7/11/2003
-
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by : GA TP-SC-209-100-0014
Reviewed by : VBR Sheet 2 of 22 Approved by: VBR
INDEX
PRESSURE PARTS SCHEDULE
Page No. Rev.No.
1. Basis for Thickness Calculation 3 03
2. Design Pressure for Pressure Parts 4 03
3. SH, RH and Economiser Pressure Drops 5 03
4. Pressure Parts Schedule:
4.1 Economiser System 6 03
4.2 Circulating System 7 - 9 03
4.3 Superheater System 10 14 03
15 03
4.4 Reheater System 16 17 03
4.5 Steam Cooled Spacer 18 03
5. Unit Material Diagram:
- SH Division Panellette
- SH Platen
- LTSH
- Reheater
19
20
21
22
03
03
03
03
7/11/2003
-
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 3 of 22 Approved by: VBR
PRESSURE PARTS SCHEDULE
BASIS FOR THICKNESS CALCULATION
1. Design Code : IBR
2. Margins over IBR Code Requirement
2.1 Water Walls:
i. ii.
0.6 mm provided for all water wall tubes over the thickness required as per IBR. Further, an additional tube thickness of 1.0 mm over and above the tube thickness of waterwall tubes calculated as per the above shall be provided on all water wall tubes coming within a radius of half a meter each wall blower. Thinning allowance for bends : 10%
2.2 Superheaters & Reheaters:
i. Erosion allowance (Leading tubes) : 1.0 mm
ii. Erosion allowance (Balance of Tubes) : 0.6 mm
iii. Thinning allowance for bends : 10%
2.3 Economiser
i. Erosion allowance : 1.0 mm
ii. Thinning allowance for bends : 10%
-
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 4 of 22 Approved by: VBR
PRESSURE PARTS SCHEDULE
DESIGN PRESSURE FOR PRESSURE PARTS
1. Design Code : IBR 2. Drum SHO pressure at BMCR : 178 kg/cm2(g) SH System pressure drop at BMCR : 17.50 kg/cm2 Drum operating pressure : 195.5 kg/cm2(g) Design pressure : 1.05 x Max. operating pressure : 1.05 x 195.5 : 205.3 kg/cm2(g) Drum design pressure used : 208.5 kg/cm2(g)
3. SH system
Design pressure : Drum Design pressure - Pressure drop in preceeding sections (or) 1.05 x Max. operating pressure whichever is higher.
4. RH system Max. operating pressure : 47.41 kg/cm2(g) Design pressure : 1.05 x Max. operating pressure : 1.05 x 47.4 : 49.8 kg/cm2(g) RH design pressure used : 52.4 kg/cm2(g)
5. Economiser system Max. operating pressure : 201 kg/cm2(g) Design pressure : 1.05 x Max. operating pressure : 1.05 x 201 : 211.1kg/cm2(g) Economiser coil design pressure
used. : 214.0 kg/cm2(g)
6. Circulation system Design pressure upto pump : Drum design pressure + Static head (or)
1.05 x Max. operating pressure whichever is higher.
Design pressure after pump : Drum design pressure + Static head + Pump head (or) 1.05 x Max. Operating pressure whichever is higher.
-
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 5 of 22 Approved by: VBR
PRESSURE PARTS SCHEDULE
SH, RH AND ECONOMISER PRESSURE DROP (Load : BMCR)
I. SUPERHEATER SYSTEM
Saturated connecting links : kg/cm2 0.25
Radiant Roof : kg/cm2 0.65
Back Pass SCW : kg/cm2 2.45
LTSH : kg/cm2 2.08
LTSH outlet Tee : kg/cm2 0.20
Links to DESH : kg/cm2 0.25
DESH : kg/cm2 0.37
Links to Panel SH : kg/cm2 0.40
Panel SH inlet Tee : kg/cm2 0.25
SH Division Panel : kg/cm2 3.48
Panel SH Outlet Tee : kg/cm2 0.30
Links to Platen : kg/cm2 1.34
Platen SH inlet Tee : kg/cm2 0.30
Platen SH : kg/cm2 4.93
SH outlet Tee : kg/cm2 0.25
Total SH Pressure Drop : kg/cm2 17.5
II. REHEATER SYSTEM
RH Pressure Drop : kg/cm2 1.70
III. ECONOMISER SYSTEM
Economiser Links : kg/cm2 0.40
Economiser Coils : kg/cm2 2.80
Static Head : kg/cm2 2.30
Economiser pressure drop including static head
: kg/cm2 5.5
-
PRESSURE PARTS SCHEDULE
(Economiser System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 6 of 22 Approved by : VBR/KR
Sl.
