Emirate of Abu Dhabi Lighting Specification Parks, Public Realm & Architectural Lighting DRAFT Part A General Lighting Specification (Pages 2 to 18) Part B Lighting for Sports Area Use (Pages 19 to 32) Part C Lighting Poles & Mounting Accessories (Pages 33 to 36) Version 0 Dated 18 th September 2011 Department of Municipal Affairs Municipality of Abu Dhabi City Parks & Recreational Facilities Division

description

Abu Dhabi Municipality - Lighting specification - ADM specs.

Transcript of DRAFT ISSUE - Lighting Specs - ADM

Page 1: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Lighting Specification

Parks, Public Realm & Architectural Lighting

DRAFT

Part A – General Lighting Specification (Pages 2 to 18)

Part B – Lighting for Sports Area Use (Pages 19 to 32)

Part C – Lighting Poles & Mounting Accessories (Pages 33 to 36)

Version 0 Dated 18th

September 2011

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Page 2: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 1 18 Sep 2011

Document Control

Revision Date Description Prepared

by Checked

by Approved

by

0 18

th

September 2011

Lighting Specification

Parks, Public Realm and Architectural Lighting

Martin Valentine

Page 3: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 2 18 Sep 2011

Part A – General Lighting Specification

LED Lighting Requirements 1 As part of the overall Sustainable Lighting Strategy for Abu Dhabi, ADM requires that quality LED

lighting fixtures and solutions are put forward where ever possible. However, where specific tasks may indeed be proved better performed by an energy-efficient lighting technology other than LED then ADM will accept their inclusion as an option in the design proposals and view the technical details before making a final decision.

Where the total lighting installation needs to meet tight project budgetary constraints, then both LED options and traditional energy-efficient technology fixture options must be tabled to ADM with full comparison costings and technical data in order for the final decision to be made. The additional technical specification requirements for LED fixtures necessary to ensure quality solutions are proposed is detailed within this specification alongside the basic lighting specification and design requirements.

Solar Lighting Requirements

2 ADM strives to be a leader in sustainability and as part of this aim it is required that for every park and public realm lighting project the Consultant is to explore the current viability and options for solar lighting solutions in the marketplace and propose where best it can be offered for incorporation into the project.

Particular attention should be paid to areas of the project which might provide specific advantages for having some solar lighting technology and/or their cost of implementation can be mitigated by other factors. These include, but are not limited to, interactive/awareness zones, integrated with local structures, isolated areas without current electrical infrastructure, dedicated sports areas, children’s play areas, sculptures/arts or specific paths.

ADM may require detailed cost/payback analysis to develop any approved options through to Detailed Design and Tender Issue.

General Lighting Requirements 3 The design, specification, calculation, manufacturing, testing, shipment, installation and

performance of lighting system shall be in accordance with the applicable requirements of all ADM general electrical standards for electrical distribution works, except as specified herein. Copies should be requested from ADM if not already held. The luminaires shall be designed to operate continuously at the specified ambient temperature and humidity with special attention given to the occasional sand storms and dusty weather in specifying/designing the luminaire body.. The manufacturers shall guarantee adherence to this Specification and the performance of their luminaires under all the required design conditions.

Page 4: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 3 18 Sep 2011

4 The luminaires shall be provided with suitable optical assemblies for their locations and tasks as

indicated on the drawings and shall provide efficient even glare-free illumination with correct cut-off angles as set out in CIE 126-1997 (Guidelines for Minimizing Sky Glow. Commission Internationale de L 'Eclairage / 01-Jan-1997) and the overall requirements for Estidama Communities projects as applicable for the area and zone of the project.

The luminaire housings shall be of either extruded aluminium or die cast aluminium with very low copper-content and high corrosive resistance. The finish coating for housing shall be with an anti-corrosive anodized/painting process or equivalent, providing excellent UV and environmental exposure resistance to fading, peeling cracking or corrosion. The control gear/driver(s) shall be integral or remote as applicable, encapsulated/potted or non-potted as applicable for the fixture and protected in a waterproof(IP) environment, enabling access to the gear for easy maintenance requirements. The fixtures shall be CE or UL certified, or comply with equivalent international standards with all certification made available if requested.

