    Activity ID Activity Name Start Finish

    MC-7 ANDMC-7 AND LATERAL SHY-1 09-Dec-12 A 28-Nov-13

    PROJECTPROJECT MILESTONE 09-Dec-12 A 28-Nov-13

    MC-7 REMAIMC-7 REMAINING MILESTONE 09-Dec-12 A 28-Nov-13OLD SCOPEOLD SCOPE MILESTONE 09-Dec-12 A 28-Nov-13

    CM-36 Start Installation Of Scrapers 15-Dec-12 A

    CM-44 Start Installation Of Electrical And Instrument Cables & Wires 21-May-13

    CM-40 Start Hydrotest Under Ground Piping 20-J ul-13

    CM-38 Start Hydrotest Above Ground Piping 10-Aug-13

    CM-56 Start Commissioning Of New Rerouted Pipes 23-Sep-13

    CM-58 Schedule Completion Date Of All Facilities As Per Schedule "B" Paragraph #.9 28-Nov-13

    CM-05 Procurement Remaining Material Start 09-Dec-12 A

    CM-10 Procurement Completion For Shy-1 & Petrorabigh(170-B1 & B2) 23-J un-13

    CM-11 Procurement Completion FOR 30" Lateral(170-B3) 22-May-13CM-51 Partial M/C Of 26" Shy-Line To Support Commissioning Of Line 01-Oct-13

    CM-52 Partial M/C Of 18" YRBETH-1 Line To Support Commissioning Of Line 23-Sep-13

    CM-53 Partial M/C Of 6" YRBUT- 1 LIne To Support Commissioning Of Line 03-J ul-13

    CM-57 Mechanical Completion Of MC-7 29-Oct-13

    CM-55 Demolition & Removal Of Original Pipelines 19-Nov-13

    CM-54 Decommission Original Pipelines 07-Oct-13

    CM-26 Complete Under Ground Piping 100% Of New Shy -1 Pipe Line W/Out Hydrotest 28-J ul-13

    CM-29 Complete Under Ground Piping 100% Of New Petro Rabigh W/Out Hydrotest 28-J ul-13

    CM-47 Complete Loop Check 01-Oct-13

    CM-37 Complete Installation Of Scrapers 20-Oct-13

    CM-45 Complete Installation Of Electrical And Instrument Cable & Wires 03-Sep-13

    CM-41 Complete Hydrotest UnderGround Piping 08-Aug-13

    CM-39 Complete Hydrotest Above Ground Piping 29-Sep-13

    CM-21 Complete Above Ground Piping Sleepers 18-J un-13

    CM-32 Complete Above Ground Piping 100% Of New Shy-1 W/Out Hydrotest 28-J ul-13

    CM-35 Complete Above Ground Piping 100% Of New Petro Rabigh Lines W/Out Hydrot 28-J ul-13

    SHY-1 LATESHY-1 LATERAL MILESTONE 17-J un-13 28-Nov-13

    NEW AMENDNEW AMENDMENT 17-J un-13 28-Nov-13

    LM- 7 Partial Mechanical Completion 30" Shy -Lateral Up To NGL Fence 07-J ul-13

    LM- 3 Installation Of All Utilities FireWater Loop Inside The New SSD Fence Extension 17-J ul-13

    LM- 1 Installation Of 3 Box Culverts Inside YNGLFC 17-J un-13

    LM- 2 Installation of Above Ground Pipe Supports 18-J un-13

    LM- 8 Final Tie-In Of Shy-1 Lateral @ NGL 07-Aug-13

    LM-11 Final MCC Shy-1 Lateral & All Associated Works 28-Nov-13

    LM- 5 Electrical Work In the Scraper Trap Area Including Lighting Grounding,Cathodic 10-Oct-13

    LM- 6 Completion Of 30" Shy -Lateral And Above Ground Piping 18-J ul-13

    LM- 9 Complete Hydrotesting Of 30" Shy-1 Lateral And Above Ground Piping @ YNGL 12-Sep-13

    LM-10 Complete Commissioning Of 30" Shy-1 Lateral 21-Nov-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    2/16

    Activity ID Activity Name Start Finish

    LM- 4 Civil Work In The Scrap Trap Area Including SSD Fencing,Petrol Road And All A 25-J un-13

    PROCUREMPROCUREMENT CONTRACTOR SUPPLIED MATERIALS (170 -B1-SHY-1) 02-J an-13 A 23-J un-13

    PROCUREMPROCUREMENT CONTRACTOR SUPPLIED MATERIALS (170-B2 -PETRO RABIGH) 24-Dec-12 A 23-J un-13

    PROCUREMPROCUREMENT CONTRACTOR SUPPLIED MATERIALS (170-B3 -30" SHY-1 COMB 15-Dec-12 A 22-May-13

    REMAININREMAINING WORKS OF ORIGINAL SCOPES 09-Dec-12 A 28-Nov-13

    170-B1 INST170-B 1 INSTALLATION OF 26" U/G MAINLINE RE-ROUTE FROM (FROM 0KM TO ST) 09-Dec-12 A 24-Nov-13

    REMAININGREMAINING WORKS FOR 170-B1 30-Mar-13 30-Mar-13

    170-B1 000 Remaining Works For 170-B1 Start Milestone 30-Mar-13

    INSTALLATIINSTALLATION 26" SCRAPER TRAP ( V73-D-010 ) 09-Dec-12 A 11-Aug-13

    MECHANICMECHANICAL PIPING WORKS 09-Dec-12 A 11-Aug-13

    MC-7 239 Work Permit 09-Dec-12 A

    MC-7 295 Valves Installation for 26" Scraper Trap 29-J ul-13 11-Aug-13

    MC-7 275 Spools Installation for 26" Scraper Trap 29-J ul-13 11-Aug-13

    MC-7 240 Spools Fabrication for 26" Scraper Trap 09-Dec-12 A 22-May-13

    MC-7 265 Installation for 26" Scraper Trap 15-Dec-12 A 28-J ul-13

    MC-7 250 Hydrotest Valves & Spools for 26" Scraper Trap 10-Dec-12 A 03-J un-13

    INSTALLATIINSTALLATION OF UTILITY LINES @ SCRAPER TRAP AREA 05-May-13 24-J un-13

    MC-7 249 Work Permit 05-May-13

    MC-7 280 Install 8" & 4" U/G RTR Oily Water Sewer 13-May-13 23-May-13

    MC-7 285 Install 8" & 4" U/G Fire Water Supply 25-May-13 06-J un-13

    MC-7 270 Install 3" Utility Water Line 05-May-13 12-May-13

    MC-7 290 Install 10", 8" & 4" U/G RTR Fire Water Supply 08-J un-13 24-J un-13

    INSTALLATIINSTALLATION OF 26" U/G MAINLINE RE-ROUTE FROM (FROM 0KM TO ST) 09-Dec-12 A 18-J ul-13CIVIL & STRCIVIL & STRUCTURAL WORKS 09-Dec-12 A 24-Apr-13

    MC-7 019 Work Permit 09-Dec-12 A

    MC-7 060 Laying Riprap Stones @ Sta -2+651 09-Dec-12 A 22-Apr-13

    MC-7 030 Installation Of Markers 14-Apr-13 24-Apr-13

    MC-7 020 Install Flange /LDS Enclosure & Crash Barrier 07-Apr-13 13-Apr-13

    THRUSTBOTHRUSTBORING @ TAMA HIGHWAY 08-Apr-13 30-J un-13

    MC-7 069 Work Permit 08-Apr-13

    MC-7 070 Thrustboring @ TAMA Highway 08-Apr-13 30-J un-13

    26" U/G ME26" U/G MECH PIPING WORKS 01-J ul-13 18-J ul-13

    MC-7 109 Work Permit 01-J ul-13MC-7 110 Tie-in @ TAMA Highway Area 01-J ul-13 18-J ul-13

    26" A/G ME26" A/G MECH PIPING WORKS 23-May-13 15-J ul-13

    MC-7 141 Work Permit 23-May-13

    MC-7 145 Pipe Weld/Radiography/Girth Weld Coating for 26" A/G Pipe 07-J ul-13 15-J ul-13

    MC-7 142 Installation Of 24" A/G By-Pass Line Scraper Area 01-J ul-13 06-J ul-13

    ELECTRICALELECTRICAL /GROUNDING & COMMUNICATION 09-Dec-12 A 15-Sep-13

    MC-7 134 Work Permit 15-Dec-12 A

    MC-7 135 Trench Excavation for Electrical/Grounding & Communication 15-Dec-12 A 21-J ul-13

    MC-7 165 Loop Checking for Elect./Grounding & Comm. 11-Aug-13 14-Aug-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    3/16

    Activity ID Activity Name Start Finish

    MC-7 150 Install UG/Control Cable from Operator Shelter to Substation 28-J ul-13 12-Aug-13

    MC-7 160 Grounding Installation for Operator Shelter, Scraper Area to NGL 03-Aug-13 11-Aug-13

    MC-7 170 Backfilling for Electrical/Grounding & Communication 14-Aug-13 28-Aug-13

    MC-7 140 Area Lighting for Scraper Area 21-J ul-13 05-Aug-13

    COMMUNICCOMMUNICATION WORK OUTSIDE YERP 09-Dec-12 A 30-J ul-13

    MC-7 179 Work Permit 09-Dec-12 A

    MC-7 180 Trench Excav.,Splice Point SP-XX1 to SP-XX2 for Comm. Outside YERP 09-Dec-12 A 10-J un-13

