CF STRUCTURAL GROUP, LLCBR
5425 Louie Lane, Suite 2CReno, Nevada 89511
(775) 525-1113
DIRECTORYVICINITY MAP LOCATION MAP
GENERAL NOTES
BUILDING CODES
SHEET INDEX
SCOPE OF WORK
BID ALTERNATES
681 Sierra Rose Dr., Ste. B | Reno, Nevada 89511 | 775.826.90104600 South Syracuse, 9th Floor | Denver, Colorado 80237 | 303.256.6598pkelectrical.com © 2008 2011 PK Electrical, Inc.
FAX:PHONE:RENO, NEVADA 89511
(775) 826-1918(775) 826-1919
5434 LONGLEY LANE
CR-ENG.COMWEB:
MINDEN, NEVADA 894231600 STATE ROUTE 88
EAST FORK SWIMMING POOL DISTRICT
HVAC REPLACEMENT1600 STATE ROUTE 88
MINDEN, NEVADA 89423FOR
CARSON VALLEY SWIM CENTER
CONSULTANTS
FOR
OWNER
MECHANICAL
ELECTRICAL
NO SCALE
THE PROJECT SPECIFICATIONS AND DRAWINGS ARE A DOCUMENT SET AND SHOULD NOT BESEPARATED. INFORMATION AND REFERENCES ARE CONTAINED IN ALL SPECIFICATIONS ANDDRAWINGS.
1.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY UNDERSTAND THE COMPLETE SET OFSPECIFICATIONS AND THE DRAWINGS FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TOREVIEW ALL OF THE INFORMATION CONTAINED IN THE SPECIFICATIONS AND DRAWINGS, INCLUDINGALL OTHER DISCIPLINES (ARCHITECTURAL, ELECTRICAL, STRUCTURAL, ETC.) PRIOR TO BID ANDCONSTRUCTION.
2.
THE INFORMATION INDICATED ON THESE DRAWINGS AS EXISTING IS BASED UPON INFORMATIONTAKEN FROM AS-BUILT DRAWINGS, FIELD INVESTIGATION, AND INFORMATION OBTAINED FROMSUBMITTAL DATA, ETC. THE PLANS DO NOT GUARANTEE ACCURACY BUT ARE ONLY AN INDICATIONOF EXISTING CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXACTCONDITIONS SUCH AS EQUIPMENT PLACEMENT, DUCTWORK (SIZE, ROUTING, AND ELEVATION),PIPING (SIZE, ROUTING, AND ELEVATION), ETC. THE DRAWINGS ARE INTENDED TO PROVIDE THECONTRACTOR AN INDICATION OF THE SYSTEM INSTALLED IN THE FACILITY TO DATE. IT WILL BE THECONTRACTOR'S RESPONSIBILITY TO MAKE ADJUSTMENTS TO THE DRAWING INFORMATION ASREQUIRED TO MATCH EXISTING FIELD CONDITIONS.
4.
THE CONTRACTOR SHALL INSTALL THE NEW EQUIPMENT, DUCTWORK, AND PIPING AROUND ALLEXISTING OBSTACLES INCLUDING: ELECTRICAL CONDUIT, DOMESTIC WATER PIPING, WASTE ANDVENT PIPING, CHILLED AND HEATING WATER PIPING, AND FIRE SPRINKLER PIPING. PROVIDE OFFSETSTO AVOID RELOCATION OF OTHER UTILITIES. RELOCATE UTILITIES IF THEY ARE IN CONFLICT WITH THEMECHANICAL SYSTEM INSTALLATION, CAUSE DEVIATIONS IN THE DESIGN INTENT, UNSATISFACTORYOPERATION, NOISY CONDITIONS, OR INTERFERE WITH MAINTENANCE. IT IS THE MECHANICALCONTRACTOR'S RESPONSIBILITY TO COORDINATE ANY UTILITY RELOCATION WITH THE APPROPRIATESUBCONTRACTOR.
3.
MINDEN, NV
2012 INTERNATIONAL BUILDING CODE
2012 INTERNATIONAL FIRE CODE
2012 INTERNATIONAL ENERGY CONSERVATION CODE
2012 UNIFORM MECHANICAL CODE
2012 UNIFORM PLUMBING CODE
2011 NATIONAL ELECTRICAL CODE
STRUCTURAL
IRONWOOD DR
MACKLAND AVE
U.S HWY 395
IRONWOOD DR
COUNTY RD
BELARRA ST
ZALDIA DR
IRONWOOD DR
MA
HO
GA
NY
DR
LON
GLE
AF
PL
OAKWOOD DR
TAMARACK DR
MAHOGANY DR
LUC
ERN
E ST
LUC
ERN
E ST
HW
Y 8
8U
.S H
WY
395
PROJECTLOCATION
HW
Y 8
8
MAHOGANY DR
COUNTY RD
CARSON VALLEYSWIM CENTER
HW
Y 8
8
AREA OF WORK
NO SCALE
CONTACT: CHUN LEE, P.E.PROJECT MANAGER
DOUGLASHIGH
SCHOOL
EAST FORK SWIMMING POOL CENTER1600 STATE ROUTE 88MINDEN, NV 89423CONTACTS:
DIRECTOR (775) 782-8840
SCOTT McCULLOUGH PROJECT MANAGER
(775) 790-5212
CONTACT: CHRIS ROPER, S.E. PRINCIPAL ENGINEER
CONTACT: DUGAN HADLERPROJECT MANAGER
SHANNON HARRIS
1. DEMOLISH EXISTING SOLAR WATER STORAGE TANK AND REPLACE WITH NEW ONE. CONTRACTORTO REPIPE BACK TO EXISTING PIPING. THE NEW SOLAR WATER STORAGE TANK SUPPORTS WILL NEEDTO IN THE SAME LOCATION AS EXISTING. THE HEAT EXCHANGERS AND PIPING LOCATED NEXT TOSOLAR WATER STORAGE TANK MAY NEED TO BE REMOVED AND REINSTALLED IN ORDER TOFACILITATE THE REPLACEMENT OF THE SOLAR WATER STORAGE TANK. THE EXISTING AIRHANDLER(AH-1) LOCATED IN THE MEZZANINE OF THE MECHANICAL ROOM AND CORRESPONDINGOUTDOOR CORRESPONDING CONDENSING UNIT AND REFRIGERANT PIPING IS TO BE REPLACEDWITH NEW. THE ASSOCIATED DUCTWORK AND REFRIGERANT PIPING ASSOCIATED WITH THEDEMOLISHED DEHUMIDIFICATION UNIT (DH-1) IS TO BE REMOVED. THE EXISTING MAKE-UP AIR UNITLOCATED IN THE EXISTING OUTDOOR MECHANICAL YARD IS TO BE REPLACED WITH NEW. THEEXISTING DEHUMIDICATION UNIT (DH-2), CORRESPONDING DUCTWORK, REFRIGERANT ANDHYDRONIC PIPING, AND OUTDOOR CONDENSING UNIT ARE TO BE REMOVED. THE EXISTINGMECHANICAL YARD ON THE WEST SIDE OF THE BUILDING IS TO BE ENLARGED PER THE STRUCTURALDRAWINGS TO FACILITATE THE INSTALLATION OF A NEW DEHUMIDIFICATION UNIT AND (2)CONDENSING UNITS IN THE YARD. (4) EXISTING WINDOWS ARE TO BE REMOVED AND (4) SIDEWALLEXHAUST FANS ARE TO BE INSTALLED IN THEIR LOCATION WITH DUCTWORK SHOWN. THE EXISTINGMURAL ON THE WEST INTERIOR WALL IS NOT TO BE DISTURBED. THE SUPPLY DUCT IN THE POOLROOM TO BE FABRICAIR COMBI 70 (OR APPROVED EQUAL) FABRIC DUCT AND FABRIC DUCT AIRDISTRIBUTION WITH 10-YEAR WARRANTY WITH MANUFACTURER'S HANGERS AND SUPPORTS. RETURNDUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS.
1. SUPPLY DUCT IN THE POOL ROOM TO BE GALVANIZED STEEL DUCTWORK PER SMACNA STANDARDSTH PAINT-GRIP FINISH. DUCT PRESSURE CLASS SHALL BE THE SAME LISTED IN THE SPECIFICATIONS.DUCT TO BE PAINTED TO MATCH EXISTING. SUPPORTS ARE TO BE STAINLESS STEEL PERSPECIFICATIONS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. AIR DISTRIBUTIONTO BE WHAT IS SHOWN ON DRAWINGS.
2. THE SUPPLY DUCTWORK AND SUPPORTS IN THE POOL ROOM ARE TO BE STAINLESS STEEL PERSPECIFICATIONS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. AIR DISTRIBUTIONTO BE WHAT IS SHOWN ON DRAWINGS.
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
T0.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
CO
VER
SHEE
T
MECHANICALMP0.1 MECHANICAL ABBREVIATIONS, LEGEND, CALCULATIONS, AND SCHEDULESMP0.2 MECHANICAL SCHEDULESMP1.0 OVERALL MECHANICAL DEMOLITION FLOOR PLANMP1.1 ENLARGED MECHANICAL ROOM DEMOLITION FLOOR PLANMP1.2 ENLARGED MECHANICAL ROOM MEZZANINE DEMOLITION FLOOR PLANMP1.3 ENLARGED MECHANICAL YARD DEMOLITION FLOOR PLANMP2.0 OVERALL MECHANICAL FLOOR PLANMP2.1 ENLARGED MECHANICAL ROOM FLOOR PLANMP2.2 ENLARGED MECHANICAL ROOM MEZZANINE FLOOR PLANMP2.3 ENLARGED MECHANICAL YARD PLANMP2.4 ENLARGED MECHANICAL YARD WEST PLANMP3.1 MECHANICAL ROOM DEMOLITION SECTIONMP3.2 MECHANICAL ROOM SECTIONMP3.3 WEST WALL ELEVATIONMP3.4 SOUTH WALL MECHANICAL ELEVATIONMP4.1 MECHANICAL ROOM DEMOLITION ISOMETRICMP4.2 MECHANICAL ROOM DEMOLITION ENLARGED ISOMETRICMP4.3 BOYS LOCKER ROOM MECHANICAL DEMOLITION ISOMETRICMP4.4 MECHANICAL ROOM ISOMETRICMP4.5 MECHANICAL ROOM ENLARGED ISOMETRICMP4.6 WEST MECHANICAL YARD ISOMETRICMP5.1 DEMOLITION MECHANICAL PIPING DIAGRAMSMP5.2 DOMESTIC HOT WATER AND SOLAR DOMESTIC HOT WATER PIPING DIAGRAMSMP5.3 HOT WATER DEMOLITION PIPING DIAGRAMMP6.1 MECHANICAL DETAILSMP6.2 MECHANICAL UNIT PLANSMP7.1 CONTROL DIAGRAM AND SEQUECNCE OF OPERATIONMP7.2 CONTROL DIAGRAMS
GENERALT0.1 COVER SHEET
STRUCTURALS0.1 STRUCTURAL NOTES & SPECIFICATIONSS1.1 STRUCTURAL PLANSS2.1 STRUCTURAL ELEVATIONS, SECTIONS & DETAILS
ELECTRICALE0.1 LEGENDS & DRAWING SCHEDULEE0.2 EXISTING ONELINE DIAGRAME0.3 NEW ONELINE DIAGRAME0.4 FIXTURE SCHEDULE, ENERGY COMPLIANCE CALCULATIONS, & LIGHTING
CONTROL SCHEDULEE0.5 PANEL SCHEDULESE0.6 MCC SCHEDULESE0.7 DETAILSE1.0 ELECTRICAL SITE PLANE1.1 OVERALL ELECTRICAL PLANE2.1 PARTIAL ELECTRICAL DEMOLITION PLAN - NORTHE2.2 PARTIAL ELECTRICAL DEMOLITION PLAN - SOUTHE2.3 MECHANICAL ROOM DEMOLITION PLAN - MEZZANINEE2.4 MECHANICAL YARD DEMOLITION PLAN - SOUTHE3.1 PARTIAL LIGHTING PLAN - NORTHE4.1 PARTIAL POWER & SIGNAL PLAN - NORTHE4.2 PARTIAL POWER & SIGNAL PLAN -SOUTHE4.3 MECHANICAL ROOM NEW WORK POWER PLAN - MEZZANINEE4.4 MECHANICAL YARD POWER PLAN - SOUTHE4.5 MECHANICAL YARD POWER PLAN - WEST
1
1
1
PROJECT NOTES
SOLAR STORAGE TANK - LOCHINVAR MODEL DOMESTIC HOT WATER STORAGE TANK WITH LOCHINVAR MODEL LTWX10054-4 TUBE BUNDLE. TANK STORAGE CAPACITYSHALL BE 1,400 GALLONS. TANK TO BE HORIZONTAL CONFIGURATION WITH DIMENSIONS OF 60" DIAMETER BY 120" LONG AND CONSTRUCTED OF STEEL AND GLASSLINED. TANK SHALL HAVE INTERNAL BAFFLE FOR MIXING OF WATER. STORAGE TANK OPTIONS: LIFTING LUGS, MANWAY, 125 PSI TEMPERATURE AND PRESSURE RELIEFVALVE, AND TEMPERATURE AND PRESSURE GAUGE. TANK SHALL BE ASME CERTIFIED AND “HLW” STAMPED. SUPPORTS ARE TO BE LOCATED IN EXISTING LOCATIONELECTRICAL REQUIREMENTS: NONE.OPERATING WEIGHT: 15,000 LBS.
2½"
SOLAR RETURN TO PANELS 2½"
PTRV 2"
DRAIN 2"
SOLAR SUPPLY FROM PANELS
2½"
POOL RETURN 2½"
POOL SUPPLY
LOBBY 111
DEFAULTOCCUPANT
DENSITY(PEOPLE/1,000 SF)
PEOPLEOUTDOOR
AIR RATE(CFM EACH)
CALCULATEDNUMBER OF
PEOPLE
CALCULATEDMINIMUMPEOPLE
OUTDOOR AIRREQUIRED
(CFM)
AREAOUTDOOR
AIR RATE(CFM/SF)
CALCULATEDMINIMUM
AREAOUTDOOR
AIR REQUIRED(CFM)
ZONE AIRDISTRIBUTIONEFFECTIVENESS
TOTALMINIMUMOUTDOOR
AIR REQUIRED(CFM)
OFFICE 114
LIFE GUARD 108
FIRST AID 107
WOMENS FOYER 106
STAIRS
WORK ROOM 113
MEZZANINE
ROOM OR AREA NAME
LOBBY
OFFICE
CORRIDOR
SPECTATOR
7.5 0.06 30 25 188 49 0.8 300
5 1 5 8 0.8 20
5 1 5 9 0.8 20
5 1 5 7 0.8 15
- - - 14 0.8 20
- - - 9 0.8 15
7.5 17 128 33 0.8 205
7.5 210 1575 84 0.8 2,075
CALCULATION BASED ON CHAPTER 4 "VENTILATION AIR SUPPLY" OF THE 2012 UMC AND ASHRAE STANDARD 62.1-2010 "OUTDOOR AIR REQUIREMENTS FOR VENTILATION"
5
5
5
-
-
30
150
FLOORAREA(SF)
OCCUPANCY CATEGORY
CORRIDOR
LOBBY
810
120
140
115
230
150
535
1,400
TOTAL OUTSIDE AIR REQUIRED 2,670
OFFICE
OFFICE
0.06
0.06
0.06
0.06
0.06
0.06
0.06
SST-1
PLUMBING FIXTURE SCHEDULE
SYMBOL LEGENDABBREVIATIONS
MECHANICAL PIPE MATERIAL SCHEDULE
MECHANICAL PIPE INSULATION SCHEDULE
OUTSIDE AIR CALCULATION
BACKFLOW PREVENTERBFP
LOW PRESSURE GAS PIPING
EQUIPMENT OR CONDENSATE DRAIN PIPING
G G
D
HOT WATER RETURN
HW
TW TW
HWR
CW
HOT WATER
TEMPERED WATER
COLD WATER
PRESSURE REDUCING VALVEPRV
PIPE BRANCH, TOP CONNECTION
PIPE BRANCH, BOTTOM CONNECTION
CLEANOUT OR WALL CLEANOUT
FLOOR CLEANOUT OR GRADE CLEANOUT
PRESSURE AND TEMPERATURE RELIEF VALVE
FCO,GCO
FS
FD
FLOOR SINK
FLOOR DRAIN
CO,WCO
PTRV
BACKFLOW PREVENTER
GAS PRESSURE REGULATOR
FLOW CONTROL (BALANCE) VALVE
GPR
GC
GV
CV
FCV
BFV
GAS COCK
GATE VALVE
CHECK VALVE
BUTTERFLY VALVE
BFP
BV BALL VALVE
POOL SUPPLY/ RETURN PIPINGPS/R
SOLAR HOT WATER SUPPLY/ RETURN PIPINGSHS/RSHS/R
PS/R
D
CFH CUBIC FEET PER HOUR
FPS FEET PER SECOND
DHW DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURNDHWR
MARK FIXTURE CONNECTION SIZE DESCRIPTION
PIPE ELBOW UP
TOTAL STATIC PRESSURE
WATER COLUMN/GAUGE
TYP
TSP
WC/WG
TYPICAL
GALLONS PER MINUTE
REVOLUTIONS PER MINUTE
TOTAL DYNAMIC HEAD
THOUSAND BRITISH THERMAL UNITS PER HOUR
DRY BULB, WET BULB TEMPERATURE
ENTERING/LEAVING AIR TEMPERATURE
ENTERING/LEAVING WATER TEMPERATURE
CUBIC FEET PER MINUTE
EXTERNAL STATIC PRESSURE
DIFFERENTIAL PRESSURE
MBH
(N)
TDH
RPM
HP
GPM
FPM
NEW
HORSEPOWER
FEET PER MINUTE
EAT/LAT
EWT/LWT
(E)
ESP
CFM
DP
DB,WB
EXISTING
BELOW FINISHED FLOOR/GRADE
REFRIGERANT SUCTION PIPING
POINT OF CONNECTION
ABOVE FINISHED FLOOR/GRADE
POINT OF DISCONNECT
HOT WATER SUPPLY/RETURN PIPING
TEMPERED WATER SUPPLY/RETURN PIPING
REFRIGERANT LIQUID PIPING
BFF/BFG
AFF/AFG
AF
RS RS
POC
AIR FILTER
HWS/HWR
TWS/TWR
RL RL
HWS/R
TWS/R
PRESSURE SENSOR, TEMPERATURE SENSOR WITH WELL
PRESSURE GAUGE, TEMPERATURE GAUGE
FLEXIBLE PIPE CONNECTOR
PIPE BRANCH, TOP CONNECTION
PIPE BRANCH, BOTTOM CONNECTION
TP
P T
M
FLEX
WATER METER
PIPE RISER
PIPE TEE
PIPE DROP
BFV BUTTERFLY VALVE
PIPE CAP OR PLUG
FLOW CONTROL (BALANCE) VALVE
PRESSURE AND TEMPERATURE RELIEF VALVE
TEMPERATURE CONTROL VALVE (2-WAY OR 3-WAY)
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVETDV
ELL
STR
PIPE ELBOW
PIPE ELBOW DOWN
STRAINER
PIPE BREAK
UNION
PRV
TCV
PTRV
GV
FCV
CV
GATE VALVE
CHECK VALVE
SPRING WOUND BYPASS TIMER @ 48" AFF
THERMOSTAT OR TEMPERATURE SENSOR @ 48" AFF
EXHAUST/RETURN GRILLE
SIDE WALL DIFFUSER
MOTORIZED ACTUATOR
BV
SW
EG/RG
BALL VALVE
T TSTAT
B
M
PARALLEL BLADE DAMPER
DUCT SIZE - FIRST SIZE IS SIDE SHOWN
POSITIVE PRESSURE DUCT SECTION - FIRST SIZE IS TOP
NEGATIVE PRESSURE DUCT SECTION - FIRST SIZE IS TOP
OPPOSED BLADE DAMPER
MANUAL VOLUME DAMPER
FLEXIBLE DUCT CONNECTOR
PBD
OBD
MVD
(L) LINED DUCT
FLEXIBLE DUCT
OA
20x10
SA
RA
EA
OUTSIDE AIR
SUPPLY AIR
RETURN AIR
EXHAUST AIR
ABBR.SYMBOL DESCRIPTION
DEMOLISH(D)
DOOR GRILLEDG
R REGISTER
TRANSFER GRILLETG
AIR PRESSURE DROPAPD
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITS PER HOURBTUH
DIAMETERDIA
ACFM ACTUAL CUBIC FEET PER MINUTE
FLA FULL LOAD AMPERES
FT FOOT
KW KILOWATT
LBS POUNDS
MAXIMUM OVERCURRENT PROTECTIONMOCP
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
V VOLTS
W WATT
IN INCH
SEASONAL ENERGY EFFICIENCY RATIOSEER
ENERGY EFFICIENCY RATIOEER
COEFFICIENT OF PERFORMANCECOP
PUMPP
AMPEREA
MINIMUM EFFICIENCY REPORTING VALUEMERV
MINIMUMMIN
MAX MAXIMUM
HZ HERTZ
EFFICIENCYEFF
DECIBELS, A-WEIGHTED MEASUREMENTdBA
MINIMUM CIRCUIT AMPACITYMCA
RATED LOAD AMPERESRLA
LRA LOCKED ROTOR AMPERES
VALVE FLOW COEFFICIENTCv
NC NOISE CRITERIA
PPM PARTS PER MILLION
FT SQUARE FOOT
FT CUBIC FOOT3
IN SQUARE INCH
IN CUBIC INCH
DOWNDN
GAUGEGA
2
3
2
M WATER METER
POD
DEMOLISH(D)
1. PROVIDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT, SERVICES AND INSURANCES TO COMPLETETHE HEATING, VENTILATING AND AIR CONDITIONING WORK WITHIN THE FULL INTENT OF THEDRAWINGS AND SPECIFICATIONS CONTAINED HEREON AND TO THE ENTIRE SATISFACTION OF THEENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL PERMITS AND FEES AS REQUIRED FOR THE WORK.
