East avenue PD&E STUDY | EVALUATION MATRIX
Transcript of East avenue PD&E STUDY | EVALUATION MATRIX
East avenue PD&E STUDY | EVALUATION MATRIX
Addresses capacity needs and provides acceptable Level of Service in 2045 YesEnhances roadway safety Yes
Number of Parcels Impacted 106Residential Relocations 24Business Relocations 6
Historical, Archeological or Section 4(f) Sites Affected Medium
Wetlands Impacted (Acres) LowFloodplains Impacted (Acres) 4.78Impacts to Threatened and Endangered Species Low
Potential Impacts from Noise Low5 High Risk Sites
4 Medium Risk SitesPotential Impacts to Utilities Relocations to electric, water, sewer, communications
Preliminary Design $3,150,000 Preliminary Right of Way $53,300,000 Preliminary Construction Cost $35,291,490 Total Preliminary Cost $91,741,000
Physical Resource Effects
Potential Contamination Sites (within 500')
Cost Estimate ($ million)
Impact potential: Low
Project Goals
Social and Economic Effects
Cultural Resource Effects
Natural Resource Effects