East Fork of Fountain Creek Mandatory Pre Bid Meeting. 14 May 2013. East Fork of Fountain Creek. Aerial of Flood Insurance Rate Map (FIRM). East Fork of Fountain Creek Floodplain Hazard Development Permit. Aerial View of Existing Creeks. Photos looking North – Upstream. April 11, 2013. - PowerPoint PPT Presentation

Transcript of East Fork of Fountain Creek Mandatory Pre Bid Meeting

Page 1: East Fork of Fountain Creek Mandatory Pre Bid Meeting

14 May 2013

Page 2: East Fork of Fountain Creek Mandatory Pre Bid Meeting

Aerial of Flood Insurance Rate Map (FIRM)

East Fork of

Fountain Creek

Page 3: East Fork of Fountain Creek Mandatory Pre Bid Meeting

Aerial View of Existing Creeks

Page 4: East Fork of Fountain Creek Mandatory Pre Bid Meeting

April 11, 2013

Photos looking North – Upstream

Page 5: East Fork of Fountain Creek Mandatory Pre Bid Meeting
Page 6: East Fork of Fountain Creek Mandatory Pre Bid Meeting

April 11, 2013

Confluence of Main Stem and East Fork of Fountain Creek

South of the Confluence of

Fountain Creek

Page 7: East Fork of Fountain Creek Mandatory Pre Bid Meeting

Administrative NotesBid Opening will be 3:00 PM,

Thursday 30 May 2013 at City HallBid Bonds requiredPlease include completed CDOT

Forms 605, 606 and 621CDOT funded projectDBE & OJT Goal = zeroDavis Bacon wages not required

Substantial completion by 30 Sep 2013

All RFI’s should be in writing and sent via e-mail to: [email protected] or [email protected]

Staging area – TBD and negotiated between the Contractor and property owner

Page 8: East Fork of Fountain Creek Mandatory Pre Bid Meeting

Channel Fill and ReclamationWithin the Easement:

Per plans and specsCity Engineering Specs (Title 7;

Section 7.5.2.1. Utility Mains – available on line)

95% Modified Proctor (ASTM D-1557) unless otherwise directed

Contractor is responsible for all QC & soils testing

City may do some QA testing

Outside the Easement:Will require special attentionSee supplemental plans

Page 9: East Fork of Fountain Creek Mandatory Pre Bid Meeting

Alternative Pipe MaterialsProposals will be evaluated

separatelyDecision to use alternative pipe

materials will be collaboratively evaluated and approved by the City, the property owner and CDOT

Must include:Recent experience with similar

72” and 84” pipe diametersCrew shall also have recent

experience with large diameter pipe installations (i.e. Project Superintendent, Foreman, etc.)

Provide referencesProvide QC plan

Page 10: East Fork of Fountain Creek Mandatory Pre Bid Meeting
Page 11: East Fork of Fountain Creek Mandatory Pre Bid Meeting
Page 12: East Fork of Fountain Creek Mandatory Pre Bid Meeting
Page 13: East Fork of Fountain Creek Mandatory Pre Bid Meeting
Page 14: East Fork of Fountain Creek Mandatory Pre Bid Meeting
Page 15: East Fork of Fountain Creek Mandatory Pre Bid Meeting

Trail Ridge Apartments – Grading Plan