DRIQ BOARD - HIGHWAYS DESIGN WING STATUS OF ONGOING BRIDGE...
Transcript of DRIQ BOARD - HIGHWAYS DESIGN WING STATUS OF ONGOING BRIDGE...
Page 1
DRIQ BOARD - HIGHWAYS DESIGN WING
STATUS OF ONGOING BRIDGE DESIGN WORKS AS ON 15th October 2010
Name of bridge No. of span File No Present Status
KASARGOD DISTRICT
1 8 x 37.062 BD/5/2007/Design/HW Design Completed
2 4 x 19.32 BD/23/2009/Design/HW
3 6 x 25.32 BD/27/2009/Design/HW Design completed
4 BD/43/2010/Design/HW
5 BD/44/2010/Design/HW Fair proposal approved
KANNUR DISTRICT
1 7 x 25.32 BD/10/2004/Design/HW Design completed
2 7 x 25.32 BD/20/2009/Design/HW
3 2 x 17.07 BD/37/2004/Design/HW
4 4 x 22.32 BD/32/2009/Design/HW
5 2 x 17.07 BD/5/2010/Design/HW
6 5 x 22.32 BD/7/2010/Design/HW
Sl. No
Kottappuram
Chalakkadavu Bridge in Madikai Panchayat
Letter for bore details at both abutments despatched on 17/06/10. Reminder sent on 25/9/10. Detailed design pending for want of details.
Munnamkadavu Bridge
Nedumkallu BridgeApproved alignment plan, clarification on chainage and reduced levels of boreholes and LWL called for on 25.09.10.
Kollada Bridge
Mannur Irukkurr
Koralai - Theralai Bridge General Design despatched. Detailed Design under preparation.
Kuniyanpuzha Bridge(Revision)
General Design despatched. Fair Detailed Design drawing approved. [Design revised due to change in span arrangement suggested by CE(R&B)]
Bridge at Manakayi kadavu General Design despatched. Detailed Design under preparation
Nadalpuzha Bridge Proposal drawing despatched on 04-09-10. Feasibility report awaited
Kuttiyerikadavu Bridge Proposal drawing despatched on 27-08-10. Feasibility report awaited
Page 2
Name of bridge No. of span File No Present StatusSl. No
7 1 x 25.32 BD/16/2010/Design/HW
8 5 x 25.32 BD/26/2010/Design/HW
9 6 x 22.32 BD/36/2010/Design/HW
10 8 X 25.32 BD/45/2010/Design/HW Proposal approved
11 Clarification received on 04.10.10. Design in progress
12 4 x 25.32 Design Completed
WAYANAD DISTRICT
1 2 x 15.07 BD/3/2010/Design/HW
2 BD/35/2010/Design/HW
KOZHIKKODE DISTRICT
1 10 x 25.32 BD/15/2005/Design/HW
2 6 x 25.32 BD/7/2006/Design/HW
3 3 x 25.32 BD/46/2009/Design/HW
Mathuvayal BridgeGeneral Design despatched on 04-09-10. Detailed Designunder preparation
Moolakkeelkadavu Proposal drawing despatched. Feasibility report awaited
Irinavu Bridge Proposal drawing despatched on 04-09-10. Feasibility report awaited
Chekkikadavu Bridge
Pulleppikadavu Bridge (Revision)
BD/13/1994/Design/HW (Revision)
Pulinjolikkadavu Bridge
Kottoor BridgeProposal changed.Tentative General Design despatched on 21-06-10 . Feasibility of tentative GD not received. Detailed design can be taken up only on receipt of feasibility report.
Bridge at VellamundaA complete investigation report, after rectifying the defects of the report already furnished called for on 02/08/10.
Koolimadu General Design despatched.
Ullorkadavu Tentative General Design sent on 29-03-10. Bore hole details along new alignment called for. Not yet received. Reminder sent on 7/10/10.
Kandappanchal bridge
Chainage is not marked in bore chart. Quality and type of rock is not specified, no recommendation of geotechnical consultant regarding type of foundation, founding level and SBC. Details called for videLetter sent on 30-12-09. Reminder sent on 28-05-10
Page 3
Name of bridge No. of span File No Present StatusSl. No
MALAPPURAM DISTRICT
1 5 x 25.32 BD/16/2005/Design/HW
2 6 x 25.32 BD/14/2008/Design/HW
3 BD/22/2008/Design/HW
4 BD/21/2008/Design/HW
5 BD/12/2008/Design/HW
6 3 x 22.32 BD/42/2009/Design/HW
8 Karma Road Bridge BD/27/2010/Design/HW
9 1 x 25.32 BD/46/2010/Design/HW
10 4 x 25.32 Design Completed
PALAKKAD DISTRICT
1 2 x 25.32 BD/25/2009/Design/HW
2 BD/32/2010/Design/HW
MampaduSoil report not furnished. Clarification regarding alignment plan and soil report called for on 28/05/05. Reminder despatched on 06/10.