no. Description No.
off Size OD mm
Thick. mm
Min.orderthickness
mm
Min. insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2(g)
Design Working
Temperature oC
Design Working
Gas side metal temp.
0C 1. Eco. inlet
lead 1 457.2 50 43.8 @ - SA106Gr.C 219.7
201.0 282 254 $
2. Eco. inlet header
1 508 75 65.6 @ - SA106Gr.C 214.0 201.0 282 254 296
3. Eco. coils 552 38.1 5.3 (Bend)
5.3 4.1 1.0 SA210Gr.A1 214.0 201.0 319 308 321
4.
Eco. outlet header
1 406.4 60 52.5 @ - SA106Gr.C 210.2 197.2 336 308 350
5. Eco. outlet links
2 368 40 35.0 @ - SA106Gr.C 210.2 197.2 336 308 $
6. Eco. outlet links to drum
3 323.9 36 31.5 @ - SA106Gr.C 210.2 197.2 336 308 $
Notes: $ - Outside gas path.
@ After generation of Drawing.
Data for Main pipes and tubes are furnished. For other components the product drawings may be referred.
-
PRESSURE PARTS SCHEDULE
(Circulation System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 7 of 22 Approved by : VBR/PSG
Sl. no.
`Description No. off
Size OD mm
Thickness. mm
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure kg/cm2(g) Design Working
Temperature oC
Design Working
Gas side metal temp.
oC
1. Drum 1 ID=1778
170 (min) / 205 (min) ## (F) 160(min) / 190 (min) ## (S)
165(min) / 200 (min) # (F)
155(min) /185 (min) # (S)
149.74/ 179.79 (F) 149.74 / 180.3 (S)
-
SA 299
208.5
195.5
368
363
$
2. Downcomer
6 368 36 31.5 27.8 - SA106GrC 211.5 198.5 368 354 $
3. Suction manifold
1 508
55 48.1 @ - SA106Gr.C 211.5 198.5 368 354 $
4. Suction spool 3 457.2 45 39.38 34.3 - SA106Gr.C 211.5 198.5 368 354 $ 5. Circulating
pumps 3
$
6. Discharge valves
6
$
7. Discharge lines
6 323.9 36
31.5 27.14 -
SA106Gr.C 213.5 200.5 368 354 $
8. Waterwall bottom ring heade
1 914 90 (min) ## 85 (min) # @ (Front&Rear)
@(Sides)
-
SA 299 213.5 200.5 368 354 $
Notes: $ - Outside gas path @ - To be supplied after generation of drawings. ## Raw plate thickness # Finished shell thickness (F) For the First boiler (Vindhyachal-9) (S) For the Second boiler (Vindhyachal-10)
-
PRESSURE PARTS SCHEDULE
(Circulation System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 8 of 22 Approved by : VBR/PSG
Sl. no.
`Description No. off
Size OD mm
Thickness. mm
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure kg/cm2(g) Design Working
Temperature oC
Design Working
Gas side metal temp.
oC
9.
