Dynacor: August 2014 Corporate Presentation

22
INVESTOR PRESENTATION August - 2014

description

Dynacor: August 2014 Corporate Presentation

Transcript of Dynacor: August 2014 Corporate Presentation

Page 1: Dynacor: August 2014 Corporate Presentation

INVESTOR PRESENTATIONAugust - 2014

Page 2: Dynacor: August 2014 Corporate Presentation

Forward Looking StatementsThis presentation contains certain forward-looking statements regarding operational information, futureexploration and development plans and anticipated future production. Words such as, potential”, “building”“inferred”, “if”, “will”, “expect”, “forecast”, “estimate”, “consider”, “may”, “possible” and similar expressions havebeen used to identify these forward-looking statements. These statements are management’s current beliefs andare based on information currently available to management.

Forward-looking statements involve significant risk and uncertainties. A number of factors could cause actualresults to differ materially from the results discussed in the forward-looking statements including, but not limitedto, changes in general economic, political and market conditions and other risk factors. Although the forward-looking statements contained herein are based upon what management believes to be reasonable assumptions,management cannot assure that actual results will be consistent with these forward-looking statements. Investorsshould not place under reliance forward-looking statements.

Forward-looking statements and other information contained herein concerning the metals and mining industryand Dynacor’s general expectations concerning the industry are based on estimates prepared by managementusing data from publicly available industry sources as well as from private sources, industry analysis and onassumptions based on data and knowledge of the this industry which the Company believes to be reasonable.However, this data is inherently imprecise. While Dynacor is not aware of any misstatements regarding anyindustry data presented herein, the industry involves risks and uncertainties and is subject to change based onvarious factors. There is no certainty the projections will be met.

2014-08-19DYNACOR GOLD MINES | TSX:DNG 2

Page 3: Dynacor: August 2014 Corporate Presentation

A Gold Performer

Only 36 million shares outstanding

High-Reward

Home Run Potential

2014-08-19DYNACOR GOLD MINES | TSX:DNG 3

A non-dilutive business model

The key to $1.00 eps

Page 4: Dynacor: August 2014 Corporate Presentation

A Non-Dilutive Strategy

An industrialized-type gold company with low risk business model in Peru

Operating in Peru for almost twenty years; well acclimatized to its customs and politics

Gold and silver production via ore-processing operation – CASH FLOW GENERATOR

Self finances exploration campaigns

36.4 million shares outstanding

Net income of $9.1 million in fiscal 2013 ($0.25 earnings per share)

$19.2 million working capital as of June 30, 2014

2014-08-19DYNACOR GOLD MINES | TSX:DNG 4

Page 5: Dynacor: August 2014 Corporate Presentation

Operations

Ore-Processing

Huanca: Producing

Chala: Emerging Producer

Exploration

Flagship Project: Tumipampa

Greenfield Projects: Anta and Casaden

2014-08-19DYNACOR GOLD MINES | TSX:DNG 5

PERU

Page 6: Dynacor: August 2014 Corporate Presentation

Operating Areas

2014-08-19DYNACOR GOLD MINES | TSX:DNG 6

S

EW

N

Zoom

Huanca 1

Producer: 250 tpd

Chala2

Emerging Producer: Awaiting plant permit on new 300 -600 tpd mill

Tumipampa3

Exploration: Underground high-grade gold drilling; surface drilling on disseminated zone

Lima

DRIVING0 HOURS 30 HOURS

Page 7: Dynacor: August 2014 Corporate Presentation

Objectives

Short-term (12 months):

Produce 80,000 ounces on annual basis

Continue cross-cut to 750 meters

Underground drilling (Manto Dorado, Veta Rosa, Veta Tumi)

Geophysical, geochemical and surface drilling (Disseminated Breccia zone)

Begin exploration campaign on Anta (Ag)

Long-term (12-36 months)

Increase ore-processing capacity to 600 tpd (Chala)

Maximize shareholder value via direct production at Tumipampa

To be the leading ore-processing company in Peru

2014-08-19DYNACOR GOLD MINES | TSX:DNG 7

Page 8: Dynacor: August 2014 Corporate Presentation

Delivering Over Time: Huanca

0

20,000

40,000

60,000

80,000

100,000

120,000

2010 2011 2012 2013

43,743

74,568

104,994112,114

33,525

46,025

61,264

76,883

Operational Performance (2010-2013)

Sales ($000) Gold Production (oz) (000)

Sold 76,883 ounces with an average grade of 1.04 oz/tonne

(32.34 g/t Au) in 2013

2014-08-19DYNACOR GOLD MINES | TSX:DNG 8

Page 9: Dynacor: August 2014 Corporate Presentation

Production Estimate With New Mill Expansion: Chala

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

300 TPD (0.90 OZ/T AU) 450 TPD (0.82 OZ/T AU) 600 TPD (0.75 OZ/T AU)

86,000

118,000

144,000

Go

ld o

un

ces

Annual Production Estimate

Chala

2014-08-19DYNACOR GOLD MINES | TSX:DNG 9

Page 10: Dynacor: August 2014 Corporate Presentation

Solid Operational Execution

2014-08-19DYNACOR GOLD MINES | TSX:DNG 10

25,000

45,000

52,000

66,00070,000

33,525

46,025

61,264

76,883Gold Production

2010Guidance

2010Actual

2011Guidance

2011Actual

2012Guidance

2012Actual

2013Guidance

2013Actual

2014???