Thoothapuzha Bridge Feasibility report not received. Reminder for feasibility despatched on3/ 06/10.
Thuruppangavil Kadavu
Missing details and clarification regarding. v.c, bore hole locations, continuous chainage & alignment plan etc are required and details called for on 11-12-08, 19-02-09 & 09-06-09. & approved . Reminder despatched on 16-06-10.
Puzhakkathara Hydraulic particulars, c/s showing bore hole chainage, modifiied alignment called for. Reminder sent on 06/10.
Kakkathodu BridgeLetter sent calling details for taking up this as a fresh work. Letter sent on 14/08/08. Reminder sent on 28-05-10.
Panampalam Bridge Proposal drawing despatched on 02-07-10. Feasibility report awaited.
Only subsoil investigation report was received. Letter for further details despatched on 06-2010. Details not yet received
Cheerpungalthodu Bridge Proposal drawing despatched
Mudikkodu
Kakkathodu Bridge in Ottapalam byepass
Span arrangement change requested. AEE has agreed to send a new set of details. Details not yet received. Reminder sent on 30-06-2010
Athipotta Proposal drawing despatched. waiting for feasibility from the CE(R&B) for finalising General Design.
Page 4
Name of bridge No. of span File No Present StatusSl. No
3 BD/49/2010/Design/HW
4 BD/50/2010/Design/HW
5 Details such as L/s, C/s, hydraulic particulars etc. called for.
6 3 x 17.07 Design completed
THRISSUR DISTRICT
1 BD/13/2009/Design/HW Clarification regarding vertical clearance called for 08-07-2009.
ERNAKULAM DISTRICT
1 BD/34/2004/Design/HW1
2 1 x 17.07 BD/08/2006/Design/HW
3 2 x 15.00 BD/03/2002/Design/HW
4 2 x 19.4 BD/33/2009/Design/HW
Njettarakkadavu BridgeLetter sent on 13/10/10 for missing details such as approved alignment plan in larger scale,hydraulic particulars,design data form,list of gradient and curves etc. …………..
Bridge at Kampa over Kalpathi River
Letter regarding missing details like approved alignment plan,c/s,hydraulic particulars,design data form etc sent on 19/10/10.
Kooliyattukadavu Bridge BD/31/2010/Desin/HW
Bridge across Gayathri River
Bridge at Azhikkode - Munambam
Puthenthodu BridgeClarification regarding feasibility of providing a single span bridge instead of box culvert called for. But not yet received. Reminder for clarification sent twice. Latest reminder on 16-06-2010.
Ramanchira Bridge Proposal despatched. Feasibility received on 09/2010. General Design under preparation
Nedungad-Nayarambalam Bridge
Letter sent asking for present stage on 5/06/10 for finalising detailed design.
Kottichirappadam bridge Tentative General Design despatched. Feasibility report for the tentative GD received on 11/10/2010. Detailed design approved.
Page 5
Name of bridge No. of span File No Present StatusSl. No
5 BD/2/2010/Design/HW
6 3 x 22.32 BD/24/2010/Design/HW
7 1 x 25.32 BD/21/2010/Design/HW General Design completed and ready for issuance.
8 5 x 25.32 BD/14/2010/Design/HW
9 8 x 37.32 BD/30/2010/Design/HW
10 1 x 19.32 Design completed
11 4 x 22.32 Design Completed
12 Design work completed
13 6 x 22.32 BD/25/2010/Design/HW General Design approved and ready for issuance
12 2 x 22.32 BD/34/2010/Design/HW Feasibility report received . General Design under preparation
ALAPPUZHA DISTRICT
1 5 x 25.32 BD/09/2006/Design/HW
New bridge across Panamkutty river
Reminder for details sent on 16-06-10 Missing Details such as hydraulic calc, c/s, bore hole loations, Design data, approved align plan called for. Calrification received again with missing details. Hydraulic calculations, Bore locations, cross sectional
Convent Beach Bridge at Pallipuram
Proposal despatched on 10/06/10. Feasibility received. General Design draft approved.
Kothaithodu Bridge
Murikallu bridge General Design depatched
Kumbalanghi Bridge Proposal despatched on 11-08-10.Feasibility report and report regarding capacity of piles and clarification on alignment called for. Not received.
