRX BAY 6

STATION 7STATION 2

104

OFFICE

101

RECEPTION

102

RETAIL

105

TOILET

106

TOILET

103

LOCKERS

107

SHOWER

109

UTILITY ROOM

108

MECHANICAL

110

TRAINING

ROOM

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

ELECTRICAL POWER PLAN KEYED WORK NOTES:

ELECTRICAL

POWER PLAN

E3

SCALE:

POWER PLAN

1/4" = 1'-0"

1

Sheet Title

Sheet No.

Drawing Issue

Civil Engineer

Ea

t T

he

F

ro

g F

itn

es

s

Architect

PR

OP

OS

ED

C

OM

ME

RC

IA

L IN

TE

RIO

R T

EN

AN

T IM

PR

OV

EM

EN

T

Date

Description

SPACE INTENTIONALLY LEFT BLANK FOR CITY

APPROVAL / STAMPS

82

8 D

AV

IS

S

T. S

UIT

E 3

00

EV

AN

ST

ON

, IL

6

02

01

OF

FIC

E: 8

47

.4

92

.1

99

2 | F

AX

: 3

12

.4

53

.0

69

9

Checked By: SWB

Structural Engineer

Landscape Architect

Interior Architect

MEP Engineer

Developer

Kolbrook

Job No.

1653.001

Consultant

Job No.

-

Drawn By: ZT

05/21/2020FOR CLIENT / ETF-CORP. REVIEW

IL

LIN

OIS

D

ES

IG

N R

EG

IS

TR

AT

IO

N #

18

4.0

06

08

5

29

9 S

. IL

R

ou

te

8

3

Elm

hu

rst, IL

6

01

26

Exp: 11/30/2020

Seal

Signed: 06/26/2020

07/13/2020FOR PERMIT

SCALE:

ROOF POWER PLAN

1/4" = 1'-0"

2

Page 4: Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED COMMERCIAL INTERIOR TENANT IMPROVEMENT Description Date SPACE INTENTIONALLY LEFT BLANK FOR

PANEL: A MOUNTING: SURFACE

120/240 VOLTS, 3 PHASE, 4 WIRE

MAIN CB 200A BUS 225A MIN, INTERRUPTING RATING 22 KAIC

CKT NO. TRIPAMPS DESCRIPTION OF LOAD LOAD

TYPELOAD(KVA)

PER PHASE (KVA) LOAD(KVA)

LOADTYPE DESCRIPTION OF LOAD TRIP

AMPSCKTNO.A B C

1 20 LIGHTING RECEPTION, RETAIL L 0.65 1.37 0.72 R RECEPTACLE GENERAL 20 23 20 LIGHTING RECEPTION TRACK L 0.60 0.96 0.36 E TRAINING ROOM TV's 20 45 20 LIGHTING TRAINING L 0.60 0.96 0.36 E TRAINING ROOM TV's 20 67 20 LIGHTING TRAINING L 0.60 1.68 1.08 R USB RECHARFEABLE OUTLETS 20 89 20 CEILING FAN L 0.60 1.68 1.08 R USB RECHARFEABLE OUTLETS 20 10

11 20 RECEPTION DESK SIGN L 0.50 1.58 1.08 R USB RECHARFEABLE OUTLETS 20 1213 20 LIGHTING OFFICE, RESTROOM L 0.50 1.58 1.08 R USB RECHARFEABLE OUTLETS 20 1415 20 EXTERIOR SIGNAGE L 0.50 0.7 0.20 L EM/EXIT LIGHTS 20 1617 20 SHOW WINDOW RECEPTACLE R 0.36 0.54 0.18 R TV RECEPTACLE 20 1819 20 POS RECEPTACLE E 0.36 0.46 0.10 E CEILING MOUNTED SPEAKERS 20 2021 20 POS RECEPTACLE E 0.36 0.46 0.10 E CEILING MOUNTED SPEAKERS 20 2223 20 CHECK IN I-PAD STATION E 0.10 0.2 0.10 E CEILING MOUNTED SPEAKERS 20 2425 20 RECEPTACLE RESTROOM R 0.72 5.72 5.00 H

WATER HEATER

50/3P

2627 20 ELECTRIC WATER COOLER E 1.00 6 5.00 H 2829 20 RECEPTACLE GENERAL R 0.54 5.54 5.00 H 3031 20 HWCP-1 E 0.03 6.79 6.76 H

RTU-1

80*/3P

3233

60/3P TO PANEL BE 0.81 7.57 6.76 H 34

35 E 0.81 7.57 6.76 H 3637 E 0.81 1.81 1.00 E TRAINING ROOM PROJECTOR's 20 3839 20 UTILITY GFI RECEPTALE R 0.36 0.36 SPARE 20 4041 20 UTILITY QUARD RECEPTALE R 0.36 0.36 SPARE 20 42

TOTAL LOAD (KVA) 19.41 17.73 16.75

PANEL: B MOUNTING: SURFACE

120/240 VOLTS, 3 PHASE, 4 WIRE

MAIN CB BUS 100A MIN, INTERRUPTING RATING 22 KAIC

CKT NO. TRIPAMPS DESCRIPTION OF LOAD LOAD

TYPELOAD(KVA)

PER PHASE (KVA) LOAD(KVA)

