Title: Change Master RecipeSBU : DSAP (DuPont SAP)
Workstreams : ManufacturingDuPont - For internal use only
Change Master Recipe C202
Change History
Update the following table as necessary when this document is changed:
Date Name Change Description
11/26/01 Greg McConnell Re-recorded and created Parent
11/26/01 Greg McConnell Incorporated SME comments
12/20/2001 B. Jackson Training Prelim
12/20/2001 B. Jackson Draft A
02/08/02 B. Jackson Rev 1
10/20/2005 Angel Perez DuPont SAP Standardization.
Uncontrolled document when printed
File name: document.docReference Number:
Version: Rev2Last Modified: 3/26/2014 04:45:00 PM
Parent DocumentPage 1 / 24
Trigger
Change to a master recipe is desired.
Business Process Description OverviewRecipes contain all the data needed to create a product. Recipes can be changed or logically deleted via this transaction. Changes may be necessary because operation steps change or because components and/or standards have changed.
Physical deletion takes effect with the next database reorganization. Until the database reorganization occurs, you can reinstate a logically deleted recipe at any time.
Input - Required Fields Field Value/Comments
Recipe group Key which identified the recipe group
Output - Results Comments
Master recipe has been changed None
Tips and Tricks
Save and save often.
Screen Flow
Situation
You have to change a Master Recipe: Insert a phase beneath the last existing operation.
Instructions
Use the appropriate procedure to complete the exercise scenario on the system. As you progress through the scenario, complete the questions associated with each exercise task on the following pages.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise.
Field Value
Material See user-specific data below
Plant 3431
Operat.,phase 120
Destinatn. 01
Description Phase 2
Base qty. 3500
Control key ZPI3
User-Specific Data
This section provides the user-specific data required to complete this exercise.
User Material
Instructor D10874241
1 D11034400
2 D11034162
3 D10874090
4 D10873958
5 D10874102
6 D10874155
7 D11034176
8 D10874255
9 D10874265
10 D11711590
11 D11034206
User Material
12 D11034195
13 D10874117
14 D11130707
15 D11659283
Tasks
Use the appropriate procedure and data provided to complete the following tasks. After each task, answer the question(s).
Change Master Recipe: Initial Screen - perform the required steps.
Change Master Recipe: Recipe (Operations) - perform the required steps.
Change Master Recipe: Recipe (Operations) - perform the required steps.
Where did Resource and Superior operation values come from?
Change Master Recipe: Operation - perform the required steps.
What operational processes does Control key ZPI3 include?
Change Master Recipe: Recipe (Operations) - perform the required steps.
When you delete operations, what does it happen to subordinate phases?
Change Master Recipe: Initial Screen - perform the required steps.
Congratulations, you have completed this exercise.
Purpose
Use this procedure to change a master recipe.
Trigger
Perform this procedure when you need to change a master recipe.
Prerequisites
None
Menu Path
Use the following menu path(s) to begin this transaction:
Select Logistics Production - Process Master Data Master Recipes Recipe and Material List Change to go to the Change Material Master: Initial Screen.
Transaction Code
C202
Helpful Hints
None
Procedure
1. Start the transaction using the menu path Logistics Production - Process Master Data Master Recipes Recipe and Material List Change or transaction code C202.
Change Master Recipe: Initial Screen
2. Complete the following fields:
Field Name R/O/C Description
Material R Any item/product/SKU that exists in SAP. Materials are created, purchased, ordered, received, moved within and between plants and sold.
Example: D10201366
Plant R A physical definition of a group of manufacturing processes.