    MC-7 216 Termination Works/Loop Checking for Comm. Outside YERP 24-J ul-13 28-J ul-13

    MC-7 205 Splicing Both Ends SP-XX1 To SP-XX2 for Comm. Outside YERP 17-J ul-13 22-J ul-13

    MC-7 190 Laying of Fiber Optic Cable for Comm. Outside YERP 21-May-13 16-J ul-13

    MC-7 215 Install Metallic Warning Tape for Comm. Outside YERP 22-J ul-13 24-J ul-13

    MC-7 235 Install Cable Marker for Comm. Outside YERP 28-J ul-13 30-J ul-13

    MC-7 200 Continuity Test for Comm. Outside YERP 23-May-13 17-J ul-13

    MC-7 225 Backfilling for Comm. Outside YERP 09-Feb-13 A 03-J ul-13

    INSTRUMENINSTRUMENT INSTALLATION @ 26" SCRAPER AREA 12-Aug-13 29-Aug-13

    MC-7 9212 Work Permit 12-Aug-13

    MC-7 9233 Name Plate & Tagging for Cable & Conduts @ 26" Scraper Area 24-Aug-13 27-Aug-13

    MC-7 9231 Install ZV-517A/ZV-516A/ZB-921B 26" Shy-1 21-Aug-13 24-Aug-13

    MC-7 9232 Install ZV-516A/ZV-517A/ZB-921B 30" PXXX1-9CS9P 24-Aug-13 26-Aug-13

    MC-7 9226 Install TI-101/TE-101 17-Aug-13 18-Aug-13

    MC-7 9225 Install PT-101 & PT-103 15-Aug-13 17-Aug-13

    MC-7 9213 Install PI-XX3 on 26" Shy-1 12-Aug-13 13-Aug-13

    MC-7 9223 Install PI-XX2 on 2" Equalizing line 13-Aug-13 14-Aug-13

    MC-7 9224 Install PI-XX1 on 4" PXXX8-9CS9P 14-Aug-13 15-Aug-13

    MC-7 9228 Install Limit Switch on Emerg. Shutd. Va ZV-516/517 19-Aug-13 19-Aug-13

    MC-7 9229 Install Limit 12" Bypass line ESVa ZV-516/517 19-Aug-13 19-Aug-13

    MC-7 9230 Install XS-102 & 104 ON 26" SHY-1 20-Aug-13 21-Aug-13

    MC-7 9242 Fire Alarm System Installation @ 26" Scraper Area 26-Aug-13 29-Aug-13

    MC-7 9237 Analog Digital J unction Box Installation @ 26" Scraper Area 24-Aug-13 27-Aug-13

    INSTRUMENINSTRUMENT CABLE INSTALLATION @ 26" SCRAPER AREA 14-Aug-13 15-Sep-13

    MC-7 9089 Work Permit 14-Aug-13

    MC-7 9103 Trenching Inst Cable Shutdown Cabinet to Air Surge Drum @ 26" Scraper Area 19-Aug-13 25-Aug-13

    MC-7 9123 Trenching Inst Cable FJ B-02CJ B-001 to Marshalling Rack @ 26" Scraper Area 26-Aug-13 01-Sep-13

    MC-7 9113 Trenching Inst Cable FJ B to AJ B -001 & to LCP516/517 @ 26" Scraper Area 22-Aug-13 28-Aug-13

    MC-7 9093 Trenching for MOV not Include Main Trench Petro Rabigh @ 26" Scraper Area 15-Aug-13 21-Aug-13

    MC-7 9209 Termination All Installation Cables @ 26" Scraper Area 07-Sep-13 12-Sep-13

    MC-7 9090 Survey Layout & Markings @ 26" Scraper Area 14-Aug-13 20-Aug-13

    MC-7 9219 Loop Checking @ 26" Scraper Area 14-Sep-13 15-Sep-13

    MC-7 9192 Lay Inst Cable PC-0003/0004/0005/0231/0232 Sub. to MOVs @ 26" Scraper Ar 02-Sep-13 03-Sep-13

    MC-7 9195 Lay Inst Cable Cable FJ B-02CJ B-001 to Marshalling Rack @ 26" Scraper Area 02-Sep-13 03-Sep-13

    MC-7 9194 Lay Inst Cable Cable FJ B to AJ B -001 & to LCP516/517 @ 26" Scraper Area 02-Sep-13 03-Sep-13

    MC-7 9196 Lay Inst Cable Cable AJ B-001/DJ B-001 to RTU Marsha. Cab. @ 26" Scraper Ar 02-Sep-13 03-Sep-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    4/16

    Activity ID Activity Name Start Finish

    MC-7 9193 Lay Inst Cable & Accesso. Shut. Cab. to Air Surge Drum @ 26" Scraper Area 02-Sep-13 03-Sep-13

    MC-7 9204 Install Local Shut Down Cabinet 02-LCP-517A @ 26" Scraper Area 04-Sep-13 05-Sep-13

    MC-7 9143 Conduitting/Stubups & Sealing @ 26" Scraper Area 26-Aug-13 01-Sep-13

    BACKFILINBACKFILING WORKS FOR E & I @ SCRAPER AREA 04-Sep-13 10-Sep-13

    MC-7 9154 Work Permit 04-Sep-13

    MC-7 9155 Stockfiling of Backfilling Materials for E & I @ Scraper Area 04-Sep-13 05-Sep-13

    MC-7 9160 Hauling Fill Sand for E & I @ Scraper Area 05-Sep-13 08-Sep-13

    MC-7 9170 Hauling Fill Marl for E & I @ Scraper Area 08-Sep-13 09-Sep-13

    MC-7 9180 Grading/Leveling & Compaction for E & I @ Scraper Area 09-Sep-13 10-Sep-13

    MODIFYINGMODIFYING EXISTING OPERATOR SHELTER NEAR SCRAPER AREA 09-Dec-12 A 29-J un-13

    CIVIL/STRUCIVIL/STRUCTURAL WORKS 09-Dec-12 A 07-May-13

    MC-7 299 Work Permit 09-Dec-12 A

    MC-7 310 Install Tie Beam for Operator Shelter 29-Dec-12 A 31-J an-13 A

    MC-7 315 Install Slab On Fill for Operator Shelter 30-Mar-13 11-Apr-13

    MC-7 330 Install Roof Beam & Suspended Slab for Operator Shelter 13-Apr-13 25-Apr-13

    MC-7 340 Install Parapet for Operator Shelter 27-Apr-13 07-May-13

    MC-7 320 Install Column for Operator Shelter 30-J an-13 A 12-Feb-13 A

    MC-7 300 Install Column Foundations for Operator Shelter 09-Dec-12 A 10-J an-13 A

    EXTERIOR /IEXTERIOR /INTERIOR FINISHING WORKS 27-Apr-13 27-J un-13

    MC-7 354 Work Permit 27-Apr-13

    MC-7 390 Roof Slab Water Proofing for Operator Shelter 05-J un-13 23-J un-13

    MC-7 360 Plumbing Works & Water Supply for Operator Shelter 07-May-13 12-May-13

    MC-7 370 Interior Finishing for Operator Shelter 13-May-13 04-J un-13

    MC-7 355 Install CMU Wall for Operator Shelter 27-Apr-13 06-May-13

    MC-7 380 Exterior Finishing for Operator Shelter 05-J un-13 27-J un-13

    CONSTRUCCONSTRUCT CONCRETE PAD PACU-1 @ OPERATOR 03-J an-13 A 02-J un-13

    MC-7 399 Work Permit 27-Apr-13

    MC-7 400 Survey Lay Out & markings 03-J an-13 A 03-J an-13 A

    MC-7 820 Submit RFI Prior to Conc. for Pad PACU-1 16-May-13 16-May-13

    MC-7 730 Rebar Installation for Conc. Pad PACU-1 09-May-13 11-May-13

    MC-7 720 Rebar Cutting & Bending Hauling Of Rebar for Conc. Pad PACU-1 02-May-13 08-May-13

    MC-7 790 Form Works for Conc. Pad. PACU-1 12-May-13 15-May-13

    MC-7 700 Excavation for Conc. Pad PACU-1 27-Apr-13 28-Apr-13

    MC-7 830 Concreting for Pad PACU-1 18-May-13 18-May-13

    MC-7 840 Concrete Curing for Pad PACU-1 19-May-13 27-May-13

    MC-7 710 Base Preparation & Lean Conc. for Pad PACU-1 29-Apr-13 01-May-13

    MC-7 850 Backfilling /Levelling & Compaction By Layer for Pad PACU-1 28-May-13 02-J un-13

    ELECTRICAELECTRICAL & HVAC @ OPERATOR SHELTER 06-May-13 29-J un-13

    MC-7 404 Work Permit (Access) 06-May-13

    MC-7 580 Termination All Power Cable Grounding @ Operator Shelter 15-J un-13 19-J un-13

    MC-7 406 Power Line Conduiting Lighting /Switches & Outlets @ Operator Shelter 07-May-13 12-May-13

    MC-7 671 Loop Checking @ Operator Shelter 26-J un-13 29-J un-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    5/16

    Activity ID Activity Name Start Finish

    MC-7 490 Install Wall Mounted Exaust Fun & Wiring @ Operator Shelter 05-J un-13 08-J un-13

    MC-7 420 Install Switches , Outlets & Utility Boxes @ Operator Shelter 27-May-13 29-May-13

