Drive efficiency across your SAP plant maintenance … · Masses of Master Data to set up and...

22
Drive efficiency across your SAP plant maintenance processes

Transcript of Drive efficiency across your SAP plant maintenance … · Masses of Master Data to set up and...

Drive efficiency across your SAP plant maintenance processes

2

Chris TownSales Director, EMEA/APAC

London, UK

Divya KaiwarPrincipal Solutions Engineer

London, UK

3

EMPOWERING BUSINESS TEAMS TO MAKE AN IMPACT

4

How much is bad data costing you?

$3.1Trillion/year*

* IBM - 2016

INCREASED DOWNTIME

HIGHER LABOR COSTS

EHS AND REGULATORY COMPLIANCE RISKS

BUSINESSDISRUPTION

POOR EQUIPMENT PERFORMANCE

HIGHER EQUIPMENT & MATERIAL COSTS

DATAIs a strategic

asset

increasingly

managed by the

business

Masses of Master Data to set up and maintain

PLANT

FUNCTIONAL LOCATION

EQUIPMENT

SPARE PARTS MATERIALS, BoMS, serial numbers

MAINTENANCE STRATEGY/MAINTENANCE PLANS

MAINTENANCE ITEMS

TASK LISTS

THE MAIN PM MASTER DATA

OBJECTS

POOR DATA QUALITY

SKILLED PERSONNEL

WASTING TIME

SUB-OPTIMAL DECISIONS

Poor equipment performance

Increased downtime

Business Disruption

9

Avg. # records processed

148,112Avg. days saved

565

Based on partial customer base analysis for SAP PM transactions, 2016 data

How much time could you be saving?

How are you currently maintaining your PM master data?

One flexible toolkit to improve all SAP PM processes

MASTER DATA OPERATIONAL REPORTING

WORK ORDERS & NOTIFICATIONS

Designed to empower maintenance teams

BUSINESS AUTHOR• Use Winshuttle software to

author solutions

• Typically SAP analysts or SAP super users

• No technical coding skills required

BUSINESS USERSUse Excel or web forms to:

• Supply, approve, or change data

• Run operational reports

USER ADMIN• Can be the business author or IT

• Control licenses, oversee usage,

define policies, run audit reports.

Winshuttle has empowered our end users to complete processes themselves, and the simplicity of the system allows us to understand how it works, and how to get things done.

David Price-Cooper O&M Manager, E.ON

MASTER DATA

Migration of data from legacy system

Mass creation

Mass changes

Day-to-day additions and maintenance

Automate & streamline master data tasks

15

TECHNICAL OBJECT TASK T-CODE DATA ENTRY TIME SAVED*

Create work center IR01 93%

Create/change functional location IL01/IL02 95%/85%

Create/change equipment IE01/IE02 96%/75%

Change equipment serial number IQ02 84%

Create/change materials MM01/MM02 89%/77%

Create/change equipment BoMs IB01/IB02 81%/67%

Manage classes & characteristics CL02/CT04 91%

* Average time saved versus manual data entry, based on Winshuttle customer data.

16

Product Demonstration

DEMO• Equipment master records creation

• Mass update of functional locations records – ‘round trip’

• Embedded in Excel workbook

• Developed with Winshuttle Studio

18

Empower your maintenance team to make an impact

CONTINUALLY IMPROVE OPERATIONS

SAVE TIME IMPROVE DATA QUALITY

MAKE BETTER DECISIONS

Q&A

Let’s answer some questions

Real results

The cost of not having data in the system for 6-8 weeks significantly outweighed the cost of the tool, so it was a no brainer.

David Price-Cooper O&M Manager, E.ON

Record-to-report Order-to-cashProcure-to-pay

A single toolkit to automate and streamline your SAP business processes

New Product Introduction

Plant Maintenance

Upcoming webinars…

Improve your Material Master Data with Web Forms

May 17th

Best practices to Accelerate your Transition to SAP S/4HANA

June 20th

www.winshuttle.com/events/webinars

Let’s continue the conversation…

Contact us

Set up a 30 minute personalized demo

US: 1-800-711-9798UK: +44 (0) 208 879 5400

[email protected]

winshuttle.com

Demos

White Papers

Case Studies