Page 11: Dynacor: August 2014 Corporate Presentation

Actual Cash Flow and Earnings Per Share

2014-08-19DYNACOR GOLD MINES | TSX:DNG 11

2011 2012 2013

$0.13

$0.26

$0.29

$0.09

$0.21

$0.25

Cash Flow/Share Earnings/Share

Page 12: Dynacor: August 2014 Corporate Presentation

Earnings Scenario

2014-08-19DYNACOR GOLD MINES | TSX:DNG 12

300TPD 450TPD 600TPD 900TPD 1200TPD

86,000Au oz/yr

118,000Au oz/yr

144,000Au oz/yr

216,000Au oz/yr

288,000Au oz/yr0.29

EPS

0.39EPS

0.48EPS

0.71EPS

0.95EPS

Planned Development Potential Future Development

NET PROFIT/OZ

NET PROFIT MARGIN

$118-126

8-11%

$10.3 MILLION $0.29 EPS

$14.3 MILLION $0.39 EPS

$17.2 MILLION $0.48 EPS

$25.9 MILLION $0.71 EPS$34.5 MILLION $0.95 EPS

Earnings per share forecast based on: 36 million o/s | $120 per ounce net profit

Range over last 2 years

2012-2013

36 Mshares

Page 13: Dynacor: August 2014 Corporate Presentation

Tumipampa: High Grade Gold Project:

Ongoing cross-cut and undergrounddrill program

Surface exploration and drilling on disseminated breccia zone

Surrounded by six senior miners in south central Peru

Released drill results of 115.7 g/t (3.7 ounces) Au in December 2013

Auto-financed exploration model

2014-08-19DYNACOR GOLD MINES | TSX:DNG 13

Page 14: Dynacor: August 2014 Corporate Presentation

2014-2015 Exploration Campaign: Tumipampa

Exploration budget of $4.5 million

Excavate 420m cross-cut to Rosa/A/Tumi veins

Drill 12 holes (2000m) in the cross-cut

Drill 5 holes (1800m) in the disseminated zone

Geophysical/surface studies of disseminated zone

Channel samples 19.49 g/t Au, 0.35 oz/t Ag (July 2014)

Geochemical and mapping of disseminated zone

2014-08-20DYNACOR GOLD MINES | TSX:DNG 14

Page 15: Dynacor: August 2014 Corporate Presentation

Tumipampa: Project Location

2014-08-19DYNACOR GOLD MINES | TSX:DNG 15

LIMA

CUZCO

Cuzco Region

Apurimac Region

Arequipa Region

“La Yegua”Cu/Au project

Joint Venture with Japan (JOGMEC)

Drilling campaign underway

“Cotobambas”404Mt, 0.42% Cu

“Los Chancas”355Mt, 0.62% Cu$1.2B projected

development budget

Dynacor“Tumipampa”

AdvancingHigh-Grade Gold zone

“Las Bambas”1.7Bt, 0.60% Cu

SOLD FOR $6B TO CHINA/ 04/14

“Constancia”277Mt, 0.43% Cu

Acquired March/11$520M ($0.10/lb Cu)

“Haquira”569Mt, 0.64% CuAcquired Oct/10

$460M ($0.06/lb Cu)

• HIGH-GRADE GOLD DEPOSIT• ADJACENT TO TUMIPAMPA’S SW BORDER• MINED BY LOCALS FOR OVER 10 YEARS• AVERAGE GRADE OF 1/OUNCE TONNE

• ORCOPAMPA / BUENAVENTURA• HIGH-GRADE GOLD/SILVER VEIN DEPOSIT• 2.1 MILLION OZ AU / 19.8 MILLION OZ AG• EXHIBITS SIMILAR CHARACTERISTICS TO TUMIPAMPA’S HIGH-GRADE VEIN STRUCTURE

0 km 200 km

$8 billion in development and 3.6 billion tons of ore surround

Tumipampa

Page 16: Dynacor: August 2014 Corporate Presentation

Tumipampa: Project Display Model

BRECCIA

Poctococha Lagoon

Balsacocha Lagoon

Patacocha Lagoon

Skarn (E)Cu-Au

Skarn (W)Cu-Au

Gold veins

Disseminated gold

Zone 4

Old Spanish gold-rich tailings

Cross-cut tunnel location

0 1 km

15 gold veins discovered to dateAncient drifts from Spanish colonial period 2 old stock piles discovered by Tumipampa River Project consists of three types of gold mineralization: Skarn, Gold Veins and Disseminated Gold associated with

