DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking...

8
SUBSEA WELLHEAD CONNECTORS DX e

Transcript of DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking...

Page 1: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

SUBSEA WELLHEAD CONNECTORSDXe™

Page 2: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

• Testedwithnoboltsinstalled-loadpathisthroughtheconnectorupperbody,latchsegmentsandwellheadandnotthebolts

• Maximizesthedrillingvesselwatchcircle• Nogasketleaksduringworstcasesurvivalloadtesting(allload

cases)at20,000psiborepressure• Increasedhubfacecontactareaprovideshighbendingcapacity• Self-aligningprimaryandsecondaryDXeringgasketsstandard• Designiscompatiblewithexistingblowoutpreventerhydraulic

controlsystems• CanbeconfiguredforH4andSHDH4lockingprofile

Illustrationshown:DXe-30ConnectorwithDXelatchingsegment

Latch Segmentwith DXe locking

profile

Primary Unlock

Port

LowerBolts

Latch Segment Spreader

Ring Gasket

Retainer

Annular Piston/Cam

Ring

Secondary Unlatch Piston

DXe Ring Gasket

Upper Split Ring Retractor

UpperBolts

Lower Split Ring Retractor

Primary Lock Port

Upper Body

The DXe Wellhead Connector delivers a long service life with reliable field performance.

DXe™ WELLHEAD CONNECTOR

F E A T U R E S B E N E F I T S• 20KsiDXe-30isAPI17TR8approvedby13PandBSEE

• FullscaleloadtestedtoAPI16A4thEditionPR2andAPI17TR7qualificationrequirements

• DXegasketsqualifiedtoAPI6APR220,000psi(withgas),35°to400°F and 11,000 ft water depth

• Uniqueproprietaryhighlyengineeredmandrellockingprofileprovideslongestandunmatchedfatiguelifeandhighestloadcapacityproventhroughfullscaletesting

2

Page 3: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

DXe-27 SpecificationsRatedWorkingPressure(Ksi)Swallow(inches)MinimumAddedStackHeight(inches)MaximumOutsideDiameter(inches)Weight(lbs)FluidVolumetoLatch(gal)FluidVolumetoUnlatch(gal)FluidVolumeforSecondaryUnlatch(gal)MaxLatchingPressure(psi)

15

23.32 22.13 54.88

17,800 7.39

11.2613.663,000

DXe-30 SpecificationsRatedWorkingPressure(Ksi)Swallow(inches)MinimumAddedStackHeight(inches)MaximumOutsideDiameter(inches)Weight(lbs)FluidVolumetoLatch(gal)FluidVolumetoUnlatch(gal)FluidVolumeforSecondaryUnlatch(gal)MaxLatchingPressure(psi)

15 or 20

27.49 27.50 64.53

38,500 14.5320.5025.643,000

Ideallysuitedforstandardanddeepwaterdrillingapplications,Dril-Quip’sDXe-27WellheadConnectorisdesignedfor27"O.D.wellheadandisavailableina15,000psiworkingpressure.

Ideallysuitedforstandardandhighbendingdeepwaterapplications,Dril-Quip’sDXe-30WellheadConnectorisdesignedfora30"O.D.wellheadandisavailableina20,000psiworkingpressurerating.AnadapterkitisavailabletoconfigureaDXe-30tomatewitha15,000psi27"O.D.wellhead.

DXe-27 Connector

DXe-30 Connector

Capacities based on 3-D FEA, and validation testing with the following assumptions:• Internal pressure acting on 18-3/4" nominal bore with pressure end load included• Preload at 3,000 psi locking pressure

Contact Dril-Quip Engineering for capacities with various levels of tension/compression

Capacities based on 3-D FEA, and validation testing with the following assumptions:• Internal pressure acting on 18-3/4" nominal bore with pressure end load included• Preload at 3,000 psi locking pressure

Contact Dril-Quip Engineering for capacities with various levels of tension/compression

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

0 1,000 2,000 3,000 4,000 5,000 6,000

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

0123456789

1011121314151617181920

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000

Bending Moment (ft-kips)

Inte

rnal

Pre

ssur

e (k

si)

Inte

rnal

Pre

ssur

e (k

si)

Pres

sure

End

Loa

d (k

ips)

Pres

sure

End

Loa

d (k

ips)

Bending Moment (ft-kips)

Rated Capacity (67% of yield) Extreme (80% of yield) Survival (100% of yield)

Rated Capacity (67% of yield) Extreme (80% of yield) Survival (100% of yield)

