10-18-11
SECTION
Bridge Approach Pavement RKNO. DATE TITLE
RK-16 04-19-11 Bridge Approach Details (in Conjunction with Bridge Deck Overlay)
RK-17 04-19-11 PCC Overlay of Reinforced Bridge Approach SectionRK-18 04-19-11 Bridge Approach Details (Secondary Roads)
RK-19A 04-19-11 Bridge Approach Section (General Details)
RK-19B 04-19-11 Bridge Approach Section (Two-Lane) (Abutting PCC Pavement)RK-19C 04-19-11 Bridge Approach Section (Two Lane for Bridge Reconstruction, P.C.C. Pavement)
RK-19F 04-19-11 Bridge Approach Section (at Existing Bridges, PCC Pavement)
RK-19G 04-19-11 Bridge Approach Section (Two Lane, HMA Pavement)
RK-19H 04-19-11 Bridge Approach Section (Two Lane for Bridge Reconstruction, HMA Pavement)RK-19J 04-19-11 Bridge Approach Section (at Existing Bridges, HMA Pavement)
RK-20 10-18-11 Double Reinforced 12" ApproachRK-21 04-19-11 Bridge Approach (abutting PCC or Composite Pavement)
RK-22 04-19-11 Bridge Approach (abutting HMA Pavement)
RK-23 04-19-11 Bridge Approach (Multi-Lane, Curbed Roadway)
RK-25 10-18-11 Double Reinforced 10" ApproachRK-26 10-18-11 Double Reinforced 10" Approach with Variable Depth Paving Notch
RK-27 10-18-11 Double Reinforced 12" Approach with Variable Depth Paving Notch
RK-30 04-19-11 Bridge Approach (Abutting Pavement)
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 5/30
Variable
Shoulder line
Transverse joints skewed or
perpendicular as specified
elsewhere in the plans.
Typical end of
normal bridge
Bridge
See Detail A
Typical end of
skewed bridge
B
A A
T Y P I C A L B R I D G E A P P R O A C H P L A N
T
Regular Pavement Bridge
Subbase (if applicable)
Granular Backfill
(by others)
See Detail ’A’
SEC TI O N A - A
T
Bridge
Abutm ent
Bridge
Approach
Pavem ent
MOVAB L E AB UT ME NT B R IDGE
DETAIL ’A’
F I X E D A B U T M E N T B R I D G E
T
Bridge
Approach
Pavem ent
Bridge
Abutm ent
’E’ Joint
Temporary paving b lock
removed by paving contractor
Reinforcing
Ba r
6’’
Normal Pavement Slope
TYPICAL HALF SECTION B
T
Length of Transverse Rebars: 23’-6’’ (20 required)
Length of Longitudinal Rebars: 19’-6’’ (24 required)
Shoulder line
Symet
lb
CL
1
Place 2 layers of subgrade
paper or other approved
material to prevent bond.
12’ (Lane Width)
#5 bars at
12’’ centers
1’-0’’’-0’’
60’ Min. 20’
60’
Min. 20’0’0’
24’
Pavem ent
Width
’F’
F-
o
’T’ is same thickness as is required for remainder of project pavement.
CF-1
CF-2
CF-3
Joint
370’
465’
575’
250’
320’
400’
See table for joint type
1 If bridge is skewed, place additional #5 bar parallel to skewed face.
’EF’ or ’CF-3’ joint shall be installed as part of regular pavement.
pavement is 53.33 sq. yds. of "Bridge Approach."
Quantity for 20’ long approach section for 24’
Pay Limits for
Contract Item
Joints shall be the same as
in adjacent pavement
’CD’ joint
For joint details, see
Reinforced Bridge
Approach Section
Min. 15’
Concre te used for the bridge ap proach sec t ion shal l be the
same as tha t used for remainder of projec t pavement .
Concrete Beam
Maximum
Bridge Length
Steel Girder
Maximum
Bridge Length
JOINT TYPE FOR
M OVAB L E AB UT M E NT B R I DGE S
#8 bars at 12’’ centers
21
2’’ Clear
Possible Cont rac t Items:
Bridge Approach, RK-18
Standard or Sl ip-Form PCC Pavement
Possible Tabula t ion:
112-6
RK-18
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
10
BRIDGE APPROACH DETAILS
(SECONDARY ROADS)
PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 6/30
Bridge End Post
2
Bridge End Post
2
1
1
Skew Angle
2O’ M in.
