Transcript of Draft Stormwater Monitoring and Assessment Strategy for the Puget Sound Region: Volume 1 Scientific...
Draft Stormwater Monitoring Draft Stormwater Monitoring and Assessment Strategy for and Assessment Strategy for
the Puget Sound Region:the Puget Sound Region:Volume 1Volume 1
Scientific FrameworkScientific FrameworkNovember 18, 2009November 18, 2009
Jim Simmonds and Karen DinicolaJim Simmonds and Karen DinicolaStormwater Work GroupStormwater Work Group
22
Today’s TalkToday’s TalkOverview of programOverview of program
Purpose and scope of this effortPurpose and scope of this effort Scientific basis of the strategyScientific basis of the strategy Initial hypotheses and monitoring designsInitial hypotheses and monitoring designs Peer reviewPeer review
Schedule and approach to finalize, Schedule and approach to finalize, adopt and implement the strategyadopt and implement the strategy
33
Stormwater Work GroupStormwater Work Group Pilot topical work group to be part Pilot topical work group to be part
of the new regional ecosystem of the new regional ecosystem monitoring programmonitoring program
Caucus-based committee with broad Caucus-based committee with broad representationrepresentation
Committed to creating a Committed to creating a new business model for new business model for monitoringmonitoring
44
What We Are DoingWhat We Are DoingCreating a monitoring and assessment Creating a monitoring and assessment
strategy for the Puget Sound region strategy for the Puget Sound region that:that: Assesses and quantifies stormwater impactsAssesses and quantifies stormwater impacts Evaluates efficacy of management practicesEvaluates efficacy of management practices Describes roles and responsibilitiesDescribes roles and responsibilities
55
What This Effort Has TakenWhat This Effort Has Taken Project manager: 75% Project manager: 75% FTEFTE Facilitator: 25% Facilitator: 25% FTEFTE Chair: 30-50% Chair: 30-50% FTEFTE Committee members: 20 x 5-20% Committee members: 20 x 5-20% FTEFTE Non-members on subgroups: ~8 x 5-15% Non-members on subgroups: ~8 x 5-15% FTEFTE Consultant assistance: ~800 hoursConsultant assistance: ~800 hours Meetings and workshops: $25K/yearMeetings and workshops: $25K/year TimeTime
Scientific BasisScientific BasisAdaptive managementAdaptive managementStart with highest priority monitoringStart with highest priority monitoring
Provide the most important Provide the most important information to decision makersinformation to decision makers
Hypothesis-driven approachHypothesis-driven approach““Credible, Testable, Actionable”Credible, Testable, Actionable”
66
77
88
Assessment QuestionsAssessment QuestionsLong-term status, trends, and spatial Long-term status, trends, and spatial
extent of beneficial uses impacted by extent of beneficial uses impacted by stormwater?stormwater?
Efficacy of stormwater management Efficacy of stormwater management actions at reducing impacts?actions at reducing impacts?
Sources of stormwater causing the Sources of stormwater causing the impacts? impacts?
99
Prioritization ProcessPrioritization ProcessBrainstorming by committeeBrainstorming by committeeTechnical expert work sessionsTechnical expert work sessionsConsultant assistanceConsultant assistancePublic workshopsPublic workshops
ApproachApproachReview scientific frameworks for Review scientific frameworks for
other regional programsother regional programsDevelop and prioritize Develop and prioritize
hypotheseshypothesesDraft initial experimental Draft initial experimental
designsdesigns
1010
Stressors
Direct effects on receiving waters:
• channel modifications• riparian clearing• water withdrawal• addition of alien taxa
Indirect effects on receiving waters:
• changing land use• appropriation of water• stormwater runoff• pollutant generation
All driven by humanpopulation growth andresource consumption
Biological responses
Biotic interactions
Biotic interactions
Water qualityand toxicity
Water qualityand toxicity
Land conversion: “the driver”
Altered waterresource features
Biological or human health
endpoint
Habitat structureHabitat
structure
Flow regimeFlow
regime
Energy sourceEnergy source
Conceptual ModelConceptual Model
1111
1212
Agricultural Residential Commercial Industrial
Marine toxics accumulation
in food chain toxics accumulation
in food chain
Nearshore shellfish growing
areas contact recreation
shellfish growing areas
toxics accumulation in food chain
contact recreation
shellfish growing areas
contact recreation
shellfish growing areas
toxics accumulation in food chain
contact recreation
Small streams
benthic invertebrates
acute toxicity contact recreation physical habitat eutrophication
benthic invertebrates
acute toxicity contact recreation physical habitat eutrophication flooding
benthic invertebrates
acute toxicity physical habitat flooding
benthic invertebrates
acute toxicity physical habitat
Rivers benthic
invertebrates
Lakes
benthic invertebrates
contact recreation eutrophication
benthic invertebrates
toxics accumulation in food chain
contact recreation eutrophication drinking water
Groundwater drinking water drinking water drinking water drinking water
Wetlands physical habitat physical habitat physical habitat physical habitat
Major Stormwater ImpactsMajor Stormwater Impacts
1313
Scientific FrameworkScientific FrameworkHypotheses for each of three Hypotheses for each of three
categories of monitoring that categories of monitoring that address different scales:address different scales:Status and trendsStatus and trendsEffectivenessEffectivenessSource identificationSource identification
Proposed InitialProposed InitialExperimental DesignsExperimental Designs
