EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations...

25
September 2007 ALMA Community Meeting 2007 1 EAST-ASIAN ARC KEN TATEMATSU MANAGER

Transcript of EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations...

Page 1: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 1

EAST-ASIAN ARC

KEN TATEMATSUMANAGER

Page 2: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 2

EA-ARC MANAGER CHANGE

• RYOHEI KAWABE (-2007 MAR)BECAME NOBEYAMA DIRECTOR

• KEN TATEMATSU AS NEWMANAGER (2007 JUL-)

Page 3: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 3

ALMA-J ORGANIZATION (2007 Oct 1-)

Page 4: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 4

ORGANIZATION (FUTURE)

ARC MANAGER

ADM ASSISTANT

SCIENCE

SERVICE

TEAM

DATA

SERVICE

TEAM

TECHNICAL

SERVICE

TEAM

SOFTWARE

SERVICE

TEAM

TAIWAN CONTACT

EPO

TEAM

Page 5: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 5

ALMA Regional Centers: Full Operations

NA ARC EA ARCEU ARC

Database Managr1 - mirror-6/2009.3Archive Tech1 - CSV+0/2009.1Archive Tech2 - mirror-3/2009.4Archive Operator1 - mirror-3/2009.4Archive Operator2 - mirror+0/2010.1

ARC Head Office ARC Manager - Ops+15/2006.3

AdminAsst1 - Ops+33/2008.1

User Science Support

Archive Ops

ARC Astronomer1 - Ops+21/2007.1ARC Astronomer2 - CSV-9/2008.2ARC Astronomer3 - CSV-3/2008.4ARC Astronomer4 - ES-3/2010.2ARC Astronomer5 - ES-3/2010.2ARC Astronomer6 - ES+6/2011.1ARC Scientist1 - CSV-15/2007.4ARC Scientist2 - CSV-3/2008.4ARC Scientist3 - ESDP-9/2009.2ARC Scientist4 - ES-3/2010.2Web Developer - ESDP-3/2009.4

Database Managr1 - mirror-6/2009.3Archive Tech1 - CSV+0/2009.1Archive Tech2 - mirror-3/2009.4Archive Operator1 - mirror-3/2009.4Archive Operator2 - mirror+0/2010.1

ARC Head Office ARC Manager - Ops+15/2006.3

AdminAsst1 - Ops+33/2008.1

User Science Support

Archive Ops

ARC Astronomer1 - Ops+21/2007.1ARC Astronomer2 - CSV-9/2008.2ARC Astronomer3 - CSV-3/2008.4ARC Astronomer4 - ES-3/2010.2ARC Astronomer5 - ES-3/2010.2ARC Astronomer6 - ES+6/2011.1ARC Scientist1 - CSV-15/2007.4ARC Scientist2 - CSV-3/2008.4ARC Scientist3 - ESDP-9/2009.2ARC Scientist4 - ES-3/2010.2Web Developer - ESDP-3/2009.4

Database Managr1 - mirror-6/2009.3Archive Tech1 - CSV+0/2009.1Archive Tech2 - mirror-3/2009.4Archive Operator1 - mirror-3/2009.4Archive Operator2 - mirror+0/2010.1

ARC Head Office ARC Manager - Ops+15/2006.3

AdminAsst1 - Ops+33/2008.1

User Science Support

Archive Ops

ARC Astronomer1 - Ops+21/2007.1ARC Astronomer2 - CSV-9/2008.2ARC Astronomer3 - CSV-3/2008.4ARC Astronomer4 - ES-3/2010.2

ARC Scientist1 - CSV-15/2007.4ARC Scientist2 - CSV-3/2008.4ARC Scientist3 - ESDP-9/2009.2

Web Developer - ESDP-3/2009.4

Page 6: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 6

ARC• CORE FUNCTIONS WE OUGHT TO DO

– Phase 1 PROPOSAL SUPPORT, TECHNICALCHECK

– Phase 2 PROGRAM SUPPORT, SB VALIDATION– DATA PRODUCT SUPPORT– MIRROR ARCHIVE OPPERATIONS– HELP DESK, MANUAL, F2F SUPPORT– CSV PARITICIPATION– AoD– ETC