    MC-7 405 Install Power Panel Board @ Operator Shelter 07-May-13 09-May-13

    MC-7 610 Install Power Line to PACU-1 @ Operator Shelter 22-J un-13 24-J un-13

    MC-7 410 Install Power Cable Wiring /Cabling @ Operator Shelter 09-May-13 27-May-13

    MC-7 590 Install Pacu-1 Equipment Outside Operator Shelter 19-J un-13 22-J un-13

    MC-7 480 Install Lighting Fixtures ,Outlets & switches @ Operator Shelter 01-J un-13 05-J un-13

    MC-7 510 Install Grounding Transformer & Panel Board @ Operator Shelter 10-J un-13 12-J un-13

    MC-7 570 Install Grounding Rad & Test Station All Loc. @ Operator Shelter 12-J un-13 15-J un-13

    MC-7 500 Install Grounding Cable Around Shelter Building @ Operator Shelter 08-J un-13 10-J un-13

    MC-7 470 Install Dry Type Transformer Inside Store Room @ Operator Shelter 29-May-13 01-J un-13

    MC-7 670 Install Condensation Drain Near PACU-1 @ Operator Shelter 24-J un-13 25-J un-13

    CIVIL WORKCIVIL WORKS/FENCE & MARL ROAD @ SCRAPER AREA 16-J an-13 A 23-J ul-13

    CIVIL/STRUCIVIL/STRUCTURAL WORKS 16-J an-13 A 23-J ul-13

    MC-7 504 Work Permit 16-J an-13 A

    MC-7 521 Scraper ReceIver Area Paving 25-J un-13 23-J ul-13

    MC-7 505 Installation of Air Surge Drum Fdns. (2 Units) @ Scraper Area 16-J an-13 A 24-J un-13

    MC-7 520 Install Platforms of V73-D-010 @ Scraper Area 25-J un-13 06-J ul-13

    HYDROSTATIHYDROSTATIC TESTING OF SHY-1 20-J ul-13 19-Aug-13

    HYDROTESHYDROTESTING OF 26" MAIN LINE (FROM 0KM TO ST) 20-J ul-13 08-Aug-13

    MC-7 529 Work Permit 20-J ul-13

    MC-7 540 Water Filling for Hydrotest of 26" Main Line 22-J ul-13 25-J ul-13

    MC-7 530 Line Cleaning Works for Hydrotest of 26" Main Line 20-J ul-13 22-J ul-13

    MC-7 541 Hydrotesting Of Line for 26" Main Line 25-J ul-13 30-J ul-13

    MC-7 561 Drying Of Line for Hydrotest of 26" Main Line 04-Aug-13 08-Aug-13

    MC-7 551 Dewatering Of Line for Hydrotest of 26" Main Line 30-J ul-13 04-Aug-13

    HYDROTESHYDROTESTING OF 24" BY-PASS LINE @ SCRAPER AREA 10-Aug-13 19-Aug-13

    MC-7 549 Work Permit 10-Aug-13

    MC-7 550 Water Filling for Hydrotest of 24" By-Pass Line @ Scraper Area 10-Aug-13 12-Aug-13

    MC-7 560 Hydrotest Process of 24" By-Pass Line @ Scraper Area 12-Aug-13 14-Aug-13

    MC-7 572 Drying Of Line for Hydrotest of 24" By-Pass Line @ Scraper Area 17-Aug-13 19-Aug-13

    MC-7 562 Dewatering Of Line for Hydrotest of 24" By-Pass Line @ Scraper Area 14-Aug-13 17-Aug-13

    PRE-COMMIPRE-COMMISSIONING & FINAL COMMISSIONING FOR 170B1 @ SCRAPER AREA16-Sep-13 24-Nov-13

    PRE-COMMIPRE-COMMISSIONING AT SCRAPER AREA 16-Sep-13 15-Oct-13

    MC-7 563 Work Permit 16-Sep-13

    MC-7 565 Pre-Commissioning Of Shy-1 MOV's @ Scraper Area 24-Sep-13 01-Oct-13

    MC-7 595 Pre-Comm.Shut Down System @ Scraper Area 02-Oct-13 06-Oct-13

    MC-7 575 Pre-Comm.Of Transmiters ,SPI,PI, & Gas Detec.Syst. @ Scraper Area 24-Sep-13 01-Oct-13

    MC-7 585 Pre-Comm.Lighting System ,Functional Test @ Scraper Area 28-Sep-13 01-Oct-13

    MC-7 605 Pre-Comm.Communication System @ Scraper Area 07-Oct-13 10-Oct-13

    MC-7 615 Pre-Comm. HVAC System Operator Shelter @ Scraper Area 12-Oct-13 15-Oct-13

    MC-7 564 Loop Checking All Elect & Instrument @ Scraper Area 16-Sep-13 23-Sep-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    6/16

    Activity ID Activity Name Start Finish

    PRE-COMMIPRE-COMMISSIONING OF 26" U/G MAINLINE (FROM 0KM TO ST) 23-Sep-13 20-Oct-13

    MC-7 624 Work Permit 23-Sep-13

    MC-7 629 Ready for Trail Run for Pre-Commissioning of 26" Main Line 15-Oct-13 20-Oct-13

    MC-7 628 Nitrogen Purging for Pre-Commissioning of 26" Main Line 09-Oct-13 15-Oct-13

    MC-7 625 Dewatering for Pre-Commissioning of 26" Main Line 23-Sep-13 28-Sep-13

    MC-7 627 Bolt Tighting for Pre-Commissioning of 26" Main Line 03-Oct-13 09-Oct-13

    MC-7 626 Air Drying for Pre-Commissioning of 26" Main Line 28-Sep-13 03-Oct-13

    FINAL COMFINAL COMMISSIONING OF 26" U/G MAINLINE (FROM 0KM TO ST) 21-Oct-13 24-Nov-13

    MC-7 634 Work Permit (Access Inside Plant) 21-Oct-13

    MC-7 655 Walk Thru & Sign PMCC for Final Comm. of 26" Main Line 24-Oct-13 31-Oct-13

    MC-7 635 Walk Thru & Punchlisting for Final Comm. of 26" Main Line 21-Oct-13 28-Oct-13

    MC-7 675 Prepare & Submit QC Documents for Final Comm. of 26" Main Line 05-Nov-13 12-Nov-13

    MC-7 685 Prepare & Submit Close Out Report for Final Comm. of 26 " Main Line 05-Nov-13 24-Nov-13

    MC-7 665 Prepare & Submit As Built for F inal Comm. of 26" Main Line 28-Oct-13 04-Nov-13

    MC-7 645 Complete Exceptional Items for F inal Comm. of 26" Main Line 23-Oct-13 03-Nov-13

    DEMOLITIONDEMOLITION OF EXISTING SHY-1 SCRAPER TRAP AREA 07-Oct-13 21-Oct-13

    DEMOLITIODEMOLITION WORKS 07-Oct-13 21-Oct-13

    MC-7 429 Work Permit 07-Oct-13

    MC-7 430 Shutdown Of Existing Pipelines @ Shy-1 ST 07-Oct-13 10-Oct-13

    MC-7 445 Removal Of Valves @ Shy-1 ST 12-Oct-13 13-Oct-13

    MC-7 455 Removal Of Spools @ Shy-1 ST 12-Oct-13 13-Oct-13

    MC-7 465 Removal Of ScraperTrap @ Shy-1 ST 14-Oct-13 15-Oct-13

    MC-7 485 Removal Of Pipe Supports @ Shy-1 ST 16-Oct-13 21-Oct-13

    MC-7 475 Install Blind Flange To Existing Line @ Shy-1 ST 16-Oct-13 17-Oct-13

    MC-7 440 Degasing of Pipelines,Spools @ Shy-1 ST 12-Oct-13 14-Oct-13

    DEMOLITIONDEMOLITION REMOVAL EXISTING SHY-1 PIPELINE 13-Oct-13 30-Oct-13

    ACTIVITIESACTIVITIES AFTER SHUTDOWN AT SHY-1 13-Oct-13 30-Oct-13

    MC-7 449 Work Permit 13-Oct-13

    MC-7 461 Transport Cut Pipes To Laydown Yard @ Shy-1 ST 14-Oct-13 21-Oct-13

    MC-7 450 Removal Of Existing Pipeline @ Shy-1 ST 13-Oct-13 28-Oct-13

    MC-7 460 Cutting Of Dismantled Pipeline To J oints @ Shy-1 ST 13-Oct-13 28-Oct-13

    MC-7 471 Backfilling Works @ Shy-1 ST 15-Oct-13 30-Oct-13

    170-B2 AT170-B 2 AT PETRO RABIGH (FROM ST TO NGL)09-Dec-12 A 28-Nov-13

    170-B2 AT PE170-B2 AT PETRO RABIGH REMAINING WORKS START 30-Mar-13 30-Mar-13

    170-B2 000 170-B2 Remaining Works Milestone 30-Mar-13

    INSTALLATIINSTALLATION PETRO RABIGH 18" & 6" LINES 09-Dec-12 A 01-Aug-13

    CIVIL/STRUCIVIL/STRUCTURAL WORKS MAINLINE 23-Apr-13 06-May-13

    MC-7 567 Work Permit 23-Apr-13

    MC-7 600 Laying Of RipRap Stones @ Sta.-2+651 30-Apr-13 06-May-13

    MC-7 568 Fabricate of P/L Enclosure / Markers and Installation 23-Apr-13 29-Apr-13