RatedCapacity

ExtremeCapacity

SurvivalCapacity

RatedCapacity

ExtremeCapacity

SurvivalCapacity

3

Page 4: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

Ring Gaskets are Self-AligningTheDXeConnectorringgaskethasbeendesignedwithaselfaligningfeature,whileprotectingtheprimaryandsecondarysealingsurfaces.Thisisaccomplishedwithauniquemetalsealingsurfacethatfeaturesupperandloweralignmentguidance.TheringgasketRetainerMechanismisspringloadedforautomaticringgasketretention.Theretentionmechanismreleasestheringgasketwithhydraulicpressure.IdealforinstallinggasketsontowellheadsusingROV.

Primary and Secondary Metal-to-Metal Sealing

Dril-QuipDXe™seriesConnectorsisauniqueprofilethatmateswithaproprietaryDXeringgasket.ThisDXesealingprofilefeaturesapairofindependentmetal-to-metalsealingsurfaces,aprimaryandsecondindependentsealingsurface.

TheprimaryDXegasketisusedduringnormaloperationsandprotectsthesecondarymetal-to-metalsealingsurface.Intheeventofdamageorleak,asecondaryDXeringgasketcanbeinstalled.Thesecondaryringgasketutilizesthesecondarysealingsurfaceforareliablemetal-to-metalseal.

Internal Pressure Rating - 20,000 psiExternal Pressure Rating - 5,000 psiWater Depth Rating - over 11,000 ftTemperature Range - 35° F to 400° F

TheDXe ringgaskethasalignmentguidesthatengagetheringgasketsurfaceintheupperbodyoftheconnector.Thesealignmentguidesassistalignmentwhileprotectingthemetalsealingsurfaces.

Downwardmovementoftheconnectorandthealignmentguidesautomaticallyadjuststheringgasketintothepropersealingposition.Bothalignmentguidesassurethesealingsurfacesarenottouchedasthismovementoccurs.

Astheconnectorlandsout,theringgasketsettlesintothesealingpositionandispreloadedwhentheconnectorislockedandthelatchsegmentsareenergized.

H i g H l y E n g i n E E r E d U n i q U E r i n g g a s k E t d E s i g n

DXe ConnectorUpper Body

DXe ConnectorUpper Body

DXe ConnectorUpper Body

UpperAlignmentGuide

UpperAlignmentGuide

LowerAlignmentGuide

LowerAlignmentGuide

PrimarySealing

PrimarySealingHigh Pressure

Subsea WellheadHigh PressureSubsea Wellhead

High PressureSubsea Wellhead

Primary Ring Gasket Secondary Ring Gasket

H i g H l y E n g i n E E r E d U n i q U E r i n g g a s k E t d E s i g n

4

Page 5: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

DXe™ Connector and Assembly Bolt Standards

Somewellheadconnectorsusedinthesubseadrillingindustryhavealoadpaththatdrivesappliedpreloadthroughaseriesofboltsrequiredforassembly.Theseboltsareexposedtoseawaterandexperiencecyclicloadsfromthedrillingriserandtensionloadsgeneratedbyinternalpressure.Fatiguecyclescoupledwithmaterialimperfections,materialstrength,toughnessandcoatingvariationscometogethertoformcracksthatcanpropagatethroughthethreadsonthebolt,causingittobreak.Beingexposedtoseawateracceleratesthecorrosionprocess.

Inrecentyears,boltsintegraltosubseaequipmenthavefailedduetothisphenomenon.In2013,theU.S.DepartmentoftheInterior(DOI)startedaninvestigationafternumerousboltsoninserviceconnectorswerefoundtobebroken.Additionalindustrygroupsinvestigatedmetallurgicaldatatodetermineifalloysusedintheheavysteelboltsareductileenoughtosurviveharshsubseaenvironments.AsaresultAPIhasreleasedAPI20Etomandatebolttraceabilityandestablishstandardsforquality.

TheDXeConnectordesignaddressesthisproblem.Itfeaturesradiallatchsegmentsthataredrivenintomatingloadprofileswithanannularpiston/camring.Thisactionprovidesthenecessarypreloadrequiredbetweenwellheadhubfaceandtheupperbodyoftheconnector.Whentheconnectorislockedandinoperation,theloadpathtravelsthroughtheconnector,thewellheadmain

bodyandthelatchsegmentsviathelockingprofile.Asthesegmentlatchestothewellhead,itclampstotheconnectorupperbodysimultaneouslyandcreatesaclosedloopwithanearstraightloadpath.Anyloadsappliedtotheconnectortravelonlythroughthesegmentsthataremadefromductilealloysteelanddonotpassthroughbolts.BoltsintheDXeConnectordonotseecyclicstressesattheoperatingloadsandarenotsubjectedtothefailedboltproblemsassociatedwithotherindustryconnectors.