• JOHN AND PAOLA DID/WILL DO PRECISEEXPLANATIONS, THEN I OMIT HERE

Page 7: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 7

ARC IS IMPORTANT• TO FACILITATE SCIENCE BY TAKING INTO

ACCOUNT DIFFERENT REGIONAL FLAVOR• END-TO-END LOCAL USER SUPPORT• COLLABORATION BASE:

NOBEYAMA,NANTEN2(radio), ASTE(submm),SMA(submm), SUBARU(opt/IR), SUZAKU(X),AKARI(IR), VERA(VLBI), ETC

• ORIGINAL CATALOG, VO

Page 8: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 8

INPUT FROM COMMUNITY

• “EA-ARC SCIENCE REQUIREMENTS”(CHAIR: M. OHISHI) IS BEING DRAFTED– 1st VERSION BY SEP 30– NON-CORE AS WELL AS CORE

FUNCTIONS• WILL EVOLVE WITH “CONTINUOUS

INTERACTION WITH COMMUNITY”

Page 9: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 9

DIFFERENT TOOLSVLA-Nobeyama-IRAM-GBT…

Page 10: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 10

HOW TO COOK?

• CASE STUDY WITH BEEF

Page 11: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 11

EAST-ASIAN FLAVOR…UNBIASED SURVEYS OF CORES VIA MM-

WAVE• TAURUS (MIZUNO ET AL. 1995)

Page 12: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 12

TAURUS IN H13CO+

• ONISHI ET AL. (2002) WITH Nobeyama 45m BEARS

Page 13: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 13

HIRAMATSU ET AL. (2007)CHAMAELEON WITH ASTE

Page 14: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 14

Ori A GMC

• CS (Tatematsu et al. 1993) Nobeyama 45m• H13CO+ (Ikeda et al. 2007) Nobeyama 45m+BEARS

Page 15: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 15

CHEMISTRY AND CLOUD EVOLUTION

• SUZUKI ET AL. (1992)• MAEZAWA ET AL. (1999)• HIROTA ET AL. (2006)

Page 16: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 16

NOBEYAMA 45m+BEARSKUNO ET AL. (2007)

Page 17: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 17

Page 18: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 18

ALMA-J VO PROTOTYPEBASED ON JVO INFRASTRUCTURE

Page 19: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 19

KANDORI ET AL. (2005)STABILITY OF GLOBULES

Page 20: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 20

Page 21: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 21

Page 22: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 22

0

0.5

1

1.5

2

2.5

0 5 10 15 20 25 30

I

(

C

1

8 O

)

(

K

k

m

s

-

1 )

Av (mag)

Depletion of C18

O in the globule CB131

(Kandori et al.)

Lada et al. (1994)

CORRELATION BETWEEN N(mol)AND Av THROUGH ALMA-J VO

PROTOTYPE

Page 23: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 23

Page 24: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 24

SUMMARY• EA-ARC IS RESPONSIBLE FOR ARC CORE

FUNCTIONS• EA-ARC WILL FACILITATE “ASTRONOMY IN EAST

ASIA” THROUGH ALMA– COLLABORATION BASE– LOCAL USER SUPPORT

• POSSIBILITIES– ORIGINAL CALALOG(ALMA-EAST ASIAN SURVEY)– VO FOR EAST-ASIAN CONTENTS/SCIENCE

FLAVOR

Page 25: EAST-ASIAN ARC...September 2007 ALMA Community Meeting 2007 5 ALMA Regional Centers: Full Operations EU ARC NA ARC EA ARC Database Managr1 - mirror-6/2009.3 Archive Tech1 - CSV+0/2009.1

September 2007 ALMA Community Meeting 2007 25

www.alma.info

The Atacama Large Millimeter/submillimeter Array (ALMA), an international astronomy facility, is a partnership among Europe, Japan andNorth America, in cooperation with the Republic of Chile. ALMA is funded in Europe by the European Organization for AstronomicalResearch in the Southern Hemisphere, in Japan by the National Institutes of Natural Sciences (NINS) in cooperation with the AcademiaSinica in Taiwan and in North America by the U.S. National Science Foundation (NSF) in cooperation with the National Research Councilof Canada (NRC). ALMA construction and operations are led on behalf of Europe by ESO, on behalf of Japan by the NationalAstronomical Observatory of Japan (NAOJ) and on behalf of North America by the National Radio Astronomy Observatory (NRAO), whichis managed by Associated Universities, Inc. (AUI).