Example: 3431
3. Click to go to the Change Master Recipe: Recipe (Operations) screen.
Change Master Recipe: Recipe (Operations)
4. Perform one of the following:
If You Want To Go To
Insert a new operation/phase in between two existing operations/phases
Step 5
Insert a new operation/phase at the end of the existing operations/phases
Step 7
Delete existing operation/phase Step 18
Change components data Step 22
Change master recipe header data Step 28
Save your changes Step 31
5. Click second existing operation/phase you want to insert in between of.
6. Click to insert a new-line in between existing operations/phases.
Change Master Recipe: Recipe (Operations)
7. Perform one of the following:
If You Want To Insert Go To
A phase Step 8
An operation Step 11
8. Select Phase indicator.
9. Complete the following fields:
Field Name R/O/C Description
Operat.,phase R Unique number assigned to each operation/phase step.
Field Name R/O/C Description
Destinatn. R The control recipe destination specifies whether the technical address to which a control recipe is transferred, or how the transfer takes place (for example, initiated by R/3 or by process control).
Description O Description of the phase.
Base qty. O Quantity of the material to be produced to which the standard values of the operation refer.
Resource and Superior operation values are copied from upper phase/operation.
10. Go to Step 12.
11. Complete the following fields:
Field Name R/O/C Description
Resource O Means of production and persons involved in a production process that have capacities assigned to them.
Description O Description of the operation.
Base qty. O Quantity of the material to be produced to which the standard values of the operation refer.
12. Click to validate your entries.
13. Click next to the new operation/phase to select it.
Change Master Recipe: Recipe (Operations)
14. Click to go to the Change Master Recipe: Operation screen.
Change Master Recipe: Operation
15. As required, complete/review the following fields:
Field Name R/O/C Description
Control key R Code used to identify operational processes. Examples of operational processes include costing, scheduling, and completion confirmations.
Base quantity R Quantity of material referenced by the standard values.
Charge quantity O Numerator of the quotient that describes the relationship between the unit of measure of the charge quantity and the unit of measure for the operation, phase, or secondary resource.
Operation qty. O Denominator of the quotient that describes the relationship between the unit of measure of the charge quantity and the unit of measure for the operation, phase, or secondary resource.
Field Name R/O/C Description
Duration C Length of time from start to finish.
Fixed cost C Portion of the total cost that remains constant regardless of the operating rate and lot size.
16. Click to return to the Change Master Recipe: Recipe (Operations) screen.
17. Go to Step 4.
18. Click next to the operation/phase you want to delete.
Subordinate phases will also be deleted when you delete operations.
Change Master Recipe: Recipe (Operations)
19. Click to go to the Delete window.
Delete
20. Click to return to the Change Master Recipe: Recipe (Operations) screen.
Note deleted operation/phase is no longer displayed.
21. Go to Step 4.
22. Click to go to the Change Master Recipe: Recipe (Materials) screen.
Change Master Recipe: Recipe (Materials)
23. Click to go to the Change material BOM: General Item Overview screen.
Change material BOM: General Item Overview
24. As required, complete/change the following fields:
Field Name R/O/C Description
ICt O Determines classification of material. For example, stock material, consumed material, etc. Classification determines which fields and screens are required. In LIS, defines how purchase of an item is controlled.
Component O Element of a BOM used for creating a material.
Quantity O Number of items being processed.
Un O Unit of measure.
25. Click to validate your entries.
26. Click to return to the Change Master Recipe: Recipe (Materials) screen.
Change Master Recipe: Recipe (Materials)
27. Go to Step 4.
28. Click to go to the Change Master Recipe: Recipe (Recipe header) screen.
Change Master Recipe: Recipe (Recipe header)
29. As required, review/change the following fields:
Field Name R/O/C Description
Status O Used to identify the completion status of an event. Used to determine the allowed business transactions.
Example: 4
Usage O Code identifying the area in which the task list will be used.
Example: 1
30. Go to Step 4.
31. Click to save the changes to the recipe and to return to the Change Master Recipe: Initial Screen.
Change Master Recipe: Initial Screen
The system displays the message, "Recipe was saved in recipe group XXXX."
32. You have completed this transaction.
Result
You have changed a master recipe.
Comments
None