    CIVIL/STRUCIVIL/STRUCTURAL WORKS @ TIE-IN KM 0.020 & KM 0.139 07-May-13 01-Aug-13

    MC-7 619 Work Permit 07-May-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    7/16

    Activity ID Activity Name Start Finish

    MC-7 620 Structural Steel Installation @ Km 020 & Km 139 07-May-13 13-May-13

    MC-7 630 Install Type -1 Fence @ Km 020 & Km 139 16-J ul-13 01-Aug-13

    U/G 18"ETHU/G 18"ETHANE MECH PIPING MAINLINE WORKS 02-J an-13 A 09-Apr-13

    MC-7 639 Work Permit 02-J an-13 A

    MC-7 640 Spool Fabrication for 18" U/G Pipe 02-J an-13 A 24-J an-13 A

    MC-7 650 Pipe Weld ,Gerth Weld Coating,Lowering(Remaining) for 18" U/G Pipe 17-J an-13 A 30-J an-13 A

    MC-7 660 Completion Of 18" A/G By Pass Line @ Km. 0.00 30-Mar-13 09-Apr-13

    U/G 6"BUTAU/G 6"BUTANE MECH PIPING MAINLINE WORKS 09-Dec-12 A 03-J ul-13

    MC-7 679 Work Permit 09-Dec-12 A

    MC-7 695 Tie-In All Existing Facilities & Crossing for 6" U/G Pipe 01-J ul-13 03-J ul-13

    MC-7 680 Pipe Weld,Gerth Weld Coating ,Lowering (Remaining) for 6" U/G Pipe 09-Dec-12 A 26-J an-13 A

    MC-7 690 Completion Of 6",4",10"AG Bypass @ Km. 0.00 30-Mar-13 09-May-13

    SUBSTATIONSUBSTATION-150 @ SCRAPER TRAP 09-Dec-12 A 09-Sep-13

    CIVIL/STRUCIVIL/STRUCTURAL & PLUMBING WORKS 09-Dec-12 A 20-May-13

    MC-7 739 Work Permit 09-Dec-12 A

    MC-7 760 Roof Slab Water Proofing @ Substation 30-Mar-13 09-Apr-13

    MC-7 770 Ramp & WalkWays @ Substation 10-Apr-13 17-Apr-13

    MC-7 740 Interior Finishing @ Substation 09-Dec-12 A 01-J an-13 A

    MC-7 780 Install 8" RTR Sewer & Plumbing Lines @ Substation 15-May-13 20-May-13

    MC-7 750 Exterior Finishing @ Substation 09-Dec-12 A 08-J an-13 A

    ELECTRICAELECTRICAL & HVAC FOR SUBSTATION 13-May-13 09-Sep-13

    MC-7 799 Work Permit 13-May-13

    MC-7 851 Test ,Splicing & Termination Medium Volts Power Cables @ NGL 150A To 150B 21-Aug-13 07-Sep-13

    MC-7 861 Loop Checking @ Substation 07-Sep-13 09-Sep-13

    MC-7 841 Installation Of Medium Volts Transformer,4.16 KV 1000KVA @ Sub Sta.Area 14-Aug-13 21-Aug-13

    MC-7 821 Installation Of Lighting Fixtures @ Substation 29-J ul-13 03-Aug-13

    MC-7 811 Installation Of Electrical Devices @ Substation 15-J ul-13 27-J ul-13

    MC-7 810 Installation Of Electrical CableWires @ Substation 16-J un-13 15-J ul-13

    MC-7 831 Installation Of A/C Units @ Substation 03-Aug-13 14-Aug-13

    MC-7 800 Cable Tray Installation Inside Substation 13-May-13 16-J un-13

    INSTALL 18INSTALL 18" & 6" SCRAPER TRAPS (170-B2) 15-J an-13 A 29-Oct-13

    CIVIL WORCIVIL WORKS @ 18" SCRAPER LAUNCHER FACILITIES (K98-D-0001E) 29-J an-13 A 24-J ul-13

    MC-7 887 Work Permit 29-J an-13 A

    MC-7 941 Site Clearing @ 18" Scraper Launcher 23-J ul-13 24-J ul-13

    MC-7 931 Removal Of Forms for Containment Slab @ 18" Scraper Launcher 20-J ul-13 22-J ul-13

    MC-7 911 Rebar Works for Containment Slab @ 18" Scraper Launcher 06-J ul-13 14-J ul-13

    MC-7 888 Installation Of Platforms @ 18" Scraper Launcher 25-J un-13 08-J ul-13

    MC-7 912 Formworks for Containment Slab @ 18" Scraper Launcher 11-J ul-13 16-J ul-13

    MC-7 921 Concreting Works for Containment Slab @ 18" Scraper Launcher 17-J ul-13 18-J ul-13

    MC-7 891 Compaction Of Base-Containment Slab @ 18" Scraper Launcher 30-J un-13 06-J ul-13

    MC-7 889 BackFill All Fdns. @ 18" Scraper Launcher 29-J an-13 A 01-Feb-13 A

    PIPING WOPIPING WORKS @ 18" SCRAPER LAUNCHER 13-Apr-13 29-Oct-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    8/16

    Activity ID Activity Name Start Finish

    MC-7 899 Work Permit 13-Apr-13

    MC-7 900 Spool Fabrication @ 18" Scraper Launcher 13-Apr-13 28-Apr-13

    MC-7 910 Scraper Trap Installation @ 18" Scraper Launcher 14-Oct-13 16-Oct-13

    MC-7 925 Installation Of Valves @ 18" Scraper Launcher 17-Oct-13 26-Oct-13

    MC-7 920 Installation Of Spools @ 18" Scraper Launcher 17-Oct-13 29-Oct-13

    CIVIL WORCIVIL WORKS @ 6" SCRAPER LAUNCHER FACILITIES (K99-D-0001) 15-J an-13 A 01-Aug-13

    MC-7 969 Work Permit 15-J an-13 A

    MC-7 999 Site Clearing @ 6" Scraper Launcher 30-J ul-13 01-Aug-13

    MC-7 998 Removal Of Forms for Containment Slab @ 6" Scraper Launcher 27-J ul-13 29-J ul-13

    MC-7 971 Installation Of Platforms @ 6" Scraper Launcher 09-J ul-13 17-J ul-13

    MC-7 996 Formworks for Containment Slab @ 6" Scraper Launcher 18-J ul-13 23-J ul-13

    MC-7 997 Concreting Works for Containment Slab @ 6" Scraper Launcher 24-J ul-13 25-J ul-13

    MC-7 995 Compaction Of Base-Containment Slab @ 6" Scraper Launcher 30-J an-13 A 14-Feb-13 A

    MC-7 990 Backfill All Fdns. @ 6" Scraper Launcher 15-J an-13 A 06-Feb-13 A

    PIPING WOPIPING WORKS @ 6" SCRAPER LAUNCHER 13-Apr-13 29-Oct-13

    MC-7 0999 Work Permit 13-Apr-13

    MC-7 1000 Spool Fabrication @ 6" Scraper Launcher 13-Apr-13 28-Apr-13

    MC-7 1010 Scraper Trap Installation @ 6" Scraper Launcher 19-Oct-13 20-Oct-13

    MC-7 1220 Installation Of Valves @ 6" Scraper Launcher 20-Oct-13 28-Oct-13

    MC-7 1020 Installation Of Spools @ 6" Scraper Launcher 20-Oct-13 29-Oct-13

    1.2.2.6 CIVIL1.2.2.6 CIVIL WORKS FENCE/ROADS MARL ROAD WITHIN YGP 09-Dec-12 A 22-May-13

    PRECASTINPRECASTING OF LIGHT WEIGHT FDNS 27-Apr-13 14-May-13

    MC-7 1459 Work Permit 27-Apr-13

    MC-7 1460 Installation of Precast Light Weight Fnds. for Area Lighting 27-Apr-13 14-May-13

    CAST IN PLCAST IN PLACE CONCRETE STRUCTURES (FROM ST TO SUBSTATION AREA) 09-Dec-12 A 23-Apr-13

    MC-7 1489 Work Permit 09-Dec-12 A

    MC-7 1490 Installation of Air Surge Drum Fdns. @ Scraper Area 10-J an-13 A 02-Feb-13 A

    MC-7 1510 Install Transformer Pad @ Substation Area 20-Dec-12 A 20-J an-13 A

    MC-7 1550 Install Transformer Fire Wall @ Substation Area 26-Dec-12 A 22-J an-13 A

    MC-7 1530 Install Concrete Pad PACU-Unit-2 @ Substation Area 10-Dec-12 A 31-J an-13 A

    MC-7 1540 Install Concrete Pad PACU-Unit-1 @ Substation Area 09-Dec-12 A 06-Feb-13 A

    MC-7 1500 Install Acid Containment & Valve Box @ Substation Area 30-Mar-13 23-Apr-13

    MC-7 1560 Backfilling Works @ Scraper Area 18-J an-13 A 03-Feb-13 A

    INSTALLATIINSTALLATION FENCE AROUND TRANS. PAD & BACKFILLING @ SUBSTATION AREA 04-Apr-13 22-May-13

    MC-7 1569 Work Permit 04-Apr-13

    MC-7 1580 Install Type -III Fence Around Tranformer Pad @ Substation Area 23-Apr-13 06-May-13

    MC-7 1570 Excavation Works for Fence Around Trans. Pad @ Substation Area 04-Apr-13 22-Apr-13

