e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA...
-
Upload
trinhquynh -
Category
Documents
-
view
213 -
download
0
Transcript of e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA...
![Page 1: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/1.jpg)
e-VLBI applications & requirements
Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona
![Page 2: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/2.jpg)
What is JIVE?
Operate the EVN correlator and support astronomers doing VLBI.
A collaboration of the major radio-astronomical research facilities inEurope, China and South Africa
A 3 year program to create a distributed astronomical instrument of inter-continental dimensions using e-VLBI, connecting up to 16 radio telescopes
![Page 3: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/3.jpg)
Radio Astronomy
Courtesy of NRAO
![Page 4: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/4.jpg)
Radio vs. Optical astronomyThe imaging accuracy (resolution) of a telescope: θ ≈ 1.2 λ/D (λ = wavelength, D = diameter)
Hubble Space Telescope:λ ≈ 600nm (visible light)D = 2.4mθ = 0.06 arcsecond
Onsola Space Observatory:λ = 6cm (5GHz)D = 25mθ = 600 arcsecondsWanted: 240km dish
![Page 5: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/5.jpg)
Very Long Baseline Interferometry• Create a huge radio telescope by using telescopes in different locations around the world at the same time
![Page 6: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/6.jpg)
Very Long Baseline Interferometry
Huygens
• Highest angular resolution
• High sensitivity
• Observations typ. 12 hours
• Large data volume
• Active Galactic Nucleae
• Supernovae, remnants, pulsars
• Spacecraft
• And much more
![Page 7: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/7.jpg)
Very Long Baseline Interferometry
tekst
• Initially (1990) we used large single-reel tapes
tekst
• Then (2004) came harddisk-packs
• And now: e-VLBI
![Page 8: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/8.jpg)
The EXPReS project
• EXPReS ran from March 2006 to September 2009
• Fundec by the EC
• Established competitive, real-time VLBI
• Regularly connecting > 10 telescopes
• Global collaboration and reach
• Target-of-Opportunity observations
• Robust
• Producing new science
![Page 9: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/9.jpg)
The EXPReS project
Size of bubble set by number of telescopes participating, height by station sustained bit-rate
![Page 10: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/10.jpg)
Lessons from EXPReS
• TCP does not perform well on long paths at high speed
• UDP requires overprovisioned or dedicated networks
• Routed (research) networks, VLANs, Lightpaths
• Paths without redundancy have unscheduled outages
• Especially the long-haul paths
• e-VLBI is robust and efficient
e-VLBI
![Page 11: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/11.jpg)
International Year of Astronomy
![Page 12: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/12.jpg)
Observation of J0204+15 (IYA)
![Page 13: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/13.jpg)
Observation of J0204+15 (IYA)
![Page 14: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/14.jpg)
Observation of J0204+15 (IYA)
![Page 15: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/15.jpg)
VLBI and Grids• EVN correlator is hardware based
• We have also developed a software
correlator:
• Higher flexibility, frequency resolution
• Huge computational demand
• Correlation is fairly easy to parallelise
• Low number of operations per byte,
but high input data rate
• Regular ‘batch’-like Grid processing
(GridFTP etc.) not a good match
• Need clusters with high input
connectivity
• Researching distributed correlation
IF 2 CHAN 3 - 30 STK RRAmplitude andPhase vs Time for N08C1.DIFX.1 Vect aver. CL # 2PLot file version 1 created 13-MAY-2009 12:14:39
Mill
iJan
skys
180160140120100806040200
EF - MC ( 1 - 2 ) CH 3
Degr
ees
TIME (HOURS)17 27 00 30 28 00 30 29 00 30 30 00
120
100
80
60
40
20
0
-20
IF 2 CHAN 3 - 30 STK RRAmplitude andPhase vs Time for N08C1.MKIV.1 Vect aver.PLot file version 1 created 13-MAY-2009 12:14:40
Mill
iJan
skys
180160140120100806040200
EF - MC ( 1 - 5 ) CH 3
Degr
ees
TIME (HOURS)17 27 00 30 28 00 30 29 00 30 30 00
120
100
80
60
40
20
0
-20
IF 2 CHAN 3 - 30 STK RRAmplitude andPhase vs Time for N08C1.SFXC.1 Vect aver.PLot file version 1 created 13-MAY-2009 12:14:40
Mill
iJan
skys
180160140120100806040200
EF - MC ( 1 - 5 ) CH 3
Degr
ees
TIME (HOURS)17 27 00 30 28 00 30 29 00 30 30 00
120
100
80
60
40
20
0
-20
Red: SFX Blue: DiFX Green: Mk4
![Page 16: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/16.jpg)
VLBI paramater space
• Resolution: depends on longest baseline,
and observing frequency
• Sensitivity: depends on √Bandwidth,
number and size of radio telescopes
• Current EVN correlator limitations:
16 stations @ 1024Mb/s each
Technological advances in e.g. A/D converters, RF
technology, digital signal processing, networking and
HPC can now enable much increased sensitivity
![Page 17: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/17.jpg)
The Uniboard project• Collaboration of European &
Korean Astronomical Institutes
• Reconfigurable FPGA-based
platform for astronomical
signal processing
• Digital back-end, pulsar timing,
RFI mitigation, beam-forming,
correlation
• Standardized on Ethernet
10Gb/s connections
• First hardware in December
![Page 18: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/18.jpg)
Irbene 32m
Miyun 50mKunming 40m
Sardinia 64m
Zelenchukskaya
Svetloe
Yebes 40m
Badary
New telescopes
![Page 19: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/19.jpg)
The future of VLBI• All VLBI can be e-VLBI !
• Caching when neccesary (outages, lack of bandwidth)
• Real-time correlation is a great
diagnostic tool
• Much higher bandwidths per
telescope
• 4 Gb/s soon, 10 Gb/s, how
about 64Gb/s ?
• More telescopes, global array
• New correlators (hardware,
software)
![Page 20: e-VLBI applications & requirements filee-VLBI applications & requirements Joint EGEE SA2 - TERENA NRENS and Grids Workshop, 22 Sept 2009, Barcelona](https://reader031.fdocuments.us/reader031/viewer/2022040701/5d61987488c993d6258ba2f4/html5/thumbnails/20.jpg)
Questions?