Status and trends monitoringStatus and trends monitoring Small streamsSmall streams NearshoreNearshore
Effectiveness studiesEffectiveness studies Low-impact development (LID)Low-impact development (LID) Industrial source controlIndustrial source control
1414
1515
Status and TrendsStatus and TrendsSmall streams and nearshoreSmall streams and nearshoreFocus on biotaFocus on biotaProbabilistic designProbabilistic designPuget Sound widePuget Sound wideCan be sampled atCan be sampled at
higher density higher density for areas/issues of for areas/issues of
concernconcern
1616
Small Streams Status & TrendsSmall Streams Status & Trends Consistent with State’s Consistent with State’s
ambient programambient program Permanent & rotating sitesPermanent & rotating sites
StreamflowStreamflow Benthic macroinvertebratesBenthic macroinvertebrates Sediment chemistrySediment chemistry Physical habitatPhysical habitat Water qualityWater quality Toxicity testingToxicity testing
1717
Nearshore Status & Trends Nearshore Status & Trends Probabilistic design focused on biotaProbabilistic design focused on biotaPermanent and rotating sitesPermanent and rotating sitesMonitoring:Monitoring:
Bacteria Bacteria Marine benthosMarine benthos Physical habitatPhysical habitat Sediment chemistrySediment chemistry Tissue chemistry Tissue chemistry
• mussels, herring, and English sole (also lesions)mussels, herring, and English sole (also lesions)
1818
EffectivenessEffectivenessCategories:Categories:
Low-impact development Low-impact development techniques for future new techniques for future new developmentdevelopment
Retrofit techniques for Retrofit techniques for existing developmentexisting development
Non-structural operational and Non-structural operational and programmatic approachesprogrammatic approaches
Initial studiesInitial studies
1919
Low-impact DevelopmentLow-impact Development Small-scale residential Small-scale residential
LID projectsLID projects Outfall stations, Outfall stations,
background stations, background stations, downstream stationsdownstream stations
3 years of monitoring:3 years of monitoring: Weather, flow, ground-Weather, flow, ground-
water elevationwater elevation Benthic macroinvertebratesBenthic macroinvertebrates Water & sediment quality, toxicityWater & sediment quality, toxicity
November, 2009November, 2009 2020
Industrial Source ControlIndustrial Source Control Outfalls at both test and control basinsOutfalls at both test and control basins 3 years of water quality monitoring:3 years of water quality monitoring:
Baseflow Baseflow Storms Storms
2121
Source IdentificationSource Identification Local scale plus collective regional Local scale plus collective regional
assessmentsassessments ID and track sources of chemicals or runoff ID and track sources of chemicals or runoff
volumes that are impacting beneficial usesvolumes that are impacting beneficial uses
2222
Summary of Proposed Monitoring Summary of Proposed Monitoring Status and Trends Effectiveness Source ID
Marine
Nearshore
Probabilistic survey design (resident fish, forage fish, shellfish, bacteria, sediment, toxics)
Fecal coliform bacteria Industrial (toxics)
Smallstreams
Probabilistic survey design (salmon, invertebrates, toxics)
Low impact development (hydrology, biota, water quality)
Urban retrofits (pollutants, toxics, water quantity)
Industrial source control (pollutants)
Public education (pollutants)
Street sweeping (pollutants)
Altered flows Impervious surface
(hydrology) Industrial (toxics) Vehicle miles as surrogate
(pollutants)
Rivers
Lakes
Groundwater
Wetlands
2323
Additional Science NeedsAdditional Science NeedsData managementData managementStandard operating Standard operating
proceduresproceduresLand use/land cover Land use/land cover
datadataClimate dataClimate dataModelingModeling
2424
Formal Peer Review PanelFormal Peer Review PanelRich HornerRich Horner, Univ. of Washington, Univ. of WashingtonBob PittBob Pitt, Univ. of Alabama, Univ. of AlabamaJean SpoonerJean Spooner, North Carolina State Univ., North Carolina State Univ.Tom SchuelerTom Schueler, Chesapeake Stormwater , Chesapeake Stormwater
NetworkNetworkSteve WeisbergSteve Weisberg, Southern California , Southern California
Coastal Water Research ProjectCoastal Water Research Project
Completing the Completing the Scientific FrameworkScientific Framework
Public comments and peer review due Public comments and peer review due COB November 30, 2009COB November 30, 2009
Post on webpage:Post on webpage: All comments All comments Responses to formal peer review commentsResponses to formal peer review comments
SWG will address gaps, issues: scientific SWG will address gaps, issues: scientific framework complete early 2010framework complete early 2010
2525
2626
Volume 2: Volume 2: Implementation PlanImplementation Plan
Necessary mechanics for a Necessary mechanics for a scientifically credible programscientifically credible program SOPs, data reporting, data management, etc.SOPs, data reporting, data management, etc.
Roles and responsibilities Roles and responsibilities Coordinated approach to implementationCoordinated approach to implementation
Completing the StrategyCompleting the Strategy Complete scientific frameworkComplete scientific framework Implementation planning January-April 2010; Implementation planning January-April 2010;
another workshop in May 2010another workshop in May 2010 Interact with Ecosystem Coordination BoardInteract with Ecosystem Coordination Board Interact with Science PanelInteract with Science Panel
Final strategy to PSP and Ecology by June 30, Final strategy to PSP and Ecology by June 30, 20102010 Brief Leadership CouncilBrief Leadership Council
2727