Breccias

Zone 3

Zone 2

Zone 1

2014-08-19DYNACOR GOLD MINES | TSX:DNG 16

Page 17: Dynacor: August 2014 Corporate Presentation

2014-08-19DYNACOR GOLD MINES | TSX:DNG 17

VE

TA

TU

MI

HDD 11

HDD 07

HDD09HDD10

HDD08

4200

4250

4300

4350 CRUCERO 330NWContinuación de Crucero 330NW

PROY HDD

PROY HDD

PROY HDDPROY HDD

HDD18

4400

4450

HDD 21TCD 06

A

B

C

D

E

0 100

GAL 190E

CH 125

1

2

3

4

5

67

8

PROY HDD

PROY HDD

Future drill targets

HDD-2013

1

2

3

4

5

6

7

8

HDD Ancho (m) Au (g/t) Ag(oz/t) Cu (%)

HDD01-350-IM 1.56 14.67 0.24 0.51

HDD02-350-IM 1.10 115.66 0.52 3.03

HDD03-350-IM 1.42 23.73 0.25 0.19

HDD04-350-IM 0.60 7.25 0.10 0.42

HDD05-350-IM 1.91 0.99 0.07 0.01

HDD06-350-IM 1.10 0.37 0.09 0.10

HDD07-350-IM 1.20 3.08 0.17 0.32

HDD08-350-IM 1.00 17.28 0.25 2.68

HDD08-350-IM 1.50 14.31 0.69 9.57

HDD08-350-IM 0.50 122.00 1.02 6.59

HDD09-350-IM 1.70 7.09 0.09 0.46

Tumipampa: Cross Section of Underground Works

Page 18: Dynacor: August 2014 Corporate Presentation

Tumipampa: Ongoing Drilling and Cross-cutting

Drilled 1753 meters in 2nd half of 2013

Excavated a 300 meter (978 foot) cross-cut measuring

3 meter (11.0 feet) wide X 2.5 meter (8.0 feet) high in

the Manto Dorado in 2013

Conducted a 1,064 ha geophysical study

including a magnetic and induced polarization survey in 2011

Collected 1,300 geochemical samples

Drilled a total of 14,060 meters at Tumipampa

2014-08-19DYNACOR GOLD MINES | TSX:DNG 18

Page 19: Dynacor: August 2014 Corporate Presentation

Financial Overview

As at June 30, 2014, the Company’s working capital amounted to $19.2M

Dynacor Gold Mines: A self-financed gold company: operating an ore-processing business to generate gold sales that fund the exploration of high-reward mineral properties.

”Dynacor Gold Mines is NOT a diluting asset.”

2014-08-19DYNACOR GOLD MINES | TSX:DNG 19

Page 20: Dynacor: August 2014 Corporate Presentation

Three Year Overview

2014-08-19DYNACOR GOLD MINES | TSX:DNG 20

Page 21: Dynacor: August 2014 Corporate Presentation

Senior Management

Experienced and well-balanced team with expertise in:

Geology/Exploration Metallurgy Custom milling Business management Finance Marketing

Since the inception of Dynacor Gold Mines Inc. in the fall of 2007, the management team has remained focused on a disciplined capital structure, via generating cash flow from its ore-processing division, to unlock the greater shareholder value through the exploration of its 100% owned Tumipampa advanced gold exploration project.

Management strives to avoid dilution of its shareholders by repeated financings that typify the junior gold exploration sector.

JEAN MARTINEAU, PRESIDENT AND CEO• 20 YEARS EXPERIENCE IN THE RESOURCE INDUSTRY IN CANADA AND SOUTH

AMERICA• FORMER DIRECTOR OF WESDOME GOLD MINES 1999 – 2007

LEONARD TEOLI, VICE PRESIDENT AND CFO• 20 YEARS EXPERIENCE IN ACCOUNTING AND FINANCE EXECUTIVE • FORMER CFO OF DIA BRAS EXPLORATION 2003-2008 • STARTED CAREER WITH PRICE WATHERHOUSE 1987 – 1996• MEMBER OF THE CANADIAN INSTITUTE OF CHARTERED ACCOUNTANTS SINCE 1990

JORGE LUIS CARDENAS, GENERAL MANAGER ORE-PROCESSING• MINING ENGINEER AND METALLURGIST• MORE THAN 20 YEARS EXPERIENCE IN MINING (18 YEARS WITH DYNACOR)

ALONSO SANCHEZ, CHIEF GEOLOGIST• 15 YEARS EXPERIENCE AS A MINE AND EXPLORATION GEOLOGIST (EXPERT OF

PERUVIAN GEOLOGY)• FORMER GEOLOGIST OF PUBLICLY LISTED COMPANY BUENAVENTURA S.A.A FROM

1995-2006• EXPERT IN EPITHERMAL GOLD, SILVER, TIN, TUNGSTEN, POLYMETALLIC DEPOSITS

AND SKARNS IN PERU

2014-08-19DYNACOR GOLD MINES | TSX:DNG 21

Page 22: Dynacor: August 2014 Corporate Presentation

Head Office

625, boul. René-Lévesque OuestSuite 1105

Montréal, (Québec)H3B 1R2

(514) 393.9000

Dale NejmeldeenInvestor Relations

(604) 492.0099

www.dynacorgold.com

2014-08-19DYNACOR GOLD MINES | TSX:DNG 22