TodemonstratetheDXeConnectorhasnoboltsintheloadpath,acombinedloadtestfollowingAPI16Aspecificationswasperformed.Thistestconsistedoflockingaconnectortoateststumpwithstandardlockingpressure.Theteststumphada30"O.D.DXewellheadlockingprofile.Lockingpressurewasbledoffandthelockingcircuitwasvented.Allexternalattachmentboltswereremoved,includingboltsintheupperandlowerbodies.Astructuralloadtestwasperformed,whichincludedtension/compressionto1.0MMLbscombinedwithbending,andpurebendingtoasmuchas8.2MMft-lbs.Theloadtestswereperformedbothwithoutborepressureandwithborepressureappliedinincrementsof5,000psiupto20,000psi.The"no-bolts"connectorsuccessfullypassedeachtestanddemonstratedidenticalperformancewiththestandardconnectortestedwithalloftheboltsinstalled.

Bolts not in the load path

Bolts not in the load path

Connector Bolts Removed

Piston Up (Bending Moment Applied)

nO BOlts tEst

DXe Connector Load Path

DXe Connector Load Test with No Bolts

5

Page 6: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

Verification AnalysisHighlysophisticateddesigntools,anextensive3-Dadvancedfiniteelementanalysis(FEA)wereusedtooptimizeeverydetailoftheconnectorlockingprofile.Theanalysissimulatesconnectorinstallationandoperatingconditionswhichincludespreloadingandapplicationofinternalandexternalloads(pressure,bending,tension/compression,andloadcombinations)whileobservingthestressbehaviorthroughouttheconnectorcomponents.Particularattentionhasbeenpaidtoachieveuniformloaddistributionandminimizingpeaksurfacestressesthataredirectlyrelatedtothefatigueperformanceoftheconnector.ThismethodologyhasallowedthecompanytodeveloptheDXe™lockingprofile.Theanalysisandtheresultshaveenabledthecompanytocreateawellheadconnectordesignwithhighloadcapacityandhighfatigueresistance,allwithinthesmallestpossibledimensionalenvelope.

Validation Testing - StructuralDril-QuiputilizesitsownHorizontalandVerticalTestMachinestoperformphysicalvalidationtestingofitswellheadconnectors.Atestspecimenthatconsistedofawellheadconnector,18-3/4"wellhead,lockedintoa36"conductorhousingwasassembledandinstalledintothecompany'sHorizontalTestMachine.Testswereconductedusingnormal,extremeandsurvivalloadconditions,perAPI17TR7requirements.

StraingaugeswereinstalledatallcriticallocationsofthetestspecimenanddatacollectedforcomparisontostrainsfromtheFEAat thesamelocations.Bendingmomentswereappliedtothespecimenwithavarietyofcombinedloads.Testresultswerecollectedandacomparisonof3-DFEAandvalidationtestresultsindicate aclosecorrelationbetweenanalysisandtestdata.Variationsbetweenanalysisandtestingresultswereattributedtoseveralidealizedassumptionsmadeintheoriginal3-DFEA.Factorssuch asstraingaugeerror,gaugeorientation/alignment,componenttolerances,out-of-roundnesseffects,

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000

Inte

rnal

Pre

ssur

e (k

si)

Pres

sure

End

Loa

d (k

ips)

Rated Capacity (67% of yield) Extreme Capacity (80% of yield) Survival Load (100% of yield)

C O n n E C t O r v E r i f i C a t i O n a n d v a l i d a t i O n t E s t i n g

RatedCapacity

ExtremeCapacity

SurvivalCapacity

2-D and 3-D FEA Analysis Used In Design

Dril-Quip’sHorizontalTestMachinewithaWellheadandaConnectorSpecimen

3-DFEAAnalysisShowingNormal,ExtremeandSurvivalCapacitiesOn20KsiDXeConnectorwith30”WellheadProfile

6

Page 7: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

positioningofcomponentsrelatedtotheplaneofbending,non-uniformityinmaterialpropertiesandfrictioncontributedtothevariationsrecorded.

The3-DFEAwasperformedtogeneratecapacitychartswhenNormal(66.7%ofyield),Extreme(80%ofyield)andSurvival(100%ofyield)loadconditionsareappliedtothewellheadsystem.Thesethreeloadconditionsareappliedinboththeverificationanalysisandphysicalvalidationtestingofthewellheadsystemandisbelievedtobethemostaccuraterepresentationofconnectorperformancetodate.

StructuraltestingisonlyonecomponentoftheCompany'soverallvalidationprogram.Thesecondvalidationcomponentisarigorousfatiguetestingprogram.

Physical Validation Testing - Fatigue ResistanceTheaimoffatigueresistantdesignistoensurethestructureconsidered,inthiscaseawellheadconnectorlockedtoawellheadsystem,hasanadequatefatiguelifetomeetthecustomersperformancestandardsthroughoutthelifeoftheproject.Toproperlyevaluatefatiguecharacteristicsofthewellheadsystemandwellheadconnector,met-oceandata(waveandcurrentprofiles),drillingvesselmotionsandsoilconditionswerecollectedonspecificwellsitesfromseveralseveredrillingcasesaroundtheworld.Aglobalriseranalysiswasperformedtoidentifyarepresentativefatiguespectrumandapredictedfailurepoint.Thedatawasusedtodevelopandconductafullscalefatiguetestprogram.

Afatiguetestmachine,designedandbuiltbyDril-Quipwasusedtoacceleratethefatiguephenomena.Thesametestspecimenusedinthestructuralvalidationtest(acompletewellheadsystemincludingthewellheadconnector)wasusedforthistest.Thespecimenwasinstalledinthemachine,straingaugeswereappliedandpressurewasintroducedinthebore.

Themachinewasoperatedwithaneccentricloadthatintroducedanalternatingstressleveltothespecimen.Achangeinthevibrationspectrumwasmonitoredforanyvariationthatwouldindicatetheonsetofafatiguecrackthatwouldultimatelyresultinapressureleak.Continuouscyclicstresswasappliedtothespecimenuntilthepredictedfailurepointwasreachedinthe5thweekoftesting.Therewasnochangeinvibrationspectrumorleakageoccurrence,sothetestwascontinueduntil60millioncycleswereapplied,anumberthatfarexceededanymaximumfatigueconditionsevaluated.Thetestspecimenwasdisassembled,andinspectionofallcomponentsindicatednofatiguedamagewasfound.

ItisbelievedthatDril-Quipisthefirstcompanytoapplyrigourousfatiguetestprogramtoacompletewellheadsystemandconnector.ThisvalidationmethodologyisanotherexampleofDril-Quip'scommitmenttodelivertechnologicalinnovationwithreliableperformance.

WellheadConnector,HighPressureWellheadandConductorSpecimenInDril-Quip’sFatigueTestFixture

7

Page 8: DXe - Dril-Quip, Inc. · The test stump had a 30" O.D. DXe wellhead locking profile. Locking pressure was bled off and the locking circuit was vented. All external attachment bolts

W O R L D W I D E S A L E S & S E R V I C E

DRIL-QUIP Western HemisphereD���-Q���, Inc. World Headquarters6401 North Eldridge Pkwy.Houston, Texas 77041Tel +1 713 939 7711Fax +1 713 939 8060

D���-Q��� do Brasil, LTDA.Macaé, BrazilTel +55 22 2791 8950Fax +55 22 2791 8989

TIWWestern HemisphereTIW Corporate HeadquartersP.O. Box 35729Houston, Texas 77235Tel +1 713 729 2110Fax +1 713 728 4767

DRIL-QUIP

Asia PacificD���-Q��� Asia Pacific Pte. Ltd.No. 80 Tuas West DriveSingapore, 638417Tel +65 6861 0600Fax +65 6861 5700

DRIL-QUIP Eastern Hemisphere Stoneywood Park, DyceAberdeen, Scotland, UK AB21 7DZTel +44 1224 727000Fax +44 1224 727070

TIW Eastern Hemisphere TIW U.K. LimitedUnit D Abbotswell RoadWest TullosAberdeen, Scotland, UK AB12 3ADTel +44 1224 894411Fax +44 1224 896171

TIW Asia PacificTIW International Inc.9 Tuas Avenue 12Singapore 639031Tel +65 6545 0110Fax +65 6545 0137

Engineering, Manufacturing,Sales & Service

Sales & Service

Sales Representatives

DRIL-QUIP.COM121918