CMS week28 June 2011
A. Benvenuti (INFN Bologna)
A Few Problems Since May Workshop
5 Work Packages for LV related problems 6 WP for HV fixes• Fan Tray Operation test (with Silverio Dos Santos) => It does not !
LV Problems
In reality only two problems in YB-1:- A3100 Connector temperature
- A3050 (MB1 MB2 S12) repeated power off due to high temperature interlock
• One UXC access was needed because the A3050 had lost communication due to the brutal switch off following the power cut. Was fixed by extracting and reinserting the module
• Vcon error on YB+2 MB3S12 only a modest temperature increase (but not the first time)
MC OFF (May 24 @ 22:20)°C
June 7, Temperature jumped to 37 °C
°C
MC OFF (June15 @ 22:16)
MC OFF (June25 @ 07:12)
YB-1 MB1, MB2 S12 LV Supply
• The A3050 switched OFF the MC on a high temperature interlock on May 24 ( 64°C), June 15(66°C) and June 25 (72°C)
• The first two instances were recovered quickly
• On June 25 , switching ON the MB1 MC caused again the interlock.
• The rest of the fill was taken with MB1 S12 MC off
• After the beams were dumped, ~13:20, the MB1 went ON, but we decided to replace the A3050
• Looking at the error messages, I discovered two additional cases on February 10 and March 10
What should we do with this module? We can send it to CAEN but I am afraid they will not be able to reproduce the problem.
Sensors Mounted on A3100 side
Sensors mounted on cable connectors at SC sideYB-1
• Alarms started on June 24 ~13:00 as the temperature measured with V307 went above 27.7 °C
• The temperature stabilized at 29.1 °C .• In UXC It was measured at 41.5 °C • Disconnecting and reconnecting the cable brought
V307 down to 25.8 °C
• The same incident occurred on May 20
• The A3100 is in the same crate where we substituted the A3050 for MB1MB2 S12
LV Modules Temperatures
• The available cooling power is marginal for the crates with A3100
• Check heat exchangers during next Technical Stop
• After the insertion trick the A3100 temperature dropped to 39 °C
HV Problems
16 Channels lost
L2 16 Channels lost
16 Channels lostA876 Replaced
5 modules that failed in the detector but were OK in B904 were inserted in easy positions. OK so far
YB-1 MB2S02, switched OFF while in STANDBY
3 DT stuck/tripped due to HV Spikes on wires while at step 1
HV Problems
In Summary:12 Chambers: 4MB1, 1MB2, 2MB3, 5MB4
6 in YB0, 2 in YB±1, 1 in YB±2
If the detector opens for the Pixels, priority to YB-2, we can recover 1 or 2 MB4
Planned Activities During Next TS
Done
Improving the TJB grounding consists of a few steps:- Substitute plastic cover with aluminum
plate- add pigtail ground connection to TJB- close box with aluminum tape- connect ground shield on the cable with
box - wrap everything with aluminum foil…
• Reduces synchronous noise (it can’t hurt)
• It is difficult to intervene on the TJB (if needed)
• 10 TJBs to be done Make the procedure simpler
Modified A3050s (Matteo)
• 4 Modified A3050 are in B904• Daniele will test them this Friday• We will replace modules in YB0
sectors that already gave problems:
MB1S01, MB4S02, MB2S10, MB3S04
YB0 H20 content (ppm) from March 08 to May 31
H20 Content in peak from March 08 to June 14
Gas System• Stable situation (no changes)• H2O content increased 30%
(60% in peak) since March 8• O2 content in input lines
varies from 82 to 106 ppm and from 89 to 103! In output
• Position of O2 spikes very stable
• N2 content measured in USG on common return line but data still not summarized
It is summer, vacation time Decided with Roberto to consolidate:
- O2 analysis cells calibration- H2O station calibration (YB0)- N2 last measured
In September review some issues: Online gas chromatograph, H20 control (~400 ppm), O2 content (100 - 200 ppm)