3. WORK SHALL BE IN ACCORDANCE WITH 2012 IBC, 2012 IFC, 2012 IECC, 2012 UMC, 2012 UPC,NFPA, NEC, AND ALL APPLICABLE CODES, RULES AND LOCAL REQUIREMENTS.
4. CONTRACTOR SHALL CHECK AND VERIFY ALL SIZES, DIMENSIONS, AND CONDITIONS BEFORESTARTING ANY WORK. ANY DEVIATIONS OR PROBLEMS SHALL BE TRANSMITTED TO THE ENGINEERFOR REVIEW.
5. SUBMISSION OF A BID PROPOSAL, DIRECTLY OR INDIRECTLY BY THE CONTRACTOR FOR THIS WORKSHALL IMPLY THAT THE BIDDER HAS EXAMINED THE JOB SITE AND UNDERSTANDS THE CONDITIONSTHAT MAY AFFECT THE PERFORMANCE OF THE WORK. CONTRACTOR IS EXPECTED TO CONTACT THEENGINEER FOR ANY PARTICULAR PROBLEMS AND CLEAR UP ANY POSSIBLE MISUNDERSTANDINGBEFORE BID IS SUBMITTED. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED FOR ANYALLEGED MISUNDERSTANDING OF THE CONTRACT DOCUMENTS AND THE WORK TO BEACCOMPLISHED.
6. THE CONTRACTOR SHALL PROVIDE ALL SLEEVES, OPENINGS, CUTTING, AND PATCHING NECESSARYFOR THE INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE DONE BY WORKMENSKILLED IN THE TRADES REQUIRED.
7. THE CONTRACTOR SHALL PROVIDE ALL RIGGING, HANDLING OF MATERIALS AND EQUIPMENT, ANDTHE NECESSARY PROTECTION FOR MATERIALS AND EQUIPMENT.
8. TOOLS AND EQUIPMENT WILL BE STORED IN OWNER DESIGNATED AREAS ONLY.
9. THE CONTRACTOR WILL PROTECT THE WORK AND MATERIAL AGAINST DIRT, THEFT, INJURY, ORDAMAGE UNTIL ACCEPTED BY OWNER. ALL WORK SHALL BE TURNED OVER TO OWNER CLEAN ANDIN PERFECT CONDITION, READY FOR SATISFACTORY SERVICE.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DONE TO THE EXISTING BUILDING,PIPING OR EQUIPMENT.
11. PROVIDE 96 HOUR ADVANCE WRITTEN NOTICE TO THE CARSON VALLEY SWIM CENTER BOARD FORSERVICE SHUT DOWNS. ALTERATIONS TO EXISTING SERVICE PIPING SHALL BE MADE AT TIMES THATWILL LEAST AFFECT THE OPERATION OF THE FACILITY.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING CEILING TILES FOR PIPE DEMOLITION,REPLACING CEILING TILES AFTER NEW PIPE INSTALLATION, AND REPLACING ANY DAMAGED CEILINGTILES CAUSED BY CONSTRUCTION. CONTRACTOR SHALL DETERMINE EXTENT OF CEILING TILESREMOVAL PRIOR TO BID.
13. PATCH AND MATCH COLOR OF ANY OPENING OR DISTURBANCE OF EXISTING STRUCTURE.
SYSTEM TAG SIZE (IN) MATERIAL FITTINGS
1. SEE SPECIFICATION FOR ADDITIONAL INFORMATION REGARDING PIPE MATERIAL.
EQUIPMENT DRAIN ALLD WROT COPPER/SOLDER JOINTS
ALLREFRIGERANT LIQUID & SUCTION RL/RS ASTM B280, COPPER ASME B16.22 WROT COPPER/BRAZED JOINTS
SCHEDULE/TYPE
M
ACR
HOT WATER SUPPLY / RETURN HWS/HWR
ASTM B88, COPPER
3 AND LARGER
2 TO 21/2
ASTM A53, STEEL ASME B16.9 STEEL/WELDED JOINTS
11/2 AND SMALLER ASTM B88, COPPER L
40
ASME B16.22 WROT COPPER/SOLDER JOINTS
ASTM B88, COPPER L ASME B16.22 WROT COPPER/BRAZED JOINTSHOT WATER SUPPLY / RETURN
HOT WATER SUPPLY / RETURN
HWS/HWR
HWS/HWR
GENERAL NOTES:
SYSTEM TAG SIZE (IN) THICKNESS (IN)
1. SEE SPECIFICATION FOR ADDITIONAL INFORMATION REGARDING PIPE INSULATION.
2. PROVIDE PIPE INSULATION JACKET PER SPECIFICATIONS. ALL EXTERIOR PIPE INSULATION TO BE JACKETED.
3. POLYISOCYANURATE INSULATED PIPING IS TO BE COVERED WITH PVC JACKET.
LOCATION TYPE
REFRIGERANT LIQUID & SUCTION INTERIOR
EXTERIORALL
ALL 1
2
RL/RS
REFRIGERANT LIQUID & SUCTION RL/RS
HOT WATER SUPPLY / RETURN HWS/HWR
11/2 AND LARGER
1/2-11/4 INTERIOR FIBERGLASS 1½
2
ALL 2
FLEXIBLE ELASTOMERIC
POLYISOCYANURATE FOAM
INTERIOR
EXTERIOR
FIBERGLASSHOT WATER SUPPLY / RETURN HWS/HWR
HOT WATER SUPPLY / RETURN HWS/HWR
FLEXIBLE ELASTOMERIC
GENERAL NOTES:
POOL SUPPLY / RETURN PS/PR
2 AND LARGER
11/2 AND SMALLER ASTM B88, COPPER L ASME B16.22 WROT COPPER/SOLDER JOINTS
ASTM B88, COPPER L ASME B16.22 WROT COPPER/BRAZED JOINTSPOOL SUPPLY / RETURN PS/PR
SOLAR SUPPLY / RETURN SHS/SHR
3 AND LARGER
2 TO 21/2
ASTM A53, STEEL ASME B16.9 STEEL/WELDED JOINTS
11/2 AND SMALLER ASTM B88, COPPER L
40
ASME B16.22 WROT COPPER/SOLDER JOINTS
ASTM B88, COPPER L ASME B16.22 WROT COPPER/SOLDER JOINTSSOLAR SUPPLY / RETURN
SOLAR SUPPLY / RETURN
SHS/SHR
SHS/SHR
11/2 AND LARGER 2
ALL 2POLYISOCYANURATE FOAM
INTERIOR
EXTERIOR
FIBERGLASSPOOL HEATING WATER SUPPLY / RETURN PS/PR
POOL HEATING WATER SUPPLY / RETURN PS/PR
2HOT WATER SUPPLY / RETURN (INSIDE POOL ROOM) HWS/HWR
POOL HEATING WATER SUPPLY / RETURN (INSIDE POOL ROOM)
ALL FLEXIBLE ELASTOMERICINTERIOR
ALLPS/PR 2INTERIOR FLEXIBLE ELASTOMERIC
ALL 2INTERIOR FIBERGLASSSOLAR HEATING WATER SUPPLY / RETURN SHS/SHR
HOT GAS BYPASSHGBP
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP0.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ABB
REVI
ATI
ON
S, L
EGEN
D, C
ALC
ULA
TIO
NS,
AN
D S
CH
EDU
LES
1
LOUVER SCHEDULE
PLUMBING FIXTURE AND EQUIPMENT SCHEDULE
6034603ACH550ABBEF-1EF1
OPTIONSHZPHASEVOLTSHP
ELECTRICALMODELMANUFACTURER
A,B,C,D
VFD~
EQUIPMENT SERVED
6034603ACH550ABBEF-2EF2 A,B,C,D
6034603ACH550ABBEF-3EF3 A,B,C,D
6034603ACH550ABBEF-4EF4 A,B,C,D
OPERATINGWEIGHT
(LBS)
AIRFLOW(ACFM)
ESP(IN WC)
MOTOR(HP)
WHEELSPEED(RPM)
SOUND POWER(OCTAVES 1-8)
1. ALUMINUM HOUSING
2. ALUMINUM WHEEL
3. ADJUSTABLE MOTOR PULLEY
1 POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 10,750 0.5 750 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D
2
3
4
UNIT OPTIONSdBALwASONES
SOUND PERFORMANCE
DRIVE TYPEFAN TYPEFLAVOLTS/Ø/HzMODELMANUFACTURERSERVICE
UNIT GENERAL DATA ELECTRICAL FAN PERFORMANCE
GENERAL NOTES: UNIT FEATURES: UNIT OPTIONS:
TAG TYPE FACE FRAME MODEL REMARKSMANUF.
CD-1 AIR CONCEPTS SUPPLY PLAQUE DUCT SPD
RG-1 TITUS RETURN EGG CRATE DUCT 50F
SG-1 DRUM DL-SSAIR CONCEPTS SUPPLY DUCT
GENERAL NOTES: OPTIONS
1. ALL DRIVES TO BE SUPPLIED BY CONTROLS CONTRACTOR,WIRED BY ELECTRICAL CONTRACTOR. CONTROLSCONTRACTOR TO COORDINATE WITH EQUIPMENTMANUFACTURER FOR INSTALLATION AND START-UPREQUIREMENTS.
2. COORDINATE EXACT LOCATION WITH ELECTRICAL DRAWINGS.
POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 0.5 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D
POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 0.5 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D
POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 0.5 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D
SERVICE MANUFACTURER MODELOPERATING
WEIGHT(LBS)
UNIT GENERAL DATA ELECTRICAL
VOLTS/Ø/Hz MCA MOCP
1A 5,200 460/3/60 24 25DH-1 DECTRON KVG427
COOLING PERFORMANCE
TOTAL SENSIBLE
-- 733 733
CAPACITY (MBH)AMBIENTDESIGN
TEMPERATURE(°F DB/WB)
105/61
UNIT OPTIONS
A,B,F
GENERAL NOTES: UNIT FEATURES: UNIT OPTIONS:
1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION.
2. ALL ELECTRICAL COMPONENTS SHALL BE UL OR ETL LISTED.
1. R410A REFRIGERANT SYSTEM.
2. LOUVERED HAIL GUARDS
A. LOW AMBIENT CONTROL WITH CONDENSER FAN SPEED CONTROL
B. REFRIGERATION SERVICE VALVE
C. 115V TRANSFORMER
D. PHASE FAILURE
E. HOT GAS BYPASS TEE
F. 4 STAGE COOLING
2
MIN EFFICIENCY
SEER EER
11.4
AH-1 DAIKIN RCS025D 2,000 50 60 -- 276 276 A,B,C,D,E,F11460/3/60
GENERAL NOTES: OPTIONS:
CAPACITY(MBH)
AIRFLOW(CFM)
MAXAPD
(IN WC)
EAT(°F)
LAT(°F)
FLUIDFLOW(GPM)
MAXWPD
(FT WC)
LWT(°F)
EWT(°F)
1,507 43,000 10 76 108 160 15 180 160 2 8
ROWS FINS/IN
HOT WATER HEATING PERFORMANCE
FLUID
40% GLYCOL
CIRCUITS
44
EAT(°F db/wb)
LAT(°F db)
DX COOLING
CAPACITY (MBH)
SENSIBLETOTAL
1,3041,885 100/61 75
ROOMTEMPERATURE
(°F db)
DESIGN CONDITION
86
RELATIVEHUMIDITY(%)
50
SUMMERAMBIENT DESIGN
(°F db/wb)
95/61
WINTER AMBIENTDESIGN
(°F db/wb)
0/0
DEHUMIDIFICATIONLOAD (LB/HR)
460
OPERATINGWEIGHT
(LBS)
SIZE(DIA)
MAXAIRFLOW(ACFM)
MIN OAAIRFLOW(ACFM)
ESP(IN WC)
TSP(IN WC)
MOTOR(HP)
CAPACITY(MBH)
AIRFLOW(CFM)
MAXAPD
(IN WC)
EAT(°F)
LAT(°F)
FLUIDFLOW(GPM)
MAXWPD
(FT WC)
LWT(°F)
EWT(°F)
CAPACITY (MBH)AIRFLOW
(CFM)
MAXAPD
(IN WC)
LAT(°F)
UNIT OPTIONS
1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION.
2. ALL ELECTRICAL COMPONENTS SHALL BE UL OR ETL LISTED.
3. HEATING COIL TO BE SIZED FOR 40% PROPYLENE GLYCOL FLUID.
1. PRE FILTERS: 2" PLEATED, MERV 832 QTY - 20x20x2500 FPM FACE VELOCITYAPD: 0.50"WC (DIRTY)
2. PRE FILTERS: 2" PLEATED, MERV 83 QTY - 16x20x2500 FPM FACE VELOCITYAPD: 0.50"WC (DIRTY)
A. UNIT SHALL COME IN 3 SPLITS
B. FACTORY WIRED AND MOUNTED VFD
C. LOW LEAKAGE OUTSIDE AIR AND RETURN AIR DAMPERS
D. PREMIUM EFFICIENT MOTOR
E. FILTER GAUGE
F. DUCT MOUNTED SMOKE DETECTOR
EAT(°F DB/WB)
FACEVELOCITY
(FPM)
FACESIZE(SF)
FACEVELOCITY
(FPM)
FACESIZE(SF)
1 LOBBY AREA DAIKIN CAH017GDGC 4,000 460/3/60 17.9 25 1 PLENUM 8,00027 2,675 2.5 4.1 10 374 8,000 500 16 2 40 95 37 5 180 160 2 10 357 272 12,000 493 24.3 5 80 / 61 55 4 10 A,B,C,D,E,F
SERVICE MANUFACTURER MODEL VOLTS/Ø/Hz FLA MOCP
ELECTRICALUNIT GENERAL DATA
TYPEQTY
SUPPLY FAN
ROWS FINS/INTOTAL SENSIBLE
ROWS FINS/IN
DIRECT EXPANSION COOLING PERFORMANCEHOT WATER HEATING PERFORMANCE
UNIT OPTIONS:
AIR FILTER DATA:
10,750
10,750
10,750
750
750
750
EG-1 TITUS EXHAUST SINGLE DEFLECTION DUCT 350RL-SS
UNIT OPTIONS:GENERAL NOTES:
1B 4,000 460/3/60 18 20DH-1 DECTRON KVG345 -- 571 571 A,B,F11.4
1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION.
2. ALL ELECTRICAL COMPONENTS SHALL BE UL OR ETL LISTED.
3. HEATING COIL TO BE SIZED FOR 40% PROPYLENE GLYCOL FLUID.
1. PRE FILTERS: 4" PLEATED, MERV 133 QTY - 24x24x4500 FPM FACE VELOCITYAPD: 1.00"WC (DIRTY)
2. PRE FILTERS: 4" PLEATED, MERV 133 QTY - 12x24x4500 FPM FACE VELOCITYAPD: 1.00"WC (DIRTY)
UNIT OPTIONS:
AIR FILTER DATA:
UNIT OPTIONS:GENERAL NOTES:
105/61
105/61
F. BLYGOLD, ANTI MICROBIAL COIL COATING
G. BACNET MICROPROCESSOR CONTROLLER
H. DIRTY FILTER SENSOR
I. RETURN AIR TEMPERATURE SENSOR
J. RETURN AIR HUMIDITY SENSOR
K. OUTDOOR TEMPERATURE SENSOR
L. FACTORY MOUNTED AND WIRED NON-FUSED DISCONNECT
M. MANUFACTURER'S CONTROLS FOR REMOTE PURGE (FIELD WIRED ANDCONFIGURED)
N. DUCT MOUNTED SMOKE DETECTOR
O. HOT GAS BYPASS
A. PROVIDE WITH 5% INPUT LINE REACTORS
B. PROVIDE AND INSTALL BACNET COMMUNICATION CARDS
C. MANUFACTURER'S CIRCUIT BREAKER TYPE DISCONNECT
D. MANUFACTURER'S NEMA 3R ENCLOSURE, FOR OUTDOORINSTALLATION
A. BACKDRAFT DAMPER.
B. PREMIUM EFFICIENT MOTOR SUITABLE FOR USE WITH VARIABLEFREQUENCY DRIVE (VFD).
C. STAINLESS STEEL BIRD SCREEN.
D. HI-PRO POLYSTER COATING ON ALL INTERNAL PARTS OF THE FANWHICH COMES IN CONTACT OF THE AIR STREAM.
1. ALL CAPACITIES LISTED ARE AT 4,500 FEET ELEVATION
2. ALL FANS SHALL BEAR THE AMCA CERTIFICATED RATING SEAL FOR SOUND ANDAIR PERFORMANCE.
3. FAN SHALL BE UL 705 LISTED
4. WHEELS SHALL BE STATICALLY AND DYNAMICALLY BALANCED IN ACCORDANCETO AMCA STANDARD 204-05.
5. LwA - A WEIGHTED SOUND DATA BASED ON ANSI S1.4
6. dBA - A WEIGHTED SOUND PRESSURE BASED ON 11.5 dB ATTENUATION PEROCTAVE BAND AT 5 FT - NOT LICENSED AMCA INTERNATIONAL
7. SONES CALCULATED USING AMCA 301 AT 5FT
1. OUTSIDE AIR DAMPER. DAMPERS SHALL BE SIZED FOR NO GREATER THAN 0.15"WC PRESSURE DROP AND 800 FPM VELOCITY THROUGH THE FREE AREA.
2. PREMIUM EFFICIENCY FAN MOTOR.
3. FACTORY INSTALLED AIR VENTS AT THE TOP OF EACH COIL.
A. SUPPLY FANS CONTROLLED BY FACTORY WIRED AND MOUNTED VARIABLEFREQUENCY DRIVES (VFD)
B. FACTORY WIRED, PIPED, AND TESTED 3-WAY MODULATING HEATING HOTWATER CONTROL VALVE
C. DOUBLE WALL CONSTRUCTION
D. 2" INSULATION
E. EPOXY COATED FAN
L
SIZE TDH(FT)
IMP. DIA.(IN)
FLUIDFLOW(GPM)
MINEFF.(%)
SUCTION(IN)
UNIT OPTIONDISCH.(IN)
TRIPLE DUTYVALVE MODEL
TRIPLE DUTYVALVE SIZE
(IN)
TRIPLE DUTYPRESS DROP
(PSI)
SUCTIONDIFFUSERMODEL
FRAME SIZEMOTOR
INFORMATION FOR INLINE POOL PUMPS SCHEDULED ABOVE
A. TEFC PREMIUM EFFICIENCY MOTOR
OPTIONS FOR PUMPS SCHEDULED ABOVE
OPERATINGWEIGHT (LBS)
PP-1 (E) TRAINING POOL PENTAIR WHISPERFLO-XFK-8 150 2AAB INLINE 40 60 POOL 7 60 2" 2" N/A N/A N/A N/A N/A 2 460/3/60 1,750 A
RPMV/Ph/HzHPTYPEMODELMANUFACTURERSERVICE
UNIT GENERAL DATA
PP-2 (E) INDOOR MAIN POOL 150 2AAB INLINE 120 60 POOL 7 60 3" 3" N/A N/A N/A N/A N/A 5 1,750PENTAIR WHISPERFLO-XFK-20 460/3/60 A
THRU
GENERAL
1. DESCRIPTION: MAINTENANCE FREE, CLOSE COUPLED, CENTRIFUGAL PUMP DESIGNEDFOR USE WITH POOL WATER.
2. PUMP TO BE NSF-50 COMPLIANT
PUMP
1. PUMP SHALL BE CLASS 30 CAST IRON WITH UNION CONNECTIONS.
2. IMPELLER SHALL BE PLASTIC
MOTOR
1. PREMIUM EFFICIENCY.
2. MOTOR SHALL MEET NEMA SPECIFICATIONS AND BE NON-OVERLOADING FOR ENTIREPUMP CURVE.
HEAT TRACERAYCHEM MODEL 5XL2-CR HEATING CABLES, COMPONENTS, AND CONTROLS TO PREVENTPIPES FROM FREEZING. HEAT TRACE SHALL BE CONSTRUCTED OF (2) 16 AWG NICKEL-COPPERBUS WIRES EMBEDDED IN A SELF REGULATING POLYMER CORE. CABLE SHALL BE COVERED BYA POLYOLEFIN DIELECTRIC STANDARD JACKET. TOTAL LENGTH OF NEW HEAT TRACE SHALL BE200 FT. PROVIDE HEAT TRACE WITH 120V POWER KIT, AMBIENT TEMPERATURE SENSOR,GROUND FAULT DEVICE, END SEAL KITS, SPLICE KITS, LABEL KIT, AND TEE KITS AS REQUIRED.HEAT TRACE TO PROVIDE AUTOMATIC 24-HOUR FREEZE PROTECTION. ELEC.: 120V/1Ø/60Hz(5W PER 1 FOOT) = 1,000 WATTS
3. BUILT IN BASKET STRAINER
1. OUTSIDE AIR DAMPER. DAMPERS SHALL BE SIZED FOR NO GREATER THAN 0.15"WC PRESSURE DROP AND 800 FPM VELOCITY THROUGH THE FREE AREA.
2. PREMIUM EFFICIENCY FAN MOTOR.
3. FACTORY INSTALLED AIR VENTS AT THE TOP OF EACH COIL.
DEHUMIDIFICATION UNIT SCHEDULE
MAKE-UP AIR UNIT SCHEDULE
EQUIPMENT SCHEDULE
EXHAUST FAN SCHEDULE
AIR DISTRIBUTION SCHEDULE
VFD SCHEDULE
CONDENSING UNIT SCHEDULE
AIR HANDLER SCHEDULE
PUMP SCHEDULE
DH-1 RETURN1
GENERAL NOTES: OPTIONS:
A,B43,00041.74 0.05
PRESSUREDROP (IN.
W.C.)
FREE AREA(SQ. FT.)
AIRFLOW(CFM) OPTIONS
WIDTH(IN)
HEIGHT(IN)
FACE SIZE
MODELMANUFACTURERSERVICE
RETURN AIR
FUNCTION
1,030
FACEVELOCITY
(FPM)
1,100
FACEVELOCITY
FOR WATERPENETRATION
(FPM)
GREENHECK ESD-403 84 132
1. 4" DEEP DRAINABLE BLADE LOUVER
2. LOUVER TO BE CONSTRUCTED OF MINIMUM0.081 THICK EXTRUDED ALUMINUM FRAME WITHMINIMUM 0.081 EXTRUDED ALUMINUM BLADE
A. CHANNEL FRAME
B. HI-PRO POLYSTER FINISH, PROVIDE OWNERWITH COLOR SAMPLES WITH SUBMITTALS
DRAIN 3/4"
DRAIN 3/4"
3/4"COLD WATER
EF~
NECK DIA.DIFFUSER
AIRFLOWTHROW
8-24x24 CD-1
200 CFM 4W
12x12 CD-1
200 CFM 4W
RECTANGULAR NECK:
DIFFUSER
THROWAIRFLOW
NECK DIA.
NOTE:
ROUND NECK:
FRAME SIZE
COLOR SHALL BE OFF-WHITE WITHINTERIOR FLAT BLACK UNLESS NOTEDOTHERWISE.
SLOT WIDTH
(V)ERT. OR (H)ORIZ. THROW(WALL SIDE, ROOM SIDE)
200 CFM (V,H)
48 - 2 - 1 LSD-1
# OF SLOTS
DIFFUSER
ADJUSTMENT
LENGTH
AIRFLOW
LINEAR SLOT:
CU~
DH~ SERVICE MANUFACTURER MODEL
OPERATINGWEIGHT (LBS)
ELECTRICAL
VOLTS/Ø/HZ MCA MOCP
SUPPLYAIRFLOW
(CFM)
WHEELSPEED(RPM) SOUND POWER LEVEL
(OCTAVES 1-8)
UNIT OPTIONS
SUPPLY AIREXTERNAL
STATICPRESSURE
(in wc)
460/3/60 A,B,C,D,E,F,G,H,I,J,K,L,M,N
UNIT GENERAL DATA
1 INDOOR POOL DECTRON RS-404/484C 30,000 262 300 43,000 1.50 1,780 92,89,96,93,92,87,82,78
MUA~
1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION
2. UNIT SHALL BE ETL OR UL LISTED TO ANSI 283.4
3. MOTORS SHALL MEET EPACT AND NEMA 1210 EFFICIENCIES
1. G90 GALVANIZED STEEL CONSTRUCTION WITH BAKED ENAMEL PAINT
STANDARD FEATURES:
SERVICE MANUFACTURER MODEL OPERATINGWEIGHT (LBS)
ELECTRICAL
VOLTS/Ø/HZ HP MCA MOCP
AIRFLOW(CFM)
WHEELSPEED(RPM) HEATING TYPE GAS TYPE ENTERING
AIR (°F)LEAVINGAIR (°F)
MAXINPUT(MBH)
OUTPUT(MBH)
THERMALEFFICIENCY
(%)
HEATING PERFORMANCE
COOLINGTYPE
ENTERINGAIR (°F)
LEAVINGAIR (°F)
EVAPEFF.(%)
MEDIATYPE
COOLING PERFORMANCE SOUND CRITERIA (MAXIMUM ALLOWABLE RATINGS)
SOUND POWER LEVEL(OCTAVES 1-8)
SONESUNIT OPTIONS
82.065.0100 GLASSdek800 103 400 272
EXTERNALSTATIC
PRESSURE(in wc)
460/3/60 A,B,C,D,E,F,G,H,I,J,K,L,M
UNIT GENERAL DATA
1 SLIDE TOWER GREENHECK IGX-115-H22 1,600 0.5 5.1 15 3,000 0.50 674 INDIRECT NATURAL EVAP 73,81,80,85,82,73,73,76 26
RETURN AIREXTERNAL
STATICPRESSURE
(in wc)
0.50
OUTSIDEAIRFLOW
(CFM)
4,500
AH~
VOLTS/Ø/HZ MCA MOCP
120/1/60 10 15
I. STAINLESS STEEL HEAT EXCHANGER
J. DUCT MOUNTED SMOKE DETECTOR.SYSTEM SENSOR MODEL D4120W (ORAPPROVED EQUAL). RATED FOR OUTDOORUSE WITH EXTRA SET OF CONTACTS FORCONNECTING TO (E) FIRE ALARM CONTROLPANEL.
L. 12" GLASSDEK EVAPORATIVE COOLINGMEDIA
M. CONTROLS CONTRACTOR TO PROVIDEAUTO DRAIN AND FLUSH EVAPORATIVECONTROLS.
SOUND CRITERIA (MAXIMUMALLOWABLE RATINGS)
E. MOTORIZED INLET AIR DAMPER
F. 4 TO 1 ELECTRONIC FURNACE MODULATION
G. PREMIUM EFFICIENCY SUPPLY FAN MOTOR
H. 2-10Vdc FURNACE TEMPERATURE CONTROL.DISCHARGE OVERRIDE BY CONTROLSCONTRACTOR
A. 24" HIGH SEISMIC CURB FOR MOUNTINGON CONCRETE SLAB
B. NEOPRENE BLOWER VIBRATION ISOLATION
C. INLET AIR TEMPERATURE SENSOR
D. FREEZESTAT
TYPE#
HT1
HT6
MARK FIXTURE CONNECTION SIZE DESCRIPTION
DRAIN VALVE - HONEYWELL MODEL #VBN2BK3S0CM 2-WAY FLOW CONTROL VALVE AND ACTUATOR (PROVIDED BY CONTROLSCONTRACTOR, INSTALLED BY CONTRACTOR). VALVE SHALL BE 3/4'' WITH FPT CONNECTIONS AND STAINLESS STEEL BALL WITHREINFORCED TEFLON SEATS. VALVE ACTUATOR SHALL BE 24 VAC WITH SPRING RETURN. PROVIDE AND INSTALLMANUFACTURER'S NEMA 3R ENCLOSURE FOR OUTDOOR USE.
DRAIN VALVE - HONEYWELL MODEL #VBN2BK3S0CM 2-WAY FLOW CONTROL VALVE AND ACTUATOR (PROVIDED BY CONTROLSCONTRACTOR, INSTALLED BY CONTRACTOR). VALVE SHALL BE 3/4'' WITH FPT CONNECTIONS AND STAINLESS STEEL BALL WITHREINFORCED TEFLON SEATS. VALVE ACTUATOR SHALL BE 24 VAC WITH SPRING RETURN. PROVIDE AND INSTALLMANUFACTURER'S NEMA 3R ENCLOSURE FOR OUTDOOR USE.
FILL VALVE - HONEYWELL MODEL #VBN2BK3S0CM 2-WAY FLOW CONTROL VALVE AND ACTUATOR (PROVIDED BY CONTROLSCONTRACTOR, INSTALLED BY CONTRACTOR). VALVE SHALL BE 3/4'' WITH FPT CONNECTIONS AND STAINLESS STEEL BALL WITHREINFORCED TEFLON SEATS. VALVE ACTUATOR SHALL BE 24 VAC WITH SPRING RETURN. PROVIDE AND INSTALLMANUFACTURER'S NEMA 3R ENCLOSURE FOR OUTDOOR USE.
DV-1
DV-2
FV-1
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP0.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
SCH
EDU
LES
1
SCHEDULES HAVE BEEN REVISED
EXISTING EXERCISE POOL
MODIFIED TRAINING POOL
EXISTING INDOOR POOL
RECEIVINGPOOL
EXISTING POOL
MP1.1A
MP1.21
MP1.3A
NO WORK INTHIS AREA
(D) 4'x4' WINDOWS INCLUDINGMULLION AND FRAMES FORINSTALLATION OF SIDEWALLEXHAUST FAN (TYP-4)
(E) 36"Ø SA
(E)
32"
Ø S
A
(E) 32"Ø SA
(E)
28"
Ø S
A (
E) 2
4"Ø
SA
(E) 36"x36" SA
(E) 36"x36" RA
(E) DEHUMIDIFICATION UNIT
(E) CONDENSING UNIT
(D) 24"Ø SA (D) 22"Ø SA (D) 18"Ø SA
(D) 2
8"Ø
SA
(D) 3
0"Ø
SA
(D) 3
2"Ø
SA
(D) 3
4"Ø
SA
(D) 26"Ø SA
(D) 34"Ø SA
(E) 34"Ø SA
(D) 24"Ø SA
(D) 12"Ø SA
(D) 28"Ø SA (D) 22"Ø SA
CONDENSING UNITREMOVED AS PART OFPHASE 1. (D) ASSOCIATEDREFRIGERANT PIPING.
(D) CMU WALL, SEESTRUCTURAL DRAWINGS
(D) REFRIGERANT PIPING
MEZZANINE
FIRST FLOOR
(D) REFRIGERANT PIPING
(D) UNDERGROUNDREFRIGERANT PIPING
(D) UNDERGROUNDREFRIGERANT PIPING
(E) HWS, HWR & PS, PR
DEMO DUCTWORK AND ALLASSOCIATED SUPPORTS
DEMO DUCTWORK AND ALLASSOCIATED SUPPORTS
DEMO DUCTWORK AND ALLASSOCIATED SUPPORTS
(E) PVC SLEEVE
(D) CONDENSING UNITCOMPLETE INCLUDINGSUPPORTS, ELECTRICAL,AND REFRIGERANTPIPING.
