    Lecture Objectives.By the end of this lecture , YOU should beable to

    !ist the " #ain DST co#ponents

    !ist the " #ain DST pressures

    !ist the " #ain DST types Describe the DST concept

  • 7/21/2019 Dst Concept

    3/17

    3 FTC

    The pri#ary DSTfunctions, $hetherconducted in openhole

    or cased $ells, are to

    %solate the tar&et'one( Control $ell )o$( Con*ey )uid tosurface( +cuire do$nholedata(

    DST Concept

  • 7/21/2019 Dst Concept

    4/17

    4 FTC

    DST Concept

    The 3 basic euip#ent fora drill ste# test consits of astrin&-tubin& or drillpipe., apac/erand a *al*e(

    1. The stringchannels the )o$ tosurface(

    2. The packeris arubber ele#ent toisolate the 'one to

    be tested(3. The valvepro*ides

    a #ethod ofcontrollin& the $ellnear the reser*oir(

  • 7/21/2019 Dst Concept

    5/17

    5 FTC

    Ph: 0ydrostaticpressurePf: 1or#ationpressurePc: Cushion pressure

    2enerally, therelationship a#on&

    these pressures is

    Ph > Pf > Pc

    DST Concept

    3

  • 7/21/2019 Dst Concept

    6/17

    6 FTC

    The Packer isolates the for#ationfro# the annulus, the t$o pressures-Ph and Pf. #ust be isolated fro# oneanother(

    The Tester valvecontrols thefor#ation(3 shut the $ell do$nhole to #ini#i'e$ellbore stora&e e4ect3 isolates annular )uid fro# cushion$hile 5%0, pre*entin& U3tubin&

    3pro*ides a seal for pressure test thestrin&

    +fter the pac/er is set and sealed, thetest *al*e can then be opened and

    hydrocarbons can be produced tosurface(

    DST Concept

  • 7/21/2019 Dst Concept

    7/17

    7 FTC

    6( 78! perforated 9o*er3balance:

    ;( 5%0 DST $ith Tester *al*eclosed,

  • 7/21/2019 Dst Concept

    8/17

    8 FTC

    6( Open the re*erse circulatin&*al*e and 95e*erse out: -)ushhydrocarbons fro# drillpipe ortubin&.(

    ;( Close the re*erse circulatin&*al*e(

    "( Open the tester *al*e(

    =( Pu#p #ud into test strin& to /illthe tested inter*al(

    ?( Unseat the pac/er(

    @( Pull the strin& out of the holePOO0

    DST Concept

    The &eneral steps for endin& aDST are

  • 7/21/2019 Dst Concept

    9/17

    9 FTC

    DST Concept

    Tpes of "#T

  • 7/21/2019 Dst Concept

    10/17

    10 FTC

    DST Concept

    $ell location % con&guration

    DST C t 8

  • 7/21/2019 Dst Concept

    11/17

    11 FTC

    DST Concept 8P+CAE5S

    P+CAE5S are desi&ned to isolate theperforated inter*al fro# the #udcolu#n( The $ei&ht applied on thepac/er co#press its rubber ele#entsa&ainst the casin& and creates a sealbet$een the annulus and tubin&(

    Three #ain types of Pac/ers

    3 'le(Pac packer

    3 PosiTest packer

    3 Positrieve packer

  • 7/21/2019 Dst Concept

    12/17

    12 FTC

    DST Concept 8P+CAE5S

    1lePac

    PosiTest Positrie*e

  • 7/21/2019 Dst Concept

    13/17

    13 FTC

    DST Concept 8 Testeral*es

    )arious tpes are use*:

    + ,'- ,ulti 'low -valuator/

    Operated by #anipulation of the test strin&(

    +pplications Onshore and ac/3up ri&s

    3 P0T Pressure 0ontrolle* Tester/

    Operated by annulus -and tubin&. pressure(

    +pplication O4shore, )oatin& facilities(

    3 # *ual+valve tool ")/

    -%5%S %ntelli&ent 5e#ote %#ple#entationSyste#.

    Operated F +pplication as PCT

  • 7/21/2019 Dst Concept

    14/17

    14 FTC

    DST Concept 8 Testeral*e

    %5%S dual3*al*etool

    PCT*al*e

    T bi d ill i

  • 7/21/2019 Dst Concept

    15/17

    15 FTC

    Tubin& or drillpipe

    Slip Goints -; or #ore.

    Drill collars

    5edundant circulatin&*al*e

    Drill collars

    Surface 5ead out

    5+ #ar/er

    Drills collar

    Surface readout

    Do$nhole *al*e

    0ydrostatic reference tool

    Pressure recorders -; or#ore.

    0ydraulic Gar

    Safety GointPac/er

    Slotted tailpipe

    Debris sub

    Tubin&

    1irin& head

    Safety spacer

    DSTConcept

    Tpical "#T or T0Ptool string

  • 7/21/2019 Dst Concept

    16/17

    16 FTC

    Durin& the initial phase of the test, the$ellbore )uids, and, later, the drillin&)uid -#ud. that has in*aded thefor#ation in the *icinity of the $ellbore)o$ to surface( This is /no$n as thecleanupperiod( Cleanup is co#plete

    $hen the $ell eHuent at surface isreser*oir )uid that contains no #udparticles or cuttin&s at surface(Once cleanup is co#plete, the #ain)o$period can be #aintained for theplanned duration, durin& $hich do$nhole

    pressure #easure#ents and surface )o$rates are recorded( +t the end of the#ain )o$ period, the tester *al*e isclosed( 1or#ation pressure builds upa&ainst the *al*e $hile do$nhole

    pressure #easure#ent continues(

    DST Concept

    asic operation:

  • 7/21/2019 Dst Concept

    17/17

    17 FTC

    DST CONCEPT

    TheEND