Duke Energy WSL III Units 1 & 2 COLA (Final Safety ...

1
1 1 Original ground surface B-2006 B-2005 WLS COL 2.5-6 WLS COL 2.5-7 N12°W Partially weathered rock Residual soil/saprolite Partially weathered rock Partially weathered rock Continuous rock Artificial fill Residual soil/saprolite Continuous rock ? Continuous rock B-558 (proj. 31 ft.) B-558 (proj. 31 ft.) B-53 (proj. 72 ft.) B-58 B-58 (proj. 70 ft.) (proj. 70 ft.) B-237 (proj. 7 ft.) B-245 (proj.10 ft.) B-248 (proj.10 ft.) B-297 (proj.10 ft.) CPT-1316 (proj. 23 ft.) B-1015 B-1013 S-1506 CPT-1307 Unit 2 (SC-I) Yard Grade Radwaste Building (non-seismic) Turbine Building (non-seismic) B-1018 (proj. 46 ft.) B-1017 (proj. 65 ft.) B-1023 (proj. 52 ft.) B-1022 (proj. 52 ft.) F' South North F Yard Grade 0 100 feet 0 50 feet Scale Vertical exaggeration 2X Intersection of CC - CC' Intersection of BB - BB' Intersection of UU - UU' Intersection of ZZ - ZZ' First Bay (SC-II) Existing ground surface 600 620 640 580 560 540 520 500 480 460 440 420 400 380 360 340 320 300 Elevation (feet) 600 620 640 580 560 540 520 500 480 460 440 420 400 380 360 340 320 300 Elevation (feet) NUCLEAR STATION UNITS 1 & 2 WILLIAM STATES LEE III Planned Excavation Profile Geologic Cross Section F-F' FIGURE 2.5.4-263 Rev 9 Explanation Fill – granular Fill – Group I (soil) Fill – CNS soil WLS fill concrete

Transcript of Duke Energy WSL III Units 1 & 2 COLA (Final Safety ...

Page 1: Duke Energy WSL III Units 1 & 2 COLA (Final Safety ...

1 1

Originalgroundsurface

B-2006

B-2005

WLS COL 2.5-6WLS COL 2.5-7

N12°W

Partiallyweathered rock Residual

soil/saprolite

Partially weathered rock

Partially weathered

rock

Continuous rock

Artificial fill

Residual soil/saprolite

Continuous rock

?

Continuous rock

B-558(proj. 31 ft.)

B-558(proj. 31 ft.)

B-53(proj. 72 ft.)

B-58B-58(proj. 70 ft.)(proj. 70 ft.)

B-237(proj. 7 ft.)

B-245(proj.10 ft.)

B-248(proj.10 ft.)

B-297(proj.10 ft.)

CPT-1316(proj. 23 ft.)

B-1015

B-1013

S-1506

CPT-1307

Unit 2(SC-I)

YardGrade

RadwasteBuilding

(non-seismic)

Turbine Building(non-seismic)

B-1018(proj. 46 ft.)

B-1017(proj. 65 ft.)

B-1023(proj. 52 ft.)

B-1022(proj. 52 ft.)

F'

SouthNorth

F

YardGrade

0 100 feet

0

50 feet

Scale

Vertical exaggeration 2X

Intersection of CC - CC'

Intersection of BB - BB'

Intersection of UU - UU'

Intersection of ZZ - ZZ'

First Bay (SC-II)

Existinggroundsurface

600

620

640

580

560

540

520

500

480

460

440

420

400

380

360

340

320

300

Ele

vatio

n (f

eet)

600

620

640

580

560

540

520

500

480

460

440

420

400

380

360

340

320

300

Ele

vatio

n (f

eet)

NUCLEAR STATION UNITS 1 & 2WILLIAM STATES LEE III

Planned Excavation Profile Geologic Cross Section F-F'

FIGURE 2.5.4-263 Rev 9

Explanation

Fill – granular

Fill – Group I (soil)

Fill – CNS soil

WLS fill concrete