    Principles of system protection technology

    Test Switches

    Trainer: Hermann Paetzold

    PTD PA16

    Phone: +49-911/433-8321

  • 7/31/2019 E 12 Test Switches

    3/15

    Commissioning test

    Functional check (every two years, without tools)

    -Comparing measured values (current, voltage)

    - Trip test- Reading the event buffer- Verifying the protective fault message

    Protection test ( about every five years )- Testing a measuring point (current, voltage)- Testing all used BIs and BOs- Interface testing

    Testing Protective Relays

  • 7/31/2019 E 12 Test Switches

    4/15

    Enables easy, reliable, and quick test with currents andvoltages to verify correct A/D and calculation.

    Interrupts the TRIP and CLOSE commands to the circuit

    breaker

    Visual- and electrical indication of test position

    Pre-assembled connection to the portable test set

    Design and connection matches all digital protection devices

    Protection Test via Test Switch

  • 7/31/2019 E 12 Test Switches

    5/15

    The right test switch for application to every protection device

    Feeder protection with starpoint inside the test switch

    Feeder protection with open star point in the test switch

    Test switch for transformer differential protection

    Test switch design with additional contacts and functions

    Test Switch Versions

  • 7/31/2019 E 12 Test Switches

    6/15

    Prfung der EingangsmegrenTesting the Measured Input Values

    Test switch

    1

    2

    3

    Betrieb

    Test

    Prfschalter

    X2Schutzrelais

    X2

    4

    - S1

    L1

    L2

    L3 Operation

    Protect. relay

    Test switch

  • 7/31/2019 E 12 Test Switches

    7/15

    Prfschalter mit aufgelstem Sternpunkt im Strommekreis (Betrieb)

    Test Switch with Open Starpoint in the Current MeasuringCircuit (Operation)

    1

    2

    3

    Betrieb

    Test

    Prfschalter

    X2 Schutzrelais

    4

    - S2

    L1

    L2

    L3

    L1

    L2

    L3

    N

    Zu weiteren

    Schutzgerten

    Test switch

    Operation

    Protect. relay

    To other protect. relays

  • 7/31/2019 E 12 Test Switches

    8/15

    Prfschalter mit aufgelstem Sternpunkt im Strommekreis (Test)

    1

    2

    3

    Betrieb

    Test

    Prfschalter

    X2Schutzrelais

    4

    - S2

    L1

    L2

    L3

    L1

    L2

    L3

    N

    Zu weiterenSchutzgerten

    Protect. relay

    Test switch

    Operation

    To other prot. relays

    Test Switch with Open Starpoint in the Current MeasuringCircuit (Test)

  • 7/31/2019 E 12 Test Switches

    9/15

    Unterbrechung AUS / EIN bei Prfung mit PrfschalterInterruption of TRIP / CLOSE During Test via Test Switch

    Protective relayTrip Trip Trip

    Operation

    Circuit breakertrip

    CB CloseTestindication

    indication

  • 7/31/2019 E 12 Test Switches

    10/15

    The TIRP command contact remains closed - the CB closingcircuit remains open until reset

    It is used to:

    - output the TRIP command continuously- disable the CLOSE command

    Only upon acknowledgement is the latched command reset.

    Latching takes place:- in the SW of the protection device ( SIPROTEC 4)- via separated lock-out relays which are mechanically linked.

    Reset: electrically or hand reset

    Lock-Out Function

  • 7/31/2019 E 12 Test Switches

    11/15

    Lock Out RelaisLOCK-OUT RELAY

    Kontakte dargestellt

    bei Stellung Reset

    L+

    LS

    EIN

    Schutz

    AUS

    Reset

    R S

    L-

    LS

    AUS

    1 L+

    Reset

    LS

    EIN

    LockOutRelais

    Close

    CloseTrip

    ProtectionTrip

    Lock-outrelay

    Close

    Contacts shown atreset position

    CB

    CB CB

  • 7/31/2019 E 12 Test Switches

    12/15

    The trip circuit is monitored as to:- Presence of the control voltage- Interruption in the wiring- Interruption in the trip coil of the CB

    Supervision takes place:- in the protection device via BI ( advantage of self-monitoringand oscillographic record with time stamp)

    - with separated special monitoring relays

    The trip-circuit supervision is possible for phase-selectivetripping and / or three-phase tripping

    Trip-circuit Supervision

  • 7/31/2019 E 12 Test Switches

    13/15

    Auslsekreisberwachung im Schutzgert mit zwei Binreingngen

    ~2 mA

    Trip-circuit Supervision in the Protection Device with Two Binary Inputs

    AUS

    Schutz

    StU

    L+

    BE1

    BE2

    HIKO1 HIKO2

    LSS

    L-

    LS

    EIN

    Meldung

    SIPROTEC

    AUSSchutz

    StU

    L+

    BE1

    BE2

    HIKO1 HIKO2

    LSS

    L-

    LS

    AUS

    Meldung

    SIPROTEC

    BI1 BI1

    BI2 BI2

    CB CB

    TripClose

    Aux.

    Cont.1Aux.

    Cont.1

    Aux.

    Cont.2Aux.

    Cont.2

    indication indication

    TRIP

    protectionTRIPprotection

    CBTCCBTC

    VCTRL

    VCTRL

  • 7/31/2019 E 12 Test Switches

    14/15

    Trip-circuit Supervision in the Protection Device with One Binary Inp

    ~2 mA

    AUS

    Schutz

    StUL+

    BE1

    HIKO1 HIKO2

    LSS

    L-

    LS

    EIN

    Meldung

    SIPROTEC

    R

    EIN AUS

    AUS

    Schutz

    StU

    L+

    BE1

    HIKO1 HIKO2

    LSS

    L-

    LS

    AUS

    Meldung

    SIPROTEC

    REIN AUS

    VCTRLVCTRL

    BI1 BI1protection protectionTRIP TRIP

    indication indication

    Trip Trip

    Trip

    CB CB

    Close

    CBTC CBTC

    Close Close

    Aux.

    Cont.1

    Aux.

    Cont.1

    Aux.

    Cont.2

    Aux.

    Cont.2

  • 7/31/2019 E 12 Test Switches

    15/15

    AuslsekreisberwachungTrip-circuit Supervision

    AUSSchutz

    L+

    HiKo1

    L-

    LS

    EIN

    Meldung

    HiKo2Aux.Cont.1

    Aux.Cont.2

    indication

    TRIP

    protection

    CB

    Close