DIVISION OF RECLAMATION MINING AND SAFETY Department of Natural Resources 1313 Sherman St Room 215 Denver Colorado 80203 Phone 303 866 3567 FAX 303 832 8106 May 10 2013 on Coram Gold Eagle Mining Inc P O Box 3007 Montrose Colorado 80402 STATE OF COLORADO rc COLORADO D I V I S ION O F RECLAMATION MINING SAFETY RE Withdrawal of Temporary Cessation Notices for the Hawkeye Mine M 1978 311 Ellison Mine M 1978 342 Burros Mine M 1977 297 and JD 5 Mine M 1977 248 Dear Mr Coram John W Hickenlooper Governor Mike King Executive Director Loretta Pineda Director The Division of Reclamation Mining and Safety Division received Gold Eagle s notices of Temporary Cessation TC for the above referenced sites on March 1 2013 On May 7 2013 Gold Eagle submitted withdrawals of those notices and affirmed previous statements it would initiate reclamation The Division acknowledges the withdrawal of the notices of Temporary Cessation and is returning the required fee of 115 00 for each site Gold Eagle first committed to reclamation in lieu of submitting an Environmental Protection Plan on January 7 2013 Gold Eagle U S Department of Energy and the Division will be meeting on site in mid May to discuss reclamation plans and requirements for all 4 sites Gold Eagle will be required to submit a plan and timetable for initiation of reclamation to the Division within 60 days of issuance of the site visit inspection report Final reclamation of all four sites must be achieved no later than May 31 2014 Once the plans are reviewed and accepted by the Division it shall be incumbent upon Gold Eagle to commence reclamation in accordance with the approved timetables Failure to meet set deadlines may result in the Division issuing a Reason to Believe a Violation Exist letter and scheduling the matter for an enforcement hearing before the Mined Land Reclamation Board If you need additional information please contact me at the Division of Reclamation Mining and Safety Grand Junction Field Office 101 S 3rd St Suite 301 Grand Junction Colorado 81501 by telephone at 970 241 1117 or by e mail at russ means @state co us Sincerely j 4 d lwc ARussell Means Senior Environmental Protection Specialist Cc Loretta Pineda Division of Reclamation Mining and Safety Director ony Waldron Minerals Program Supervisor Bob Oswald EPS Minerals Durango Field Office Ed Cotter Department of Energy Stoller Jeff Fugate Department of Natural Resources AGO Counsel Office of Office of Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines

description

Colorado DRMS order to reclaim Burros, Ellison, Hawkeye and JD-5 uranium mines by May 31, 2014. Notice to Gold Eagle Mining Inc. dated May 10, 2013.

Transcript of DRMS May 10 2013 Reclamation Order

Page 1: DRMS May 10 2013 Reclamation Order

DIVISION OF RECLAMATION MINING AND SAFETYDepartment of Natural Resources

1313 Sherman St Room 215

Denver Colorado 80203Phone 303 866 3567

FAX 303 832 8106

May 10 2013

on Coram

Gold Eagle Mining IncP O Box 3007

Montrose Colorado 80402

STATE OF COLORADO

rcCOLORADOD I V I S ION O F

RECLAMATIONMINING

SAFETY

RE Withdrawal of Temporary Cessation Notices for the Hawkeye Mine M 1978 311Ellison Mine M 1978 342 Burros Mine M 1977 297 and JD 5 Mine M 1977 248

Dear Mr Coram

John W Hickenlooper

Governor

Mike KingExecutive Director

Loretta Pineda

Director

The Division of Reclamation Mining and Safety Division received Gold Eagle s notices of TemporaryCessation TC for the above referenced sites on March 1 2013 On May 7 2013 Gold Eagle submittedwithdrawals of those notices and affirmed previous statements it would initiate reclamation The

Division acknowledges the withdrawal of the notices of Temporary Cessation and is returning therequired fee of 115 00 for each site

Gold Eagle first committed to reclamation in lieu of submitting an Environmental Protection Plan onJanuary 7 2013 Gold Eagle U S Department of Energy and the Division will be meeting on site in midMay to discuss reclamation plans and requirements for all 4 sites Gold Eagle will be required to submit

a plan and timetable for initiation of reclamation to the Division within 60 days of issuance of the sitevisit inspection report Final reclamation of all four sites must be achieved no later than May 31 2014

Once the plans are reviewed and accepted by the Division it shall be incumbent upon Gold Eagle tocommence reclamation in accordance with the approved timetables Failure to meet set deadlines mayresult in the Division issuing a Reason to Believe a Violation Exist letter and scheduling the matter foran enforcement hearing before the Mined Land Reclamation Board

If you need additional information please contact me at the Division of Reclamation Mining and SafetyGrand Junction Field Office 101 S 3rd St Suite 301 Grand Junction Colorado 81501 by telephone at970 241 1117 or by e mail at russ means @state co us

Sincerely

j4 d lwcARussell Means

Senior Environmental Protection Specialist

Cc Loretta Pineda Division of Reclamation Mining and Safety Directorony Waldron Minerals Program Supervisor

Bob Oswald EPS Minerals Durango Field Office

Ed Cotter Department of Energy StollerJeff Fugate Department of Natural Resources AGO Counsel

Office of Office of

Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines