6' 11' 11' 6' 11'
45'
Install high-visibility crosswalksand new curb ramps on thewest side of the intersection
Install "STOP" signs for
northbound and southboundtraffic along Crowell Rd.
Access point to on-site Class Ishared use path at CSUS
All improvements will take placewithin the City's existing right-of-way
Install high-visibility crosswalk
Install bicycle detection equipment
Existing STOPshall remain
Remove existing striping from roadway;install new striping (Detail 23, 39, 39A),pavement markings and signsParking will be prohibited
on west side of the street byred curb or NO PARKING signs
Provide break in striping atSeaside Way
www.invarion.co
-
7/25/2019 E Proposed Plans - Christofferson parkway
4/5
At tachment E: Project PlansCrowell Rd. Concept Diagram
Existing Conditions
Proposed Conditions
-
7/25/2019 E Proposed Plans - Christofferson parkway
5/5
5' 5' 11' 11' 13' 5'
4' 15' 4'
50 ft
180 ft
50' Right-of-Way
415 ft
Grind/pave failing pavement surface;install curb, gutter, sidewalk andClass II bicycle facilities
Replace residential driveway
Replace residential driveway
At-grade transition point for pedestrians fromthe sidewalk to the Class I shared-use path
New sign postwith end ofroadway sign(s)facing north
Install accessible ramp;transition to existing sidewalk
within existing right-of-way
Install accessible ramp
Accessible ramps installed to provideaccess to bicyclists transitioning fromClass II facilities to the Class I shared-use
path (both sides)
Wide accessible ramp installed to provide
access to bicyclists transitioning fromthe Class II facility to the Class I path
Signs and pavement markings usedat various locations to identify useas a Class 1 shared-use facility for
pedestrians and bicyclists
Pave over existing, failing surface (AC)to provide suitable walking/riding surface
NON-PARTICIPATING COSTSPortion of widening solely for vehicle
parking on east side of street shall bepaid with local funds. This is the onlynon-participating portion of work.