Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined...
1
Dredging of Gold Tailings Dam (WA) (HDPE Lined Pond) Material Pumped Gold Tailings Depth Pumped 1-5 m Pump Capacity 4000 L/min (clear water) Slurry Ratio 15% Slurry Pumping Flow Rate 202 m 3 / hr Average slurry extraction 1617 m 3 /day* Average wet solid extraction 242 m 3 /day* Pumping Distance 180 m
Transcript of Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined...
DredgingofGoldTailingsDam(WA)(HDPELinedPond)
Material Pumped Gold Tailings
Depth Pumped 1-5 m
Pump Capacity 4000 L/min (clear water)
Slurry Ratio 15%
Slurry Pumping Flow Rate
202 m3/ hr
Average slurry extraction
1617 m3/day*
Average wet solid extraction
242 m3/day*
Pumping Distance 180 m