Waterwall rifle tubes
1062 51
51
51
63.5
63.5
5.6 (Straight)
6.0 (Bend)
7.1 (WB opgs)
7.1 (Straight)
7.1 (Bend)
5.6
6.0
7.1
7.1
7.1
5.25
5.25
6.25
6.32
6.32
0.6
0.6
1.6
0.6
0.6
SA210Gr.C
SA210Gr.C
SA210Gr.C
SA210Gr.C
SA210Gr.C
213.5
213.5
213.5
210.8
210.8
200.5
200.5
200.5
198.0
198.0
396
396
396
396
396
363
363
363
363
363
448
448
448
448
448
Waterwall smooth tubes
63.5
63.5
51
51
51
51
7.1 (Straight)
7.1 (Bend)
5.6 (Straight)
6.0 (Bend)
8.8 (Straight)
8.8 (Bend)
7.1
7.1
5.6
6.0
8.8
8.8
6.32
6.32
5.25
5.25
3.88
3.88
0.6
0.6
0.6
0.6
-
-
SA210Gr.C
SA210Gr.C
SA210Gr.C
SA210Gr.C
SA210Gr.C
SA210Gr.C
210.8
210.8
213.5
213.5
213.5
213.5
198.0
198.0
200.5
200.5
200.5
200.5
396
396
396
396
368
368
363
363
363
363
363
363
448
448
448
448
$
$ Waterwall
hanger rifle tubes
63.5 12 12 6.32 0.6 SA210Gr.C 210.8 198.0 396 363 448
Notes: $ - Outside gas path
-
PRESSURE PARTS SCHEDULE
(Circulation System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 9 of 22 Approved by : VBR/PSG
Sl. no.
`Description No. off
Size OD mm
Thickness. mm
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure kg/cm2(g) Design Working
Temperature oC
Design Working
Gas side metal temp.
oC
10. Top headers 3 2
273
273
40
50
35
43.75
@ (Hanger)
@ (Screen)
@ (Front)
@ (Side)
- - - -
SA106Gr.C
SA106Gr.C
SA106Gr.C
SA106Gr.C
208.5
208.5
208.5
208.5
195.5
195.5
195.5
195.5
368
368
368
368
363 363
363
363
$
$
$
$
11. Relief Pipes 68 159 18
15.75 13.4 -
SA106Gr.C
208.5
195.5
368
363
$
Notes : $ - Outside gas path @ - To be supplied after generation of drawings. Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.
-
PRESSURE PARTS SCHEDULE
(Superheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 10 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp. oC
1. SH saturated connecting links
21 159.0 18.0 15.8 @ - SA106Gr.C 208.5 195.5 368 363 $
2. Radiant roof inlet header
1 273.0 50.0 43.8 @ - SA106Gr.C 208.3 195.3 368 363 $
3. Radiant tubes front
150 63.5 6.3(Straight) 6.3 5.9 - SA213T11 208.3 195.3 414 364 424
4. Radiant tubes -rear
150 57.0 6.0(Bend) 6.0 5.3 - SA213T11 208.3 195.3 414 364 420
5. Radiant roof outlet header
1 406.4 60.0 52.5 @ - SA106Gr.C 207.6 194.6 368 364 $
6. Backpass sidewall inlet header
2 368.0 50.0 43.8 @ - SA106Gr.C 207.5 194.5 368 364 $
7.
Backpass sidewall tubes (front)
120 6
63.5 63.5 76.1
6.3 (Straight) 7.1 (Bend) 12.5 (Bifurcate)
6.3 7.1 12.5
5.5 5.5 6.6
- - -
SA210Gr.C SA210Gr.C SA210Gr.C
207.5 207.5 207.5
194.5 194.5 194.5
393 393 393
365 365 365
397 397 397
$ Outside gas path @ After generation of Drawing.
-
PRESSURE PARTS SCHEDULE
(Superheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 11 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp. oC
8.
Backpass sidewall tubes (rear)
62 51.0
51.0
5.0 (Straight)
5.6 (Bend)
5.0
5.6
4.4
4.4
-
-
SA210Gr.C
SA210Gr.C
207.5
207.5
194.5
194.5
393
393
365
365
397
397
9. Backpass lower side header Front
2 406.4 60.0 52.5 @ - SA106Gr.C 206.9 193.9 393 365 $$
10. Backpass lower side header Rear
2 323.9 50.0 43.8 @ - SA106Gr.C 205.6 192.6 393 365 $$
11. Backpass lower front header
1 406.4 60.0 52.5 @ - SA106Gr.C 206.9 193.9 393 365 $$
12. Backpass Front wall tubes
126
51.0
51.0
5.0(Straight)
5.6(Bend)
5.0
5.6
4.4
4.4
-
-
SA210Gr.C
SA210Gr.C
206.9
206.9
193.9
193.9
393
393
365
365
397
397
13. Backpass screen tubes
126 51.0 6.3 (Bend) 6.3 5.4 1.0 SA210Gr.C 206.9 193.9 394 366 398
14. Backpass roof tubes
126 51.0 5.0(Straight) 5.0 4.4 - SA210Gr.C 206.3 193.3 394 366 398
$$ Partially gas touched.
