3
Priority Grid layout EKD CB foundation 1 SMB FC Yes NA NA NA 2 Rampura Yes NA NA NA 3 RG-22 can issue TnR can isssue ABB 4 Haiderpur Yes ABB 5 Bhalswa can issue TnR can isssue ABB 6 GTK RC not placed PTR foundation Not clear site finalise Not clear Not clear to visit site PTR to finalise

description

drawings for Substation

Transcript of Drawing Status

Page 1: Drawing Status

Priority Grid layout EKD PTR foundation CB foundation

1 SMB FC Yes NA NA NA NA

2 Rampura Yes NA NA NA NA

3 RG-22 Not clear can issue TnR can isssue ABB Heptacare4 Haiderpur Yes to visit site PTR to finalise ABB Kapcos

5 Bhalswa Not clear can issue TnR can isssue ABB Heptacare

6 GTK Not clear to visit site PTR to finalise RC not placed Kapcos

CT (Structure + foundation)

Page 2: Drawing Status

cable schedule

NA Heptacare Not clear NA can issue - Ranibagh

NA Heptacare Not clear NA not to issue

Heptcare Heptacare Not clear Raychem can issue can issue - BWN 7Kapcos Heptacare Not clear NA can issue - Ranibagh

Heptcare Heptacare Not clear Raychem can issue can issue - BWN 7

Kapcos Heptacare Not clear NA can issue - Ranibagh

PT (Structure + foundation)

11KV NCT (Structure + foundation +

location)

Isolator ( Structure + foundation)

LA (structure + foundation)

Page 3: Drawing Status

Earthing DSLP

can issue NA

NA

can issuecan issue can issue

can issue

can issue - PO to discuss with grid manager the requirement

after site visit can final

after layout can final

after layout can final

after layout can final