E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable...

9
E3Construction Kit E3 Structural Design E3 Building Materials E3 Construction Scheme Any Architectural Design could be constructed with E3 Construction Kit

Transcript of E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable...

Page 1: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3Construction KitE3 Structural DesignE3 Building Materials

E3 Construction SchemeAny Architectural Design could be constructed with E3 Construction Kit

Page 2: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Structural DesignE3 Structural Design is in accordance with EUROCODE:•EC3 [Steel Structure]

•EC8 [Seismic Design & Composite Structural Systems]

EUROCODE compliance ensures obtaining of planning and

building permits, as well as a safe environment for the tenant

with regards to earthquakes, winds and thermal

expansions/contractions.

E3 Structural Design includes documentation and guidance to

actions required for issuing an ENERGY CERTIFICATE [Class “A”]

for the Buildings according to the EU direction 2002/91/EC.

E3 Structural Design supports ANY Electromechanical

Technology (e.g. Home automation, geothermal pumps, solar

panels etc), and offers much more EASIER installation: it adopts

the Electrical Design to regional constrains/directions!

Page 3: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Building Materials Steel Structures: this enables a structural construction system with no loading bearing on the walls.Steel has a widespread reputation for its:High Strength / Weight ratio making it an attractive option for the construction of High-rise buildings, Long-Span bridges and structures located in highly seismic areasFast Construction – steel structures can be erected quite rapidly thereby enabling quick time-to-market.High Ductility since it can withstand large plastic deformation before failure, thus providing a large reserve strength.

Page 4: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Building MaterialsWooden Frames: these are used for the construction of the Roof, Floors and External/Internal Walls. Wood is an organic, hygroscopic and anisotropic material. Its thermal, acoustic, electrical, mechanical, aesthetic and working properties make it most suitable for the construction of E3 buildings. It is emphasised that all wood used is dried up to 20% humidity and specially treated for fire resistance and against timber worms.

ECO Wool Insulation: ECO-Wool is a mineral wool produced 100% from recycled wool and paper and specially treated with antipyrine and anticeptic. ECO Wool further enhances the thermal conductivity and fire resistance of the walls and roofs at a very low cost.

Page 5: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Building MaterialsCellular Lightweight Concrete (CLC) boards: CLC boards are produced by introducing micro-sized air bubbles in the cement-based mixture. The additional use of expanded polystyrene in the mixture enhances:Thermal conductivity and performance (thermal performance is 10 times better as compared to conventional CLC)Sound Insulation: up to 42db sound reduction can be achievedWater Resistance: can resist water absorption up to 90%.Resistance to Fire: can withstand heat transmission for up to 5 hours without releasing toxic fumes.

In alternation, traditional cement or gypsum boards could be used in the case that local regulations requires it.

Page 6: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Construction SchemeIn addition to E3 Structural Design and BuildingMaterials, E3 Construction Scheme is provided toconstructor that enables him to construct the buildingwith optimised costs in respect of labor andequipment.E3 Construction could be based on prefabricated walls(panels) or to be performed directly at constructionsite through assembling of delivered E3 BuildingMaterials.In any case, E3 Construction Scheme includesnormative concerning labor and equipment that allowsthe constructor to assemble E3 Building materials inten minutes per square meter of the building!

Page 7: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Construction Kit delivers:Long lifetime buildingLifetime of E3 home is over 80 years with lower maintance costs comparing with traditionally built houses;

Class “A” energy efficient buildingThermal conductivity (U-value) of E3 home is 0.185 W/m2K;

Health living environmentElements are made from natural materials and treated with eco friendly components;

High resistance on fire, water & humidityIt burns up to 3 hours without damages-elements are protected with natural materials in order to prevent damages from water and humidity exposures;

High seismic resistance on earthquake, tornados and other natural disasters The light and flexible construction allows E3 home to suffer earthquakes up to 9 degrees of Richter scale without damages.

Page 8: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

Energy Efficiency Illustration

ENVELOPE LOADS FOR SPACE IN ZONE

COOLING COOLING HEATING

Area U-Value Shade TRANS SOLAR TRANS

(m²) (W/(m²-°K)) Coefficient (W) (W) (W)

N EXPOSURE

WALL 89 0.187 - 187 - 498

H EXPOSURE

ROOF 55 0.138 - 330 - 226

The given data sheet illustrates energy efficiency withoutimplementations of optional solutions, such as PV panels,geothermal heat exchangers, home automation systems, etc-please note that any implementation of said optional solutionscould convert E3 constructed premise into stable source ofincome due to energy production from renewable sources, orinto almost energy independent unit that reduces your energyexpenditures!

Page 9: E3Construction Kit - EcoPower · 2019. 11. 23. · could convert E3 constructed premise into stable source of income due to energy production from renewable sources, or into almost

E3 Construction Kit is provided following any architectural design:•E3 Structural Design;•E3 Building Materials (stands, beams, walls, roof);•E3 Construction Scheme;

Starts as from EUR 185 per square meter of desired building!The basic term of delivery is EXW “EVROGOR” Branesko Polje (Cajetina), Serbia

Delivery: 40-45 working days upon received order!

All components used in production of E3 building materials are EU certified!

For additional information, please contactE3 LIFESTYLE HOMES LTDwww.e3-lifestyle.comE-mail: [email protected]