Valappid Bridge
Inchiyoor Bridge
Paithuruthu 3 x 19.32
(single lane)
Korankadavu Bridge
Chirayam - Methanam
P. S. Kadavu BridgeProposal drawing despatched. Feasibility not received. Reminder sent on 16-06-2010. Reply received on 27-07-10 mentioning that A.S is not received. Hence design not urgently needed.
Page 6
Name of bridge No. of span File No Present StatusSl. No
2 6 x 26.6 BD/16/2008/Design/HW
3 9 x 37.032 BD/28/2009/Design/HW
4 BD/08/2010/Design/HW Hydraulic details called for on 4/5/10
5 5 x 37.032 BD/20/2010/Design/HW Proposal sent on 14-09-10. Feasibility report awaited
6 BD/02/2010/Design/HW Revised general design & detailed design part I in progress
7 1 x 19.32 BD/28/2010/Design/HW
8 BD/22/2010/Design/HW
9 BD/23/2010/Design/HW
10 4 x 25.32 Design Completed
KOTTAYAM DISTRICT
1 BD/28/2004/Design/HW
2 4 x 22.32 BD/03/2005/Design/HW
Construction of bridge connecting Kuttenchal island and Polekadavu
Detailed Design despatched.
Thykkattuserry Bridge General Design despatched. Detailed Design draft approved.
Cartable bridge at Kakkathuruthu Ferry in Aroor lake
Vaisambhagom Bridge over Pookaitha river
Champakulam Bridge (Revision)
Vettiyar Bridge connecting Mavelikkara- Pandalam
Proposal despatched. Feasibility received on 17-09-10 from EE Roads Division. General Design under preparation. Feasibility report from CE(R&B) not yet received
Cheruthana Cartable Brdige Letter sent regarding missing details like I/s, 3c/s, hydraulic, DA form, approved align plan etc on 7/6/10
Wadai Bridge Only 3 borehole details and copy of alignment plan received. Other details called for on 14/6/10
Vazhuvadikadavu
Cherpunkal 3 x 32.162+1 x 17.07
General Design Despatched. Detailed design under preparation
MoolekadavuProposal forwarded for reporting feasibility. Feasibility not received. Capacity of 1.2m dia piles is requested along with feasibility report. Reminder sent on 28-05-10.
Page 7
Name of bridge No. of span File No Present StatusSl. No
3 BD/17/2007/Design/HW
4 3 x 18 BD/24/2008/Design/HW
5 BD/01/2009/Design/HW
6 6 x 25.32 BD/04/2010/Design/HW
7 4 x 25.32 BD/10/2010/Design/HW
8 BD/15/2010/Design/HW
9 BD/29/2010/Design/HW
10 BD/40/2010/Design/HW
11 BD/47/2010/Design/HW
PATHANAMTHITTA DISTRICT
1 3 x 26.62 BD/06/2001/Design/HW
Vattamoodu
Clarification required regarding velocity, approved alignemnt, L/S, chainage of bore hole etc. Alignment is seen approved on 08/2000, the feasibility of adopting the same is also requested. Reminder sent on 5/2010.
Foot-bridge at Edakkattupally Tentative General Design despatched on 25-02-10. Feasibility report received on 12-08-10. General and Detailed Design part I ready.
Vattolikkadavu Bridge at Bharamanganam
Letter send regarding missing details such as Align plan, L.S, c/s etc on 2/1/10. Waiting for details. Reminder sent on 27/05/10 (Work to be carried out by LSGD).
Bridge at Cherukara Proposal despatched on 17-03-10. Feasibility report received on 02-09-10. General design under preparation
Chempilavu Bridge Proposal sent on 26-07-10. Feasibility report not received. General Design can be finalised only on receipt of feasibility report.
Tharappel kadavuFor finalizing the proposal, the EE was requested to report the feasibility adopting PSC deck for reducing number of spans. Awaing report.
Byepass road brdige connecting Kanjirapally town
Letter send for details such as approved alignment plan, discharge, design data form etc. Details received on 8/10/10. Proposal under preparation..
Companykkadavu BridgeProposal under preparation. AEE was informed of the missing chainages of foundation of existing bridge, pre-stressed span of 30m is under consideration, proposal can be finalised on reeipt of report from EE.
ROB at mooledomOnly soil report received. Details such as alignemnt plan LS, design data called for on 30/9/10.
Madanasseri Kadavu Bridge
Bore hole taken only at abutment points. Details of boreholes at pier points not received. Reminder sent on 06/2010.