2
3
Curb
6’’ Standard
Curb
4’ ’ S loped
3
Bridge End Post
2
2
Bridge End Post
Floor
B r idge
Floor
B r idge
Floor
B r idge
DETAIL ’C’
DETAIL ’C’
DETAIL ’C’
DETAIL ’C’
Five Hole Bridge End Post
Retrofit Bridge End Post
Flared Bridge End Post
Low Speed Bridge End Post
Detail ’A’
Joint Per
’CF’ or ’E’
’E’ Joint
’E’ Joint
’E’ Joint
’E’ Joint
Detail ’A’
Joint Per
’CF’ or ’E’
J O I N T P L A C E M E N T
C U R B A LI G N M EN T a n d
CF-1
CF-2
CF-3
Joint
370’
465’
575’
250’
320’
400’
12
11
10
9
8
7
6
5
4
3
2
1
RK-19B through RK-19J.
Sections and details apply to Standard Road Plans RK-16 and
15’ Minimum
Floor
B r idge
Pavem ent
Roadway
L A Y O U T A T A S K E W
T W O L A N E A P P R O A C H P A V E M E N T
Bridge Length
Maximum
Concrete Beam
Bridge Length
Maximum
Steel Girder
M OVAB L E AB UT M E NT B R I DGE S
JOINT TYPE FOR
Possible Cont rac t Item:
Bridge Approach , RK-19
Possible Tabula t ion:
112-6
Curb
4’ ’ S loped
Curb
4’ ’ S loped
Detail ’A’
Joint Per
’CF’ or ’E’
F loor
B r idge
Detail ’A’
Joint Per
’CF’ or ’E’
SECTION C-C
Pavem ent
Design Shoulder
1O
2’
Polym er Gr id
1O:1 Earth Slope
Earth
SECTION B-B
2’-O’’
Polym er Gr id
Back of 4’’ Sloped Curb
Subbase
Modified
Curb
4’ ’ S loped
Subbase
Modified
Approach Sect ion
Reinforced Bridge
Movable Abutment Bridge
Fixed Abutment Bridge
4’’
1’-O
1’-O
’E’ Joint
2
2
6
6
8
8
45
Polym er Gr id
DETAIL ’A’
DETAIL ’A’
Polym er Gr id
4’’
for Joint Type
See Table
2’
Excavation LimitsModified Subbase
#5 Bars at 12’’ Centers
Normal Pavement SlopeT
2’ Clear
CL
SEC TI O N A - A
11
12
9
6’’
7
Earth
Polym er Gr id
Curb
4’ ’ S loped
Approach Roadway
#8 Bars at 12’’ Centers
T = 10 inches.
face.
If bridge is skewed, place additional #5 bar parallel to skewed
Trim fabric to edge of excavation.
Extend polymer grid to 2’ outside edge of pavement.
Secure polymer grid on top of paving notch.
Two pours - Use ’KS-1’ joint.
Single pour - Saw cut joint per Detail B.
Longitudinal Joint: (PV-101)
Bridge Abutment .
Temporary paving block removed by paving contractor.
Reinforcing Bar.
Build 4" Sloped Curb.
Reinforced Bridge Approach Section.
Design Shoulder width.
RK-19A
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards . APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
17
(GENERAL DETAILS)
BRIDGE APPROACH SECTION
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 8/30
Floor
B r idge
1O ’
’EF’ JointC D’ Joint
Bridge Floor
by others
Backfill
Granular
2’Modified Subbase
PL AN VIE W
’
D’
’
F’
A
B
B
A
CL
(See Project Typical Drawings)
Design Shoulder
(See Project Typical Drawings)
Design Shoulder
P
Possible ’CD’ Joint
Existing Joint or Crack
Existing Pavement
4’’ Perforated Subdrain
Modified Subbase
12’’
12’’
1O’’
4’’
Existing Joint or Crack
Doweled PCC Pavement
C
C
4’’ Perforated Subdrain
Existing Subbase
1O ’
Existing Pavement
See Detail ’C’
See Detail ’C’
1
X
X
See Detail ’B’
’RT’ Jo in t
’RT’ Jo in t
S E C T I O N T H R U C E N T E R L I N E
See Detail ’A’
’
T’
’
T’
Modified Subbase; otherwise Modified Subbase.