Applicable Standards & Guidance Documents 5 The following documents (or other equivalent International approved documents) shall be followed:

a) IESNA (Illuminating Engineering Society of North America) - Lighting Handbook 10th

Edition. b) CIBSE/SLL(Chartered Institute of Building Services Engineers/Society of Light & Lighting) - Code For Lighting 2009

c) CIBSE/SLL - Lighting Handbook 2009

d) CIE(Commission Internationale de L 'Eclairage) 129 – Guide for Lighting Exterior Work Areas e) CIE 126-1997 Guidelines for Minimizing Sky Glow f) IESNA TM-10 Addressing Obtrusive (Urban Sky Glow and Light Trespass) in conjunction with Urban Lighting

g) CIBSE/SLL LG06 - SLL Lighting Guide 6: The Outdoor Environment 1992

h) WCLC (from CIBSE/SLL) - The Colour, Light and Contrast Manual: Designing and Managing Inclusive Built Environments 2010 i) CIBSE/SLL/ILE ILE02 - Guide to fibre-optic and remote-source lighting 2001 j) CIE S 015/E:2005: Lighting of Outdoor Work Places k) ISO 8995-3:2006(E)/CIE S 016/E:2005: Joint ISO/CIE Standard: Lighting of Work Places - Part 3: Lighting Requirements for Safety and Security of Outdoor Work Places l) IEC 60529, EN 60 529 (IP) and EN 50 102 (IK).Degrees of Protection Provided by Enclosures (IP Code for ingress protection and IK Code for Mechanical Strength).

Page 5: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 4 18 Sep 2011

m) EN 12464 - Part 2, Workplace Lighting (Outdoor Workplaces)

n) IESNA RP-33-99 Lighting for Exterior Environments o) IESNA TM-11-00 Technical Memorandum on Light Trespass: Research, Results, and Recommendations

p) IESNA DG-13 Guide for the Selection of Photo controls for Outdoor Lighting Applications

q) IESNA DG-3-00 Application of Luminaire Symbols on Lighting Design Drawings r) IESNA DG-18-08 Light + Design: A Guide to Designing Quality Lighting for People and Buildings

s) IESNA G-1-03 Guideline on Security Lighting for People, Property, and Public Spaces

t) IESNA G-2-10 Guideline for the Application of General Illumination (“White”) Light-Emitting Diode (LED) Technologies u) IESNA TM-16 -05 Technical Memorandum on Light Emitting Diode (LED) Sources & Systems. v) IESNA RP-16-10 Nomenclature & Definitions for Illuminating Engineering. w) IES/IESNA LM-79-08 Approved Method: Electrical and Photometric Measurements of Solid-State Lighting Products.

x) IES/IESNA LM-80-08 Approved Method for Measuring Lumen Maintenance of LED Light Sources. y) ANSI/NEMA/ANSLG C78.377-2008-Americian National Standard for Chromatically of Solid State Lighting Products.

z) BS EN 62471:2008, CEI/IEC 62471/CIE S 009/E&F:2006: or ANSI/IESNA RP-27.3-07 Photobiological Safety of Lamps and Lamp Systems. za) EN 61547, EN 61000-3-2, EN 61000-3-3 & EN 55015 – for Electromagnetic Compatibility (Immunity Requirements, Harmonics Requirements, Flicker Requirements & Radiated and Conducted Emissions, respectively).

zb) Joint Electron Device Engineering Council (JEDEC). zc) National Electric Code (NEC) 2011 zd) ADM Sustainability Guideline Standards ze) ESTIDAMA - Community Pearl Rating System.

Page 6: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 5 18 Sep 2011

Construction

6 LED Luminaires

Within the Luminaire:

The light source shall be high brightness white light emitting Diodes (LEDs) with individual minimum efficacy of at least 75lm/W arranged modularly to provide the required lighting output. All lumen figures shall be Deliver (Hot) Lumens. The LEDs shall be from a reputed manufacturer of LEDs with proven past performance in accordance with ANSI/NEMA/ANSLG C78.377-2008 – (American National Standard for Chromatically of Solid State Lighting Products) or similar approved International Standard. They shall only be from MacAdam Ellipse Step-2, Step-3 or Step-4 Bins. Step-7 Binning is not acceptable. The CRI ≥80 The LEDs shall be removable/replaceable on site by modular means without any possible risk to maintaining luminaire photometry and without the need to demount the fixtures for sake of future upgrading/maintenance requirements.

Whole Luminaire Efficacy: The optimum efficiency of the luminaire shall be confirmed as follows: Minimum luminaire efficacy shall be:

≥ 50llm/cctW (@50-degC, 95%RH) Which is given as Total Luminaire Design(Deliver) Lumen Output (llm) over Total Luminaire Circuit Watts(cctW) at 50-degrees Centigrade Operating Outside Ambient Temperature and 95% Relative Humidity. Luminaire Maximum % Direct Uplight shall be as CIE 126-1997 and as required/allowed for the project for the Estidama application as applicable. Please note the importance of providing the correct lumen output figures for 50 degreeC-ambient temperature operation of the luminaire. The above figure must not be based on using lumen output given for the standard 25 or 35-degreeC ambient lab test results unless stated that they are the same.