(D) TREE COMPLETE INCLUDINGROOTS (TYP-2)
(D) SHED RELOCATED PEROWNERS REQUEST (TYP-2)
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP1.0
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
OVE
RALL
MEC
HA
NIC
AL
DEM
OLI
TIO
N F
LOO
R PL
AN
SCALE: 1/8" = 1'-0" MP1.0
AOVERALL MECHANICAL DEMOLITION FLOOR PLAN
1
2 ADDENDUM 2 7/28/16
1
(E) BOILER (B-1)
(E) BOILER (B-2)
(E) BOILER (B-3)
(E) 3/4"CW
(E) 3/4"HWR
(E) 3/4"HWS
(E) 1"HWS
(E) 1"HWR
(E) 1 1/2"CW
(E) 3"HWS
(E) 3"HWS
(E) 3"HWS
(E) 2"G
(E) 4"G
(E) 3"HWR
(E) 5"HWS
(E) 2"PS
(E) 2"PR
(E) 1 1/2"CW
(E) 4"HWR
(E) 4"HWS
(E) 2 1/2"HWS
(E) 2 1/2"HWR
(E) 2"D
(E) 1"HWR
(E) 1"HWS
(E) 1"SHS
(E) 1 1/2"CW
(E) 2"SHR
(E) 2 1/2"CW
(E) 1 1/2"PS
(E) 3/4"CW
(E) 1 1/4"CW
(E) 3"HWR
(E) 4"HWS
(E) 5"HWR
(E) PLENUM
(E) POOL FILTER(E) POOL FILTER
(E) POOL FILTER
(E) FLOOR DRAIN (TYP-2)
(E) POOL CHARCOALFILTER (TYP-5)
(E) FLUE(E) FLUE
(E) FLUE
(E) COMBUSTIONAIR (TYP-3)
(E) AIRSEPARATOR
(E) POOLFILTER
(E) POOL FILTER
(E) HEATING HOTWATER EXPANSIONTANK
(E) HEATING HOTWATER PUMP
(E) HEATING HOTWATER MAKEUP
(E) 1"SHS
(E) HEATING HOTWATER EXPANSIONTANK
(E) 96x48LOUVER
(E) 1 1/2"PR (E) 4"CW
(D) REFRIGERANTPIPING (TYP-4)
(E) 4"G
(E) 1"HWS
(E) 3"HWR
(E) 2"SHR
(E) CIRCULATION PUMP
(E) GAS METER
(E) 1"PR
(E) 1 1/2"CW
(E) 4"SHR
(E) 1"PS
(E) 1"PR
(E) 4"PR
(E) 4"PR
(E) 3"PS
(E) 1"PR
(E) 1"PS
(E) 3"PR
(E) 4"SHR
1MP3.1
(D) UNDERGROUNDREFRIGERANT PIPING(TYP-4)
(D) UNDERGROUNDREFRIGERANT PIPING(TYP-4)
2"PS
(E) PUMP
(E) PUMP
(E) PUMP
(E) PUMP
(E) PUMP
(E) CAPS
(E) PUMP
(E) 8"Ø EA
(E) 1 1/2"PR
(E) 2"PR
(E) 2"PS
(E) 2"PR
(E) 2"PS
1
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP1.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
ROO
M D
EMO
LITI
ON
FLO
OR
PLA
N
SCALE: 1/2" = 1'-0" MP1.1
AMECHANICAL ROOM DEMOLITION 1ST FLOOR PLAN
(E) 38"x38" OA
(E)
38"
x38"
OA
(E) 72"x96" OA
(D) 89"x38" (E) 34"Ø SA
(E) 40"Ø RA
(D) 48"x48"
(D
) 34"
Ø
(D) 30"x36"
(D) DUCT TRANSITION
(D) AIR HANDLER (AH-1)COMPLETE, INCLUDING SUPPORTS
(D) SOLARSTORAGE TANK
(E) 2"PS
(E) 2"PR
(E) 1"HWS
(E) 2"HWS
(E) 2"HWR
(E) 2"HWS
(E) 2"HWR
(E) 4"PR
(E) 4"HWS
(E) 4"HWR (E) 1 1/2"HWS
(E) 1"PR
(E) 1"HWR
(E) 1"PS
(E) 2"HWR (E) 2"HWS
(E) 1"HWS
(E) 1"PS
(E) 4"HWS
(E) 3"HWR
(E) 1"HWS
(E) 2"HWS
(E) 3"PS
(E) 3"HWS (E) 3"HWS
(E) 3"HWR
(E) 3"PR
(E) 1"SHS
(E) 2"SHS
(E) 2"HWR
(E) 2"HWS
(E) 4"PR
(E) 4"HWR
(E) 2"PS
(E) 2"HWR
(E) 2"HWS
(E) 2"PR
(E) 4"SHR
(E) 4"HWS (E) 1 1/2"HWS
(E) 1 1/2"HWR
(E) 8"Ø EA
(E) 1 1/2"HWS
(E) 6"RD
(E) 2"HWR
(E) 2"HWS
(E) 2"D
(E) 2"D
(E) 2"SHR
(E) 2"SHS
(E) 1"HWS
(E) 1"HWR
(E) 1/2"D
(E) 2"HWS
(E) 2"HWR
(E) 2"PS
(E) 2"PR
(E) 1"TWR
(E) 2"TW
(E) 2 1/2"CW
(E) 1"TW
(E) 2"CW
(D) UNIT HEATER
(E) 2"SHR
(E) HEATEXCHANGER (2)
(E) HEATEXCHANGER
(E) HEATEXCHANGER
(E) HEATEXCHANGER
(E) 8"Ø COMBUSTION AIR
(E) 8"ØCOMBUSTION AIR
(E) 8"ØCOMBUSTION AIR
(E) 12"ØFLUE
(E) 12"Ø FLUE
(E) 12"Ø FLUE
1MP3.1
(E) 1"HWS
(E) 8"Ø OA
(E) 8"Ø OA
(E) 8"Ø O
A
(E) 5"HWS
(E) 3"HWR
(E) 3"HWS
(E) 3"HWS
(E) 5"HWS
(E) 3"HWR
(E) AIRSEPARATOR
(E) 1 1/2"HWS
(E) 1"HWS
(E) 1"CW (D) 3/4"HWS,R
(D) PUMPON RISER
(D) 2"HWR
(D) 2"HWS
(D) 38"x38" OA
(D) REFRIGERANTPIPING COMPLETE,INCLUDINGSUPPORTS
(D) REFRIGERANTPIPING COMPLETE,INCLUDING SUPPORTS
(D) REFRIGERANTPIPING COMPLETE,INCLUDING SUPPORTS
(D) 2"HWS, 2"HWR, FROMDEHUMIDIFICATION UNITRACKED ON WALL
CAP 2"HWS, 2"HWR AT RISER
2"PR
EXISTING HEAT EXCHANGERS ANDASSOCIATED PIPING NEEDS TO BE REMOVEDAND REINSTALLED TO FACILITATE REMOVALAND REINSTALLATION OF SOLAR STORAGETANK.
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP1.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
ROO
M M
EZZA
NIN
E D
EMO
LITI
ON
FLO
OR
PLA
N
SCALE: 3/8" = 1'-0" MP1.2
1MECHANICAL ROOM DEMOLITION MEZZANINE FLOOR PLAN
1
(E) 8"Ø EA
(E) 8"Ø SA
(E) 16"Ø SA
(E)
12"
Ø S
A
(E) 14"Ø SA
(E)
12"
Ø S
A
(E)
10"
Ø S
A
(E) 14"Ø SA
(E) 8"Ø EA
(D) REFRIGERANTPIPING
(D) 28"x28" SA (D) 54"x50" SA (D) 30"Ø SA
(D) 42"x53 SA UPTO INTAKE HOODON ROOF
(D) 1 1/2"HWS, HWR
(E) 2"PS, 2"PR,(D) 1 1/2"HWS, &(D) 1 1/2" HWR
(D) HEATEXCHSANGER
(D) CONDENSING UNITCOMPLETE INCLUDINGELECTRICAL
(D) MAKE-UP AIR UNITCOMPLETE INCLUDINGSUPPORTS
(E) CONDENSING UNIT
(E) CONDENSING UNIT
(E) FLOOR SINK
(D) REFRIGERANTPIPING
(E
) 19"
x19"
SA
(E) 3/4"CW
(E) 1"G
(D) 30"x30" UP TO INTAKEHOOD ON ROOF
(D) 29"x13" RA
(D) 16"x14" SA
CAP 29"x13" RA,SEAL WATER TIGHT
(E)
10"
Ø S
A
118
MECHANICALROOM
109
MENS LOCKERROOM
(E)
16"
Ø S
A
(E) 2"CW
(E) 1"TW
(E) 2"CW
(E) 1"TW
(E) 1"TWR
(E) 2"TW
(E) 2 1/2"CW
(E) 1 1/2"CW
(E) 1 1/2"TW
(D) ERC PUMP
(E) 2"G
FOR WORK IN THIS AREASEE FROM M1.01 ANDP1.01 PROJECT NO. 107716
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP1.3
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
YARD
DEM
OLI
TIO
N F
LOO
R PL
AN
SCALE: 1/2" = 1'-0" MP1.3
AENLARGED MECHANICAL DEMOLITION FLOOR PLAN
1
EXISTING EXERCISE POOL
MODIFIED TRAINING POOL
EXISTING INDOOR POOL
RECEIVINGPOOL
EXISTING POOL
1MP3.3
MP2.1A
MP2.3A
MP2.4A
2CU
4EF
1MP3.4
36"Ø SA
36"
Ø S
A
38"
Ø S
A
38"
Ø S
A
48"Ø SA
36x6 SG-1750 CFM(TYP-16)
36x6 SG-1750 CFM(TYP-14)
36x6 SG-11,000 CFM(TYP-7)
36x6 SG-11,000 CFM
36x6 SG-1650 CFM(TYP-6)
2MP3.4
(N) REFRIGERANTPIPING
FIRST FLOOR
(E) 36"Ø SA
(E)
32"
Ø S
A
(E) 32"Ø SA
(E)
28"
Ø S
A (
E) 2
4"Ø
SA
30x10 SG-1750 CFM(TYP-4)
4"HWS
4"HWR
3"PS
3"PR
2"PS
2"PR
(E) PVC SLEEVE
(E) PVC SLEEVECAP EXISTING 34"Ø SA
NO WORK INTHIS AREA
(E) 1 5/8"RSL
(E) 1 5/8"RSL
(E) 7/8"RSL
(E) 7/8"RSL
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP2.0
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
OVE
RALL
MEC
HA
NIC
AL
FLO
OR
PLA
N
SCALE: 1/8" = 1'-0" MP2.0
AOVERALL MECHANICAL FLOOR PLAN
1
(E) BOILER (B-1)
(E) BOILER (B-2)
(E) BOILER (B-3)
(E) PLENUM
(E) POOL FILTER
(E) POOL FILTER
(E) POOL FILTER
(E) FLOOR DRAIN (TYP-2)
(E) POOL CHARCOALFILTER (TYP-5)
(E) FLUE (TYP-3)
(E) COMBUSTIONAIR (TYP-3)
(E) AIRSEPARATOR
(E) POOLFILTER
(E) POOL FILTER
(E) HEATING HOTWATER EXPANSIONTANK
(E) HEATING HOTWATER PUMP
(E) CHEMICAL FEEDTANK
(E) DOMESTICWATEREXPANSION TANK
(E) 96x48 LOUVER
(E) 3/4"HWR
(E) 3/4"HWS
(E) 1"HWS
(E) 1"HWR
(E) 4"G
(E) 1 1/2"G
(E) 3"HWS
(E) 3"HWS
(E) 3"HWS
(E) 2"G
(E) 4"G
(E) 3"HWR
(E) 5"HWS
(E) 2"PS
(E) 2"PR
(E) 4"HWR
(E) 2 1/2"HWS
(E) 2 1/2"HWR
(E) 2"PS
(E) 2"PR
(E) 2"D
(E) 1"HWR
(E) 1"HWS
(E) 1"SHS
(E) 2"SHR
(E) 1 1/2"PS (E) 3"HWR
(E) 4"HWS
(E) 5"HWR
(E) 1"SHS
(E) 1 1/2"PS
1 5/8"RS & 7/8"RLFROM CU-2 UP, MP2.2FOR CONTINUATION(TYP-2)
(E) 1 1/2"HWS
(E) 1 1/2"HWR
(E) 3"HWR
(E) 5"HWR
(E) 3/4"CW
(E) 4"CW
(E) 4"HWS
(E) SOLAR HEATING WATER PUMP
(E) 2"PTRV FROM ST-1
(E) 2"D FROM ST-1
(E) 2"PTRV FROM WH-1
(E) 1"D FROM WH-1 CONDENSATENEUTRALIZATION KIT
(E) 1"D FROM WH-1
(E) 2"PTRV FROM WH-2
(E) FLOOR DRAIN
(E) 1"D FROM WH-2 CONDENSATENEUTRALIZATION KIT
(E) 1"D FROM WH-2
(E) 1 1/2"PR
(E) 2"PS
(E) 4"PR
(E) 1 1/2"PR
(E) 4"SHR
(E) 4"CW
(E) 2"CW
(E) 1"PS (E) 1"PR (E) 2"PR
(E) 3"PS
(E) 2"PS
(E) 1"PR
(E) 1"PS
(E) 3"PR
(E) 2 1/2"CW
(E) 2"CW
(E) 1 1/2"CW
(E) 4"CW
(E) FLOOR SINK
(E) 4"SHR
(E) 3/4"CW
(E) 2"G UP
(E) PUMP
(E) PUMP
(E) PUMP
(E) PUMP
(E) 2 1/2"CW(E) PUMP
(E) CAPS
(E) PUMP
119
FOYER
139
TELEPHONE
125
ELECT.
(E) 8"Ø EA
(E) PUMP
127
MECHANICAL
126
STORAGE
1"D
1"D FROM AH-1
4"HWR
4"HWS
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP2.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
ROO
M F
LOO
R PL
AN
SCALE: 1/2" = 1'-0" MP2.1
AMECHANICAL ROOM 1ST FLOOR PLAN
1
(E) 38"x38" OA
(E)
38"
x38"
OA
(E) 72"x96" OA
(E) 34"Ø SA
(E) 40"Ø RA
(E) 2"PS
(E) 2"PR
(E) 2"HWS
(E) 2"HWR
(E) 4"HWS
(E) 4"HWR (E) 1 1/2"HWS
(E) 1"PR
(E) 1"PS
(E) 2"HWR
(E) 2"HWS
(E) 1"HWS
(E) 1"PS (E) 4"HWS
(E) 3"HWR
(E) 1"HWS
(E) 2"HWS
(E) 3"PR
(E) 1"SHS
(E) 2"SHS
(E) 2"HWR
(E) 2"HWS
(E) 4"HWR
(E) 2"PS
(E) 2"HWR (E) 2"HWS
(E) 2"PR
(E) 4"SHR (E) 4"HWS (E) 1 1/2"HWS
(E) 1 1/2"HWR
(E) 6"RD
(E) 2"HWR
(E) 2"HWS
(E) 2"D
(E) 2"D
(E) 2"SHR
(E) 2"SHS
(E) 1"HWS
(E) 1"HWR
(E) 1/2"D
(E) 1"TWR
(E) 2"TW
(E) 2 1/2"CW
(E) 1"TW
(E) 2"CW
(E) HEATEXCHANGER
(E) HEATEXCHANGER
(E) HEATEXCHANGER
(E) HEAT EXCHANGER
(E) HEAT EXCHANGER
1 5/8"RS & 7/8"RLREFRIGERANT PIPINGTO AH-1 (TYP-2)
(E) BOILER 1
(E) BOILER 3
(E) BOILER 2
(E) 2"CW
(E) 2"DHW
(E) 1"CW
(E) 2"TW
(E) 1"TWR
(E) 4"DHW
(E) 3"DHWR
(E) 1 1/2"G
(E) 4"Ø FLUE AND 4"ØCOMBUSTIONAIR TO CONCENTRICVENT KIT (TYP-2)
(E) MANUFACTURERS CONDENSATENEUTRALIZATION KIT (TYP-2)
(E) 1"D
(E) 1"D
(E) 2"D
(E) 2 1/2"CW
(E) PTRV
(E) 2"CW, 2"HW, 2"TW,1"TWR AND 1"TWRTO TS-1
SST-1
(E) 2"PTRV
(E) 4"G
(E) 2"G
(E) 5"HWS
(E) 3"HWS
(E) 3"HWS
(E) 3"HWS
(E) 8"Ø OA
(E) 8"Ø OA
(E) 8"Ø OA
(E) 5"HWS
(E) 5"HWS
(E) 1"HWS
(E) 3"HWR
(E) 2"HWS
(E) 2"HWR
(E) 1"D
(E) 2"D
(E) 2"D
(E) 1"D
1MP3.2
4"Ø FLUE
(E) 4"ØFLUE
(E) 1"CW
(E) TEMPERING STATION
(E) EXPANSION TANK
(E) CIRCULATIONPUMP
(E) CIRCULATIONPUMP
(E) WATER HEATER
(E) WATERHEATER
(E) STORAGETANK
(E) CIRCULATIONPUMP
22"x38" OA 2
2"x3
8" O
A
22"x38" OA
36"x22" SA
2 1/2"HWS,R
(E)
38"
Ø S
A
(E) 36"Ø SA
1AH
1 5/8"RS & 7/8"RLDOWN, SEE MP2.1FOR CONTINUATION
(E) 2 1/2"HWS
2"PR
3"PR
3"PS
4"HWR
4"HWS
DUCT MOUNTEDSMOKE DETECTOR
(E) UNIT HEATER
66"x18" INTERNALLYLINED OA PLENUM
1"D
4"HWS
4"HWR
2"PR
2"PS 3"PR
3"PS
1PP
2PP
2"PR 2"PS
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP2.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
ROO
M M
EZZA
NIN
E FL
OO
R PL
AN
SCALE: 3/8" = 1'-0" MP2.2
AMECHANICAL ROOM MEZZANINE FLOOR PLAN
1
1
158
ADA FAMILY
141
STORAGE
107
CONCESSIONS
159
FOYER
115
OFFICE
163
FIRESPRINKLER
ROOM
(E) 1
9x19
SA
(E) FLOOR SINK
INSTALLED (DV-1) TO DRAINOF MUA-1 AND (DV-2) ONCOLD WATER TO MUA-1.PROVIDED BY CONTROLSCONTRACTOR AND INSTALLEDBY CONTRACTOR.
MUA-1 IS ON A 24"HIGH SERVICE CURB
39"x41"SADISCHARGE
1MUA
19"x19" SA
DUCT MOUNTEDSMOKE DETECTOR
(E) 6"Ø SA
(E
) 10"
Ø S
A (
E) 1
0"Ø
SA
(E
) 16"
Ø S
A
(E
) 12"
Ø S
A
(E) 14"Ø SA
(E
) 12"
Ø S
A
(E) 16"Ø SA
(E) 18"Ø SA
(E) 8"Ø EA
(E
) 8"Ø
EA
(E) 8"Ø SA (
E) 1
0"Ø
SA
118
MECHANICALROOM
109
MENS LOCKERROOM
(E) 2"CW
(E) 1"TW
(E) 1"TW
(E) 1 1/2"CW
(E) 1/2"CW
(E) 3/4"CW
(E) 3/4"TW
(E) 3/4"CW
(E) 1"G
(E) 2"G
(E) 2 1/2"CW (E) 2"TW
(E) 2"CW
(E) 1"TW
(E) 1"TWR
(E) 1 1/2"CW
(E) 1 1/2"TW
FOR WORK IN THIS AREA SEEFROM M2.01 AND P2.01PROJECT NO. 107716
FV-1
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP2.3
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
YARD
PLA
N
SCALE: 1/2" = 1'-0" MP2.3
AENLARGED MECHANICAL FLOOR PLAN
1
1ACU
1DH
1EF
2EF
3EF
EF-1VFD
EF-2VFD
EF-3VFD
EF-4VFD
1BCU
ACESS DOOR LOCATION
11' -
9"
(E) ROOF ACCESSLADDER
(E) ROOF ACCESSPLATFORM
NEW SCREEN WALL,SEE STRUCTURALDRAWINGS
56"
x48"
SA
60"
x52"
SA
64x16 EA 64"x16"EA 64x16 EA
1 1/8"HGBP
1 1/8"HGBP
1 1/8"RL
1 1/8"RL
4' -
0"
104"x44"RA RISER FROM DH-190"x54"SA RISERFROM DH-1
L1
84"x32"RAPLENUM TO84"x132" L-1
56"x48" SA
2"PR
2"PS
3"PR
3"PS
4"HWR
4"HWS
84"x132" RA
84"
x132
" RA
(E) 2"PR
(E) 2"PS
(E) 2"HWR
(E) 2"HWS
HT4
HT3
HT2
HT1
HT5
HT6
38"Ø SA 48"Ø SA 38"Ø SA
T
DH-1 TEMPERATURE SENSOR
DH-1 HUMIDISTAT SENSOR
HU
30x10 SG-1750 CFM(TYP-4)
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP2.4
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
ENLA
RGED
MEC
HA
NIC
AL
YARD
WES
T PL
AN
SCALE: 1/2" = 1'-0" MP2.4
AENLARGED MECHANICAL YARD WEST FLOOR PLAN
1
1
MECHANICAL 2NDFLOOR PLAN
110' - 0"
(E) HEATING HOTWATER EXPANSIONTANK
(E) 1"HWS
(E) 1"HWR
(E) 1/2"D
(E) 2"HWS
(E) 2"HWR
(E) 2"PS
(E) 2"PR
(E) 2"SHS
(E) 2"SHR
(E) 2"D
(E) 2"HWS
(E) 2"HWR
(E) 6"RD
(E) 1 1/2"HWR (E) 1 1/2"HWS
(E) 1 1/2"HWS
(E) 1 1/2"HWR
(E) 2"D
(E) 1"HWR
(E) 1"SHS
(E) 1 1/2"PR
(E) 4"HWS
(E) 2 1/2"HWR
(E) 1"HS
(E) 2"D
(E) 2"HWR
(E) 2"SHS
(E) CIRCULATIONPUMP
(D) SOLAR STORAGE TANK.
(D) 2"CW
(D) TANK SUPPORTS(TYP-2)
(E) WATER HEATER
1MP3.4
(D) 2"HWR
(D) 2"HWS
(E) 1 1/2"G (E) 2"G
(E) 1 1/2"HWS
(E) 1 1/2"HWR
(D) 2"
(D) 2"
(E) 2"D (E) 2"SHS
(E) 2"PR
(E) 2"PS
(E) 2"HWR
(E) 3/4"CW
(E) PUMP
(E) 5"HWS
(E) 5"HWR
(E) 2"HWS
(E) 2"HWR
(E) 4"HWS (E) 4"HWR
(E) 2"PS
(E) 2"PR
(E) 2"PR
(E) 2"PS
(E) PUMP
(E) HEAT EXCHANGER
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP3.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ROO
M D
EMO
LITI
ON
SEC
TIO
N
SCALE: 1/2" = 1'-0" MP3.1
1MECHANICAL DEMOLITION SECTION
1
MECHANICAL 2NDFLOOR PLAN
110' - 0"
DEMOLITION ROOFPLAN
120' - 0"
Level 1100' - 0"
(E) 2"HWR
(E) 2"HWR
(E) 2"SHS
(E) 1 1/2"HWR
(E) 3/4"HWR
(E) 3/4"HWS
(E) 1"HWS
(E) 6"RD
(E) 1 1/2"HWR
(E) 1 1/2"HWS
(E) 2"SHR
(E) 2 1/2"HWR
(E) 2"D
(E) 2"PR
(E) 2"PS
(E) 2"HWR
(E) 2"HWS
(E) 2 1/2"HWR
(E) 2"SHR
(E) 2"SHS
(E) 2"HWR
(E) 2"HWS
(E) 2"D
(E) 1 1/2"HWR
(E) 1 1/2"HWS (E) 1 1/2"PS
(E) 1 1/2"PR
(E) 1/2"CW
(E) 3/4"CW
SST-1
(E) 1"HWS
(E) 1"HS
(E) 5"HWR
INSTALL NEW SUPPORTS AT EXISTINGSUPPPORT LOCATION. CONTRACTORTO COORDINATE LOCATION PRIORTO ORDERING TANK (TYP-2)
(E) 2"SHS
(E) 2"SHR
1 1/2"G
2"G
(E) HEAT EXCHANGER
(E) CIRULATIONPUMP
(E) CIRULATIONPUMP
(E) 2"HWR
(E) 2"HWS
CONTRACTOR TO COORDINATELOCATION OF PIPINGCONNECTION WITH EXISTINGPIPING PRIOR TO ORDERING TANK
1 1/2"PS
1 1/2"PR
2"SHS
2"D
4"Ø FLUE
4"Ø COMBUSTION AIR
CONCENTRIC VENT KIT
(E) 2"G
(E) WATER HEATER
CAP (E) PIPE
2"PR
2"PS
3"PR
3"PS
(E) 2"D
(E) HEATING HOTWATER EXPANSIONTANK
(E) PUMP
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP3.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ROO
M S
ECTI
ON
SCALE: 1/2" = 1'-0" MP3.2
1MECHANICAL SECTION
1
60x48 EG-110,750 CFM
60x48 EG-110,750 CFM
(E) RETURNGRILLE
3EF
4EF
2EF
64"x16"EA PLENUMN
60x48 EG-110,750 CFM
64"x16"EA PLENUMN
(E) MURAL IS NOT TOBE DISTURBED
EF-1VFD
EF-2VFD
EF-3VFD
EF-4VFD
ON EXTERIOR ON EXTERIOR ON EXTERIOR ON EXTERIOR
L1
60"x52" SA
64"
x16"
EA
64"
x16"
EA
64"
x16"
EA
3"PR
3"PS
4"HWR
4"HWS
(E) 36"ØSA
2"PS
2"PR
(E) 2"PR
(E) 2"PS
(E) 2"HWR
(E) 2"HWS
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP3.3
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
WES
T W
ALL
ELE
VATI
ON
SCALE: 1/2" = 1'-0" MP3.3
1WEST WALL MECHANICAL ELEVATION
1
38"Ø SA
36x6 SG-1750 CFM(TYP-16)
4"HWS
4"HWR
3"PS
3"PR
2"PS
2"PR
(E) 2"PR
(E) 1/2"D
(E) 2"HWS
(E) 2"HWR
(E) 2"PS
(E) 2"PR
119
FOYER
1MP3.4
38"Ø SA 48"Ø SA
30x10 SG-1750 CFM(TYP-4)
60"x52" SA PLENUM
(E) 2"PR
(E) 2"PS
(E) 2"HWR
(E) 2"HWS
38"Ø SA
119
FOYER
2"PS
2"PR
3"PR 3"PS
4"HWR 4"HWS
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP3.4
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
SOU
TH W
ALL
MEC
HA
NIC
AL
ELEV
ATI
ON
SCALE: 1/4" = 1'-0" MP3.4
1MECHANICAL SECTION (SOUTH)
SCALE: 1/4" = 1'-0" MP3.4
2MECHANICAL SECTION (WEST)
1
1
(E) 2 1/2"CW
(E) 2"TW
(E) 1"TWR
(E) 2"SHS
(E) 2"SHR
(E) 2"D
(E) 2"HWS
(E) 1"HWS
(E) 1"HWR
(E) 1/2"D
(E) 2"HWR
(E) 2"PS
(E) 2"PR
(E) 3/4"CW
(E) 5"HWR
(E) 38"x3
8" OA
(E) 89"x3
8"
(E) 40"Ø RA
(E) 34"Ø SA
(D) 34"Ø
(E) 4"HWS
(E) 4"HWR
(E) 2"HWS
(E) 3"HWR
(E) 3"PR
(E) 3"HWS
(E) 3"PS
(E) 1"HWR
(E) 1"PS
(E) 1"PR
(E) 1"HWS
(E) 4"G
(E)
8"Ø
EA
(E)
6"R
D
(E) 5"HWS
(E) 2"HWS
(E) 1 1/2"HWS
(E) 3"HWR
(E) 1 1/2"PS
(E) 2"HWS
(E) 4"PR
(E) 1 1/4"CW
(E) 2"PR
(E) 2"PS
(E) 1"HWR
(E) 1"HWS
(E) 3"HWS
(E) 1 1/2"HWS
(E) DUCT TRANSLATION
(D) REFRIGERANTPIPING
(D) REFRIGERANTPIPING
(E) 2"D
(E) 4"CW
(E) 3/4"CW
(E) 1"SHS
(E) POOL FILTER
(E) POOL FILTER
(E) BOILER(TYP-3)
(E) 96"x48"LOUVER
(E) 1"HWS
(E) DOMESTIC WATEREXPANSION TANK
(E) UNIT HEATER
(E) PLENUM
(E) AIRSEPARATOR
(D) STORAGETANK
(E) AIR HANDLER (AH-1)
(D) 48"x48"
(D) UNIT HEATER
(E) 6"RD
(E) 12"Ø FLUE
(E) 12"Ø FLUE
(E) 12"Ø FLUE
(E) 8"ØCOMBUSTION AIR
(E) 8"ØCOMBUSTION AIR
(E) 8"ØCOMBUSTION AIR
(D) 2"
(D) 2"
2"PS
(D) 38"x38" OA
(D) 30"x36" SA
(D) 3/4"
(D) 3/4"
(D) 2"HWS, 2"HWR, 11/2"SHS & 1 1/2"SHR
(E) TEMPERINGSTATION
(E) WATERHEATER
(D) PUMP
(E) HEATEXCHANGER
(E) PUMP
(E) PUMP
(E) PUMP
(E) 4"HWS
(E) PUMP
(E) PUMP
(E) PUMP
(E) 2"PS
(E) 2"PR
(E) 2"PR
(E) 1 1/2"PR
(E) PUMP
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP4.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ROO
M D
EMO
LITI
ON
ISO
MET
RIC
SCALE : NONE MP4.1
1MECHANICAL ROOM DEMOLITION ISOMETRIC
1
(E) 2"PS
(E) 3"PS
(E) 3"PR
(E) 1"PS
(D) 1 1/2"SHS
(E) 2"PR
(E) 2"PS
(E) HEAT EXCHANGER(HE-1)
(E) 4"HWS
(E) 4"HWR
(E) 4"HWS
(E) 4"HWR
(E)
4"H
WS
(E)
4"H
WR
(E) HEAT EXCHANGER(HE-4)
(E) 3"HWR
(E) 3"PR
(E) 3"HWS
(E) 3"HWS
(E) 2"HWS
(E) 3"HWR
(E) 1"PR
(E) 1"HWS
(E) 1"HWR
(E) 2"HWS
(E) 2"HWR
(E) 1"PR
(E) 1"PS
(E) 1"HWS
(E) 1"HWR
(E) 1"HWS
(E) 2"HWR
(E) 2"PR
(E) 2"PS
(E) 4"HWR
(E) 2"HWR
(E) 4"SHR
(E) 2"PR
(E) 4"PR
(E) 4"SHR
(E) 2"PS
(E) 2"PS
(E) HEATEXCHANGER(HE-7)
(E) HEATEXCHANGER(HE-2)
(E) HEAT EXCHANGER(HE-3)
(E) HEAT EXCHANGER(HE-5)
(E) 4"HWS
(E) 4"HWR
(E) 4"HWS
(E) 2"HWS
(E) 2"HWR
(D) 2"PS
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP4.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ROO
M D
EMO
LITI
ON
EN
LARG
ED IS
OM
ETRI
C
SCALE : NONE MP4.2
1MECHANICAL ROOM DEMOLITION ENLARGED ISOMETRIC
1
(NO WORK SHOW, PROVIDED FOR INFORMATION)
12"Ø
(E) 2"HWS
(E) 2"HWR
(E) 2"CW
(E) 1 1/2"TW
(E) 1 1/2"CW
(E) 1 1/2"TW
(E) 1 1/2"CW
(E) 1"TWR
(E) 2 1/2"CW
(E) 2"TW
(E) 1"TW
(D) 24"Ø
(D) 28"Ø
(D) 30"Ø
(D) 22"Ø
(D) 28"x28"
(D
) 42"
x53"
(D) 24"Ø
(D) 54"x50"
(E) 2"CW
(E) 16"Ø SA
(E) 12"Ø SA
(E) 1
6"Ø SA
(E) 14"Ø SA
(E) 1"TW
(E) 1 1/2"CW
(D) 3/8"
(D) 3/8"
(E) 2"CW
(E) 3/4"TW
(E) 3/4"CW
(E) 3/4"TW
(E) 3/4"TW
(E) 3/4"CW
(E) 1/2"CW
(E) 14"Ø SA
(E) 12"Ø SA
(E)
12"
Ø S
A
(E)
12"
Ø S
A
(D) CONDENSINGUNIT COMPLETEINCLUDINGELECTRICAL
(D) MAKEUP AIR UNIT
(D) 29"x13"
(D) 16"x14"
(E) 19"x22" RA
(E) 19"x19" SA
(D) REFRIGERANTPIPING
(D) 42"x53 SA UP TOINTAKE HOOD ON ROOF
(D) 2"PS, 2"PR, 1 1/2"HS, & 1 1/2" HR
(D) 1 1/2"HS, HR 1"TWR
2"TW
2 1/2"CW
(D) 30"x30" UP TOINTAKE HOOD ONROOF
(D) REFRIGERANT PIPING
(E) 8"Ø SA
(E)
10"
Ø S
A
(E) SUPPLY DIFFUSER (TYP)
(E) 6"Ø SA
(E) 10"Ø SA
(E) 6"Ø SA
(E) 1
0"Ø SA
(E) 6"Ø EA
(E) EXHAUST FAN
(E) 2"G
(E) CONDENSING UNIT
(E) CONDENSING UNIT
(D) ERC PUMP
20"Ø SA
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP4.3
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
BOYS
LO
CKE
R RO
OM
MEC
HA
NIC
AL
DEM
OLI
TIO
N IS
OM
ETRI
C
SCALE : NONE MP4.3
1BOYS LOCKER ROOM MECHANICAL DEMOLITION ISOEMTRIC
1
(N) REFRIGERANTPIPING (TYP-4)
(E) POOL FILTER(E) POOL FILTER
(E) BOILER (TYP-3)
(E) 96"x48" LOUVER
(E) DOMESTIC WATEREXPANSION TANK
(E) UNIT HEATER
(E) PLENUM
(E) AIRSEPARATOR
(E) 38"x3
8" OA
(E) 40"Ø RA
(E) 34"Ø SA
(E)
8"Ø
EA
(E) 2 1/2"CW
(E) 2"TW
(E) 1"TWR
(E) 2"PS
(E) 2"PR
(E) 2"HWR
(E) 2"SHS
(E) 2"SHR (E) 2"D
(E) 2"HWS
(E) 1"HWS
(E) 1"HWR
(E) 1/2"D
(E) 2"HWR (E) 2"PS
(E) 2"PR
(E) 3/4"CW
(E) 5"HWR
(E) 4"HWS
(E) 4"HWS
(E) 4"HWR
(E) 2"HWR
(E) 2"PR
(E) 3"HWR
(E) 3"PR
(E) 3"HWS
(E) 3"PS
(E) 4"G
(E)
6"R
D
(E) 5"HWS
(E) 2"HWS
(E) 4"PR
(E) 1 1/4"CW
(E) 2"PR
(E) 2"PS (E) 1"HWR
(E) 1"HWS
(E) 3"HWS
(E) 1 1/2"HWS
(E) 2"D
(E) 4"CW
(E) 3/4"CW
(E) 1"SHS
(E) 1"HWS
(E) 6"RD
SST-1
(E) 2"G
(E) 1 1/2"HWS
(E) 1 1/2"HWR
(E) 3/4"HWS
(E) 3/4"HWR
(E) 2"PS
(E) 2"SHS
(E) 2"D
(E) 2 1/2"CW
(E) 1 1/2"G
(E) 2"TW
(E) 1"TWR
(E) 1 1/2"G
(E) 2"D
(E) 2"DHW
(E) 2"CW
(E) 3"DHWR
(E) 3"DHWR
(E) 4"DHW (E) 4"DHWR
(E) 3"DHWR
(E) 12"Ø FLUE
(E) 12"Ø FLUE
(E) 12"Ø FLUE
(E) 8"ØCOMBUSTION AIR
(E) 8"ØCOMBUSTION AIR
(E) 8"ØCOMBUSTION AIR
(E) CONCENTRICVENT KIT
(E) CONCENTRICVENT KIT
4"Ø FLUE
4"Ø FLUE
(E) 4"Ø FLUE
(E) 4"Ø FLUE
2"SHS
2"D
22"x38" O
A
22"x38" OA
22"x38" O
A
1AH
1 5/8"RS & 7/8"RL FROMCU-2 UP, TO AH-1 (TYP-2)
2 1/2"HWS,R
22"x20" RA
36"x22" SA
36"x22" SA
76"x22" SA
22"x66" RA
(E) TEMPERINGSTATION
(E) WATERHEATER
2"PR
2"PS
3"PR
3"PS
4"HWR
4"HWS
(E) 2"D
1 1/2"PS
1 1/2"PR
2 1/2"HWS
2 1/2"HWR
1PP
2PP
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP4.4
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ROO
M IS
OM
ETRI
C
SCALE : NONE MP4.4
1MECHANICAL ROOM ISOMETRIC 1
(E) 2"PS
(E) 3"PS
(E) 3"PR
(E) 1"PS
(D) 1 1/2"SHS
(E) 2"PR
(E) 2"PS
(E) HEATEXCHANGER(HE-1)
(E) 4"HWS
(E) 4"HWR
(E) 4"HWS
(E) 4"HWR
(E)
4"H
WS
(E)
4"H
WR
(E) HEAT EXCHANGER(HE-4)
(E) 3"HWR
(E) 3"PR
(E) 3"HWS
(E) 3"HWS
(E) 2"HWS
(E) 3"HWR
(E) 1"PR
(E) 1"HWS
(E) 1"HWR
(E) 2"HWS
(E) 2"HWR
(E) 1"PR
(E) 1"PS
(E) 1"HWS
(E) 1"HWR
(E) 1"HWS
(E) 2"HWR
(E) 2"PR
(E) 2"PS
(E) 4"HWR
(E) 2"HWR
(E) 4"SHR
(E) 2"PR
