EASTMANThe Chemistry of New Ideas 1983 - 20011983 - 2001
Eastman Chemical CompanyFine Tuning to Improve Availability and
Reliability of Coal Based Gasification
Gasification Technologies 2001
San Francisco, California
October 7-10, 2001
Written By
Steve Hrivnak, Principal Mechanical Engineer
Presented By
Nathan Moock, Senior Chemical Engineer
EASTMANBackground
hApproximately $5 B in sales annually
hOver 400 Chemicals, Fibers andPlastics
hHeadquarters - Kingsport, TN
hManufacturing sites around theworld
Gas Production and Rectisol Area
Simplified Flow Diagram - Gasification Plant
Water Clarification/Soot Removal
Soot
Grey waterRecycle togasifiers
Quench blowdownSlag
Coal Slurry
Oxygen
Slag
Quench blowdown
No.1Scrubber
No.2Scrubber
Gasifier
No.2
Gasifier
No.1
CoalSlurry
Oxygen
Wet
Syngas
Process Gas Cooling Train
Shift Gas Cooling Train
Dry shifted gas
Dry process gas
ShiftReactor
Coal &Water
Rod Mill A
Pump A
Coal &Water
Rod Mill B
Pump B
Hg removal
Hg removal
Yearly Gasifier Production Rate
1516171819202122232425262728
1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001**
Mill
ion
KSC
F
** 2001 data is based on annualized production through week 39
Gasification Complex Shutdown occurs on odd number years with 7-10 days of production downtime
Gasifier On-Stream Time% Uptime, without bi-annual shutdown and power failures
* 2001 is thru 9/17
* 2001 is YTD 9/17
Average Gasifier Run Length(Time between switches or shutdowns)
Top 10 Shutdown Causes1983 – 2000
Rank Shutdown Cause % of total
1 Feed Injector Failure 18.5%
2 Slurry Feed Pump 15.2%
3 Planned Switch 10.7%
4 Low Quench H2O Flow 6.7%
5 Low Slurry Flow 5.7%
6 Low level in Gasifier 4.7%
7 O2 Leak 4.0%
8 PSV failure 2.5%
9 Dip/Draft Tube 2.0%
10 DCS - PLC failure 2.0%
Description Count
Feed injector failure (prior to new design) 2Low quench flow (pump failure; hole in valve) 2Plant wide power failure 1Black Water exchanger fouling 1Oxygen Plant Shutdown (Lightning) 1PSV Relieved prematurely 1Modicon (programmable logic controller) 1Dip Tube Failure (coal contamination) 1
Shutdown Causes2000
Description Count
Feed Injector failure (Test Injector) 1Power failure 1Planned - for Complex Shut Down (bi-annual) 1Geho inverter shutdown, G-8B ($0.52 fuse) 1
Shutdown Causes2001
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Feed Injectors• Maintenance
• Coal Supply• Refractory• Fabrication Shop
• Operations
• Equipment
• Engineering
Reliability
What makes Eastman Gasification so reliable?
• Operations
•Operators - 1/2 work force has more than 10 years experience ingasification.
• 3 year total training program
• 25% with 18 years gasification experience.•Technical Staff - has an average of 12.5 years experience ingasification.•Process Improvement Staff - has an average of 2.5 years experience ingasification with an average of 13 years engineering experience.
•• Experience - Experience - Experience Experience - Experience - Experience
Reliability
What makes Eastman Gasification so reliable?
• Operations• Engineering
• Materials Engineer has 19 years experience with gasification.
• Plant Engineering staff has an electrical and mechanical engineerwith 9 years experience with gasification.
• Pressure vessel engineers and inspectors on site and available forimmediate use. We are the only builder and user in the state ofTennessee.
•Advanced process controls group
• Also have such services as video inspection, x-ray inspection, andinfrared photography, etc.
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Operations• Engineering
•Operations and Maintenance discuss successes and failures.
•Running action items list. i.e.: procedures; projects; investigations
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews• Maintenance
• Operations• Engineering
• Highly trained
• 25% with 18 years gasification experience
• PM schedules and procedures for important equipment
• Shift crew to handle emergency work
• Specialized tools and jigs to cut down maintenance times
Hoist allows for easy bolt removal
Maintenance Costs Normalized To 1996 Costs
0
20
40
60
80
100
120
1996 1997 1998 1999 2000 2001
Perc
ent
Without CSD*2001 data is projected
Complex Shutdown
•Happens once every two years for vesselinspection
•World Class Planning Process
•Includes Operations and Maintenance
2001 shutdown
•Production Suspended for 8 1/2 days
•520 Work orders completed
•22,000 man hours
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Feed Injectors• Maintenance
• Operations• Engineering
Feed Injector Team organized in 1985.
Awarded 6 Patents Dealing with Injector Improvements.
Better materials, finite element stress analysis, and shieldedtechnology have yielded a feed injector that has 5 x life increase andis reusable.
Elimination of Injector Failure as Shutdown Cause
37 Day Run 54 Day Run
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Feed Injectors• Maintenance
• Operations
• Equipment
• Engineering
• Rod Mills
• Slurry Pumps
• Lock Hopper Valves
• Quench Water Pumps
Rod Mill Pinion Failure History•“A” mill – Pinion Failure on 8/18/95, 12/5/97, 3/10/98,7/15/98
•“B” mill – Pinion Failure on 3/28/98, 5/5/98
A pinion should last 5 to 7 years and then be replacedfor wear, not breakage!
Each failure cost $20,000 to repair and we lost 15% ratefor 24 hours.
Root Cause Failure Analysis identified whatRoot Cause Failure Analysis identified whatcould be attributed to shorter pinion lifecould be attributed to shorter pinion life
••Is current rod charge level too high?Is current rod charge level too high?
••When should we add rods?When should we add rods?
••Are we floating the mill before startup?Are we floating the mill before startup?
••How do we “jog” the mill for maintenance?How do we “jog” the mill for maintenance?
••Is clutch engagement too fast?Is clutch engagement too fast?
••Can poor pinion to bull gear alignment overCan poor pinion to bull gear alignment overstress the shaft?stress the shaft?
Root Cause Failure Analysis identified whatRoot Cause Failure Analysis identified whatcould be attributed to shorter pinion lifecould be attributed to shorter pinion life
••Is current rod charge level too high?Is current rod charge level too high?
••When should we add rods?When should we add rods?
••Are we floating the mill before startup?Are we floating the mill before startup?
••How do we “jog” the mill for maintenance?How do we “jog” the mill for maintenance?
••Is clutch engagement too fast?Is clutch engagement too fast?
••Can poor pinion to bull gear alignment overCan poor pinion to bull gear alignment overstress the shaft?stress the shaft?
Rod mill - Discharge End
Trommel
BearingBull Gear
Bearings
Clutch
Pinion Shaft
Clutch Engagement Time - Before
Clutch Engagement Time - After
Poorly Aligned Pinion
Bull GearPinion
Where thegearsmesh
Lubricator
Excellent Alignment
Excellent Alignment
Ends of pinion within 15 F of each other.
Slurry Pump
PistonDiaphragms
InletCheckValves
OutletCheckValves
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Feed Injectors• Maintenance
• Coal Supply
• Operations
• Equipment
• Engineering Slag Viscosity
01200
Temperature, C
Viscos
ity,cP
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Feed Injectors• Maintenance
• Coal Supply• Refractory
• Operations
• Equipment
• Engineering
hOn-site expertise onrefractory inspection
and changeoutsComplete “hot face”
changeout in 22-26days
Eastman employs 12in-house brick masons;Each with an average10 years experiencechanging out gasifierrefractories.
Brick inspectiontechniques, at factoryand in gasifier
Wear measurementcharting
Hot Face
New
Reliability
What makes Eastman Gasification so reliable?
• Run Reviews
• Feed Injectors• Maintenance
• Coal Supply• Refractory• Fabrication Shop
• Operations
• Equipment
• Engineering
On site fabrication and engineering services!
We fabricate and repair anything from feedinjectors, Quench rings/Dip Tubes, slag crushers,pressure vessels, to valve bodies and small parts.Whatever it takes to keep the plant running.
Eastman’s’ expertise, experience, supporttechnologies, and reliability focus in
Gasification technology will enable us totake advantage of the future of coal as themajor source of energy and feedstock for
the chemical and other industries.
Conclusion
EASTMANThe Chemistry of New Ideas