Drawing Title: Blackmer Vapour Recovery System with Condenser … · 2019. 3. 26. · Condenser...
Transcript of Drawing Title: Blackmer Vapour Recovery System with Condenser … · 2019. 3. 26. · Condenser...
-
Blackmer Vapour Recovery System withCondenser General Arrangement Drawing
09093-HDL362-GA-1129 1Authorised DateDrawn ModificationSize:
Scale:Nozzle Position : N/AFabrication : 5 mmMachining : 0.5 mm
All Dimensions are in mmU.N.O.
Tolerances:Custom
A4
This drawng and its content must notbe copied or disclosed to a thrid partywithout explicit consent from Axflow
London (Head Office)Orion Park, Northfield Avenue, Ealing, London
W13 9SJ Tel: 020 8579 2111 Fax: 020 8579 7326E-mail: [email protected] Axflow Contract No:
Drawing No:
Drawing Title:
Rev
Reference Drawings
Rev
Aberdeen OfficeUnit 3, Harlaw Center Howemoss
Cresent kirkhill IND EST, DYCE Aberdeen AB21 0GN TEL: 01224 729367 FAX: 01224
729368 E-Mail: [email protected]
Huddersfield OfficeUnit 9 FieldHouse Business park
old Fieldhose Lane huddersfield HD2 1FATEL: 01484 543649 FAX: 01484 512608
E-Mail: [email protected]
Status Code
1 - For Review/Approval 'Please Return Marked Up Prints By Date Stated'2 - Approved For Manufacture3 - Certified Final4 - For Infomation Only
0 J.Pestell G.Walker 05.01.16 New Drawing 1
09093-HDL362-P&ID-1126 - Piping and Instrumentation Details09093-HDL362-BP-1127 - Skid Fabrication Details
1 J.Pestell G.Walker 05.01.16 As Built 3
-
A-A ( 1 : 25 )
A
A
Blackmer Vapour Recovery System withCondenser General Arrangement Drawing
09093-HDL362-GA-1129 1Authorised DateDrawn ModificationSize:
Scale:Nozzle Position : N/AFabrication : 5 mmMachining : 0.5 mm
All Dimensions are in mmU.N.O.
Tolerances:Custom
A4
This drawng and its content must notbe copied or disclosed to a thrid partywithout explicit consent from Axflow
London (Head Office)Orion Park, Northfield Avenue, Ealing, London
W13 9SJ Tel: 020 8579 2111 Fax: 020 8579 7326E-mail: [email protected] Axflow Contract No:
Drawing No:
Drawing Title:
Rev
Reference Drawings
Rev
Aberdeen OfficeUnit 3, Harlaw Center Howemoss
Cresent kirkhill IND EST, DYCE Aberdeen AB21 0GN TEL: 01224 729367 FAX: 01224
729368 E-Mail: [email protected]
Huddersfield OfficeUnit 9 FieldHouse Business park
old Fieldhose Lane huddersfield HD2 1FATEL: 01484 543649 FAX: 01484 512608
E-Mail: [email protected]
Status Code
1 - For Review/Approval 'Please Return Marked Up Prints By Date Stated'2 - Approved For Manufacture3 - Certified Final4 - For Infomation Only
0 J.Pestell G.Walker 05.01.16 New Drawing 1
09093-HDL362-P&ID-1126 - Piping and Instrumentation Details09093-HDL362-BP-1127 - Skid Fabrication Details
1 J.Pestell G.Walker 05.01.16 As Built 3
Bill of MaterialsItem Quantity Description
1 1 Blackmer HDL3622 1 Vacuum Pump3 1 Liquid Trap4 1 Regulating Valve5 7 Manual Valve6 1 Non Return Valve 7 1 'Y' Strainer8 1 Coolant Flow Indicator9 1 System Skid
10 1 Gauge Board11 2 Pressure Switch12 1 Temperature Switch13 2 Pressure Relief Valve14 1 Compressor Motor15 1 Condenser 16 4 Gauges 17 1 EX Panel
System Duty Details Product - Kela 132A + A125Temperature - AmbientVessel Size - 20,000 LitresHeal Volume - @ 2 tonnesCompressor RPM - 650 RPMInverter Driven - NoDischarge Pressure - PRV set at 14 Bar (Compressor max - 24 bar)Average Displacement - 49.67 m3/hrTotal Transfer Time - 1.8-2 hours approx System Design Notes 1. Panel Supply - 230/400v 3ph+N+E2. Skid material - Mild steel BS EN 10025:2004 Grd S275 - Galvanised3. Process pipe work materials - Painted carbon steel4. Coolant pipe work materials - Galvanised carbon steel 5. All dimmensiosn are in MM6. All sharp endges are to be removed7. Pipe sizes will vary accross system
580
482
810
Side ElevationFront Elevation on Vacuum Pump
Plan
894 276 236 214 380
TP1
1580
694
184
171610 5
111 8 133 14 92
6
12
7
4
15
1335
-
Blackmer Vapour Recovery System withCondenser General Arrangement Drawing
09093-HDL362-GA-1129 1Authorised DateDrawn ModificationSize:
Scale:Nozzle Position : N/AFabrication : 5 mmMachining : 0.5 mm
All Dimensions are in mmU.N.O.
Tolerances:Custom
A4
This drawng and its content must notbe copied or disclosed to a thrid partywithout explicit consent from Axflow
London (Head Office)Orion Park, Northfield Avenue, Ealing, London
W13 9SJ Tel: 020 8579 2111 Fax: 020 8579 7326E-mail: [email protected] Axflow Contract No:
Drawing No:
Drawing Title:
Rev
Reference Drawings
Rev
Aberdeen OfficeUnit 3, Harlaw Center Howemoss
Cresent kirkhill IND EST, DYCE Aberdeen AB21 0GN TEL: 01224 729367 FAX: 01224
729368 E-Mail: [email protected]
Huddersfield OfficeUnit 9 FieldHouse Business park
old Fieldhose Lane huddersfield HD2 1FATEL: 01484 543649 FAX: 01484 512608
E-Mail: [email protected]
Status Code
1 - For Review/Approval 'Please Return Marked Up Prints By Date Stated'2 - Approved For Manufacture3 - Certified Final4 - For Infomation Only
0 J.Pestell G.Walker 05.01.16 New Drawing 1
09093-HDL362-P&ID-1126 - Piping and Instrumentation Details09093-HDL362-BP-1127 - Skid Fabrication Details
1 J.Pestell G.Walker 05.01.16 As Built 3
Termination ScheduleItem Size Type Service
1 1" ASA 300 System Suction2 3/4" ASA 150 System Discharge3 1" ASA 150 Vent Valve4 1" ASA 150 Vacuum Pressure Relief Valve5 3/4" ASA 150 Vent Valve6 1" ASA 150 System Pressure Relief Valve7 1" BSP Cooling Water8 1" BSP Cooling Water
TP1
TP2
TP3
TP4
TP5
TP6
TP7
TP8
Front Elevation on Vacuum Pump Side Elevation
Plan