(E) 4"PR
(E) 4"SHR
(E) 2"PS
(E) 2"PS
(E) HEATEXCHANGER(HE-7)
(E) HEATEXCHANGER(HE-2)
(E) HEAT EXCHANGER(HE-3)
(E) HEAT EXCHANGER(HE-5)
(E) 4"HWS
(E) 4"HWR
(E) 4"HWS
(E) 2"HWS
(E) 2"HWR
2"PR
2"PS
3"PR
3"PS
1PP
2PP
3"PR
2"PS
2"PR
MANUAL AIRVENT
3/4"D
STRAINER
TEMPERATUREGAUGE
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP4.5
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
ROO
M E
NLA
RGED
ISO
MET
RIC
SCALE: MP4.5
1MECHANICAL ROOM ENLARGED ISOMETRIC
1
1BCU
1DH
3EF
2EF
1EF
64"
x16"
EA
56"
x48"
SA
56"x48" SA
44"x104" RA
84"x132" RA
1ACU
1 1/8"RL
1 1/8"HGBP
1 1/8"RL
1 1/8"HGBP
64"
x16"
EA
84"x132" RA
54"x90" SA
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP4.6
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
WES
T M
ECH
AN
ICA
L YA
RD IS
OM
ETRI
C
SCALE: MP4.6
1WEST MECHANINCAL YARD ISOMETRIC
L1
VFDEF-4
VFDEF-3
VFDEF-2
VFDEF-1
1
T
SOLAR DOMESTIC HOT WATER DEMOLITION PIPING DIAGRAM
AH-1 & CU-2 REFRIGERANT PIPING DIAGRAM
SCALE: NONE
1MP5.1
(E) 3"CW(E) 3"CW
NORMALLY OPEN
NORMALLY CLOSED
(E) BACK FLOW
(E) 2" POOLWATER MAKE-UP
(E) PUMP
2"PS/PR
(E) 2½"SHR
(E) COLLECTOR ARRAY
(D) SOLAR WATERSTORAGE TANK
(E) AIR VENT
(E) COLLECTOR ARRAY
(E) AIR VENT
(E) COLLECTORARRAY
(E) AIR VENT
(E) 2"SHS
(E) 2½"SHS
TX VALVE(TYP)
SOLENOID VALVE(TYP)
FILTER DRYER (TYP)
SCALE: NONE
2MP5.1
SIGHT GLASS (TYP)
AH1
CU2
7/8"RL
1 5/8"RS
MINIMUM 4'-0" HIGH,1 1/8"SUCTION RISER (TYP-2)
7/8"RL
1 5/8"RS
(E) PVC SLEEVE
CHECK VALVE(TYP-2)
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP5.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
DEM
OLI
TIO
N M
ECH
AN
ICA
L PI
PIN
G D
IAG
RAM
S
REMOVED PHASE I FROM DIAGRAM
1
1
T
SOLAR DOMESTIC HOT WATER PIPING DIAGRAMSCALE: NONE
(E) 3"CW(E) 3"CW
NORMALLY OPEN
NORMALLY CLOSED
(E) BACK FLOW
(E) 2" POOLWATERMAKE-UP
(E) PUMP
(E) 2"SHS/R
(E) 2½"SHR
(E) COLLECTOR ARRAY
(E) AIR VENT
(E) COLLECTOR ARRAY
(E) AIR VENT
(E) COLLECTORARRAY
(E) AIR VENT
(E) 2"SHS
(E) 2½"SHS
SST-1
1MP5.2
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP5.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
DO
MES
TIC
HO
T W
ATE
R A
ND
SO
LAR
DO
MES
TIC
HO
T W
ATE
R PI
PIN
G D
IAG
RAM
S
1
T
TT
T
T
T
T
T
T
T
T
TT
T
TT
T
TT
T
TT
T
TT
T
T
T
T
T
T
T
T
TT
T
TT
T
TT
T
TT
PP
PP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
T
PP
PP
PP
PP
PP
PP
PP PP
PP
T P
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP PP
PP
T
PP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
T
PP
PP
PP
PP
PP
PP
PP PP
PP
T P
PP
PP
PP
PP
PP
PP
PP
PP
PP PP
PP
T
PP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
PP
PP
T
T
PPP
PP
PP
PP
T
T
PPP
PP
PP PP
PP
PP PP
PP
PP
NEW PIPING DIAGRAMDEMOLITION PIPING DIAGRAM 2MP5.3SCALE: NONE
1MP5.3SCALE: NONE
(E) HEATEXCHANGERHE-4
(E) HEATEXCHANGERHE-5
(E) HEATEXCHANGERHE-3
(E) HEATEXCHANGER HE-2
(E) HEATEXCHANGER HE-1
(E) HEATEXCHANGERHE-7
(E) HEATEXCHANGERHE-6
(E) PUMP P-13
(E) PUMP P-10
(E) PUMP P-12
(E) PUMP P-9
(E) PUMP P-7
(E) PUMP P-3
(D) PUMP P-4
(D) PUMP P-8
(E) PUMP P-14
(E) PUMP P-11
(D) PUMP P-3
(E) GLYCOLCHANGING CUP
(D) HEATING COILHC-2 AT DH-2
(E) EXPANSIONTANK
(E) RADIANTHEATER RH-
TO (E)RADIANTHEATER RH-
(E) 5"HWS/R
(E) 2½"HWS/R
(E) 2"HWS/R
(E) 2"HWS/R
(E) 5"HWS/R
(E) 2"HWS/R
(E) 4"HWS/R
(E) 2"PS/R
(E) 2"HWS/R
(D) 1½"HWS/R
(E) 2½"HWS/R
(E) 2½"HWS/R
(D) 1/2"HWS/R
(E) 1½"HWS/R
(D) AIRHANDLER AH-1
(E) FLOWCONTROL VALVE
(D) HEATINGCOIL HC-1AT AH-1
(D) UNITHEATER UH-1(E) 2"HWS/R
(E) 1½"PS/R
(E) 4"HWS/R
(E) 4"HWS/R
(E) 4"HWS/R
(E) 3"HWS/R
(D) DEHUMIDIFIER DH-1
(D) DEHUMIDIFIERDH-2
(E) 3"PS/R
(E) 1"PS/R
(E) 2"PS/R
(D) 2"PS/R
(E) 3"PS/R
(D) 1½"HWS/R
(E) 4"PS/R
(E) 1"PS/R
(E) 1"HWS/R
(E) 1"HWS
(E) 1"HWR
(E) 2"HWS
(E) 2"HWR
(E) 4"HWS/R
(E) 4"PS/R
(D) 2"HWS/R
(E) 2"HWS/R
(E) 2"HWS/R
(E) 1"HWS
(E) 1"HWR
HEATING COILIN AIR HANDLERAH-2
(E) SUPPLY TOOUTDOOR POOL
(E) SUPPLY TOOUTDOOR POOL
(E) SUPPLY TOEXERCISE POOL
(E) SUPPLY TOACTIVITY POOL
(E) SUPPLY TOINDOOR POOL
(E) 5"HWS/R
(E) UNIT HEATER
(E) 1"HWS/R
(E) 2"PS/R TOINDOOR POOL
(E) DEHUMIDIFIERDH-3
(E) 1"HWS/R TOCHLORINEBUILDING
(E) HEATEXCHANGERHE-4
(E) HEATEXCHANGERHE-5
(E) HEATEXCHANGERHE-3
(E) HEATEXCHANGER HE-2
(E) HEATEXCHANGERHE-1
(E) HEATEXCHANGERHE-7
(E) HEATEXCHANGERHE-6
(E) PUMP P-13
(E) PUMP P-10
(E) PUMP P-12
(E) PUMP P-9
(E) PUMP P-7
(E) PUMP P-3
(E) PUMP P-14
(E) PUMP P-11
(E) GLYCOLCHANGING CUP
(E) EXPANSIONTANK
(E) RADIANTHEATER RH-
TO (E)RADIANTHEATER RH-
(E) 5"HWS/R
(E) 2½"HWS/R
(E) 2"HWS/R
(E) 2"HWS/R(E) 5"HWS/R
(E) 2"HWS/R
(E) 4"HWS/R
(E) 2"PS/R
(E) 2"HWS/R
(E) 2½"HWS/R
(E) 2½"HWS/R
(E) 1½"HWS/R
(E) FLOWCONTROL VALVE
(E) 2"HWS/R
(E) 1½"PS/R
(E) 4"HWS/R
(E) 4"HWS/R
(E) 4"HWS/R
(E) 3"HWS/R
(E) DEHUMIDIFIERDH-3
(E) 3"PS/R
(E) 1"PS/R
(E) 2"PS/R(E) 3"PS/R
(E) 4"PS/R
(E) 1"PS/R
(E) 1"HWS/R
(E) 1"HWS
(E) 1"HWR
(E) 2"HWS
(E) 2"HWR
(E) 4"HWS/R
(E) 4"PS/R
(E) 2"HWS/R
(E) 2"HWS/R
(E) 1"HWS
(E) 1"HWR
HEATING COILIN AIR HANDLERAH-2
(E) SUPPLY TOOUTDOOR POOL
(E) SUPPLY TOOUTDOOR POOL
(E) SUPPLY TOEXERCISE POOL
(E) SUPPLY TOACTIVITY POOL
(E) SUPPLY TOINDOOR POOL
(E) 5"HWS/R
(E) UNIT HEATER
(E) 1"HWS/R
(E) 2"PS/R TOINDOOR POOL
(E) 1"HWS/R TOCHLORINEBUILDING
DH-1, HEATRECOVERY COIL
3/4"D (TYP)
AUTOMATICAIR VENT (TYP)
PP1
3"PS/R
DH-1, HEATRECOVERY COIL
AUTOMATICAIR VENT (TYP)
PP2
2"PS/R
CAP (E) 2"PS/R
CAP (E) PIPING(TYP-5)
4"HWS/R
DH1
12"MAX
12"MAX
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP5.3
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
HO
T W
ATE
R D
EMO
LITI
ON
PIP
ING
DIA
GRA
M
1
DUCT SUPPORT DETAILSCALE: NONE
PIPE CLAMPS
UNISTRUT
REFRIGERANT PIPING (TYP)
B-LINE C-PORT SERIESSUPPORT (OR APPROVEDEQUAL)
1MP6.1
2MP6.1SCALE: NONE
REFRIGERANT PIPING.PROVIDE ISOLATIONBETWEEN COPPER PIPE ANDSTEEL CHANNEL/CLAMPASSEMBLY
HANGER ROD SECURETO STRUCTURE
1 5/8" 12 GAGECHANNEL OR2"x2"x1/4" ANGLE
PIPE CLAMP (TYP)
REFRIGERANT PIPINGINSULATION. SEESPECIFICATIONS FORREQUIREMENTS
1" MAX
4MP6.1SCALE: NONE
UNI-STRUT CROSSSUPPORT BRACE. BOLTPIPE CLAMP UNI-STRUTCHANNEL (TYPICAL)
PIPE CAP
PIPE CLAMP
ALUMINUM OR STAINLESSSTEEL JACKET
2"R-MAX RIGIDINSULATION
SA DUCT ON ROOF
REPAIR ROOF INSULATIONECT. INSTALL FLASHING &SEAL WATER TIGHT
4"x4"x1/4" STEEL BASEPLATE ATTACHED TOROOF AS REQUIRED
EXISTING ROOF DECK
6MP6.1SCALE: NONE
SECURE ANGLE BRACKET TO
2½" CONCRETE ANCHOR(TYP-4)
18 GAUGE ANGLE BRACKET(TYP-4)
SECURE CONDENSING UNITTO ANGLE BRACKET WITH 1/2"#8 SHEET METAL SCREW (TYP-4)
CONCRETE EQUIPMENT PAD
CONDENSING UNIT
3MP6.1SCALE: NONE
10MP6.1SCALE: NONE
ROUND TAPW/O FITTING
CUSHIONHEAD
ROUND TAPW/O FITTING
ROUND W/CONICAL TAP
RECTANGULAR TAPW/O FITTING
ROUND TAP W/HEEL FITTING
ROUNDLATERAL TAP
RECTANGULAR TAPW/ HEEL FITTING
ROUNDY-FITTING
RECTANGULARY-FITTING
SHORT RADIUS45° ELBOW
RECTANGULARMITERED ELBOW W/
TURNING VANES
SQUARE TOROUND
TRANSITION
SHORT RADIUS90° ELBOW
LONG RADIUS45° ELBOW
LONG RADIUS90° ELBOW
RECTANGULARMITERED ELBOW W/O
TURNING VANES
SQUARE TOROUND W/OTRANSITION
NOTE: APPROVED FITTINGS ARE NOTINTERCHANGABLE. SEE PLANS FOR DUCTLAYOUT AND PREFERREDFITTING.
NOTE: ALSO SEAL JOINT BETWEEN FLASHING AND DUCT WITH EXTERIOR WEATHER-PROOFING SEALANT.SEALANT SHALL BE DESIGN POLYMERICS DP-1010 DUCT SEALANT. APPLY SEALANT IN STRICTCONFORMANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
(APPLIES TO FRAME WALLS ONLY - NOT MASONRY OR CONCRETE)TO ALLOW FOR SECURING OF FLASHING TO WALL FRAMINGPROVIDE FRAMING AROUND DUCT OPENING
3" x 2" 24 GAUGE PVC-CLAD SHEET METAL FLASHING (CONTINUOUS/4-SIDED)
SECURE FLASHING TO WALL FRAMING W/ APPROVED FASTENERS & WASHERS.INSTALLED PER ROOF MEMBRANE MANUFACTURER'S WRITTEN INSTRUCTIONS.
SIZE WALL OPENING & FLASHING TO PROVIDE MAXIMUM 1/4" SPACE
BETWEEN ALL SIDES OF DUCT AND OPENING/FLASHING.
APPROVED URETHANE SEALANT
SINGLE PLY MEMBRANE (FULLY ADHERED TO WALL SURFACE)
BACKER ROD & APPROVED URETHANE SEALANT
APPROVED FASTENERS & WASHERS @ 4" O.C.
RECTANGULAR DUCT
SEE NOTE BELOW
SCALE: NONE
8MP6.1
1½"Ø GALVANIZED PIPESUPPORT AT 6'-0'' ONCENTER & AT EACHCORNER. TREAT ALLWELDS WITH COLDGALVANIZED COMPOUND
MAXIMUM PIPE/TUBING SUPPORT SPACING
PIPE MATERIAL
6
SPACING (FT)SIZE (IN)
1-1/2 AND SMALLER
2 AND LARGER 10
SPACING (FT)
ALL
SIZE (IN)
6
BLACK STEEL
1/2
3/4 - 1 8
1-1/4 AND LARGER 10
1/2
3/4 - 1
1-1/4 AND LARGER
6
8
EVERY FLOOR LEVEL
ALLABS ALL
3CPVC
1 AND SMALLER
1¼ AND LARGER 4ALL
COPPER PIPEOR TUBING
BASE AND EACHFLOOR. PROVIDE
MID-STORY GUIDES
EACH FLOOR, NOTTO EXCEED 10 FT
BASE AND EACHFLOOR
VERTICALHORIZONTAL
GENERAL NOTES:
1. PROVIDE FOR EXPANSION EVERY 30 FEET
2. PROVIDE SUPPORT AT EVERY CHANGE IN DIRECTION
3. NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
41
1
ADJUSTABLE ROLLER HANGERTO 1000 LB. UNIFORM LOADTRAPEZE HANGER FOR UP
ADJUSTABLE CLEVIS HANGER
INSULATION
HANGER ROD
SADDLE
WELD
HANGER RODS
HANGER ROD
10 - 12
1/2 - 4
5 - 8
BAND
1/2
5/8
3/8
NOMINAL PIPE ORTUBE SIZE
(IN)
MINIMUM RODDIAMETER
(IN)
1 5/8" 12 GAUGECHANNEL OR2"x2"x1/4" ANGLE
PROVIDE INSULATIONSHIELD & INSERT FORALL PIPING
INSULATION SHIELD ATHANGER
PROVIDE HIGHCOMPRESSIVE STRENGTHINSULATION INSERT UNDERINSULATION SHIELD
PIPE INSULATION
SCALE: NONE
7MP6.1
SCALE: NONE
11MP6.1
PLAN VIEW
FRONT VIEWELEVATION VIEW
REAR VIEW
CENTRIFUGAL PLENNUMSUPPLY FAN
76x22 SA OPENING
HINGED ACCESSDOOR WITHLOCKING CAM,TYP-ALL
DX COIL
HEATING HOTWATER COIL2" MERV 13
FINAL FILTER
2" MERV 8PRE-FILTERS
DX COIL
HEATING HOTWATER COIL
2" MERV 13FINAL FILTER
2" MERV 8PRE-FILTERS
66x18 RADAMPER
66x18 RA OPENING
66x18 RAOPENING
66x18 RADAMPER
66x18 RADAMPER
MIXING BOX
76x22 SAOPENING
76x22 SAOPENING
DX COILCONNECTION
HEATINGHOT WATERCONNECTION
NOTES:
1. SMOKE DETECTOR FURNISHED, MOUNTED, AND WIRED BY CONTRACTOR.
2. INSTALL PER MANUFACTURE'S INSTALLATION INSTRUCTIONS.
3. PROVIDE ACCESS DOOR AT SAMPLING TUBES.
4. DETECTOR TO BE MOUNTED IN SUPPLY AIR DUCT UNLESS OTHERWISE NOTED.
5MP6.1SCALE: NONE
INTAKE TUBE
MOUNTING PLATE
EXHAUST TUBE
MOUNTING NUTS
DUCT WIDTH
DU
CT
HEI
GH
T
FLEXIBLE CONDUITAS REQUIRED FORPOWER ANDCONTROL CIRCUIT
NEOPRENE GASKET
DUCT
SMOKEDETECTOR
SEALANT
PLUG
SLOPE 1/4" PER 12"
RETURN
SUPPLY
COIL
AIR
PT
PT
PT
PT
BALL VALVE (TYP)
CALIBRATED MANUALBALANCE VALVE
CONTROL VALVE
UNION (TYP)
PRESSURE & TEMPERATURETEST PORT (TYP)
MANUAL AIR VENT
STRAINER
36"x36" MINIMUM SERVICE AREA.COORDINATE WITH OTHERTRADES TO MAINTAIN SPACE FREEOF PIPING, DUCT, CONDUIT,CEILING WIRES, ETC.