Page 7: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 6 18 Sep 2011

7 Conventional (non-LED) Luminaires

Within the Luminaire:

The light source shall be of a standard proven lamp-type, energy-efficient with minimum lamp efficacy of 60lm/lampW. The lamps shall be from a reputed manufacturer with standard lamp-base type configuration and can only have high-efficiency (hf) electronic control gear specified/provided. Conventional/wire-wound control gear is not acceptable. Allowed lamp types include Compact and Linear Tri-phosphor Fluorescent, Metal Halide, Induction, Plasma and efficient electro-luminescent technologies. Tungsten(GLS), mains or low-voltage Tungsten-Halogen and Xenon lamp technologies are not acceptable for use on ADM Projects The CRI ≥80 All lamps and gear shall be removable/replaceable on site without any possible risk to maintaining luminaire photometry, the IP rating, causing any degradation and without the need to demount the fixtures for sake of future upgrading/maintenance requirements.

Whole Luminaire Efficacy: The optimum efficiency of the luminaire shall be confirmed as follows: Minimum luminaire efficacy shall be:

≥ 50llm/cctW (@50-degC, 95%RH) Which is given as Total Luminaire Design(Deliver) Lumen Output (llm) over Total Luminaire Circuit Watts(cctW) at 50-degrees Centigrade Operating Outside Ambient Temperature and 95% Relative Humidity. Luminaire Maximum % Direct Uplight shall be as CIE 126-1997 and as required/allowed for the project for the Estidama application as applicable. Please note the importance of providing the correct lumen output figures for 50 degreeC-ambient temperature operation of the luminaire. The above figure must not be based on using lumen output given for the standard 25 or 35-degreeC ambient lab test results unless stated that they are the same.

Page 8: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 7 18 Sep 2011

8 Optical Control

The luminaire shall be fitted with optical refractors, diffusers and/or reflectors. Different optics shall be proposed to exactly suit the specific applications. Independent laboratory photometric test reports shall be submitted for the luminaire photometric files used in the lighting calculations. For LED fixtures, or for LED components used within conventional fixtures, the testing should conform to IESNA LM-79-08 standards.

9 LED Fixture Thermal Management

The LED modules shall be mounted on heavy duty heat sinks to ensure excellent head dissipation. The design of the heat sinks shall be such that there is a direct thermal path from the led junctions to the atmosphere thus providing a thermal transfer effect throughout the life of the luminaire. The heat sinks shall be propriety and designed by the lighting manufacturer to enable the luminaires to work efficiently in Abu Dhabi climatic conditions. The luminaire shall be provided with a demonstrated ventilation arrangement allowing heat to be dissipated to the atmosphere. The luminaire shall be designed to prevent collection of debris on the heat sinks by proven and stated means. The design shall be such that the luminaire shall be self cleaning in normal operation. The luminaire shall be provided with a heavy-duty rugged cast aluminium adjustable slip fitter mountable to suit the proposed pole. The Contractor shall coordinate with the LED fitting manufacturer and pole/component manufacturer to make sure the complete compatibility of the products.

10 Ingress Protection

The luminaire gear and lamp or LED optical-unit components shall be externally fully rated to the minimum IP(ingress Protection)-rating and IK(Mechanical Strength)-rating as set out below for each specific fixture-type and have proven means of negating internal condensation build-up for their application. All synthetic materials to be 100% UV Stable and fixings to be non-standard, vandal resistant requiring special tools.

Fixture Type Minimum IP-rating IK-rating Column Fixture IP-65 IK07-10 Bollard IP-66 IK07-10 In-ground (buried) IP-67(top and bottom) IK08-10 Floodlight IP-66 IK07-10 Bulkhead IP-65 IK07-10 Underwater Fixture IP-68(including all connections) IK10 Specials IP-66-68(to suit type/application) IK07-10

Page 9: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 8 18 Sep 2011

All low-level lighting fixtures must have elements/components and glass suitably temperature rated for touch at <75-degrees in a 50-degree ambient operating environment. Any fixtures proposed to be operated pointed upwards and/or have optical components on the top of fixtures, the fixture design must be suitably IP rated for their installed orientation and allow water and debris not to collect on the glass/synthetic cover.

11 Copper Content

All Aluminium Die-cast components shall have a very low copper content of less than 0.1% for corrosion resistance. Please note the ADM Warranty requirements for the luminaire body as set in clause 50. Where different materials are used in isolation, or together with aluminum alloy components, and where these fixtures have specific corrosion resistant properties, suitable information must be provided to ADM for assessment.

