Lecture Objectives.By the end of this lecture , YOU should beable to
!ist the " #ain DST co#ponents
!ist the " #ain DST pressures
!ist the " #ain DST types Describe the DST concept
-
7/21/2019 Dst Concept
3/17
3 FTC
The pri#ary DSTfunctions, $hetherconducted in openhole
or cased $ells, are to
%solate the tar&et'one( Control $ell )o$( Con*ey )uid tosurface( +cuire do$nholedata(
DST Concept
-
7/21/2019 Dst Concept
4/17
4 FTC
DST Concept
The 3 basic euip#ent fora drill ste# test consits of astrin&-tubin& or drillpipe., apac/erand a *al*e(
1. The stringchannels the )o$ tosurface(
2. The packeris arubber ele#ent toisolate the 'one to
be tested(3. The valvepro*ides
a #ethod ofcontrollin& the $ellnear the reser*oir(
-
7/21/2019 Dst Concept
5/17
5 FTC
Ph: 0ydrostaticpressurePf: 1or#ationpressurePc: Cushion pressure
2enerally, therelationship a#on&
these pressures is
Ph > Pf > Pc
DST Concept
3
-
7/21/2019 Dst Concept
6/17
6 FTC
The Packer isolates the for#ationfro# the annulus, the t$o pressures-Ph and Pf. #ust be isolated fro# oneanother(
The Tester valvecontrols thefor#ation(3 shut the $ell do$nhole to #ini#i'e$ellbore stora&e e4ect3 isolates annular )uid fro# cushion$hile 5%0, pre*entin& U3tubin&
3pro*ides a seal for pressure test thestrin&
+fter the pac/er is set and sealed, thetest *al*e can then be opened and
hydrocarbons can be produced tosurface(
DST Concept
-
7/21/2019 Dst Concept
7/17
7 FTC
6( 78! perforated 9o*er3balance:
;( 5%0 DST $ith Tester *al*eclosed,
-
7/21/2019 Dst Concept
8/17
8 FTC
6( Open the re*erse circulatin&*al*e and 95e*erse out: -)ushhydrocarbons fro# drillpipe ortubin&.(
;( Close the re*erse circulatin&*al*e(
"( Open the tester *al*e(
=( Pu#p #ud into test strin& to /illthe tested inter*al(
?( Unseat the pac/er(
@( Pull the strin& out of the holePOO0
DST Concept
The &eneral steps for endin& aDST are
-
7/21/2019 Dst Concept
9/17
9 FTC
DST Concept
Tpes of "#T
-
7/21/2019 Dst Concept
10/17
10 FTC
DST Concept
$ell location % con&guration
DST C t 8
-
7/21/2019 Dst Concept
11/17
11 FTC
DST Concept 8P+CAE5S
P+CAE5S are desi&ned to isolate theperforated inter*al fro# the #udcolu#n( The $ei&ht applied on thepac/er co#press its rubber ele#entsa&ainst the casin& and creates a sealbet$een the annulus and tubin&(
Three #ain types of Pac/ers
3 'le(Pac packer
3 PosiTest packer
3 Positrieve packer
-
7/21/2019 Dst Concept
12/17
12 FTC
DST Concept 8P+CAE5S
1lePac
PosiTest Positrie*e
-
7/21/2019 Dst Concept
13/17
13 FTC
DST Concept 8 Testeral*es
)arious tpes are use*:
+ ,'- ,ulti 'low -valuator/
Operated by #anipulation of the test strin&(
+pplications Onshore and ac/3up ri&s
3 P0T Pressure 0ontrolle* Tester/
Operated by annulus -and tubin&. pressure(
+pplication O4shore, )oatin& facilities(
3 # *ual+valve tool ")/
-%5%S %ntelli&ent 5e#ote %#ple#entationSyste#.
Operated F +pplication as PCT
-
7/21/2019 Dst Concept
14/17
14 FTC
DST Concept 8 Testeral*e
%5%S dual3*al*etool
PCT*al*e
T bi d ill i
-
7/21/2019 Dst Concept
15/17
15 FTC
Tubin& or drillpipe
Slip Goints -; or #ore.
Drill collars
5edundant circulatin&*al*e
Drill collars
Surface 5ead out
5+ #ar/er
Drills collar
Surface readout
Do$nhole *al*e
0ydrostatic reference tool
Pressure recorders -; or#ore.
0ydraulic Gar
Safety GointPac/er
Slotted tailpipe
Debris sub
Tubin&
1irin& head
Safety spacer
DSTConcept
Tpical "#T or T0Ptool string
-
7/21/2019 Dst Concept
16/17
16 FTC
Durin& the initial phase of the test, the$ellbore )uids, and, later, the drillin&)uid -#ud. that has in*aded thefor#ation in the *icinity of the $ellbore)o$ to surface( This is /no$n as thecleanupperiod( Cleanup is co#plete
$hen the $ell eHuent at surface isreser*oir )uid that contains no #udparticles or cuttin&s at surface(Once cleanup is co#plete, the #ain)o$period can be #aintained for theplanned duration, durin& $hich do$nhole
pressure #easure#ents and surface )o$rates are recorded( +t the end of the#ain )o$ period, the tester *al*e isclosed( 1or#ation pressure builds upa&ainst the *al*e $hile do$nhole
pressure #easure#ent continues(
DST Concept
asic operation:
-