FLEXIBLE CONNECTION (TYP)
LOW PRESSURE GASGAS COCK
GROUND JOINT UNION
6"DIRTTRAP
SCALE: NONE
9
EQUIPMENT
MP6.1
FULL GAS PIPE SIZEFLEXIBLE CONNECTOR,METRAFLEX STRAIGHTGAS FLEX CONNECTOR(OR APPROVED EQUAL)
REDUCER(IF NEEDED)
TYPICAL PIPE HANGER DETAIL
AIR HANDLING UNIT (AH-1) DETAIL
REFRIGERANTPIPING SUPPORT DETAIL
REFRIGERANT PIPINGSUPPORT DETAIL
DUCT MOUNTEDSMOKE DETECTOR DETAIL
CONDENSING UNITANCHOR DETAIL
3-WAY COIL PIPING DETAIL
LOW PRESSUREDUCT FITTINGS DETAIL
APPROVED UNACCEPTABLE
RECTANGULAR DUCT THRU VERTICAL WALL FLASHING DETAIL
EQUIPMENT GAS PIPING DETAIL
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP6.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
DET
AIL
S
1
CO
ILA
CC
ESS
FILT
ERA
CC
ESS
ADDITIONALLIFTING LUG (TYP)
FILT
ERA
CC
ESS
UN
ITA
CC
ESS
CO
-AX
AC
CES
S
ELEC
.A
CC
ESS
VFD
AC
CES
S
UN
ITA
CC
ESS
BLO
WER
AC
CES
S
BLO
WER
AC
CES
S
LEFT HAND SIDE VIEW
TOP VIEW
FRONT VIEW
RA
SA
LIFTING LUGS: 6"LONG, 2½"Ø HOLE (TYP)
BASE: 12"H
SA OUTLET SIZE(96x54)
HEAT RECOVERY COIL
MIN EA OUTLETOUTLET CWMOTORIZED DAMPERAND HOODS
RA FILTERS
EVAPORATOR
TOP OA INLET CWMOTORIZED DAMPERS,FILTERS, AND HOOD
OA FILTERS
REHEATCOIL
SA BLOWERS
COMPRESSORS
COOLED AIR ACCONNECTIONS
MIN EA BLOWER
RA DAMPER
DRAIN PIPE: DRIP PANCW 1½" O.D.RA INLET (106x44)
ELECTRICAL SECTION CWOPERATOR PANEL AND DEADFRONT NON-FUSED DISCONNECTSWITCHVFD CONTROLLERS
POOL WATERCONNECTIONS
POOL WATERHEATERS
HOT WATER COIL
SCALE: NONE
1MP6.2
OA
RA
SA
44"
15"
104"96"
113"
7 3/4
408"
120" 6"
34"
134"
EA
54"
HINGED ACCESSDOORS WITHLOCKING CAMS
DEHUMIDIFICATION UNIT (DH-1) DETAIL DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP6.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
MEC
HA
NIC
AL
UN
IT P
LAN
S
1
DS
DSDS
460/3
460/3
120V
COMMUNICATION BUS
EVAPORATIVESECTION
MUA CONTROLLER
(N) RELAY
DDC LEAVING AIRTEMPERATURESENSOR
FACTORY LEAVINGAIR TEMPERATURESENSOR
EXISTING ROOMTEMPERATURE SENSOR
EXISTING RELAY
EXISTING SLIDE TOWEREXHAUST FAN (EF-13B)
EXISTING SLIDE TOWEREXHAUST FAN (EF-13A)
EXISTING SLIDE TOWER DDC CONTROLLER
460/3
COMMUNICATION BUS
C
C
H
C
T/H RM
460/3
EXISTINGEXHAUST FAN(EF-6)
460/3
EXISTINGEXHAUST FAN(EF-6)
120V
TEMPERATURE CONTROL SYMBOL LEGEND
CONTROL NOTESMAKE-UP AIRSEQUENCE OF OPERATION
AIR HANDLERS (AH-1)SEQUENCE OF OPERATION
SLIDE TOWER MAKEUP UNIT CONTROL DIAGRAM
AIR HANDLER (AH-1 & CU-2) CONTROL DIAGRAM
BY MECHANICAL CONTRACTOR
TRANSFORMER (SIZE & VOLTAGE AS REQUIRED)
SMOKE DETECTOR
RELAY (POLES AND VOLTAGE AS REQUIRED)
BY ELECTRICAL CONTRACTOR
OUTSIDE AIR TEMPERATURE/HUMIDITY SENSOR
MODULATING ACTUATOR (BELIMO)
TX
E
M
VFD VARIABLE FREQUENCY DRIVE
TMA
TS
TSA
TRA
SD
S
RTS
MS
R
OA
OSP
M
TEMPERATURE SENSOR (PENCIL TYPE)
ROOM TEMPERATURE SENSOR
TEMPERATURE - MIXED AIR SENSOR
TEMPERATURE - SUPPLY AIR SENSOR
TEMPERATURE - RETURN AIR SENSOR
ALARM STROBE
OUTDOOR STATIC PRESSURE SENSOR
MOTOR STARTER
FS
H
DS
DSP
DP
AS
CS
DMSD
SYMBOL
DIFFERENTIAL PRESSURE SENSOR
DISCONNECT SWITCH (FUSED)
DUCT STATIC PRESSURE SENSOR
FLOW SWITCH
ALARM HORN
AVERAGING SENSOR
CURRENT SENSOR/SWITCH
DUCT MOUNTED SMOKE DETECTOR
DESCRIPTION
RCV
ACV AIR HANDLER HOT WATER CONTROL VALVE (BELIMO)
BSP BUILDING STATIC PRESSURE SENSOR
REHEAT HOT WATER CONTROL VALVE
HDS HIGH DUCT STATIC PRESSURE SENSOR
1.
2.
3.
4.
5.
6.
EXISTING BUILDING CONTROL SYSTEM IS AN ALERTON SYSTEM.
CONTROLS CONTRACTOR CONTACT:BUILDING CONTROL SERVICES (BCS)8521 WHITE FIR STREETRENO, NEVADA 89523PH: (775) 826-8998CONTACT: TOM HULBERT
ALL WIRING TO BE IN CONDUIT. PLENUM RATED CABLE WITH J-HOOKS IS ALLOWED FOR ABOVECEILING INSTALLATION.
CONTROL SYSTEM CONTRACTOR SHALL PROVIDE A COMPLETE DIRECT DIGITAL CONTROL SYSTEM.PROVIDE AND INSTALL ALL NECESSARY WIRING TO MAKE SYSTEM OPERATIONAL ALL WIRING SHALL BEIN CONDUIT WITH ANY SPLICES MADE IN JUNCTION BOXES, REFER TO CONTROL DIAGRAMS ANDSEQUENCE OF OPERATION ON DRAWINGS.
CONTROLS CONTRACTOR SHALL CONNECT NEW CONTROLLERS TO THE CONTROL NETWORK ANDADD NEW GRAPHICS.
CONTROLS CONTRACTOR TO COORDINATE UNIT LABELING ON GRAPHICS, THERMOSTAT, ANDCONTROLLER WITH CARSON VALLEY SWIM CENTER PRIOR TO INSTALLATION.
EXHAUST FAN
HUMIDITY SENSORHS
EF
RAT RETURN AIR TEMPERATURE SENSOR
5. WHENEVER VENTILATION ONLY IS REQUIRED, ROOM THERMOSTAT DE-ENERGIZESHEATING AND EVAPORATIVE COOLING PUMP ON MUA-1.
6. EVAPORATIVE COOLER FILL AND DRAIN VALVES BV ARE POSITIONED TO DRAIN SUMP FOR 1HOUR AT 1:00 AM DAILY THROUGH DOC.
1. WHENEVER EXISTING PRESSURE SWITCH IS DE-ENERGIZED, ROOM THERMOSTAT DE-ENERGIZESMAXITROL HEATING CONTROL, EVAPORATIVE COOLER PUMP, SUPPLY AIR AND EXHAUST AIRFANS. CLOSES OA DAMPER OPENS MINUTES LATER AND ENERGIZES NIGHT LOW LIMITSETPONT.
3. EXISTING THERMOSTAT INTERNAL BY-PASS SWITCH OVERRIDES TIME CLOCK AND PLACES UNITIN "OCCUPIED CYCLE" MODE FOR PROGRAMMED LENGTH OF TIME.
1. PRODUCTS OF COMBUSTION DETECTOR POCD DE-ENERGICES MUA UNIT EXHAUST AIRFANS AND CLOSES OA DAMPER WHENEVER SMOKE IS PRESENT.
2. MUS UNIT SAFETY DEVICES DE-ENERGIZE UNIT UN ACCORDANCE WITH MANUFACTURER'SREQUIREMENTS WHENEVER ACTIVATED.
3. EVAPORATIVE COOLER FILL AND DRAIN VALVE ARE POSITIONED TO DRAIN SUMPWHENEVER OA TEMPERATURE FALLS BELOW SETPOINT.
4. MUA UNIT INTERNAL SUPPLY AIR MAXITROL 44 TEMPERATURE SENSOR OVERRIDES ROOMTEMPERATURE SENSOR TRM WHENEVER SUPPLY AIR TEMPERATURES EXCEED HIGH OR LOWLIMITS.
A. OCCUPIED CYCLE
B. UNOCCUPIED CYCLE
C. SAFETY CONTROLS
D. OPERATOR'S TERMINAL
1. EXISTING PRESSURE SWITCH "P" ENERGIZES MAKE-UP AIR UNIT (MUA-1) THROUGH DDCCONTROLLER WHENEVER EXISTING SLIDE LOUVER PUMPS START.
2. EXISTING ROOM THERMOSTAT OPENS OA DAMPER STARTS SUPPLY AIR ON MUA-1 ANDEXISTING SLIDE TOWER EXHAUST FANS.
3. WHENEVER COOLING IS REQUIRED BY ROOM THERMOSTAT HEATING ISDE-ENERGIZED AND EVAPORATIVE COOLER PUMP STARTS ON MUA-1.
1. MUA-1 COMMAND (ON/OFF).
2. MUA-1 CODE COMMAND (HEATING/COOLING).
3. ROOM TEMPERATURE SET POINT COMMAND (HEATING/COOLING/NIGHT LOW LIMITS).
4. CURRENT ROOM TEMPERATURE.
5. CURRENT OA TEMPERATURE (GLOBAL).
6. OA TEMPERATURE CHANGE OVER COMMAND (HEATING/COOLING).
7. ALARM ROOM TEMPERATURE (HIGH/LOW).
8. ALARM UNIT FAILURE (OFF).
4. WHENEVER HEATING IS REQUIRED, ROOM THERMOSTAT ENERGIZES GAS CONTROL VALVEON MUA-1 IN ACCORDANCE WITH MUA-1 MANUFACTURER REQUIREMENTS.
2. WHENEVER ROOM TEMPERATURE FALLS BELOW NIGHT LOW LIMIT SET POINT MUA-1OUTSIDE AIR DAMPER OPENS AND GAS CONTROL VALVE IS ENERGIZED.
A. WARM-UP CYCLE
B. OCCUPIED CYCLE
C. UNOCCUPIED CYCLE
D. SAFETY CONTROL
1. FREEZE THERMOSTAT DE-ENERGIZES UNIT WHENEVER TEMPERATURE FALLS BELOWSETPOINT, OA DAMPERS CLOSE AND HEATING HOT WATER VALVE VH OPENS FULLY.
2. PRODUCTS OF COMBUSTION DETECTOR DE-ENERGIZES UNIT IN ACCORDANCEWITH MANUFACTURER'S REQUIREMENTS.
1. ROOM TEMPERATURE SENSOR IN CONJUNCTION WITH EXISTING GLOBAL OA SENSORSTARTS SUPPLY AIR FAN AND ENERGIZES CONTROLS UTILIZING EXISTING OA SENSOR,STARTS SUPPLY AIR FAN AND ENERGIZES CONTROLS UTILIZING OPTIMUM STARTPROGRAM TO REACH "OCCUPIED CYCLE" ROOM TEMPERATURE AT SCHEDULED TIMEOFOCCUPANCY.
2. OA DAMPER REMAINS CLOSED.
3. HEATING WATER VALVE IS FULL OPEN.
1. SUPPLY AIR FAN STARTS IF NOT ALREADY RUNNING THROUGH "WARM-UP CYCLE" ATPROGRAMMED TIME.
2. OA DAMPERS OPEN TO MINIMUM POSITION AND INTERLOCKED EXISTING EXHAUST AIRFANS START.
3. MIXED AIR TEMPERATURE SENSOR MODULATES OA AND RA DAMPERS TOMAINTAIN SETPOINT. RETURN AIR TEMPERATURE/ HUMIDITY SENSOR OVERRIDESMIXED AIR SENSOR AND CLOSES OA DAMPER.
4. EXISTING ROOM TEMPERATURE/ HUMIDITY SENSOR MODULATES HEATING WATER VALVEAND CYCLES CONDENSING UNIT IN SEQUENCE TO MAINTAIN HEATING/ COOLINGTEMPERATURE SETPOINTS.
5. ROOM AND RETURN AIR TEMPERATURE/ HUMIDITY SENSORS MONITOR RESPECTIVERELATIVE HUMIDITY CONDITIONS (NOTE THAT THEY MAY BEUSED FOR CONTROL IF CONDITIONS WARRANT).
1. SUPPLY AIR FAN STOPS AT PROGRAMMED. OA DAMPERS CLOSE, INTERLOCKEDEXHAUST AIR FANS STOP AND HEATING WATER VALVES VH OPEN.
2. OA DAMPERS CLOSE, INTERLOCKED EXHAUST AIR FANS STOP AND HEATING WATERVALVES VH OPEN. ROOM TEMPERATURE/ HUMIDITY SENSOR T/HRM RESETS TO THENIGHT LOW LIMIT SETPOINT AND CYCLES TO MAINTAIN SETPOINT.
3. ROOM SENSOR INTERNAL BY-PASS TIMER OVERRIDES THE NIGHT LOW LIMIT FUNCTIONAND PLACES THE SYSTEM IN "OCCUPIED CYCLE" MODE FOR PRE-PROGRAMMEDLENGTH OF TIME.
E. OPERATOR'S TERMINAL
1. FAN COMMAND.2. SUPPLY AIR TEMPERATURE SETPOINT COMMAND.3. SUPPLY AIR TEMPERATURE ALARM COMMAND.4. MIXED AIR ROOM TEMPERATURE SETPOINT COMMAND.5. ROOM TEMPERATURE SETPOINT COMMAND.6. ROOM TEMPERATURE ALARM COMMAND.7. CURRENT ROOM TEMPERATURE.8. CURRENT ROOM RELATIVE HUMIDITY.9. CURRENT SUPPLY AIR TEMPERATURE.10. CURRENT MIXED AIR TEMPERATURE.11. CURRENT RETURN AIR TEMPERATURE.12. CURRENT RETURN AIR RELATIVE HUMIDITY.13. CURRENT OA TEMPERATURE (GLOBAL).14. CURRENT VALVE POSITION COMMAND (%OPEN).15. CURRENT OA DAMPER POSITION COMAND (%OPEN).16. ALARM ROOM TEMPERATURE (HIGH/LOW).17. ALARM ROOM RELATIVE HUMIDITY (HIGH/LOW).18. ALARM AIR COOLED CONDENSER FAILURE.19 ALARM PCOD ACTIVATED.20. ALARM FREEZE THERMOSTAT ACTIVATED.
R
M
R
MSMS
MSMS
RTS
LAT
LAT
MUA1
1MP7.1SCALE: NONE
2MP7.1SCALE: NONE
R R
DS
OAT
M
TRA
MATTSA TF
120V
AH-1 DDC CONTROLLER
HWR
HWS
OA SA
120V
TX DS
MSMS MSMS
EA
TX DS
VFD
DMSD
CU2
AH1
EA
EXISTING
DMSD
M
M
M
NO
NO
NC
NORMALLY CLOSED
NO
NC
NORMALLY OPEN
DV-1
DV-2
FV-1
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP7.1
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
CO
NTR
OL
DIA
GRA
M A
ND
SEQ
UEC
NC
E O
F O
PERA
TIO
N
1
T T
T T
120V
120V
DEHUMIDIFICATION UNIT (DH-1) SEQUENCE OF OPERATION
DEHUMIDIFICATION UNIT CONTROLLER DIAGRAM
DH-1 CONTROL NOTESA. SUPPLY AIR POWER
EXHAUST AIR POWERB.
