E Proposed Plans - Christofferson parkway

download E Proposed Plans - Christofferson parkway

of 5

Transcript of E Proposed Plans - Christofferson parkway

  • 7/25/2019 E Proposed Plans - Christofferson parkway

    1/5

  • 7/25/2019 E Proposed Plans - Christofferson parkway

    2/5

  • 7/25/2019 E Proposed Plans - Christofferson parkway

    3/5

    6' 11' 11' 6' 11'

    45'

    Install high-visibility crosswalksand new curb ramps on thewest side of the intersection

    Install "STOP" signs for

    northbound and southboundtraffic along Crowell Rd.

    Access point to on-site Class Ishared use path at CSUS

    All improvements will take placewithin the City's existing right-of-way

    Install high-visibility crosswalk

    Install bicycle detection equipment

    Existing STOPshall remain

    Remove existing striping from roadway;install new striping (Detail 23, 39, 39A),pavement markings and signsParking will be prohibited

    on west side of the street byred curb or NO PARKING signs

    Provide break in striping atSeaside Way

    www.invarion.co

  • 7/25/2019 E Proposed Plans - Christofferson parkway

    4/5

    At tachment E: Project PlansCrowell Rd. Concept Diagram

    Existing Conditions

    Proposed Conditions

  • 7/25/2019 E Proposed Plans - Christofferson parkway

    5/5

    5' 5' 11' 11' 13' 5'

    4' 15' 4'

    50 ft

    180 ft

    50' Right-of-Way

    415 ft

    Grind/pave failing pavement surface;install curb, gutter, sidewalk andClass II bicycle facilities

    Replace residential driveway

    Replace residential driveway

    At-grade transition point for pedestrians fromthe sidewalk to the Class I shared-use path

    New sign postwith end ofroadway sign(s)facing north

    Install accessible ramp;transition to existing sidewalk

    within existing right-of-way

    Install accessible ramp

    Accessible ramps installed to provideaccess to bicyclists transitioning fromClass II facilities to the Class I shared-use

    path (both sides)

    Wide accessible ramp installed to provide

    access to bicyclists transitioning fromthe Class II facility to the Class I path

    Signs and pavement markings usedat various locations to identify useas a Class 1 shared-use facility for

    pedestrians and bicyclists

    Pave over existing, failing surface (AC)to provide suitable walking/riding surface

    NON-PARTICIPATING COSTSPortion of widening solely for vehicle

    parking on east side of street shall bepaid with local funds. This is the onlynon-participating portion of work.

    www.invarion.co