    MC-7 1585 Backfilling Trench & Fnds Around Substation Area 07-May-13 22-May-13

    ELECTRICALELECTRICAL AND INSTRUMENTATION WORKS (FROM ST TO NGL) 09-Dec-12 A 31-Aug-13

    ELECTRICAELECTRICAL (FROM ST TO NGL) 09-Dec-12 A 12-J un-13

    MC-7 1029 Work Permit 09-Dec-12 A

    MC-7 1060 Trenching For Cable Lines from ST to NGL 28-Apr-13 21-May-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    9/16

    Activity ID Activity Name Start Finish

    MC-7 1920 Termination Works from ST to NGL 04-J un-13 10-J un-13

    MC-7 1030 Pre-casting Of Various Fnds. For Electrical (Remaining) from ST to NGL 09-Dec-12 A 17-J an-13 A

    MC-7 1230 Power Cable Laying from ST to NGL 23-May-13 04-J un-13

    MC-7 1930 Loop Checking from ST to NGL 10-J un-13 12-J un-13

    MC-7 1050 Installation Of Fnds. & Fabricated Items from ST to NGL 27-Apr-13 06-May-13

    MC-7 1040 Excavation For Various Fnds. from ST to NGL 29-Dec-12 A 03-J an-13 A

    LIGHTINGLIGHTING @ SCRAPER AREA 04-J un-13 31-Aug-13

    MC-7 1069 Work Permit 04-J un-13

    MC-7 1080 Installation Of Lighting Fixtures @ Scraper Area 04-J un-13 31-Aug-13

    MC-7 1070 Installation Of Electrical Devices @ Scraper Area 04-J un-13 16-J un-13

    INSTRUMENINSTRUMENTATION (FROM ST TO NGL) 01-J an-13 A 27-J un-13

    MC-7 1089 Work Permit 01-J an-13 A

    MC-7 1090 Trenching Works for Instrumentation from ST to NGL 01-J an-13 A 02-J un-13

    MC-7 1111 Termination Works for Instrumentation from ST to NGL 09-J un-13 25-J un-13

    MC-7 1121 Loop Checking for Instrumentation from ST to NGL 26-J un-13 27-J un-13

    MC-7 1110 Instruments Installation from ST to NGL 05-J un-13 16-J un-13

    MC-7 1100 Instrument Cable Installation from ST to NGL 03-J un-13 13-J un-13

    COMMUNICCOMMUNICATION (FROM SUBSTATION TO NGL) 12-Dec-12 A 24-J un-13

    MC-7 1118 Work Permit 12-Dec-12 A

    MC-7 1120 Trenching Works for Communication from Substation to NGL 12-Dec-12 A 08-J un-13

    MC-7 1150 Termination Works for Communication from Substation to NGL 16-J un-13 22-J un-13

    MC-7 1200 Loop Checking for Communication from Substation to NGL 23-J un-13 24-J un-13

    MC-7 1130 FOC Cable Laying for Communication from Substation to NGL 09-J un-13 15-J un-13

    MC-7 1140 Backfilling Works for Communication from Substation to NGL 16-J un-13 22-J un-13

    1.2.2.4 INSTA1.2.2.4 INSTALLATION OF UTILITY LINES @ SCRAPER TRAP AREA 09-Dec-12 A 25-Aug-13

    U/G UTILITU/G UTILITY LINE INSTALLATION 02-J an-13 A 19-May-13

    MC-7 1159 Work Permit 02-J an-13 A

    MC-7 1160 Trenching Works for U/G RTR Line @ Scraper Area 02-J an-13 A 24-Apr-13

    MC-7 1180 Laying U/G 6" RTR Oily Water Line @ Scraper Area 30-Apr-13 12-May-13

    MC-7 1170 Laying U/G 4' Fire Water Supply FW-XXXX-12 FEOU @ Scraper Area 27-Apr-13 08-May-13

    MC-7 1171 Install Air Surge Drum (2 Units) @ Scraper Area 16-Feb-13 A 11-May-13

    MC-7 1181 Backfilling Works for U/G RTR Line @ Scraper Area 12-May-13 19-May-13

    16" A/G ETH16" A/G ETHANE LATERAL PIPING INSTALLATION (FROM ST TO NGL)15-Dec-12 A 26-J un-13

    MC-7 1189 Work Permit 15-Dec-12 A

    MC-7 1190 Spool Fabrication for 16" A/G Pipe 15-Dec-12 A 26-May-13

    MC-7 1210 Coating & Installation of A/G 16" Lateral Pipe (Ethane) 05-J an-13 A 26-J un-13

    CIVIL WORCIVIL WORKS FOR 8" RELIEF LINES (FROM ST TO NGL) 29-Dec-12 A 18-J ul-13

    MC-7 1239 Work Permit 29-Dec-12 A

    MC-7 1255 Installation of Bent Supports of 8" R/L 08-J an-13 A 22-J un-13

    MC-7 1250 Installation of 8" R/L Foundations 03-J an-13 A 23-May-13

    MC-7 1240 Excavation Works of Bent Support for 8" R/L 29-Dec-12 A 05-May-13

    MC-7 1265 Backfilling Works for Fdns. of 8 " R/L 30-J an-13 A 18-J ul-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    10/16

    Activity ID Activity Name Start Finish

    PIPING WOPIPING WORKS FOR 8" R/L (FROM ST TO NGL) 09-Dec-12 A 25-Aug-13

    MC-7 1259 Work Permit 09-Dec-12 A

    MC-7 1281 Installation Of Depressurized Heater for 8" R/L 11-Aug-13 25-Aug-13

    MC-7 1280 Installation Of 8" R/L Spools 11-Aug-13 25-Aug-13

    MC-7 1270 Installation Of 8" -RL-10139-ISDOP 09-Dec-12 A 18-Aug-13

    MC-7 1260 Fabrication Of Spools for 8" R/L 15-J an-13 A 22-Apr-13

    6" A/G BUT6" A /G BUTANE LINE LATERAL PIPING INSTALLATION (FROM ST TO NGL ) 29-Dec-12 A 27-May-13

    MC-7 1309 Work Permit 29-Dec-12 A

    MC-7 1310 6" A/G Butane Piping Fabrication & Installation (6"-10086-9CAIP) 29-Dec-12 A 27-May-13

    2" INPLANT2" INPLANT LINE NITROGEN/UTILITY AIR (FROM ST TO NGL) 09-Dec-12 A 01-J ul-13

    MC-7 1319 Work Permit 09-Dec-12 A

    MC-7 1330 2" A/G UW-10235-12CGOU & 2"10236-12CGOU (Fab. & Inst.) 13-Dec-12 A 01-J ul-13

    MC-7 1340 2" A/G UA-10225-12CGOU Utility Air (Fabrication & Installation) 23-Dec-12 A 01-J ul-13

    MC-7 1320 2" A/G Nitrogen Supply Line (Fabrication & Installation) 09-Dec-12 A 10-J un-13

    1.3.2.2 HYDR1.3.2.2 HYDROTESTING PETRO RABIGH LINES 07-J ul-13 29-Sep-13

    HYDROTESHYDROTESTING (FROM 0KM TO NGL) 07-J ul-13 29-Sep-13

    MC-7 1589 Work Permit 16-J ul-13

    MC-7 1600 Hydrotesting 6" Butane U/G Main Line P/L from 0KM to ST 07-J ul-13 16-J ul-13

    MC-7 1590 Hydrotesting 18" Ethane U/G Main Line P/L from 0KM to ST 22-J ul-13 05-Aug-13

    MC-7 1640 Hydrotest For 8" RTR Line from ST to NGL 16-J ul-13 17-J ul-13

    MC-7 1630 Hydrotest 8" Relief Line from ST to NGL 25-Aug-13 31-Aug-13

    MC-7 1620 Hydrotest 2" Lines from ST to NGL 31-J ul-13 03-Aug-13

    MC-7 1610 Hydrotest 16" A/G Lateral from ST to NGL 23-Sep-13 29-Sep-13

    MC-7 1615 Hydrotest 6" A/G Lateral from ST to NGL 31-J ul-13 06-Aug-13

    PETRO RABIPETRO RABIGH (MCC) & FINAL COMMISSIONING(170B2) 15-Sep-13 28-Nov-13

    PRE-COMMIPRE-COMMISSIONING OF 18" U/G MAIN LINE FROM (0KM TO ST) 08-Oct-13 05-Nov-13

    MC-7 1634 Work Permit 08-Oct-13

    MC-7 1639 Ready for Trail Run for Pre-Commissioning of 18" Main Line 31-Oct-13 05-Nov-13

    MC-7 1638 Nitrogen Purging for Pre-Commissioning of 18" Main Line 26-Oct-13 30-Oct-13

    MC-7 1635 Dewatering for Pre-Commissioning of 18" Main Line 08-Oct-13 14-Oct-13

    MC-7 1637 Bolt Tighting for Pre-Commissioning of 18" Main Line 20-Oct-13 26-Oct-13

    MC-7 1636 Air Drying for Pre-Commissioning of 18" Main Line 14-Oct-13 20-Oct-13

    PRE-COMMIPRE-COMMISSIONING OF 6" U/G MAIN LINE FROM (0KM TO ST)19-Sep-13 17-Oct-13

    MC-7 1649 Work Permit 19-Sep-13

    MC-7 1661 Ready for Trail Run for Pre-Commissioning of 6" Main Line 12-Oct-13 17-Oct-13