EXHAUST AIR DAMPER(S)C.
OUTDOOR AIR DAMPERD.
DEHUMIDIFICATION MODEE.
POOL WATER HEATING MODEF.
1. OPERATION IS CONTINUOUS.
2. BLOWER STOPS AND ALL MOTORIZED DAMPERS CLOSE ON:
a. POWER FAILUREb. FIRESTAT ALARMc. FREEZESTAT ALARMd. REMOTE OFF CONTROL (MANUAL)
1. EF1 BLOWER OPERATION IS CONTINUOUS AND CAN BE CONTROLLED BY AN OCCUPIED/UNOCCUPIED SIGNAL FROM THE BMS TO MAINTAIN A NEGATIVE SPACE PRESSUREDEHUMIDIFICATION UNIT (DH-1) INTERNAL EXHAUST FAN EXHAUSTS 10%%% MORE AIR THAN IS INTRODUCED THROUGH THE OUTDOOR AIR OPENING AT MINIMUM SETPOINT.
2. REMOTE EXHAUST FANS (EF-1, EF-2, EF-3, AND EF-4) OPERATES ONLY ON CALL FOR DEHUMIDIFICATION UNIT (DH-1) PURGE MODE OR ECONOMIZER MODE.
3. BLOWERS STOP AND ALL EXHAUST AIR MOTORIZED DAMPERS CLOSE ON:
POWER FAILUREFIRESTAT ALARMFREEZESTAT ALARMREMOTE OFF CONTROL (MANUAL OR FROM BMS)
1. DAMPER IS NORMALLY CLOSED (UNOCCUPIED MODE).
2. ON AN OCCUPIED SIGNAL FROM THE BMS OR SEVEN_DAY TIME CLOCK THE DAMPER OPENS TO THE MINIMUM SETPOINT. RETURN AIR IS EXHAUSTED TO MAINTAIN NEGATIVEPRESSURE IN THE NATATORIUM.
3. ON SECOND STAGE EXHAUST SIGNAL THE DAMPER OPENS TO ALLOW SECOND STAGE EXHAUST FROM THE SPACE.
4. ON DEHUMIDIFICATION UNIT (DH-1) PURGE MODE SIGNAL THE DAMPER OPENS FULLY TO EVACUATE 100% INDOOR AIR FROM THE SPACE.
5. ALL MOTORIZED DAMPERS CLOSE ON SUPPLY AIR BLOWER STOP.
1. DAMPER IS NORMALLY CLOSED (UNOCCUPIED MODE).
2. ON AN OCCUPIED SIGNAL FROM THE BMS OR SEVEN_DAY TIME CLOCK THE DAMPER OPENS TO THE MINIMUM SETPOINT. OUTDOOR AIR IS INTRODUCED TO MEET THE LOCALCODE REQUIREMENTS.
3. ON DEHUMIDIFICATION UNIT (DH-1) PURGE MODE SIGNAL THE DAMPER OPENS FULLY TO EVACUATE MAXIMUM AIRFLOW FROM THE SPACE.
4. ALL MOTORIZED DAMPERS CLOSE ON SUPPLY AIR BLOWER STOP.
1. DEHUMIDIFICATION MODE OCCURS WHEN THE ROOM RELATIVE HUMIDITY RISES ABOVE SETPOINT OF 50%RH (ADJUSTABLE THROUGH BMS).
a. THE OUTDOOR AIR SENSORS (TEMPERATURE AND %RH) WILL VERIFY IF ECONOMIZER DEHUMIDIFICATION IS POSSIBLE. THE MICROPROCESSOR'S FLOATING SETPOINT VERIFIESTHAT THE OUTDOOR AIR IS COOLER AND DRYER THAN THE ACTUAL INDOOR CONDITION.
b. IF OUTDOOR AIR IS NOT SUITABLE FOR ECONOMIZER OPERATION, COMPRESSOR #1 AND 2 STARTS TO OPERATE IN "FIRST STAGE DEHUMIDIFICATION AND HOT GAS REHEATMODE". THE HOT GAS REHEAT COIL IS ENERGIZED.
c. COMPRESSOR #1 AND 2 STARTS TO OPERATE IN "FIRST STAGE DEHUMIDIFICATION AND HOT GAS REHEAT MODE". THE HOT GAS REHEAT COIL IS ENERGIZED.
d. IF THE ROOM RELATIVE HUMIDITY CLIMBS BY AN ADDITIONAL 5%RH OR IF HIGH LIMIT OF 60%RH IS REACHED, COMPRESSOR #3 AND 4 STARTS TO OPERATE AS WELL. THEUNIT IS IN "SECOND STAGE DEHUMIDIFICATION AND HOT GAS REHEAT MODE".
1. POOL WATER HEATING MODE OCCURS WHEN THE POOL WATER TEMPERATURE DROPS 1°F BELOW SETPOINT.
a. STAGE #1A: IF THE COMPRESSOR IS ALREADY OPERATING IN DEHUMIDIFICATION MODE OR COOLING MODE THE COMPRESSOR HOT GAS IS USED FOR WATER HEATING.
b. STAGE #1B: IF ALL ROOM CONDITIONS ARE SATISFIED [I.E. COMPRESSOR IS OFF], THE MICROPROCESSOR WILL SEND A SIGNAL TO THE AUXILIARY POOL WATER HEATER TOMAINTAIN WATER TEMPERATURE.
c. STAGE #2: IF THE COMPRESSOR IS ALREADY OPERATING IN STAGE #1 POOL WATER HEATING MODE AND THERE IS A CALL FOR 2ND STAGE POOL WATER HEATING [2°FBELOW SETPOINT], THEN THE MICROPROCESSOR WILL SEND A SIGNAL TO THE AUXILIARY POOL WATER HEATER TO MAINTAIN WATER TEMPERATURE.
d. STAGE #2: IF COMPRESSOR #3_4 IS ALREADY OPERATING IN 2ND STAGE DEHUMIDIFICATION MODE OR 2ND STAGE COOLING MODE AND THERE IS A CALL FOR 2ND STAGEPOOL WATER HEATING [2°F BELOW SETPOINT], COMPRESSOR #2 HOT GAS IS USED TO MAINTAIN WATER TEMPERATURE.
e. STAGE #3: IF THE POOL WATER DROPS 3°F BELOW SETPOINT, A CALL FOR 3RD STAGE POOL WATER HEATING OCCURS AND THE MICROPROCESSOR WILL ALSO SEND ASIGNAL THE AUXILIARY POOL WATER HEATER TO MAINTAIN WATER TEMPERATURE.
f. COMPRESSOR OPERATION IN DEHUMIDIFICATION MODE AND COOLING MODE IS NEVER INTERRUPTED BY LACK OF WATER FLOW TO THE UNIT.
g. SHOULD WATER FLOW BE INTERRUPTED, THE MICROPROCESSOR WILL LOCK OUT WATER HEATING MODE AND DISPLAY LOW WATER FLOW' MESSAGE ON THE OPERATORPANEL. ALL OTHER MODES OF OPERATION WILL OPERATE NORMALLY.
a.b.c.d.
MS
CS
460V
MS
CS
460V
CU1A
CU1B
OAT
VFD
MS CS 460V
DSPM
M
M
DS
460V
VFD
CSENABLEINPUT SPEEDOUTPUT SPEEDALARM
DS
460V
VFD
CSENABLEINPUT SPEEDOUTPUT SPEEDALARM
DS
460V
VFD
CSENABLEINPUT SPEEDOUTPUT SPEEDALARM
DS
460V
VFD
CSENABLEINPUT SPEEDOUTPUT SPEEDALARM
RTS HS
EF1
EF2
EF3
EF4
VFDEF-2
DH1
HEATING COIL
EVAPORATOR COILUNITCONTROLLER
INTERNALEXHAUST FAN
SARA
EA
OA
EXHAUST AIRDAMPER
RETURN AIRDAMPEROUTSIDE AIRDAMPER
HEAT RECOVERYCOIL
DEHUMIDIFICATION UNIT CONTROLLER (PROVIDED W/ EQUIPMENT )
1MP7.2SCALE: NONE
G. COOLING MODE
ECONOMIZER MODEH.
SPACE HEATING MODEI.
DEHUMIDIFICATION UNIT (DH-1) PURGE MODEJ.
SMART SAVER HEAT RECOVERYK.
ZERO AIR REHEAT MODEL.
1. WHEN THERE IS A CALL FOR DEHUMIDIFICATION & THE SPACE TEMPERATURE IS IN THE DEADBAND, BOTH THE AIR REHEAT COIL & THE (REMOTE) OUTDOOR AIR COOLED AREACTIVATED TO ACHIEVE A NEUTRAL SUPPLY AIR TEMPERATURE.
2. LEAD/LAG MODE: COMPRESSOR STARTING ORDER SHALL ALTERNATE TO MAINTAIN EQUAL RUN TIME.
1. DURING OCCUPIED PERIOD, THE OUTDOOR AIR DAMPERS OPEN TO MINIMUM POSITION. EXHAUST AIR BLOWER EF1 IS ACTIVATED. HEAT CONTAINED IN THE EXHAUST AIR ISTRANSFERRED TO THE INCOMING OUTDOOR AIR VIA THE AIR_TO_REFRIGERANT HEAT EXCHANGERS.
2. DURING UNOCCUPIED PERIOD, THE OUTDOOR AIR DAMPERS AND EXHAUST AIR BACKDRAFT DAMPERS STAY IN CLOSED POSITION.
1. DEHUMIDIFICATION UNIT (DH-1) PURGE MODE OCCURS ON A CALL FOR DEHUMIDIFICATION UNIT (DH-1) PURGE MODE FROM DEHUMIDIFICATION UNIT (DH-1)OPERATORPANEL OR REMOTE PUSH BUTTON (BY OTHERS) MOMENTARY SIGNAL. THIS TIMER_OPERATED MODE (2_20 MINUTES) IS INTENDED TO VENTILATE THE SPACE WITH ONE COMPLETEAIR CHANGE AND THEN AUTOMATICALLY RESUME NORMAL OPERATION.
a. DEHUMIDIFICATION UNIT (DH-1) COMPRESSOR(S) ARE STOPPED.
b. FACE AND BYPASS DAMPERS ON EVAPORATOR CLOSE PARTIALLY.
c. OUTDOOR AIR DAMPER OPENS FULLY TO ALLOW 100% OUTDOOR AIR INTO THE DRY_O_TRON®.
d. EXHAUST AIR DAMPER(S) OPEN(S) FULLY.
e. REMOTE EXHAUST FANS (EF-1, EF-2, EF-3, AND EF-4) OPERATE TO EVACUATE MAXIMUM AIRFLOW FROM THE SPACE.
f. OUTDOOR AIR DAMPER OPENS TO ALLOW 100% OUTDOOR AIR INTO THE DRY_O_TRON®.
g. AUTOMATED PURGE SCHEDULED TO BE ACTIVATED 15 MINUTES AFTER CLOSE (UNOCCUPIED PERIOD) AND 1 HOUR PRIOR TO OPENING (OCCUPIED PERIOD).
h. SMART PURGE: IF OA TEMPERATURE IS BELOW 65°F ONLY PREHEAT SA TO 65°F.
1. COOLING MODE OCCURS WHEN THE SPACE TEMPERATURE IS ABOVE SETPOINT.
a. THE OUTDOOR AIR SENSORS (TEMPERATURE AND %RH) VERIFY IF ECONOMIZER COOLING IS POSSIBLE. THE MICROPROCESSOR'S FLOATING SETPOINT VERIFIES THAT THEOUTDOOR AIR IS COOLER AND DRYER THAN THE ACTUAL INDOOR CONDITION.
b. IF OUTDOOR AIR IS NOT SUITABLE FOR ECONOMIZER COOLING, COMPRESSOR #1 STARTS TO OPERATE IN "FIRST STAGE COOLING MODE".
c. IF THE ROOM TEMPERATURE CONTINUES TO CLIMB BY 1°F, COMPRESSOR #2_4 STARTS TO OPERATE IN "SECOND STAGE COOLING MODE".
d. THE OUTDOOR AIR SENSORS (TEMPERATURE AND %RH) WILL VERIFY IF ECONOMIZER COOLING IS POSSIBLE.
e. IF OUTDOOR AIR IS NOT SUITABLE FOR ECONOMIZER COOLING, COMPRESSOR STARTS TO OPERATE IN "COOLING MODE".
f. COMPRESSOR STARTS TO OPERATE IN "COOLING MODE".
2. THE (REMOTE) OUTDOOR AIR_COOLED CONDENSER REJECTS COMPRESSORS' TOTAL HEAT OF REJECTION AS REQUIRED. POOL WATER HEATING MODE OCCURS WHEN THE POOLWATER TEMPERATURE DROPS 1°F BELOW SETPOINT.
1. ECONOMIZER MODE WILL OPERATE WHENEVER OUTDOOR CONDITIONS PERMIT AND OVERRIDE COMPRESSOR OPERATION.
a. IF THERE IS A CALL FOR COOLING, THE MICROPROCESSOR WILL VERIFY THAT THE OUTDOOR TEMPERATURE IS SUITABLE. IF YES, THE UNIT WILL OPERATE IN ECONOMIZERCOOLING MODE.
b. IF THERE IS A CALL FOR DEHUMIDIFICATION, THE MICROPROCESSOR WILL VERIFY THAT THE OUTDOOR MOISTURE LEVEL IS SUITABLE. IF YES AND THE OUTDOORTEMPERATURE IS NEUTRAL TO THE SPACE, THE UNIT WILL OPERATE IN ECONOMIZER DEHUMIDIFICATION MODE.
c. IF THERE IS A CALL FOR BOTH COOLING AND DEHUMIDIFICATION, THE MICROPROCESSOR WILL VERIFY THAT THE OUTDOOR TEMPERATURE AND THE OUTDOOR MOISTURELEVEL ARE SUITABLE. IF YES, THE UNIT WILL OPERATE IN ECONOMIZER COOLING AND DEHUMIDIFICATION MODE.
d. DURING ECONOMIZER MODE THE MOTORIZED O/A DAMPER OPENS TO 100% AND R/A DAMPERS (EVAPORATOR FACE AND BYPASS DAMPER) FULLY CLOSE. SUPPLY FAN ANDALL EXHAUST FANS (EF1 & EF2) VENTILATE THE SPACE WITH 100% OUTDOOR AIR.
1. HEATING MODE OCCURS WHEN THE SPACE TEMPERATURE DROPS BELOW SETPOINT.
a. IF THE ROOM TEMPERATURE DROPS BELOW SETPOINT THE DRY_O_TRON®'S MICROPROCESSOR WILL SEND A 10V DC SIGNAL AND UP TO 2 STAGE ON_OFF SIGNAL TO ASPACE HEATING COIL (FACTORY MOUNTED) TO MAINTAIN SPACE TEMPERATURE. ACCURACY IS ACHIEVED THROUGH A PID (PROPORTIONING/INTEGRAL/DERIVATIVE)HEATING CONTROL TO ELIMINATE STALLED ROOM TEMPERATURES.
b. IF THE ROOM TEMPERATURE DROPS BELOW SETPOINT THE DRY_O_TRON®'S MICROPROCESSOR WILL SEND A SIGNAL TO A HOT WATER SPACE HEATING COIL (FACTORYMOUNTED) TO MAINTAIN SPACE TEMPERATURE.
c. UNIT MOUNTED HEATING COIL FREEZE PROTECTION MODE; IF HEATING COIL AVERAGE LEAVING AIR TEMPERATURE FALLS BELOW 45°F (ADJUSTABLE) THE BLOWERS SHUTDOWN, ALL DAMPERS CLOSE AND CONTROL VALVES SHOULD FAIL TO FULL OPEN.
ALERTON CONTROLLER
FILTERS
DP
TSA
DMSDRSA
MAT
TX DS
TX DS
OAT
VFDEF-3
VFDEF-4
VFDEF-1
HWR
HWS
PP1
MS
CS
460V
PP2
MS
CS
460V
1. EQUIPMENT MANUFACTURER IS TO COORDINATE WITH CONTROLS CONTRACTOR A MINIMUM OF 2WORKING DAYS PRIOR TO BID.
2. DH-1 EQUIPMENT MANUFACTURER TO PROVIDE BACKNET MSTP INTERFACE, PROGRAMMING,START-UP AND TESTING.
3. DH-1 SUPPLY AND EXHAUST FAN VARIABLE FREQUENCY DRIVES (VFD) ARE TO BE FACTORY INSTALLED,WIRED, MOUNTED, AND TESTED.
E
E
EEEE
BACNET
BACNET
BACNET
BACNET
E
M M
M M M M
M
M
M
M
M
M M
E E
M
M
M
M
M ME
M
M
M M
M
E
M
MMM
NEWTEMPERATURESENSOR INPOOL SUPPLY(TYP-2)
MM
MM
DRAWN BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
DATE:
CONSULTANT:
SHEET NUMBER:
DESCRIPTIONREV. DATE
REVISIONS:
APPROVED BY:
- -
- -
- -
- -
- -
SEAL:
-
-
-
-
-
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.
MECHANICAL ENGINEERING CONSULTANT
5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919
FAX: 775.826.1918WEB: CR-ENG.COM
MGB
CL
CLR
CLR
PERMIT SET
ADDENDUM 2 07/29/161
1600
STA
TE R
OU
TE 8
8
MP7.2
07/13/2016
103915
CA
RSO
N V
ALL
EY S
WIM
CEN
TER
- H
VAC
REP
LAC
EMEN
T
MIN
DEN
, NV
8942
3
CO
NTR
OL
DIA
GRA
MS
1