Page 8
Name of bridge No. of span File No Present StatusSl. No
2 2 x 17.07 BD/20/2003/Design/HW Detailed Design completed. Waiting for bore-hole details at pier points
3 5 x 25.32 BD/03/2004/Design/HW2 Detailed Design completed
4 3 x 32.162 Design completed
5 1 x 22.32 BD/30/2009/Design/HW
6 1 x 25.32 Design Completed
7 BD/39/2009/Design/HW
8 BD/17/2010/Design/HW
KOLLAM DISTRICT
1 BD/01/2007/Design/HW
2 3 x 19.4(Old) BD/05/2008/Design/HW
3 BD/39/2010/Design/HW
THIRUVANANTHAPURAM DISTRICT
1 BD/23/2004/Design/HW
2 4 x 22.32 BD/38/2004/Design/HW Detailed Design in progress
Aikadu Bridge
Kavanal Kadavu Bridge
Kanamala Bridge
Widening of Peringara Bridge General Design despatched. Detailed Design in progress
Ottaffice Bridge
Vayarappuzha kadavu BridgeNew alignment received.Calrifications called for additional details like c/s along new alignment, bore details. Letter sent on 24-09-10
Vadasserikkara Foot overbridge
Details called for Soil report, c/s, l/s, hydraulic, MFL, LWL, OFL etc. vide letter dt.1/6/10. Reply received on 30-07-10. 2nd letter for further details sent on 17-08-10
ROB at Kollam16 x 19.32 + 2 x
16.62 + 2 x 14.58
Part - I detailed design despatched. Detailed design of curved deck slab is under preparation.
TRP -Spl package, Bridge at Edathuruthu in Alappat
Missing Details and clarifications called for. Work to be started as a fresh one. It is known that the design is outsourced.
Bridge at Pallikkamannadi Only soil report received. Clarification regarding approved align plan, cross sections, bore hole with chainage etc called for on 10-08-2010
Edayar 1 x 15.07+2 x 22.32
Proposal despatched on 05-2005. Fesibility not received. Reminder letters sent on 04-06-2005 &16-6-06 .Third reminder letter sent on 14-10-2010
Mullaravila
Page 9
Name of bridge No. of span File No Present StatusSl. No
3 3 x 19.32 BD/39/2004/Design/HW
4 BD/12/2005/Design/HW
5 BD/08/2000/Design/HW
6 1 x15.07 BD/10/2009/Design/HW
7 BD/14/2009/Design/HW
8 BD/15/2009/Design/HW
9 3 x 25.32 BD/41/2009/Design/HW
10 4 x 26.58 BD/44/2009/Design/HW
11 BD/09/2010/Design/HW
12 1 x 10.74 BD/18/2010/Design/HW
MunnattumukkuGeneral Design with tentative founding levels despatched on 15-11-2005 and requested to forward Subsoil report. Reminder sent on 18-08-2006. 2nd remainder sent on 14-10-10
Submersible bridge at Kannipuram
Clarification regarding providing high level bridge, exact chainages , horizontal curves etc called for. Second reminder letter sent on 06/2010
Vallakkadavu2 x 16.5 + 1 x
18.75Detailed Design in progress. Clarification on' N' value required from CE(R&B).
Thottinkara Bridge in Udiyankulangara-Kulathoor-Chavady Road
General Design drawing despatched. Detailed Design under preparation
Bridge connecting Beemapally-Paruthikuzhi-NH byepass
Missing details such as design data, check lists, l/s, c/s, soil report, hydraulic calc. etc called for on 21-04-09. Reminder sent on 16/06/10.
ROB at KazhakkuttomLetter for revised longitudinal section, approved alignment plan, design data form etc sent on 20-09-10
Bridge at Ayilam - (Design change)
Tentative General Design despatched . Feasibility report for the tentative general design not received.
Maruthamkuzhy bridge (Revision) Revised Design drawing despatched
Bridge over Kadinamkulam kayal at Murukkumpuzha
Only soil report is received. Required details like alignment plan, MFL, c/s, hydraulic calc, OFL, LWL etc called for on 21/4/10. Remainder letter sent on 18/10/10
Kambi palam bridge in Kannammula-Vadayakkad road
Proposal drawing despatched on 2-6-10. Feasibility report not received
Page 10
Name of bridge No. of span File No Present StatusSl. No
13 10th Mile stone Bridge 2 x 13.07 BD/41/2010/Design/HW
14 1 x 29.00 BD/33/2010/Design/HW
CHIEF ENGINEER
Proposal drawing despatched. Feasibility report not received
Foot-bridge at Medical College Junction.
General Design & Detailed Design-1 despatched.
Page 11
Name of bridge No. of span File No Present StatusSl. No
Legend: General Design - General Design, Detailed Design - Detailed Design
47
North
Central
South
Total
Detailed Designs
General Designs
Proposals
During 2007-08 and upto 30-09-2008.
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22