    MC-7 1660 Nitrogen Purging for Pre-Commissioning of 6" Main Line 06-Oct-13 12-Oct-13

    MC-7 1650 Dewatering for Pre-Commissioning of 6" Main Line 19-Sep-13 25-Sep-13

    MC-7 1652 Bolt Tighting for Pre-Commissioning of 6" Main Line 01-Oct-13 06-Oct-13

    MC-7 1651 Air Drying for Pre-Commissioning of 6" Main Line 25-Sep-13 30-Sep-13

    PRE-COMMIPRE-COMMISSIONING OF 8" A/G LATERAL LINE (FROM ST TO NGL) 07-Oct-13 04-Nov-13

    MC-7 9302 Work Permit 07-Oct-13

    MC-7 9292 Ready for Trail Run for Pre-Commissioning of 8" Lateral Line 29-Oct-13 04-Nov-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    11/16

    Activity ID Activity Name Start Finish

    MC-7 9282 Nitrogen Purging for Pre-Commissioning of 8" Lateral Line 23-Oct-13 29-Oct-13

    MC-7 9252 Dewatering for Pre-Commissioning of 8" Lateral Line 07-Oct-13 13-Oct-13

    MC-7 9272 Bolt Tighting for Pre-Commissioning of 8" Lateral Line 19-Oct-13 23-Oct-13

    MC-7 9262 Air Drying for Pre-Commissioning of 8" Lateral Line 13-Oct-13 17-Oct-13

    PRE-COMMIPRE-COMMISSIONING 16" A/G LATERAL L INE (FROM ST TO NGL) 06-Oct-13 03-Nov-13

    MC-7 1669 Work Permit 06-Oct-13

    MC-7 1674 Ready for Trail Run for Pre-Commissioning of 16" Lateral Line 28-Oct-13 03-Nov-13

    MC-7 1673 Nitrogen Purging for Pre-Commissioning of 16" Lateral Line 22-Oct-13 28-Oct-13

    MC-7 1670 Dewatering for Pre-Commissioning of 16" Lateral Line 06-Oct-13 12-Oct-13

    MC-7 1672 Bolt Tighting for Pre-Commissioning of 16" Lateral Line 17-Oct-13 22-Oct-13

    MC-7 1671 Air Drying for Pre-Commissioning of 16" Lateral Line 12-Oct-13 16-Oct-13

    PRECOMMIPRECOMMISSIONING - SUBSTATION 15-Sep-13 16-Oct-13

    MC-7 1653 Work Permit 16-Sep-13

    MC-7 1655 Pre Commissioning Of Peto Rabigh MOV's 18-Sep-13 25-Sep-13

    MC-7 1665 Pre Comm.Of Transmitters ,SPI,PI & Gas Detec.System 29-Sep-13 06-Oct-13

    MC-7 1695 Pre Comm.HVAC System Substation 02-Oct-13 09-Oct-13

    MC-7 1676 Pre Comm. Shut Down System 16-Sep-13 23-Sep-13

    MC-7 1675 Pre Comm. Lighting System Functional test 09-Oct-13 16-Oct-13

    MC-7 1685 Pre Comm. All Equipment Inside Substation 24-Sep-13 01-Oct-13

    MC-7 1654 Loop Checking All Elect .& Instrument 15-Sep-13

    FINAL COMFINAL COMMISSIONING OF U/G 18" MAIN LINE (FROM 0KM TO ST) 06-Nov-13 28-Nov-13

    MC-7 1704 Work Permit(Inside Plant) 06-Nov-13

    MC-7 1705 WalkThrough & Punchlisting for Final Comm. of 18 " Main Line 06-Nov-13 18-Nov-13

    MC-7 1725 Walk Thru.& Sign PMCC for Final Comm. of 18" Main Line 10-Nov-13 26-Nov-13

    MC-7 1785 Prepare & Submit QC Documents for Final Comm. of 18" Main Line 14-Nov-13 26-Nov-13

    MC-7 1795 Prepare & Submit Close Out Reports for Final Comm. of 18" Main Line 16-Nov-13 27-Nov-13

    MC-7 1755 Prepare & Submit As Built for F inal Comm. of 18" Main Line 12-Nov-13 24-Nov-13

    MC-7 1715 Complete Exceptional Items for Final Comm. of 18" Main Line 09-Nov-13 28-Nov-13

    FINAL COMFINAL COMMISSIONING OF U/G 6" MAIN LINE (FROM 0KM TO ST) 19-Oct-13 10-Nov-13

    MC-7 10272 Work Permit(Inside Plant) 19-Oct-13

    MC-7 10212 WalkThrough & Punchlisting for Final Comm. of 6 " Main Line 19-Oct-13 30-Oct-13

    MC-7 10232 Walk Thru.& Sign PMCC for Final Comm. of 6" Main Line 22-Oct-13 07-Nov-13

    MC-7 10252 Prepare & Submit QC Documents for Final Comm. of 6" Main Line 27-Oct-13 07-Nov-13

    MC-7 10262 Prepare & Submit Close Out Reports for Final Comm. of 6" Main Line 28-Oct-13 09-Nov-13

    MC-7 10242 Prepare & Submit As Built for F inal Comm. of 6" Main Line 24-Oct-13 05-Nov-13

    MC-7 10222 Complete Exceptional Items for Final Comm. of 6" Main Line 21-Oct-13 10-Nov-13

    FINAL COMFINAL COMMISSIONING OF A/G 8" LATERAL LINE (FROM ST TO NGL) 05-Nov-13 27-Nov-13

    MC-7 9852 Work Permit(Inside Plant) 05-Nov-13

    MC-7 9792 WalkThrough & Punchlisting for Final Comm. of 8" Lateral Line 05-Nov-13 17-Nov-13

    MC-7 9812 Walk Thru.& Sign PMCC for F inal Comm. of 8" Lateral Line 09-Nov-13 25-Nov-13

    MC-7 9832 Prepare & Submit QC Documents for Final Comm. of 8" Lateral Line 13-Nov-13 25-Nov-13

    MC-7 9842 Prepare & Submit Close Out Reports for Final Comm. of 8" Lateral Line 14-Nov-13 26-Nov-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    12/16

    Activity ID Activity Name Start Finish

    MC-7 9822 Prepare & Submit As Built for F inal Comm. of 8" Lateral Line 11-Nov-13 23-Nov-13

    MC-7 9802 Complete Exceptional Items for Final Comm. of 8" Lateral Line 07-Nov-13 27-Nov-13

    FINAL COMFINAL COMMISSIONING OF A/G 16" LATERAL LINE (FROM ST TO NGL) 04-Nov-13 25-Nov-13

    MC-7 10132 Work Permit(Inside Plant) 04-Nov-13

    MC-7 10072 WalkThrough & Punchlisting for Final Comm. of 16" Lateral Line 04-Nov-13 16-Nov-13

    MC-7 10092 Walk Thru.& Sign PMCC for F inal Comm. of 16" Lateral Line 07-Nov-13 24-Nov-13

    MC-7 10112 Prepare & Submit QC Documents for Comm. of 16" Lateral Line 12-Nov-13 24-Nov-13

    MC-7 10122 Prepare & Submit Close Out Reports for Comm. of 16" Lateral Line 13-Nov-13 25-Nov-13

    MC-7 10102 Prepare & Submit As Built for Final Comm. of 16" Lateral Line 10-Nov-13 21-Nov-13

    MC-7 10082 Complete Exceptional Items for Comm. of 16" Lateral Line 06-Nov-13 23-Nov-13

    1.2.2.5 DEMO1.2.2.5 DEMOLITION & REMOVAL @ PETRO RABIGH 19-Sep-13 28-Nov-13

    AFTER SHUAFTER SHUTDOWN AT PETRO RABIGH 19-Sep-13 28-Nov-13

    MC-7 1349 Work Permit 19-Sep-13

    MC-7 1390 Scraper Trap Removal, 6" 16-Oct-13 19-Oct-13

    MC-7 1389 Scraper Trap Removal, 18" 12-Oct-13 14-Oct-13

    MC-7 1360 Installation Cup East & West Portion 26-Sep-13 29-Sep-13

    MC-7 1380 Install Blind Flange @ 6" Petro Rabigh Lines 07-Oct-13 09-Oct-13

    MC-7 1370 Install Blind Flange @ 18" Petro Rabigh Lines 02-Oct-13 05-Oct-13

    MC-7 1430 Demolition of Scraper Traps Fnds 21-Oct-13 29-Oct-13

    MC-7 1445 Demolition of Petro Rabigh Pipelines 19-Nov-13 28-Nov-13

    MC-7 1442 Demolition of Electrical / Instrumentation at Scraper Area 31-Oct-13 07-Nov-13

    MC-7 1444 Demolition of Electrical / Instrumentation @ Pipe Lines 10-Nov-13 17-Nov-13

    MC-7 1350 Degasing OF 18" & 6" Petro Rabigh Lines 19-Sep-13 24-Sep-13

    AMENDMEAMENDMENT WORKS (LATERAL LINES) 09-Dec-12 A 28-Nov-13

    170 B3-30" S170 B3-30" SHY-1 COMBINED LATERAL (FROM ST TO NGL) 09-Dec-12 A 28-Nov-13

    INSTALLATIINSTALLATION 09-Dec-12 A 28-Nov-13

    170-B3 000 Remaining Works Start (For 170-B3) 09-Dec-12 A

    (LM-1)(3)BO(LM-1)(3)BOX CULVERTS (INSIDE NGL) 09-Dec-12 A 17-J un-13

    MC-7 1689 Work Permit Inside Plant 29-Dec-12 A

    MC-7 1766 Reinstate Disturbed Roads, (2 Loc.) @ Culvert #1 & (1 Loc.) @ Culvert #2 11-J un-13 17-J un-13