@ After generation of Drawing.
-
PRESSURE PARTS SCHEDULE
(Superheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 12 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp. oC
15. Backpass Economiser support tubes lower
368
38.1 44.5
5.0 (Bend) 7.1 (Straight)
5.0 7.1
4.3 4.9
1.0 1.0
SA210Gr.C SA210Gr.C
206.9 206.9
193.9 193.9
393 393
365 365
397 397
16. Backpass support tubes inter header
4 219.1 28.0 24.5 @ - SA106Gr.C 206.7 193.7 393 365 407
17.
Backpass SH support tubes inter/Lower
248
51.0
11.0(Straight)
11.0
5.4
1.0
SA210Gr.C
206.7
193.7
393
365
397
18. Backpass SH support tubes upper
248 248
51.0 51.0
11.0 6.3(Bend)
11.0 6.3
5.4 3.7
1.0 -
SA210Gr.C SA210Gr.C
206.7 206.7
193.7 193.7
393 365
365 365
398 $
19. Backpass upper rear Junction header
1 273.0 50.0 43.8 @ - SA106Gr.C 206.0 193.0 394 366 $$
20. Backpass upper rear wall tubes
137 51.0 51.0
5.0(Straight) 5.6 (Bend)
5.0 5.6
4.4 4.4
- -
SA210Gr.C SA210Gr.C
206.0 206.0
193.0 193.0
394 394
366 366
398 398
$$ Partially gas touched. $ Outside gas path @ After generation of Drawing
-
PRESSURE PARTS SCHEDULE
(Superheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 13 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp. oC
21. Backpass lower rear header
1 323.9 50.0 43.8 @ - SA106Gr.C 205.6 192.6 393 365 $$
22. Backpass lower rear wall tubes
137 44.5 5.0 5.0 3.9 - SA210Gr.C 205.6 192.6 394 366 398
23. LTSH inlet header
1 323.9 50.0 43.8 @ - SA106Gr.C 205.2 192.2 394 366 $$
24. LTSH Horizontal coils
744
47.63 47.63
6.0 (Bend) 6.6 (Bend)
6.0 6.6
5.0 5.5
0.6 1.0
SA213T11 SA213T11
205.2 205.2
192.2 192.2
418 458
379 419
428 467
25. LTSH terminal tubes
744 47.63 6.6 (Bend) 6.6 5.6 1.0 SA213T11 205.2 192.2 476 437 484
26. LTSH outlet header
1 457.2 65.0 56.9 @ - SA335P12 203.2 190.2 434 424 $
27. SH links to DESH
2 508.0 60.0 52.5 @ - SA335P12 203.0 190.0 434 424 $
28. SH DESH 2 508.0 65.0 56.9 @ - SA335P12 202.7 189.7 434 424 $ 29. Links to
Division panellettes
2 508.0 60.0 52.5 @ - SA335P12 202.3 189.3 416 406 $
$ Outside gas path @ After generation of Drawing. $$ Partially gas touched.