Porous Backfill if Trench is made through
Porous Backfill
4
3
3
’
D’
’
D’
5’ Min.
5’ Min.
1
(Polyethylene, Corrugated Tubing)
’KT-2’ or ’L-2’ ’K T-2’ or ’L -2’ ’K T-2’ or ’L -2’
5’ Min.
Granular Backfill line
Excavate to existing
See Standard Road Plan
RF-19E for outlet details
Reinforced Section Non-Reinforced Sect ion
Reinforced
SectionP
’D’
’
F’
Non-Reinforced SectionNon-R e inforced
Section
7
7
6
8
8
3
5
5
Crack
Joint or
Existing
Polym er Gr id
Grid
Polymer
(if applicable)
Subbase
DETAIL ’B’
As required by skew angle (2O’ Min.)
’EF’ Joint
2
2
2 2
2
2
Pay Limits for Contract Item
1 Build 4 inch Sloped Curb to end of Reinforced Bridge Approach Section.
See Curb Location Details (Section B-B).
2 See Standard Road Plan RK-19A.
3
Single Pour - Saw cut joint per detail B.
Two Pours - Use ’KS-1’ joint.
4 Minimum 1 panel, maximum 3 panels; 15’ minimum 20’ maximum panel
length, use ’CD’ Joints.
5 Excavation limits of Modified Subbase 2’ outside of pavement edge, see
Standard Road Plan RK-19A.
6 Slope subdrain to drain.
7 An "X" shall be placed in the plastic concrete near the ’EF’ Joint at the
outside edge of pavement.
8 Use ’RD’ Joint where PCC shoulder, ’B’ Joint otherwise.
For Joint Details,
Pay Limits for Contract Item
Approach Roadway
Pavem ent
PCC
Existing
Longitudinal Joint: (Standard Road P lan PV-101)
RK-19C
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
17
RECONSTUCTION, PCC PAVEMENT)
(TWO-LANE FOR BRIDGE
BRIDGE APPROACH SECTION
see PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 9/30
Floor
B r idge
1O’
’EF’ JointC D’ Joint
PL AN VIE W
’
F’
’F’
B
1
3
CL
(See Project Typical Drawings)
Design Shoulder
Possible ’CD’ Joint
Existing Joint or Crack
See Detail ’C’
1
X
X
’RT’ Jo in t
S E C T I O N T H R U C E N T E R L I N E
B
Detail ’A’
See
Bridge Floor
’
T’
’
T’’
D’
’
D’
(See Project Typical Drawings)
Design Shoulder
4’’ Perforated Subdrain
6’’
#5 Bars at 12’’ Centers
Normal Pavement SlopeT
CL4’’ Perforated Subdrain
1O’’
1O ’
’’EF’’ Joint’RT’ Jo in t
24’’
See Detail ’C’
See Detail ’B’
E
E
or Crack
Joint
Existing
Existing Pavement
SECTION E-E
3
6
6
5
7
1
Porous Backfill
Modified Subbase
Existing Subgrade Treatment
Existing Pavement
Modified Subbase
4’’
4
3
3
’
D’
’
D’
5’ Min.
8
(Polyethylene, Corrugated Tubing)
’L-2 or ’KT-2’ ’L-2’ or ’KT-2’ ’L-2’ or ’KT-2’
5’ Min.
Doweled PCC Pavement
RF-19E for outlet details
See Standard Road Plan
Existing
Joint or
Crack
Existing
Pavem ent
Reinforced Section Non-Reinforced Sect ion
Reinforced
Section
Non-Reinforced Section
8
9
9
5’ Min.
Earth.O’
2’ Clear
4’’
DETAIL ’B’
Grid
Polymer
Polym er Gr id
As required by skew angle (2O’ Min.)
Curb
4’ ’ S loped
2
2
2
2
For joint details,
Pay Limits for Contract Item
1 Build 4 inch Sloped Curb to end of Reinforced Bridge Approach Section.
See Curb Location Details (Section B-B).
2 See Standard Road Plan RK-19A.
3
Single Pour - Saw cut joint per detail B.
Two Pours - Use ’KS-1’ joint.
4
5 Slope subdrain to drain.
6 An "X" shall be placed in the plastic concrete near the ’EF’ Joint at the
outside edge of pavement.
7 Minimum 1 panel, maximum 3 panels; 15’ minimum 20’ maximum panel
length, use ’CD’ Joints.
8 Use ’RD’ Joint where PCC shoulder, ’B’ Joint otherwise
9 Excavation limits of Modified Subbase 2’ outside of pavement edge, see
Standard Road Plan RK-19A.
T = 10 inches.
Pay Limits for Contract Item
Approach Roadway
PCC
Approach Roadway
RK-19F
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
17
(AT EXISTING BRIDGES, PCC PAVEMENT)
BRIDGE APPROACH SECTION
#8 Bars at 12’’ Centers
Longitudinal Joint: (PV-101)
see PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 10/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 11/30
Floor
Br idge
Bridge Floor
by others
Backfill
Granula r
2’Modified Subbase
Detail ’A’
See
PLAN VIEW
A
B
B
A
1
3
CL
(See Project Typical Drawings)
Design Shoulder
(See Project Typical Drawings)
Design Shoulder
See Detail ’C’
1
S E C T I O N T H R U C E N T E R L I N E
C
C
3
3
’
D’
’
D’
’KT-2’ or ’L-2’ ’KT-2’ or ’L-2’
’
D’
’
D’
’
’
’
’
’B’ Joint
HMA Pav em en t
’CD’ JointCD’ Joint
HMA Pav em en t
Modified Subbase
4’’
12’’
Subbase
Br idge Approach
Section
DETAIL ’B’
See Detail ’B’
4’’
2O’ 2O’
4
Granular Backfill line
Excavate to existing
’B’ Joint
Existing
HMA Pav em en t
Reinforced Section
Reinforced
Section
Non-Reinforced Sect ion
5
5
7
6
6
6
7
Subbase (if applicable)
(if applicable)
Polymer Gr id
Polymer Gr idon-Reinforced Section - 4O’ Min.
As required by skew angle (2O’ Min.)
2
2 2
2
2
See Detail ’C’2
Pay Limits for Contract Item
For joint details,
1 Build 4’’ Sloped Curb to end of Reinforced Bridge Approach Section.
See Curb Location Details (Section B-B).
2 See Standard Road Plan RK-19A.
3
Single Pour - Saw cut joint per Detail B.
Two Pours - Use ’KS-1’ Joint.
4 Minimum 2 panels, maximum 3 panels; 20’ panel length, use ’CD’ Joints.
5 Excavation limits of Modified Subbase 2’ outside of pavement edge, see
Standard Road Plan RK-19A.
6 The contractor may be required to saw cut the HMA pavement full depth
to accommodate the ’B’ joints.
7 Use ’RD’ joint where PCC shoulder, ’B’ joint otherwise.
Approach Roadway
RK-19H
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
17
RECONSTRUCTION, HMA PAVEMENT)
(TWO-LANE FOR BRIDGE
BRIDGE APPROACH SECTION
Longitudinal Joint: (PV-101)
see PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 12/30
Floor
Br idge
B
1
3
CL
(See Project Typical Drawings)
Design Shoulder
1
S E C T I O N T H R U C E N T E R L I N E
Detail ’A’
See
Bridge Floor
’
D’
’
D’
Normal Pavement Slope
CL
See Detail ’C’
E
SECTION E-E
3
3
3
’
D’
’
D’
’L-2’ or ’KT-2’ ’L-2’ or ’KT-2’
(See Project Typical Drawings)
Design Shoulder
’CD’ Joint
’
’
’
’
’B’ Joint
See Detail ’B’
’B’ Joint
HMA Pav em en t
Modified Subbase
4’’
Subbase
Br idge Approach
Section
DETAIL ’B’
HM A ( ful l depth)
Modified Subbase
2’ Clear
2O’ 2O ’
Existing
Pavement
Reinforced Section
Reinforced
Section
Non-Reinforced Sect ion
E B
Earth
6’’
Excavation Limits
2’
4’’
1
7
6
7
6
5
6
(if applicable)
Polymer Gr id
Polymer Gr id
Non-Reinforced Section - 4O’ Min.
As required by skew angle (2O’ Min.)
Curb
4’ ’ S loped
2
HMA
2
2
See Detail ’C’2
Pay Limits for Contract Item
Approach Roadway
Approach Roadway
PLA N
10’’
4
4
’CD’ Joint
#5 Bars at 12’’ Centers
#8 Bars at 12’’ Centers
Bridge Approach , RK-19
Possible Contract Item:
3
4
2
1
7
5
6
Use ’RD’ joint where PCC shoulder, ’B’ joint otherwise.
pavement fu l l depth to accommodate the ’B’ jo in t .
The contractor may be required to saw cut the HM A
use ’CD’ Joints.
Minimum 2 panels, maximum 3 panels; 20’ panel length ,
pavement edge; see RK-19A.
Excavation limits of Modified Subbase 2’ outside of
Two Pours - U se ’KS-1’ Jo in t .
Single Pour - Saw cut joint per detail B.
Longitudinal Joints: (PV-101)
See RK-19A.
Sections. See Curb Location Details (Section B-B).
Build 4" Sloped Curb to end of Reinforced Br idge Approach
RK-19J
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
19
(AT EXISTING BRIDGES, HMA PAVEMENT)
BRIDGE APPROACH SECTION
For joint details see PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 13/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 14/30
’EF’ JointC D’ JointC D’ Joint
Bridge Floor
Modified Subbase
See Detail ’C’
S E C T I O N T H R U C E N T E R L I N E
Subbase (if applicable)
Detail ’A’
See
Granular Backfill line
Excavate to existing
Polym er Gr id
Bridge Floor
Modified Subbase
S E C T I O N T H R U C E N T E R L I N E
’B’ Joint
’C D’ Joint ’C D’ Joint
See Detail ’F’
Granular Backfill line
Excavate to existing
Polym er Gr id
Detail ’A’
See
Subbase (if applicable)
(Abutting HMA Pavement)
’B’ Joint
Modified SubbaseSubbase
Bridge Approach
Section
DETAIL ’F’
(if applicable)
’EF’ Joint
Modified Subbase; otherwise Modified Subbase.
Porous Backfill if Trench is made through
Porous Backfill
DETAIL ’C’
(Doweled PCC Pavement)
Polym er Gr id
Modified Subbase
HMA Pav emen t
Abutting
HMA Pav emen t
Abutting
4" Perforated Subdrain
10"
3""
3"
12"
12"
4" Perforated Subdrain
(if applicable)
Subbase
Polym er Gr id
’DW’ or ’R T’ Joint
’DW’ or ’R T’ Joint
Non-Reinforced Sectionsingle Reinforced Sectionouble Reinforced Section
(Abutting PCC or Composite Pavement)
Compos i te Pavement
Abutting PCC or
Compos i te Pavement
Abutting PCC or
Pay Limits for Contract Item
Pay Limits for Contract Item
4
4
4
If abutting pavement (PCC or HMA ) is not in place, refer to RK -30.
24"
24"
10’-0"
10’-0"
12" min.
placed with bridge
and Subdrain
Backfill
20’-0" 20’-0"s required by skew angle (20’-0" min.)
placed with bridge
and Subdrain
Backfill
Double Reinforced Section Single Reinforced Section Non-Reinforced Sect ion
As required by skew angle (20’-0" min.) 20’-0" 20’-0"
4 " S U B D R A I N L O C A T I O N
RK-20
REVISION
10-18-11
SHEET 2 of 3
REVISIONS:Changed "U" bar s ize on sheet 1 from #5 to #4 to match sheet 3. Added
note 9. Changed curb.
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
8
DOUBLE REINFORCED 12’’ APPROACH
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 15/30
33 "
D=2.5"
D=2"
20"
Skew Angle
SECTION B-B
Excavation Limits
Modified Subbase
CL
SEC TI O N A - A
Earth
Polymer Grid
Floor
Bridge
(Joint Placement)
6"
8"
(Pav emen t Lu g )
12" Centers
#5 bars at
Design Shoulder
6"
Polymer Grid
Modified Subbase
Excavation Limits
L A Y O U T A T A S K E W
A P P R O A C H P A V E M E N T
6"
B EN T B A R SH A PES
17"
5
6
6
6
5
6
7
8
Single pour Saw cut joint per Detail B.
Two pours Use KS-2Joint
Design shoulder width.
Reinforced bridge approach section.
Approach Roadway24’’
#4 bars at 12" Centers
D=2"
Refer to RK-21, RK-22, or RK-23.
or #4 Rebar
Steel Rod
" dia. x 24"
24’’
15’-0" min.
