DUVILLE ESTATES GIVES POSSESSION OF SCHEDULED TOWERS OF RIVERDALE HEIGHTS ON TIME
www.riverdalepune.com
NOVEMBER 2019
EXCEEDING EXPECTATIONS WITH TIMELY DELIVERY OF
HOMES AT TOWER A & B
Last few Apartments available in Tower C and D
Handover CeremonyHandover Ceremony
+91 7620 974 974 Call us to know more
Handover CeremonyHandover Ceremony
Mr. Mustafa Hakim, & Mrs. Zainab HakimFlat No: A1004
Mr. Prasanna Kothawade , Mr. Sahadeo KothawadeFlat No: B0601
Mrs. Sulbha Chitnis & Mr. Udaykumar ChitnisFlat No: A0704
Mr. Iftekhar Shaikh on behalf of Mr. Asif Shaikh & Mrs. Rozina Shaikh.Flat No: B0404
From the blue print and engineering designs to the timely hand over of the possession, Duville Estates has been demonstrative of its commitment of
With the on-time delivery of a superior quality product, it has shown the Duville way of building by constructing the Homes that are intrinsic to living.
“DELIVERING MORE THAN EXPECTED”
K H A R A D I , P U N E
₹1.50 L 2 BHK - ₹1 LSuites
₹50 K
*T&C Apply
Call: +91 7620 974 974
Site Address: New Kharadi - Shivane Riverside Road, Behind Zensar IT Park, Kharadi, Pune 411 014 Maha RERA Registration No.: Riverdale Suites - P52100014163 | Riverdale Heights - P52100008035 | Riverdale Residences - P52100004692
Earn a Referral Reward
Now Is The Time To Invite Your Closest Friends To Be A Part Of Your Living Community
And these are exclusive rewards designed for our customers only
Use this opportunity to not just create your own
like-minded group but also get attractive referral rewards
Riverdale Heights
2 BHK - Tower A | B | C | D
Possession started at Tower A & B
Tower A and B
Tower - C
Terrace Slab Complete/ Balcony & thToilet Water-prro�ng 18 Floors Complete
Terrace Slab Complete/th 17 Floor wall Gypsum plasters in progress
Staircase Railing &th6 Floor Flooring work-in-progress
nd22 Floor Internal Door Frame Fixingwork-in-progress
th th17 Floor Kitchen Platform & 15 Floor FlooringthKitchen Dado of 18 Floor, work-in-progress
Staircase Railing in progress
Tower - D
th11 Floor Kitchen Dado & Kitchen Platform work-in-progress
th13 Floor Toilet proo�ng in progress/th7 Floor Toilet Wall Dado work-in-progress
Unitized Galls Curtain Wall installation work-in-progress
Wall Gypsum Plasters st21 Floors in progress
th16 Floor Toilet wall Dado & Toilet Flooring work-in-progress
Internal Wall Paint/ Wall putty in progress
Passenger Lift installation work-in-progress
External Texture Paint work-in-progress
14th Floor Internal Door Frame Fixing work-in-progress
Tower - E
Terrace Slab/Over Head Water Tank RCC complete
Above Terrace Water-proo�ng/rdPlumbing 23 Floor, work-in-progress
rdAAC Block works 23 �oor/Water-proo�ng done up to 23rd �oor
rdDrainage piping 23 �oor/Electric cabling work-in-progress
rd23 Floor Electrical Conduiting and chasing & Wall Gypsum Plasters complete
st nd thFloor Tiling Flat Series 1 & 2 , 18 �oor/ th th th9 & 10 ,17 �oor work-in-progress
rd23 �oor Dado Wall Tiling Kitchen/nd22 Floor Dado Wall Tiling Toilets complete
Internal Door Frame Fixing complete/rd 23 Floor Kitchen Platform Fixing complete
Fire Staircase Railing/External Cement Plaster work-in-progress
Fire �ghting works complete
Lobby False Ceiling work-in-progress/Lift installations in progress
ODU Balcony Block Work complete/ODU Balcony MS Grill & Railing work-in-progress
Unitized Galls Curtain Walls installations work-in-progress
Staircase ceiling putty & Floor tilingwork-in-progress
EXTERNAL WORKS
Clubhouse Interior �nishes (furniture, gaming zone, library, Gymnasium) complete
Swimming Pool under test/ Curtain Wall (Facade) installation Tower A & B complete &Curtain Wall installation Tower C in progress
Private Garden Plantation in progress/Podium Green Landscape plantation complete
Ramp Driveway complete/DG installations work �nished
Fire �ghting installed all parking levels
Step Garden Landscape Garden Soil �lling in progress/ STP installation complete
Main Entry Security Cabin with Green Landscape / Main Entry Bridge Paver complete
Tower A & B Entrance Lobby & Double Height Reception Lobby complete
External Driveway Paver �xing complete Lobby Level Parking Paver �xing complete/ OWC, work-in-progress
Electrical Transformer Room complete/All Parking Lighting works complete
Water Treatment Plant Equipment's under test
UGWT Pumps installed and Fire Panels Charged
Driveway In and Vertical Fins
Landscaping at the Podium Level
Swimming pool at Podium Level
Parking Level and External Work
MNGL lines laying under progress
Reception and Lobby Area
Unit Signage and Internal Installation
Riverdale SuitesSuites
th4 Floor Aluform shutter assembling,in progress
Plinth Level PCC, Complete
Riverdale Residences
rdE2- 3 wall Gypsum work-in-progress/thE3- 7 wall Gypsum work-in-progress
thE3- 19 Floor MIVAN (Aluform) assembling/thE2- 12 Slab Completed
st nd thE2- 1 & 2 Floors & E3 - 4 Floor Toilet thWater-proo�ng/ E3- 5 Floor Concealed-
Plumbing work-in-progress
E3- Fire Fighting line installation/ E2 & E3- Podium & Parking level RCC Parapet in progress
E2 & E3- Parking level Electrical &Panel Rooms block, work-in-progress
E1 –Parking P2 Level part slab cast
E2 & E3- Scooter parking underground services in progress
Ramp and Underground Water Tank RCC/E2 & E3- Scooter Parking Floor concreting in progress
thE3- Drainage piping 12 Floor work-in-progress
E2 – External Plaster work in progress