-
PRESSURE PARTS SCHEDULE
(Superheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 14 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp. oC
30. SH Division Panellette inlet headers
2 406.4 60.0 52.5 @ - SA335P12 201.7 188.7 416 406 $
31. SH Division Panellettes
432 44.5 44.5
44.5
44.5
44.5
44.5
51.0
44.5
51.0
5.0 (Bend) 5.0 (Straight)
5.0 (Bend)
7.1 (Bend)
7.1 (Straight)
7.1 (Bend)
7.1 (Straight)
5.6 (Straight)
7.1 (Bend)
5.0 5.0
5.0
7.1
7.1
7.1
7.1
5.6
7.1
4.0 4.5
4.2
4.1
6.3
5.3
5.8
4.1
5.0
- 0.6
-
-
0.6
0.6
1.0
0.6
1.0
SA213T11 SA213T22
SA213T22
SA213T22
SA213T22
SA213T22
SA213T22
SA213T91
SA213T91
201.7 201.7
201.7
201.7
201.7
201.7
201.7
201.7
201.7
188.7 188.7
188.7
188.7
188.7
188.7
188.7
188.7
188.7
406 471
482
476
521
496
481
532
526
406 421
482
476
471
446
431
482
476
$ 485
$
$
538
514
499
547
543
32. SH Division Panellette outlet hdrs
2 406.4
70.0 61.3 @ - SA335P12 198.2 185.2 485 475 $
33. Links to Platen SH
2 508.0 60.0 52.5 @ - SA335P12 197.9 184.9 485 475 $
$ Outside gas path @ After generation of Drawing.
-
PRESSURE PARTS SCHEDULE
(Superheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 15 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp. oC
34. Platen SH inlet header
1 406.4 60.0 52.5 @ - SA335P12 196.3 183.3 485 475 $
35. Platen SH coils
400 51.0 51.0 51.0 51.0 63.5
63.5 51.0 51.0 51.0 63.5 63.5 51.0
51.0
6.3 (Bend) 9.0 (Bend) 9.0 (Straight) 11.0 (Bend) 6.3 (Bend)
12.0 (Bend) 7.1 (Bend) 7.1 (Straight) 7.1 (Bend) 8.0 (Straight) 12.5 (Bend) 12.0
12.0
6.3 9.0 9.0 11.0 6.3
12.0 7.1 7.1 7.1 8.0 12.5 12.0
12.0
4.5 4.5 8.8 8.3 5.6
8.8 5.3 6.3 5.4 6.4 6.0 5.7
4.8
- -
0.6 - -
- 0.6 0.6 0.6 1.0 1.0
-
-
SA213T22 SA213T22 SA213T22 SA213T22 SA213T22
SA213T22 SA213T91 SA213T91 SA213TP347H SA213TP347H SA213TP347H SA213T91
SA213TP347H
196.3 196.3 196.3 196.3 196.3
196.3 196.3 196.3 196.3 196.3 196.3 196.3
196.3
183.3 183.3 183.3 183.3 183.3
183.3 183.3 183.3 183.3 183.3 183.3 183.3
183.3
475 475 547 548 475
531 568 588 598 581 562 588
598
475 475 497 548 475
531 518 538 548 531 512 538
548
$ $
565 $ $
$ 583 603 610 601 587
Insert
Insert 36. Platen SH
outlet hdr. 1 508.0 110.0 96.3 @ - SA335P22 191.3 178.0 540 540 $
Notes: $ Outside gas path @ After generation of Drawing. Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.
-
PRESSURE PARTS SCHEDULE
(Reheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 16 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick. mm
Min. order thickness
mm
Min. Insitu
thickness mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2(g)
Design Working
Temperature oC Design Working
Gas side metal
temp. 0C
1. RH DESH 2 660.0 20.0 17.5 @ - SA106Gr.C 54.0 44.7 361 351 $ 2. RH Pendant
inlet header 1 457.2 28.0 24.5 @ - SA106Gr.C 52.4 44.7 361 351 $
3. RH front coils
814
44.5 44.5 44.5 63.5 54.0 54.0 54.0 54.0 54.0 54.0 54.0 63.5 63.5 63.5
5.0 (Bend) 6.3 (Bend) 8.0 (Bend) 4.5 (Bend) 4.0 (Bend) 4.0 (Bend) 4.5 (Bend) 4.5 (Bend) 4.5 (Straight) 6.3 (Bend) 4.0 (Straight) 4.0 (Bend) 4.0 (Bend) 4.0 (Bend)
5.0 6.3 8.0 6.3 4.0 4.0 4.5 4.5 4.5 6.3 4.0 4.0 4.0 4.0
1.8 1.8 1.8 2.3 2.5 3.1 2.2 3.1 3.7 3.1 2.6 2.1 3.2 3.0
- - - - -
0.6 -
0.6 0.6 0.6 0.6 -
1.0 -
SA213T11 SA213T11 SA213T11 SA213T11 SA213T22 SA213T22 SA213T22 SA213T22 SA213T22 SA213T22 SA213T91 SA213T91 SA213TP347H SA213T22
52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4
44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7
352 352 352 352 506 507 483 507 535 508 545 517 556 517
352 352 352 352 506 468 483 468 496 469 506 517 517 517
$ $ $ $ $
509 $
517 537 511 547 $
558 $
$ Outside gas path @ After Generation of Drawing.
