RISPs and ONRI’s Role in RISPs African Development Bank Group AfDB Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs– 05.02.2010 1 East African Corridors Amadou Oumarou NEPAD, Regional Integration & Trade Department AfDB ICA 2010 Annual Meeting – 6 May 2010 AfDB African Development Bank Group

Transcript of East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP...

Page 1: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

1

East African Corridors

Amadou Oumarou

NEPAD, Regional Integration & Trade Department

AfDB ICA 2010 Annual Meeting –6 May 2010

AfDB

African Development Bank Group

Page 2: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

2

1.Achievements in Transport

infrastructure

2.Transport & Trade Facilitation

3.Into the Future –Going Forw

ard

4.Challenges

2

Outline –East African Corridors

2

AfDB

African Development Bank Group

Page 3: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

33

Regional Corridors –the case for im

proved transport infrastructure

fostering Trade Growth in East Africa

3

Trade Growth in the Region 2002 & 2009 in M

US$

Trade Growth in the Region 2002 & 2009 in M

US$

The region recorded 70% growth in

trade over the period of 7 years

Page 4: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RIS

Ps a

nd

ON

RI’

s R

ole

in

RIS

Ps

Afr

ica

n D

ev

elo

pm

en

t B

an

k G

rou

p

AfD

BM

oo

no

Mu

po

tola

, O

NR

I.2

Ma

na

ge

r

ON

RI

RIS

P C

oo

rdin

ato

r

ONRI Presentation on RISPs–05.02.2010

44

Northern Corridor Mombasa-Nairobi-Kampala-Kigali-Bujumbura

4

Page 5: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RIS

Ps a

nd

ON

RI’

s R

ole

in

RIS

Ps

Afr

ica

n D

ev

elo

pm

en

t B

an

k G

rou

p

AfD

BM

oo

no

Mu

po

tola

, O

NR

I.2

Ma

na

ge

r

ON

RI

RIS

P C

oo

rdin

ato

r

ONRI Presentation on RISPs–05.02.2010

55

Central Corridor Dar es Salaam-Kampala-Kigali-Bujumbura

5

Page 6: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

6

Case of Mombasa-Nairobi-Addis Ababa Road Corridor

* AfDB: US$ 575 M

* AfDB: US$ 575 M

* EU: US$ 115 M

* EU: US$ 115 M

* Ethiopian Govt: US$ 25 M

* Ethiopian Govt: US$ 25 M

* Kenyan Govt: US$ 40 M

* Kenyan Govt: US$ 40 M

��700km missing links (roads)

700km missing links (roads)

��One stop border post

One stop border post

��Roadside social infrastructure

Roadside social infrastructure

��Increase in trade by 500% by 2014

Increase in trade by 500% by 2014

��30% increase in household in project area

30% increase in household in project area

by 2014

by 2014

��Reduced transit tim

e Addis/Nairobi from

Reduced transit tim

e Addis/Nairobi from

5 days in 2009 to 1 day by 2012

5 days in 2009 to 1 day by 2012

TTotal Funding of 496.79Musd between 2004 & 2009

otal Funding of 496.79Musd between 2004 & 2009

Page 7: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

Imp

act

of

Inve

stm

en

ts i

n P

hysi

cal

Infr

ast

ruct

ure

ON

RI

Pre

sen

tati

on

on

RIS

Ps–

05

.02

.20

10

7

77

KenyaIm

pact of Investm

ents in Physical Infrastructure

Page 8: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

88

Despite

Improved

Transport

Infrastructure, Costs remain H

igh

due to Soft Issues constraints

8

�Up to 75% of delays on transport corridors are related

to Inefficient Transport & Trade Procedures

�Therefore need to address Trade & Transport Facilitation

Page 9: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

99

Addressing Facilitation Issues

9

�One Stop Border Posts

�Customs Cooperation –

Single Document -

EDIFACT

�Harmonisationof liability

Regimes

�Institutional arrangements

for corridor management

�Legal Frameworks for

multilateral Transit

Agreements

�Harmonisationof

standards, e.g., axle loads

Page 10: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

10

10

Case ofEast Africa Trade & Transport Facilitation Project

Building One-Stop-Border Posts

10

�10 One-Stop-Border Posts being built under East Africa

Trade and Transport Facilitation Project –World Bank,

AfDB and others

�Construction of one stop border posts and harmonization

of documentation can reduce delays by 30%

Page 11: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

11

11

Case of East Africa Trade and Transport Facilitation Project

Addressing Customs Cooperation

11

�AfDB Financing of interconnection of EAC

customs Administrations networks for

electronic exchange of documents -

EDIFACT

�World Bank funded Modernisation

of

National Customs Systemsand integrated

databases

Page 12: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

12

12

Case of East Africa Trade and Transport Facilitation Project

Improving Legal and Institutional Arrangements for Transit

12

�Multilateral transit transport facilitation

agreement –signed by central corridor

countries in September 2006

�Set up Central Corridor Transit Transport

Agency -TTFA

Rwanda

Burundi

Uganda

Tanzania DRC

Page 13: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

13

13

Into the Future

13

�Approach should be

Regional, Sector-Wide &

Multi-Modal

�Planning and

Programming at Regional

level

�Prioritizingamongst

competing corridorsand

investments along

corridors

25 Year Regional

Transportation

Systems Plan

10 Year

Regional Project

Priorities

5 Year

Construction

Program

Page 14: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

14

14

Regional Level Planning & Programming is an important step forw

ard

14

�EAC Transport Strategy and Regional Road Sector

Development Program –supported by AfDB

Page 15: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

African Development Bank Group

AfDB

ONRI Presentation on RISPs–05.02.2010

15

15

Challenges Still remain..

15

Kenya

�How to translate regional plans and priorities onto

the national level planning and prioritisation

�How to ensure domestication of regional protocols,

rules and regulations

�How to enhance coordination and collaboration in

the implementation of cross border infrastructure

�How to enhance Private Sector Participation in

PPPs, e.g. the Nairobi section on the NC

�ICA Brokering Role

Page 16: East African Corridors - ICA Annual Meeting May 2010 · Moono Mupotola, ONRI.2 Manager ONRI RISP Coordinator ONRI Presentation on RISPs–05.02.2010 1 East African Corridors Amadou

RISPs and ONRI’s Role in RISPs

African Development Bank Group

AfDB

Moono Mupotola, ONRI.2 Manager

ONRI RISP Coordinator

ONRI Presentation on RISPs–05.02.2010

16

ICA 2010 Annual Meeting –6 May 2010 1616

Thank you

African Development Bank Group

AfDB

Amadou Oumarou

Division Manager

NEPAD Regional Integration and Trade Department