Introduction BTV Description A radiator is inserted into the beam path. The interaction of the particles with the material generates light. A camera system captures the light through a viewport. The image corresponds to the beam ‘footprint’ on the screen. It is used for beam observation, steering or measurement.

Transcript of East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus...

Page 1: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

East Area BTV upgrade2015_09_03S.Burger BE-BI-PM

V.Clerc EN-MEF-SII.Francescut BE-BI-MLV.deJesus EN-MEF-SIM.Lazzaroni EN-MEF-EBE…

F61 line

Page 2: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Content

• Introduction• Actual system

o Mechanicso Electronics

• Upgrade (the old ‘Marguerites’)o Vacuum tanko Screeno Screen insertion deviceo Supporto Alignmento Optical system

• Budget• Planning

ECR approved

https://edms.cern.ch/document/1531046/0.1

Page 3: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Introduction

BTV DescriptionA radiator is inserted into the beam path.The interaction of the particles with the material generates light. A camera system captures the light through a viewport. The image corresponds to the beam ‘footprint’ on the screen. It is used for beam observation, steering or measurement.

Page 4: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Actual situation (1)

1

2 3 4

5

Mechanics → non BTV standard- 5 old ‘Marguerites’ (ageing and no spares)- Only used as screen holder (not target anymore)

6 F61N.BTV02. Upgraded in 2014.

Page 5: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Actual situation (2)Electronics- BTV VME board controls → already BTV standard

- Camera- Lights- Image acquisition- Filter wheel - Screen insertion device

- CAMAC Marguerite controller → non BTV standard

Application- BTV application → BTV standard

- based on FESA classes already in use by all other BTVs installed in the all accelerator chain

- GM class software → non BTV standard

Maintenance- Requires the input of 3 groups:

- EN-STI for the mechanics- BE-CO for the actuator control - BE-BI for the camera acquisition

Upgrade:- Get rid off the old Marguerites- Get a BTV design (new screen insertion

device with a newer vacuum chamber)- Use the standard BTV hardware CTRL

and application

- For optimization reason regarding development, installation, maintenance and operability, a unique monitor is developed for the 5 BTVs with minor modification to fit with each position and application

Page 6: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

New Mechanics BTV (1)

Screen- Tests made on different PS beams on the extraction line F61, confirmed that a unique screen made of

Al2O3:CrO2 is sufficient to see the whole range of beam intensity extracted into the East Area.- Material : Al2O3:CrO2 (luminescence) 1mm thickness

- Marks : the screen will have marks only on the outside of the region of interest to optimize the S/N during measurement

- Size: Screen

Instrument Type Size [mm x mm]

Screen size seen by the beam (45deg) [mm x mm]

Screen thickness[mm]

F61.BTV01 Al2O3:CrO2 142x100 100x100 1F61.BTV02 Al2O3:CrO2 142x100 100x100 1F61.BTV03 Al2O3:CrO2 220x100 150x100 1

F61D.BTV01 Al2O3:CrO2 142x100 100x100 1F61S.BTV01 Al2O3:CrO2 142x100 100x100 1

150mm x 100mm100mm x 100mm2 different sizes

Page 7: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Screen Insertion DeviceA magnetic coupled push-pull device was chosen from UHV Design (model MPPL-150) as the screen insertion device. This actuator will be driven by a pneumatic device from SMC (model CDG1BN32). This new actuator system is already in the pipeline for being used in the new BTVs for the ELENA machine.

New Mechanics BTV (2)

Page 8: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Vacuum chamber- Taking into account the space needed by the instrument in all locations, the

vacuum chamber was designed taking into account the smallest space available to guarantee that it fits in any of the 5 locations:

- Longitudinal length = 304mm

Vacuum Interconnections- ‘KF250’ SPS type on the BTVs

- Either connection with or

Support, alignment table- The support and the alignment table are developed by EN-MEF and will be use as a

standard in the F61 line- PSZBTVMC0001 already validated for production

Mires system- The mire system is attached to the same flange than the screen insertion device

which permits to optimize the metrology (one can get the screen position wrt the mires, avoiding any metrology on the vacuum tank). The mires system stays in the BTV to optimize time in the machine for any survey.

New Mechanics BTV (3)

Page 9: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

BTV device assembly on CF250 flange- Screen insertion device- Mire system- Optical system- Cover

Optical system- Illumination system- Camera (ThermoFisher CID8726DX7)- Filter wheel

New Mechanics BTV (4)

Page 10: East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.

Budget

Planning

Post Group involved Estimate[KCHF]

Status

1 BE design BE-BI / EN-MEF 15 In progress

2 Vacuum tank BE-BI / EN-MEF 25 Design validated, in AP

3 Support / table BE-BI / EN-MEF 12 Design validated, production on going

4 Screen Insertion Device BE-BI 25 Quotation received

5 Screens BE-BI 15 Quotation received

6 Viewport Fuse Silicate BE-BI 10 Quotation received

7 Complete assembly 'cloche' BE-BI 20 Design validated

8 Cameras BE-BI 40 Quotation received

9 Cabling EN-EL 10 DIC done (only for TF camera)

10 Crates + misc BE-BI 10 OK

11 Mounting/Cabling/Testing BE-BI / TE-VSC / EN-HE 10 To be done

Total 192

Even if quite challenging from the beginning, we try to keep planning installation as : - 4 BTVs: in the PS during YETS 2015/16 (end of January, beginning February 2016)- 1 BTV: inside the primary zone, later in 2016, before the start up of the East Area (to

benefit as much from the radiation decrease)