Dubai World Central Corporation DS/DC/F -010 STRUCTURAL...

1
STRUCTURAL INSPECTION REQUEST Dubai World Central Corporation Version: 2.0 / JAN-2018 / Rev: 1 DS/DC/F-010 DEVELOPMENT CONTROL FORMS REQUEST NO Project Name: Project Owner: Plot No: Consultant: Contractor: Structural Member: Drawing No.: REQUIRED INFORMATION AND SUBMITTALS: Copy of Building Permit (For 1 st Inspection only) Copy of Demarcation Certificate (For 1 st Inspection only) Cube Test Results For Preceding Inspected Member ( Yes / No / Not Applicable ) Vertical Structural Members Checked by Consultant (Undertaking Letter) Attached Marked Sheet For Requested Member FEE: Submission Fee: AED 375 / inspection, Cheque payable to Dubai Aviation City Corporation. Total *: AED The above mentioned structural member was checked by us and found to be consistent with the approved drawings, specifications, building construction workmanship & industrial safety. We undertake that both consultant & contractors engineers shall be available at site throughout the concrete pouring period. CONTRACTOR CONSULTANT Name Name Contact No. Contact No. Email Email STAMP STAMP Signature & Date Signature & Date For Official use only Document Receiving TRN- File: DLC RC AC EC GC Received By Signature Date Remarks: Approved Approved With Comments Resubmit Name, Signature & Date Inspected By Structural Engineer Date : *- VAT applies @ 5% on submission fee + AED 20 (Knowledge & Innovation Fee)

Transcript of Dubai World Central Corporation DS/DC/F -010 STRUCTURAL...

STRUCTURAL INSPECTION REQUEST

Dubai World Central Corporation

Version: 2.0 / JAN-2018 / Rev: 1

DS/DC/F-010

DEVELOPMENT CONTROL FORMS

REQUEST NO

Project Name:

Project Owner: Plot No:

Consultant:

Contractor:

Structural Member: Drawing No.:

REQUIRED INFORMATION AND SUBMITTALS:

Copy of Building Permit (For 1st Inspection only) Copy of Demarcation Certificate (For 1st Inspection only) Cube Test Results For Preceding Inspected Member ( Yes / No / Not Applicable ) Vertical Structural Members Checked by Consultant (Undertaking Letter) Attached Marked Sheet For Requested Member

FEE: Submission Fee: AED 375 / inspection, Cheque payable to Dubai Aviation City Corporation. Total*: AED

The above mentioned structural member was checked by us and found to be consistent with the approved drawings, specifications, building construction workmanship & industrial safety. We undertake that both consultant & contractors engineers shall be available at site throughout the concrete pouring period.

CONTRACTOR CONSULTANT

Name Name

Contact No. Contact No.

Email Email

STAMP STAMP

Signature & Date Signature & Date

For Official use only Document Receiving TRN- File: DLC RC AC EC GC

Received By Signature Date

Remarks:

Approved Approved With Comments Resubmit

Name, Signature & Date

Inspected By Structural Engineer

Date :

*- VAT applies @ 5% on submission fee + AED 20 (Knowledge & Innovation Fee)