LOADTYPE DESCRIPTION OF LOAD TRIP

AMPSCKTNO.A B C

1 20 OFFICE RECEPTACLE R 0.36 0.36 SPARE 20 23 20 OFFICE RECEPTACLE R 0.36 0.36 SPARE 20 45 20 OFFICE RECEPTACLE R 0.36 0.36 SPARE 20 67 20 OFFICE RECEPTACLE R 0.36 0.36 SPARE 20 89 20 OFFICE RECEPTACLE R 0.36 0.36 SPARE 20 10

11 20 OFFICE RECEPTACLE R 0.36 0.36 SPARE 20 1213 20 ROOF LIGHTING L 0.10 0.1 SPARE 20 1415 20 ROOF RECEPTACLE R 0.18 0.18 SPARE 20 1617 20 SPARE 0 SPARE 20 1819 20 SPARE 0 SPARE 20 2021 20 SPARE 0 SPARE 20 2223 20 SPARE 0 SPARE 20 2425 20 SPARE 0 SPARE 20 2627 20 SPARE 0 SPARE 20 2829 20 SPARE 0 SPARE 20 30

TOTAL LOAD (KVA) 0.82 0.9 0.72

ELECTRICAL RISER

DIAGRAM & PANEL

SCHEDULES

E4

Sheet Title

Sheet No.

Drawing Issue

Civil Engineer

Ea

t T

he

F

ro

g F

itn

es

s

Architect

PR

OP

OS

ED

C

OM

ME

RC

IA

L IN

TE

RIO

R T

EN

AN

T IM

PR

OV

EM

EN

T

Date

Description

SPACE INTENTIONALLY LEFT BLANK FOR CITY

APPROVAL / STAMPS

82

8 D

AV

IS

S

T. S

UIT

E 3

00

EV

AN

ST

ON

, IL

6

02

01

OF

FIC

E: 8

47

.4

92

.1

99

2 | F

AX

: 3

12

.4

53

.0

69

9

Checked By: SWB

Structural Engineer

Landscape Architect

Interior Architect

MEP Engineer

Developer

Kolbrook

Job No.

1653.001

Consultant

Job No.

-

Drawn By: ZT

05/21/2020FOR CLIENT / ETF-CORP. REVIEW

IL

LIN

OIS

D

ES

IG

N R

EG

IS

TR

AT

IO

N #

18

4.0

06

08

5

29

9 S

. IL

R

ou

te

8

3

Elm

hu

rst, IL

6

01

26

Exp: 11/30/2020

Seal

Signed: 06/26/2020

07/13/2020FOR PERMIT

Page 5: Eat The Frog Fitness Work/Franchise/Eat the … · Eat The Frog Fitness Architect PROPOSED COMMERCIAL INTERIOR TENANT IMPROVEMENT Description Date SPACE INTENTIONALLY LEFT BLANK FOR

STATION 1

STATION 3

STATION 4

STATION 5

STATION 6

STATION 8

STATION 9

STATION 10

STATION 11

STATION 12

TRX BAY 1TRX BAY 2TRX BAY 3

TRX BAY 4TRX BAY 5TRX BAY 6

STATION 7STATION 2

104

OFFICE

101

RECEPTION

102

RETAIL

105

TOILET

106

TOILET

103

LOCKERS

107

SHOWER

109

UTILITY ROOM

108

MECHANICAL

110

TRAINING

ROOM

F.D.

F.D.

F.D.

F.D.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

STATION 1

STATION 3

STATION 4

STATION 5

STATION 6

STATION 8

STATION 9

STATION 10

STATION 11

STATION 12

TRX BAY 1TRX BAY 2TRX BAY 3

TRX BAY 4TRX BAY 5TRX BAY 6

STATION 7STATION 2

104

OFFICE

101

RECEPTION

102

RETAIL

105

TOILET

106

TOILET

103

LOCKERS

107

SHOWER

109

UTILITY ROOM

108

MECHANICAL

110

TRAINING

ROOM

F.D.

F.D.

F.D.

F.D.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

1

2

1

2

3

3

5

7

8

1

4

3

2

2

2

1

6

5

5

9

5

4

6

8

9

Sheet Title

Sheet No.

Drawing Issue

Civil Engineer

Ea

t T

he

F

ro

g F

itn

es

s

Architect

PR

OP

OS

ED

C

OM

ME

RC

IA

L IN

TE

RIO

R T

EN

AN

T IM

PR

OV

EM

EN

T

Date

Description

SPACE INTENTIONALLY LEFT BLANK FOR CITY

APPROVAL / STAMPS

82

8 D

AV

IS

S

T. S

UIT

E 3

00

EV

AN

ST

ON

, IL

6

02

01

OF

FIC

E: 8

47

.4

92

.1

99

2 | F

AX

: 3

12

.4

53

.0

69

9

Checked By: SWB

Structural Engineer

Landscape Architect

Interior Architect

MEP Engineer

Developer

Kolbrook

Job No.

1653.001

Consultant

Job No.

-

Drawn By: ZT

05/21/2020FOR CLIENT / ETF-CORP. REVIEW

IL

LIN

OIS

D

ES

IG

N R

EG

IS

TR

AT

IO

N #

18

4.0

06

08

5

29

9 S

. IL

R

ou

te

8

3

Elm

hu

rst, IL

6

01

26

Exp: 11/30/2020

Seal

Signed: 06/26/2020

07/13/2020FOR PERMIT

PLUMBING

PLANS

P2

SCALE:

SANITARY PLUMBING PLAN

1/4" = 1'-0"

1

SCALE:

WATER PIPING PLAN

1/4" = 1'-0"

2