    MC-7 1745 Rebars for Slab, (2 Loc.) @ Culvert #1 & (1Loc.) @ Culvert #2 25-May-13 13-J un-13

    MC-7 1710 Rebars for Base & Column, (2 Loc.) for Culvert #1 Inside NGL 13-J an-13 A 18-Apr-13

    MC-7 1700 Lean Concrete, (2 Loc.) for Culvert #1 Inside NGL 29-Dec-12 A 31-Mar-13MC-7 1735 Formworks for Slab, (2 Loc.) @ Culvert #1 & (1 Loc.) @ Culvert #2 20-May-13 05-J un-13

    MC-7 1720 Form Works for Base & Column, (2 Loc.) for Culvert #1 Inside NGL 20-Apr-13 16-May-13

    MC-7 1690 Excavation Works, (2 Loc.) for Culvert #1 Inside NGL 09-Dec-12 A 30-Mar-13

    MC-7 1765 Concreting Works for Slab, (2 Loc.) @ Culvert #1 & (1 Loc.) @ Culvert #2 15-J un-13 17-J un-13

    MC-7 1730 Concreting Works for Base & Column, (2 Loc.) for Culvert #1 Inside NGL 18-May-13 20-May-13

    (LM-2) INST(LM-2) INSTALLATION OF ABOVE GRND PIPE SUPPORTS (INSIDE NGL) 05-J an-13 A 18-J un-13

    MC-7 1759 Work Permit Inside Plant 05-J an-13 A

    MC-7 1770 Installation Of Pipe Sleepers Inside NGL 19-J an-13 A 11-May-13

    MC-7 1780 Installation Of Fabricated Structural Supports Inside NGL 28-Apr-13 27-May-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    13/16

    Activity ID Activity Name Start Finish

    MC-7 1760 Excavation Works for A/G Pipe Support Inside NGL 05-J an-13 A 23-Apr-13

    MC-7 1790 Backfilling Works for A/G Pipe Support Inside NGL 21-May-13 18-J un-13

    (LM-3) UTILI(LM-3) UTILITY PIPING /CIVIL & STRUCTURAL WORKS (FROM ST TO NGL) 29-Apr-13 17-J ul-13

    MC-7 1859 Work Permit 29-Apr-13

    MC-7 1860 Sumpit 29-Apr-13 08-May-13

    MC-7 1871 Installation Of U/G 8" Utility Line 18-J un-13 27-J un-13

    MC-7 1891 Installation Of U/G 12" Utility Line 07-J ul-13 17-J ul-13

    MC-7 1881 Installation Of U/G 10" Utility Line 27-J un-13 07-J ul-13

    MC-7 1870 Installation Of U/G -4"Utility LIne 09-J un-13 18-J un-13

    MC-7 1869 Delivery of RTR Pipes, Aramco 01-May-13

    (LM-4) CIVIL(LM-4) CIVIL & L IGHTING WORKS @ SCRAPER TRAP AREA 29-Dec-12 A 25-J un-13

    PERIMETEPERIMETER LIGHTING WORKS 20-Apr-13 25-J un-13

    MC-7 2449 Work Permit 20-Apr-13

    MC-7 2480 Termination Works for Perimeter Lighting @ Scraper Area 02-J un-13 25-J un-13

    MC-7 2500 Site Clearing for Perimeter Lighting @ Scraper Area 25-Apr-13 01-May-13

    MC-7 2470 Power Cable Laying Works for Perimeter Lighting @ Scraper Area 28-Apr-13 02-J un-13

    MC-7 2460 Installation of Lighting Pole @ Scraper Area 21-Apr-13 28-Apr-13

    MC-7 2490 Installation of lighting Devices @ Scraper Area 25-Apr-13 01-May-13

    MC-7 2451 Installation of Fdns.for Perimeter Lighting @ Scraper Area 21-Apr-13 08-May-13

    MC-7 2450 Excavation Works for Perimeter Lighting @ Scraper Area 20-Apr-13 25-Apr-13

    INSTALL SINSTALL SECURITY FENCE 29-Dec-12 A 30-Apr-13

    MC-7 1909 Work Permit 29-Dec-12 A

    MC-7 2400 Installation Of Fabric Wire & Gates @ Security Fence 13-J an-13 A 30-Apr-13

    MC-7 1910 Install Line Post & Gate Fnds. @ Security Fence 26-J an-13 A 24-Apr-13

    MC-7 2110 Formworks for Concrete Channel @ Security Fence 31-Dec-12 A 28-Apr-13

    MC-7 2380 Concreting for Concrete Channel @ Security Fence 02-J an-13 A 29-Apr-13

    MC-7 2390 Backfilling Works @ Security Fence 06-J an-13 A 30-Apr-13

    CONSTRUCONSTRUCTION OF PATROL ROAD 30-Mar-13 01-May-13

    MC-7 2419 Work Permit 30-Mar-13

    MC-7 2420 Base Coarse Preparation for Patrol Road 30-Mar-13 11-Apr-13

    MC-7 2430 Asphalt -Binder Coarse for Patrol Road 13-Apr-13 24-Apr-13

    MC-7 2440 Ashpalt-Wearing Coarse for Patrol Road 21-Apr-13 01-May-13

    (LM-5) ELE(LM-5) ELECTRICAL & INSTRUMENTATION (FROM ST TO NGL)20-Apr-13 10-Oct-13

    MC-7 2309 Work Permit 20-Apr-13

    MC-7 2330 PC Termination for E & I from ST to NGL 17-J ul-13 27-J ul-13

    MC-7 2410 Loop Checking for E & I from ST to NGL 26-Sep-13 10-Oct-13

    MC-7 2360 Installation Of Fiber Optic Cable & Devices for E & I from ST to NGL 17-Aug-13 12-Sep-13

    MC-7 2320 Inst. of Power Cable, Fixtures, Devices & Equipments for E & I from ST to NGL 23-J un-13 17-J ul-13

    MC-7 2340 Inst. of Instrument Cables & Devices for E & I from ST to NGL 28-J ul-13 21-Aug-13

    MC-7 2350 IC Termination for E & I from ST to NGL 17-Aug-13 22-Aug-13

    MC-7 2370 FOC Termination for E & I from ST to NGL 12-Sep-13 26-Sep-13

    MC-7 2310 Excavation Works for E & I from ST to NGL 20-Apr-13 19-J un-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    14/16

    Activity ID Activity Name Start Finish

    (LM-6) COM(LM-6) COMPLETION OF 30" LATERAL AND A/G PIPE (FROM ST TO NGL) 15-Dec-12 A 08-J ul-13

    MC-7 1938 Work Permit 20-Dec-12 A

    MC-7 1939 Fabrication Of Spools 15-Dec-12 A 22-May-13

    MC-7 1960 Fabrication & Installation Of 6" Lateral (Blowdown Line) ,Valves & Fiitings 22-Dec-12 A 16-J un-13

    MC-7 1970 Fabrication & Installation Of 2" UW (Utility Water),Valves & Fiitings 14-May-13 18-J un-13

    MC-7 1990 Fabrication & Installation Of 2" PG (Purge Gas),Valves & Fiitings 27-May-13 01-J ul-13

    MC-7 2000 Fabrication & Installation Of 2" N (Nitrogen),Valves & Fiitings 03-J un-13 08-J ul-13

    MC-7 1980 Fabrication & Installation Of 2" IA (Instrument Air),Valves & Fiitings 20-May-13 25-J un-13