12 Brightness & Glare

For avoidance of discomfort and disability glare on projects the requirements of Estidama regarding Communities section LC-R6: Light Pollution Reduction must be adhered to for the project and location. This includes providing the following information: a) Ensuring the individual fixture source intensities are within Estidama allowances. b) Ensuring the project surface brightness are within Estidama allowances c) Ensuring project threshold and beyond-threshold illuminances are within Estidama allowances. d) Ensuring scheme upward lighting component is within Estidama allowances e) Ensuring Light Trespass vertical illuminances to surrounding properties are within Estidama

allowances. f) Ensuring both curfew and non-curfew allowances are checked for all the above within

Estidama. Use of a well chosen control philosophy will ensure compliance with both levels. Refer also to clause 13 below.

13 Controls

Suitable controls must be proposed for the scheme to maximize the possibilities for energy saving, reduction in maintenance and increased lamp-life. Daylight linking to ensure no lighting circuits can remain on in daylight hours is statutory for the whole project whilst additional layers of control shall be applied for sports lighting areas, to split essential and non-essential lighting and to meet Estidama curfew and non-curfew allowances. Consideration can be given for control-separation of pathway/transitional lighting circuits from accent/landscaping lighting circuits on different time settings and specific to the area and project requirements.

Page 10: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 9 18 Sep 2011

14 Coloured/RGB Lighting fixtures

All proposed fixtures designed for coloured or colour-changing(RGB) lighting applications must be LED fixtures and utilize LED sources and components where ever possible. In addition pure coloured LEDs to be utilized where ever possible over rather than white LEDs and coloured filters/diffusers due to the higher losses and thus higher wattage requirements associated with using coloured filters. (refer to clause 41 for more information)

Fixture Technical Data - For each type of lighting fixture, data on features, accessories,

finishes and the following shall be included:

Note. Issue separate supporting documents if required.

15 Provide physical description of lighting fixture including dimensions. 16 Provide details of the control gear/driver(s) including, manufacturer, gear efficiency, catalogue

code, fixture imagery, certifications and input watts. 17 Provide luminaire photometric reports; including, luminaire catalogue numbers, luminaire, and full

light source (lamp or LED) specification information. Useful life lamp life data and all verification of site lighting performance at that life.

18 Provide documentation of all calculations applied in deriving the proposed LLD and useful life. 19 Provide safety certification and file number as required for the luminaire family which shall be listed,

labelled, or identified per the National electric code (NEC). Applicable testing bodies are determined by the US Occupational Safety Health Administration (OSHA) as Nationalized Recognized testing Laboratories (NRTL) and include CSA (Canadian Standards Association), ETL (Edison Testing Laboratory), UL (Underwriters Laboratory) and CE Conformance European (Communaut Europ enne / Conformit Europ enne). Japanese electrical standard JET (Japan Electrical Safety & Environment Technology Laboratories). Whole fixture with all components including lamps/LEDs and gear shall be Certified as RoHS Compliant

Light Sources Technical Requirements - Within the fixture the light sources shall

meet the following requirements:

Note. Attach separate supporting documents if required.

20 Operating temperature rating shall be between – 40

oC and +50

oC at 95% Relative Humidity (RH).

21 Storage (i.e. non-operating/daytime) temperature : all components to be designed to tolerate

between – 40oC and +80

oC at 95% Relative Humidity (RH).

Page 11: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 10 18 Sep 2011

22 Correlated colour temperature (CCT) : 2700-4200K (white light sources only, not applicable for

coloured or RGB sources) 23 Colour rendering index (CRI) : ≥ Ra80

LED Sources - Specific Technical Requirements - Within the fixture the LED

sources shall meet the following requirements:

Note. Attach separate supporting documents if required.

24 Confirm the actual/final Correlated Colour Temperature (CCT) of light source for White LEDs as part of the luminaire optical package. For RGB or coloured LEDs provide wavelength. Confirm the actual/final Colour-Rendering Index (CRI/Ra) of light source for White LEDs as part of the luminaire optical package.

25 Luminaire manufacturer shall submit reliability reports indicating that the manufacturer of the LED

(chip, diode, or package) has performed Joint Electron Devices Engineering Council (JEDEC), or similar International approved equivalent; reliability tests on the LEDs as follows. Factory pre-release test reports shall be provided from the LED manufacturer duly complying to JEDEC JESD22-A108C, or equivalent, for operating life tests at 85

o C Ambient temperature and also for

humidity and salt atmosphere corrosion tests. Standards and tests used must be stated.

Control Gear Technical Requirements - