East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19...

29
East Link Extension Mercer Island Station Open House November 2016

Transcript of East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19...

Page 1: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Link ExtensionMercer Island Station

Open House

November 2016

Page 2: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Link light rail system

• 19 miles of light rail with 16 stations currently in service

• University Link and Angle Lake opened in 2016

• ST2 Plan funded extensions to Overlake, South King County, and Lynnwood

• 50+ mile system

2

NOTE: Map does not include recently approved Proposition 1 (ST3)

Page 3: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Link overviewLength: 14 miles

Ride times from Mercer Island: • International District / Chinatown: 10

min• University of Washington = 20 min

• Overlake Transit Center = 20 min

• SeaTac Airport = 45 min (with

transfer at International District)

Rider projection: 50,000 daily riders

by 2030

Budget: $3.7 billion (YOE $)

Start of Service: Targeted 2023 3

Page 4: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Link timeline & recent progress

30% design 60% design Completion of

Final Design

Downtown Bellevue Tunnel

Page 5: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

I-90: Construction• Sound Transit is working

with WSDOT to provide full-time HOV lanes in the outer roadways, in preparation for light rail in the center roadway

• The center roadway closes and East Link construction begins June 2017

• Mercer Island station construction begins mid-2017

5

Page 6: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

What we’ve heardKey Themes:• Station design

• Noise from I-90

• Landscaping

Public Involvement:• Environmental open houses• 30% & 60% design open houses• Project briefings• Mercer Island & Integrated Transit open house• Mercer Island Listening Tour• Mercer Island Advisory Group• Drop-in sessions• Presence at Mercer Island Summer Celebration and Farmer’s

Market

Page 7: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Mercer Island Station

Page 8: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Contextual Plan

8

Page 9: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Site Plan

9

Station Platform

East EntryWest Entry

Page 10: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Site Plan

10

East Entry

Page 11: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Headhouse Perspective at 80th Avenue

11

Page 12: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Headhouse Plan

12

Entry

Ticketing

StairEscalators

Elevator

Support Spaces

Page 13: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Headhouse looking down stairs

13

Page 14: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Headhouse looking up stairs

14

Page 15: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

East Headhouse Art Inspiration

15

Page 16: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Site Plan

16

West Entry

Passenger Drop-Off

Page 17: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

West Headhouse Perspective at 77th Avenue

17

Page 18: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

West Headhouse Plan

18

Entry Ticketing Stair

Escalator

Elevator

Support Spaces

Page 19: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

West Headhouse looking down stairs

19

Page 20: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

West Headhouse looking up stairs

20

Page 21: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

West Headhouse artwork inspiration

21

Page 22: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Platform plan

22

Station Platform

Page 23: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Perspective of platform canopy – looking east

23

Page 24: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Mercer Island Station – 77th Ave Entry Landscape Plan

24

Page 25: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Supporting Structures

25

60th Ave SE

Shorewood Drive

Mercer Island Station

Page 26: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

What’s next?

Page 27: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Upcoming Construction

• Spring 2017 – Meet the Contractor Open House

• June 2017 – I-90 Two-way Transit Project

Complete– HOV lanes open in the outer

roadway• Mid-2017

– Mercer Island Station Construction

27

Page 28: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Stay in touch

• Contact Community Outreach staff:[email protected] or 206-903-7176

• 24 hour construction hotline: 888-298-2395• Sign-up to receive email updates:

www.soundtransit.org/subscribe

Visit the project website: www.soundtransit.org/eastlink

28

Page 29: East Link Extension - Sound Transit · Open House November 2016. Link light rail system • 19 miles of light rail with 16 stations currently in service • University Link and Angle

Thank You