    (LM-7)PARTI(LM-7)PARTIAL MECHANICAL COMPLETION 30" LATERAL (FROM ST TO NGL) 09-Dec-12 A 13-J ul-13

    MC-7 2009 Work Permit Inside Plant ( Access Permit) 09-Dec-12 A

    MC-7 2015 Installation Of 30" lateral Valves & Fittings 03-J ul-13 13-J ul-13

    MC-7 2012 Hydrotesting of Valves for 30" Lateral Lines 19-J un-13 07-J ul-13

    MC-7 2010 Fabrication & Installation Of 30" Lateral lines 29-Dec-12 A 02-J ul-13

    (LM-8) FINA(LM-8) FINAL TIE-IN OF SHY-1 LATERAL (INSIDE NGL) 13-J ul-13 07-Aug-13

    MC-7 2019 Work Permit Inside Plant 13-J ul-13

    MC-7 2250 Tie-In For 8" RTR Fire Water 03-Aug-13 05-Aug-13

    MC-7 2030 Tie-In For 6' Blowdown Line 18-J ul-13 22-J ul-13

    MC-7 2070 Tie-In For 4" RTR Utility Line 01-Aug-13 05-Aug-13

    MC-7 2020 Tie-In For 30" Lateral Lines 13-J ul-13 18-J ul-13

    MC-7 2040 Tie-In For 2" Utility Water Line 22-J ul-13 25-J ul-13

    MC-7 2050 Tie-In For 2" Instrument Air Line 25-J ul-13 29-J ul-13

    MC-7 2060 Tie-In For 2 " Nitrogen Line 29-J ul-13 01-Aug-13

    MC-7 2270 Tie-In For 12" RTR Fire Water 05-Aug-13 07-Aug-13

    MC-7 2260 Tie-In For 10" RTR Fire Water 04-Aug-13 06-Aug-13

    (LM-9) COM(LM-9) COMPLETE HYDROTEST OF 30" LATERAL & A /G PIPING (FROM ST TO NGL) 08-Aug-13 12-Sep-13

    MC-7 2016 Work Permit Inside Plant 08-Aug-13

    MC-7 2241 Hydrotest for 8" Utility Lines from ST to NGL 03-Sep-13 05-Sep-13

    MC-7 2190 Hydrotest for 6" (Blowdown Line) from ST to NGL 17-Aug-13 21-Aug-13

    MC-7 2240 Hydrotest for 4" Utility Lines from ST to NGL 01-Sep-13 02-Sep-13

    MC-7 2219 Hydrotest for 2" (Utility Water) from ST to NGL 27-Aug-13 28-Aug-13

    MC-7 2210 Hydrotest for 2" (Purge Gas) from ST to NGL 25-Aug-13 26-Aug-13

    MC-7 2221 Hydrotest for 2" (Nitrogen) from ST to NGL 29-Aug-13 31-Aug-13

    MC-7 2200 Hydrotest for 2" (Instrument Air) from ST to NGL 22-Aug-13 24-Aug-13

    MC-7 2300 Hydrotest for 12" Utility Lines from ST to NGL 10-Sep-13 12-Sep-13

    MC-7 2290 Hydrotest for 10" Utility Lines from ST to NGL 07-Sep-13 09-Sep-13

    MC-7 2180 Hydrotest 30" Lateral Line from ST to NGL 08-Aug-13 17-Aug-13

    (LM-10)PRE(LM-10)PRE & FINAL COMMISSIONING (FROM ST TO NGL ) 14-Sep-13 28-Nov-13

    PRE-COMPRE-COMMISSIONING (FROM ST TO NGL) 26-Sep-13 14-Nov-13

    MC-7 1686 Pre Comm. Shut Down System 06-Nov-13 14-Nov-13

    MC-7 1815 Pre Comm. Lighting System Functional test 29-Oct-13 06-Nov-13

    MC-7 1694 Loop Checking Instrument 26-Sep-13 29-Oct-13

    MC-7 1664 Loop Checking Elect. 26-Sep-13 29-Oct-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    15/16

    Activity ID Activity Name Start Finish

    MC-7 1663 Issue Work Permit 26-Sep-13

    PRE-COMPRE-COMMISSIONING OF 30" LATERAL L INE (FROM ST TO NGL) 14-Sep-13 10-Oct-13

    MC-7 1679 Work Permit 14-Sep-13

    MC-7 1684 Ready for Trail Run for Pre-Commissioning of 30" Lateral Line 06-Oct-13 10-Oct-13

    MC-7 1682 Nitrogen Purging for Pre-Commissioning of 30" Lateral Line 30-Sep-13 06-Oct-13

    MC-7 1680 Dewatering for Pre-Commissioning of 30" Lateral Line 14-Sep-13 18-Sep-13

    MC-7 1683 Bolt Tighting for Pre-Commissioning of 30" Lateral Line 24-Sep-13 30-Sep-13

    MC-7 1681 Air Drying for Pre-Commissioning of 30" Lateral Line 18-Sep-13 24-Sep-13

    PRE-COMPRE-COMMISSIONING 2" LATERAL LINE (FROM ST TO NGL) 14-Sep-13 10-Oct-13

    MC-7 9362 Work Permit 14-Sep-13

    MC-7 9352 Ready for Trail Run for Pre-Commissioning of 2" Lateral Line 06-Oct-13 10-Oct-13

    MC-7 9342 Nitrogen Purging for Pre-Commissioning of 2" Lateral Line 30-Sep-13 06-Oct-13

    MC-7 9312 Dewatering for Pre-Commissioning of 2" Lateral Line 14-Sep-13 18-Sep-13

    MC-7 9332 Bolt Tighting for Pre-Commissioning of 2" Lateral Line 24-Sep-13 30-Sep-13

    MC-7 9322 Air Drying for Pre-Commissioning of 2" Lateral Line 18-Sep-13 24-Sep-13

    PRE-COMPRE-COMMISSIONING 6" LATERAL LINE/SS BLOWDOWN LINE (FROM ST TO NGL) 18-Sep-13 16-Oct-13

    MC-7 1809 Work Permit 18-Sep-13

    MC-7 1814 Ready for Trail Run for Pre-Commissioning of 6" Lateral Line 12-Oct-13 16-Oct-13

    MC-7 1813 Nitrogen Purging for Pre-Commissioning of 6" Lateral Line 06-Oct-13 10-Oct-13

    MC-7 1810 Dewatering for Pre-Commissioning of 6" Lateral Line 18-Sep-13 24-Sep-13

    MC-7 1812 Bolt Tighting for Pre-Commissioning of 6" Lateral Line 30-Sep-13 06-Oct-13

    MC-7 1811 Air Drying for Pre-Commissioning of 6" Lateral Line 24-Sep-13 30-Sep-13

    FINAL COFINAL COMMISSIONING OF 30" LATERAL LINE (FROM ST TO NGL) 12-Oct-13 21-Nov-13

    MC-7 1774 Work Permit 12-Oct-13

    MC-7 1775 WalkThrough & Punchlisting for Final Comm.of 30" Lateral Line 12-Oct-13 28-Oct-13

    MC-7 1825 Walk Thru.& Sign PMCC for F inal Comm. of 30" Lateral Line 29-Oct-13 13-Nov-13

    MC-7 1845 Prepare & Submit QC Documents for Final Comm. of 30" Lateral Line 02-Nov-13 20-Nov-13

    MC-7 1855 Prepare & Submit Close Out Reports for Final Comm. of 30" Lateral Line 10-Nov-13 21-Nov-13

    MC-7 1835 Prepare & Submit As Built for Final Comm. of 30" Lateral Line 28-Oct-13 16-Nov-13

    MC-7 1805 Complete Exceptional Items for Final Comm. of 30" Lateral Line 21-Oct-13 13-Nov-13

    FINAL COFINAL COMMISSIONING OF 2" L ATERAL LINE (FROM ST TO NGL) 12-Oct-13 28-Nov-13

    MC-7 9502 Work Permit 12-Oct-13

    MC-7 9442 WalkThrough & Punchlisting for Final Comm.of 2" Lateral Line 12-Oct-13 28-Oct-13

    MC-7 9462 Walk Thru.& Sign PMCC for F inal Comm. of 2" Lateral Line 26-Oct-13 09-Nov-13

    MC-7 9482 Prepare & Submit QC Documents for Final Comm. of 2" Lateral Line 31-Oct-13 17-Nov-13

    MC-7 9492 Prepare & Submit Close Out Reports for Final Comm. of 2" Lateral Line 17-Nov-13 28-Nov-13

    MC-7 9472 Prepare & Submit As Built for F inal Comm. of 2" Lateral Line 28-Oct-13 13-Nov-13

    MC-7 9452 Complete Exceptional Items for Final Comm. of 2" Lateral Line 22-Oct-13 07-Nov-13

    FINAL COFINAL COMMISSIONING OF 6" LATERAL L INE/SS BLOWDOWN LINE (FROM ST TO NGL) 16-Oct-13 28-Nov-13

    MC-7 9572 Work Permit 16-Oct-13

    MC-7 9512 WalkThrough & Punchlisting for Final Comm.of 6" Lateral Line 16-Oct-13 02-Nov-13

    MC-7 9532 Walk Thru.& Sign PMCC for F inal Comm. of 6" Lateral Line 05-Nov-13 20-Nov-13

    C-7 AND LATERAL SHY-1 Classic WBS Layout 22-Apr-13 13:17

  • 7/30/2019 dugdug

    16/16

    Activity ID Activity Name Start Finish

    MC-7 9552 Prepare & Submit QC Documents for Final Comm. of 6" Lateral Line 05-Nov-13 25-Nov-13

    MC-7 9562 Prepare & Submit Close Out Reports for Final Comm. of 6" Lateral Line 17-Nov-13 28-Nov-13

    MC-7 9542 Prepare & Submit As Built for F inal Comm. of 6" Lateral Line 30-Oct-13 23-Nov-13

    MC-7 9522 Complete Exceptional Items for Final Comm. of 6" Lateral Line 26-Oct-13 17-Nov-13

    (LM-11)FINA(LM-11)FINAL COMPLETION SHY -1 LATERAL 19-Nov-13 28-Nov-13

    MC-7 2099 Work Permit 19-Nov-13

    MC-7 2150 Restoration of Damage Existing Marl & Asphalt Road 23-Nov-13 26-Nov-13

    MC-7 2140 Demollition ff Some Security Perimeter Lighting 21-Nov-13 25-Nov-13

    MC-7 2130 Demolition of Portion Of Existing Perimeter Fence 20-Nov-13 24-Nov-13

    MC-7 2120 Demolition of Existing Redundant Piping Inside YGP 19-Nov-13 23-Nov-13

    MC-7 2100 Demolition of Existing Pond (Including Fence) 19-Nov-13 23-Nov-13

    MC-7 2160 Demolition of Existing Foundations 24-Nov-13 27-Nov-13

    MC-7 2170 Demobilization, Cleaning & Clearing 25-Nov-13 28-Nov-13