DETAIL ’D’
See Detail ’E’
’E’ Joint
DETAIL ’E’
(Back of Curb Placement)
Bridge End Post
Longitudinal Joint: (PV-101)
Bridge End Post
Gutter Line
DETAIL ’G’
Deck
Bridge
Pavement
Roadway
Normal Pavement Slope
7
7
9
9
8"
4"
1"
Post (typ.)
Bridge End
2""
20’-0" min.
8
Detail ’G’
Curb per
Detail ’G’
Curb per
9"
Detail ’G’
Curb per
PV-101. Seal joint per Detail F of P V-101.
material to fit the shape of the curb per Section B-B of
curb, place full depth of pavement plus curb and shape
full depth of the bridge approach pavement. In areas with
Expansion joint at end of bridge end post: Place joint filler the
from back side of curb to front face of bridge wing.
joint width. Joint length as required to completely fill
Section 4136. Minimum filler width is the abutment ’CF’
Expansion Joint Filler in accordance w ith Specification
- Moveable Abutment Bridges: F lexible Foam
- Fixed Abutment Bridges:Type ’E’ Joint
RK-20
REVISION
10-18-11
SHEET 3 of 3
REVISIONS:Changed "U" bar s ize on sheet 1 from #5 to #4 to match sheet 3. Added
note 9. Changed curb.
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
8
DOUBLE REINFORCED 12’’ APPROACH
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 16/30
PL AN VIE W
’F’
’F’
B
A
X
X
5
5
Slope Subdrain to Drain.
1
2
3
4
5
6
7
8
’KT-2 ’ o r ’L-2 ’
Use ’RD’ Joint where PCC shoulder, ’B’ Joint otherwise.
7
7
6
(See Project Typical Drawings)
Design Shoulder
2
2
2
See Detail ’D’
’W’
T’
’W’
T’CL
(Polyethylene, Corrugated Tubing)
4" Perforated Subdrain
5 ’ Min .
4 4
4 4
5 ’ Min .
Extend ’CD’ and ’EF’ Jo in t s where PCC Shoulder .
Build 4 inch Sloped Curb to end of Double Reinforced Section.
For joint details,
Two Pours - Use ’KS-2’ Joint (Double Reinforced Section).
Use ’KS-1’ Joint (Single Reinforced Section).
’KT-2’ or ’L-2’
Joint
Contraction
Possible
Pavement
P.C.C. or Composite
Polymer Grid and excavation limits of Modified Subbase 2’ outside of
An ’’X’’ shall be placed in the plastic concrete near the ’EF’ Joint at
the outside edge of pavement.
A
1
See Detail ’D’
1
3
38
8
Floor
Bridge3
’D’
’D’
’D’
B
’D’
3
Non-Reinforced Section
Single Reinforced Section
Double Reinforced Section
1 0 ’ Max .
1 0 ’ Max .
Single Pour - Saw cut joint per detail B
include the following areas:
Pay limits for contract item
See Standard Road Plan RK-20, RK-25, or RK-26.pavement edge. See Standard Road Plan RK-20, RK-25, or RK-26.
Approach Roadway
(See Project Typical Drawings)
Design Shoulder
See RF-19E for outlet details
RK-21
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
6
COMPOSITE PAVEMENT)
(ABUTTING PCC OR
BRIDGE APPROACH
Longitudinal Joint: (See PV-101)
see PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 17/30
3
2
4
Use ’RD’ joint where PCC shoulder, ’B’ joint otherwise.
5
6
1
A
5
5
See Detail ’D’
’KT-2’ or ’L-2’
(See Project Typical Drawings)
Design Shoulder
(See Project Typical Drawings)
Design Shoulder
2
2
See Detail ’D’
CL
4
Extend ’CD’ Jo in t s where PCC Shoulder .
Two Pours - Use ’KS-2’ Joint (Double Reinforced Section).
Pavement
HMA
’’
’’
Build 4’’ Sloped Curb to end of Double Reinforced Section.
For joint details,
Use ’KS-1’ Joint (Single Reinforced Section).
PL AN VIE W
Polymer Grid and excavation limits of Modified Subbase 2’ outside of
B
A
1
1
3
3
’D’
’D’
6
6
Floor
Bridge
2
3
4
’D’
B
’D’
3
Single Pour - Saw cut joint per detail B
Non-Reinforced Section
Single Reinforced Section
Double Reinforced Section
include the following areas:
Pay limits for contract item
Approach Roadway
pavement edge. See RK-20, RK-25, or RK-26.
See RK-20, RK-25, or RK-26.
Longitudinal Joint: (See PV-101)
see PV-101.
RK-22
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
6
(ABUTTING HMA PAVEMENT)
BRIDGE APPROACH
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 18/30
’
D’
’
D’
’
D’
’
D’’F’
’F’’
F’
’F’
X
X
’
F’
See Detail ’D’
See Detail ’D’
See Detail ’D’
Floor
B r idgeC
’E’ ’E’
’E’E’
Floor
B r idge
’
D’’
F’
’
D’
’
F’
’
D’’F’
’
D’
A
CL
’
D’’
F’
’
D’’F’
’
D’’F’
’
D’’F’
C
PL AN VIE WPL AN VIE W
’KT-2’ or ’L-2’
’KT-2’ or ’L-2’
’KT-2’ or ’L-2’
’KT-2’ or ’L-2’
Slope subdrain to drain.
P.C.C.
Pavem ent
P.C.C.
Pavem ent
4
4
5
6
6
4
4
5
6
6
6
5
4
3
2
1
2
2
2
2
See Detail ’D’
7
8
7
8
8
7
2’
Earth
6’’
Excavation LimitsModified Subbase
Normal Pavement Slope 1
SECTION C-C
6’’
Polym er Gr id
Curb
4’ ’ S loped
9
Build 4 inch Sloped Curb, unless noted otherwise in the plans.
’E’ Joint
’KT-2’ or ’L-2’
’KT-2’ or ’L-2’
’KT-2’ or ’L-2’KT-2’ or ’L-2’
7
8
9
9
9
9
9
9
’DW’ or ’RT’ Joint.
9
9
9
9
9
9
1
Two Pours -Use ’KS-2’ Joint (Double Reinforced Section).
Use ’KS-1’ Joint (Single Reinforced Section).
1
3
3
3
3
5
Raised Median
1
1
’KT-2’ or ’L-2’
’KT-2’ or ’L-2’
3
4 inch perforated subdrain (polyethylene, corrugated tubing).
For joint details,
Joint
Contraction
3
’
D’
’
D’
’
D’
’
D’
’
D’
’
D’
3
3
3
A
Joint
Contraction
’
D’
3
’
D’
3
3
3
’
D’
’
D’
’
D’
’
D’
’E’E’
’E’ ’E’
10’ Max.
5’ Min
10’ Max.
5’ Min
10’ Max.
5’ Min
10’ Max.
5’ Min
CL
CL
Polymer grid and excavation limits of Modified Subbase 2’ outside
An ’’X’’ shall be placed in the plastic concrete near the ’EF’ joint
at the outside edge of pavement.
Single Pour - Saw cut joint per detail B.Non-Reinforced Section
Single Reinforced Section
Double Reinforced Section
include the following areas:
Pay limits for contract item
Approach Roadway
Approach Roadway
Approach Roadway
See RF-19C or RF-19E for outlet details.
of pavement edge. See RK-20, RK-25, or RK-26.
See RK-20, RK-25, or RK-26.
RK-23
REVISION
04-19-11
SHEET 1 of 1
REVISIONS:Updated references to renamed s tandards .
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
7
(MULTI-LANE, CURBED ROADWAY)
BRIDGE APPROACH
Longitudinal joint: (PV-101)
see PV-101.
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 19/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 20/30
’EF’ JointC D’ JointC D’ Joint
Bridge Floor
Modified Subbase
See Detail ’C’Subbase (if applicable)
Detail ’A’
See
Granular Backfill line
Excavate to existing
Polym er Gr id
Bridge Floor
Modified Subbase
’B’ Joint
’C D’ Joint ’C D’ Joint
See Detail ’F’
Granular Backfill line
Excavate to existing
Polym er Gr idSubbase (if applicable)
(Abutting HMA Pavement)
’B’ Joint
Modified Subbase
Bridge Approach
Section
’EF’ Joint
Modified Subbase; otherwise Modified Subbase.
