Priority Grid layout EKD PTR foundation CB foundation
1 SMB FC Yes NA NA NA NA
2 Rampura Yes NA NA NA NA
3 RG-22 Not clear can issue TnR can isssue ABB Heptacare4 Haiderpur Yes to visit site PTR to finalise ABB Kapcos
5 Bhalswa Not clear can issue TnR can isssue ABB Heptacare
6 GTK Not clear to visit site PTR to finalise RC not placed Kapcos
CT (Structure + foundation)
![Page 2: Drawing Status](https://reader036.fdocuments.us/reader036/viewer/2022082406/55cf933f550346f57b9d21c0/html5/thumbnails/2.jpg)
cable schedule
NA Heptacare Not clear NA can issue - Ranibagh
NA Heptacare Not clear NA not to issue
Heptcare Heptacare Not clear Raychem can issue can issue - BWN 7Kapcos Heptacare Not clear NA can issue - Ranibagh
Heptcare Heptacare Not clear Raychem can issue can issue - BWN 7
Kapcos Heptacare Not clear NA can issue - Ranibagh
PT (Structure + foundation)
11KV NCT (Structure + foundation +
location)
Isolator ( Structure + foundation)
LA (structure + foundation)
![Page 3: Drawing Status](https://reader036.fdocuments.us/reader036/viewer/2022082406/55cf933f550346f57b9d21c0/html5/thumbnails/3.jpg)
Earthing DSLP
can issue NA
NA
can issuecan issue can issue
can issue
can issue - PO to discuss with grid manager the requirement
after site visit can final
after layout can final
after layout can final
after layout can final