-
PRESSURE PARTS SCHEDULE
(Reheater System)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW Rev 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 17 of 22 Approved by : VBR/KR
Sl. no.
Description No. off
Size OD mm
Thick. mm
Min. order thickness
mm
Min. Insitu
thickness mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2(g)
Design Working
Temperature oC Design Working
Gas side metal
temp. 0C
4. RH Rear Coils
814 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 63.5 54.0 54.0
4.5 (Bend) 4.0 (Bend) 4.5 (Bend) 6.3 (Bend) 6.3 (Bend) 4.0 (Bend) 4.0 (Bend) 4.0 (Bend) 4.0 (Bend) 3.6 (Bend) 3.6 (Straight)
4.5 4.0 4.5 6.3 6.3 4.0 4.0 4.0 4.0 3.6 3.6
2.4 2.5 3.8 3.8 3.7 3.4 2.7 2.1 2.1 2.6 2.8
- -
0.6 0.6 1.0 1.0 0.6 - -
0.6 0.6
SA213T22 SA213T22 SA213T22 SA213T22 SA213T22 SA213T91 SA213T91 SA213T91 SA213T91 SA213TP347H SA213TP347H
52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4 52.4
44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7
498 506 538 540 519 582 552 556 517 571 595
498 506 499 501 480 543 513 556 517 532 556
$ $
540 543 522 585 555 $ $
573 597
5. RH Outlet Header (Siamese)
2 558.8 60.0 52.5 @ - SA335P22 52.4 42.5 540 540 $
Notes: $ Outside gas path @ After generation of Drawing.
Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.
-
PRESSURE PARTS SCHEDULE
(Steam Cooled Spacer)
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev. 03 Date TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation Prepared by : GA TP-SC-209-100-0014 Reviewed by : VBR Sheet 18 of 22 Approved by : VBR/KR
Sl. No.
Description No. off
Size OD mm
Thick mm.
Min. order thickness
mm
Min. Insitu thickness
mm
Erosion allowance
mm
Material specification
Pressure Kg/cm2 (g) Design Working
Temperature oC Design Working
Gas side metal temp.
oC 1. Steam
cooled spacers for Platen SH
1
1
51
51
5 (Bend)
7.1 (Bend)
5.0
7.1
3.8
5.9
-
1.0
SA210 GR C
SA213T11
206.9
206.9
193.9
193.9
367
456
367
406
$
477
2. Steam cooled spacers for RH
1
1
51
51
5 (Bend)
7.1 (Bend)
5.0
7.1
3.8
5.8
-
1.0
SA210 GR C
SA213T11
206.9
206.9
193.9
193.9
368
445
368
406
$
460
3 Steam cooled spacers for Panellette SH
6 63.5
63.5
51.0
63.5
63.5
9.0 (Bend)
8.0 (Bend)
7.1 (Bend)
7.1 (Bend)
12.5
9.0
8.0
7.1
7.1
12.5
5.5
6.1
5.1
5.1
6.1
-
1.0
1.0
-
1.0
SA213T22
SA213TP347H
SA213TP347H
SA213T22
SA213TP347H
201.7
201.7
201.7
201.7
201.7
188.7
188.7
188.7
188.7
188.7
469
519
501
406
519
469
469
451
406
469
$
542
522
$
INSERT
Notes: $ Outside gas path
Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.