Porous Backfill if Trench is made through
Porous Backfill
(Doweled PCC Pavement)
Polym er Gr id
Modified Subbase
HMA Pav emen t
Abutting
HMA Pav emen t
Abutting
4" Perforated Subdrain
10"
3""
3"
12"
12"
4" Perforated Subdrain
(if applicable)
Subbase
Polym er Gr id
’DW’ or ’R T’ Joint
’DW’ or ’R T’ Joint
(Abutting PCC or Composite Pavement)
Compos i te Pavement
Abutting PCC or
Compos i te Pavement
Abutting PCC or
Pay Limits for Contract Item
Pay Limits for Contract Item
4
4
24"
10’-0"
10’-0"
12" min.
24"
Non-Reinforced Sect ion
placed with bridge
and Subdrain
Backfill
Double Reinforced Section Single Reinforced Section
As required by skew angle (20’-0" min.)
20’-0" 20’-0"
placed with bridge
and Subdrain
Backfill
Non-Reinforced Sectionsouble Reinforced Section Single Reinforced Section
As required by skew angle (20’-0" min.) 20’-0" 20’-0"
4
If abutting pavement (PCC or HMA) is not in place, see RK-30.
S E C T I O N T H R U C E N T E R L I N E
DETAIL ’C’
S E C T I O N T H R U C E N T E R L I N E
DETAIL ’F’
4 " S U B D R A I N L O C A T I O N D E T A I L
Subbase
(if applicable)
RK-25
REVISION
10-18-11
SHEET 2 of 3
REVISIONS:Changed "U" bar s ize on sheet 1 from #5 to #4 to match sheet 3. Added
note 9. Changed curb.
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
8
DOUBLE REINFORCED 10’’ APPROACH
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 21/30
33"
D=2.5"
D=2"
20"
Modified Subbase
Earth
Polym er Gr id
6"
8"
(Pavement Lug)
12" Centers
#5 bars at
Design Shoulder
6"
Polym er Gr id
Modified SubbaseExcavation Limits
4"15"
Single pour Saw cut joint per Detail B.
Two pours Use KS-2Joint
Design shoulder width.
Reinforced bridge approach section.
Approach Roadway
#4 bars at 12" Centers
D=2"
24"
8
7
6
5
6
6
5
or #4 Rebar
Steel Rod
" dia. x 24"
24"
Excavation Limits
Normal Pavement SlopeCL
See RK-21, RK-22, or RK-23.
Longitudinal Joint: (PV-101)
SEC TI O N A - A
SECTION B-B
B EN T B A R SH A PES
Skew Angle
L A Y O U T A T A S K E W
A P P R O A C H P A V E M E N T
15’-0" min.
Deck
Bridge
Pavement
Roadway
7
7
Post (typ.)
Bridge End
20’-0" min.
9
8
DETAIL ’E’
(Back of Curb Placement)
Bridge End Post
Gutter Line
8"
Detail ’G’
Curb per
9"
DETAIL ’G’
(Joint Placement)
6
DETAIL ’D’
See Detail ’E’
’E’ Joint
9
Detail ’G’
Curb per
Flo o r
Bridge
Bridge End Post
Detail F of PV-101.
the shape of the curb per Section B-B of PV-101. Seal joint per
place full depth of pavement plus curb and shape material to fit
full depth of the bridge approach pavement. In areas with curb,
Expansion joint at end of bridge end post: Place joint filler the
from back side of curb to front face of bridge wing.
joint width. Joint length as required to completely fill
Section 4136. Minimum filler width is the abutment ’CF’
Expansion Joint Filler in accordance w ith Specification
- Moveable Abutment Bridges: Flexible Foam
- Fixed Abutment B ridges:Type ’E’ Joint
per Detail ’G’
Sloped Curb
RK-25
REVISION
10-18-11
SHEET 3 of 3
REVISIONS:Changed "U" bar s ize on sheet 1 from #5 to #4 to match sheet 3. Added
note 9. Changed curb.
APPROVED BY DESIGN METHODS ENGINEER
STANDARD ROAD PLAN
8
DOUBLE REINFORCED 10’’ APPROACH
4"
1"
2""
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 22/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 23/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 24/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 25/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 26/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 27/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 28/30
8/3/2019 Drawing of Bridge Approach
http://slidepdf.com/reader/full/drawing-of-bridge-approach 29/30