Drathen (BTS-PMT IPS) Seite1; 2003-01-24 Process Management Technology Process Control Systems...
-
Upload
alyssa-bruce -
Category
Documents
-
view
213 -
download
1
Transcript of Drathen (BTS-PMT IPS) Seite1; 2003-01-24 Process Management Technology Process Control Systems...
<Investitionsanteil PMT> Drathen (BTS-PMT IPS)Seite 1; 2003-01-24
Process Process Management Management TechnologyTechnology
Process Control Systems
Electrical & Instrumentation
• Control systems (PLS, SPS, safety-related systems; recipe control, Start-up / shut-down recipes, load alternation, material flow control)
• Process optimization (control optimization, advanced control)• E-technology & measurement and control technology (sensors, actuators, buses,
concepts for power supply and distribution, redundancy concepts, MCC, etc.)• Process analysis technniques
Process
Manufacturing Execution Systems(MES)
• Horizontal and vertical integration (interfaces to ERP and PCS systems)• Material flow management• Process / laboratory data acquisition and administration (LIMS, PIMS)• Data analysis/process management (data mining, key performance indicators,
Performance monitoring, alarm analysis)• Training simulators• Asset management (preventive maintenance devices / process diagnosis)
• Production planning (of campaign, space and personnel deployment; production fine planning)
• Manufacturing execution (electronic batch recording, recipe administration, order accounting, tracing of batches/materials)
• Sales planning, (rough) capacity planning, availability planning
Steps in Enterprise Automation / Optimization
• Logistics control• Logistics administration
Enterprise Resource Planning, Advanced Planning System
(ERP, APS)
<Investitionsanteil PMT> Drathen (BTS-PMT IPS)Seite 1; 2003-01-24
Process Process Management Management TechnologyTechnology
Systems
Manufact. prep.
(control status)
Manufact.execution
(batch)
Manufact.data
evaluation
Asset managemt.
SAP: Enterprise Resource Planning (ERP)
WMWarehouse Management
Manufacturing Execution System
Exchange of information
Technicallogistics(MIMS)
Plant - Operation - Process - Laboratory
Laboratoryautomation
(LIMS)
Control system
Sensors, actuators PAT online Offline analysis (lab.)
MMMaterial
Management
QMQuality
Management
PP-PIProduction Planning
Process Industry
PMPlant
Maintenance
Perform.monitoring
Processcontrol
Advanced Process Control
APOAdvanced Planner
and Optimizer
Feed logistics Product logistics
<Investitionsanteil PMT> Drathen (BTS-PMT IPS)Seite 1; 2003-01-24
Process Process Management Management TechnologyTechnology
PMT Investment and Assembly Share 23% of Total Plant Investment
2% Process analysis systems
8% classical sensors
3% Final control equipment
3% Electroengineering
3% Control systems
3% MES Systems
1% Supply Chain and Logistics
Total costs of plant
100 %
Mean value of 15 assessed projects Period: 2000 - 2002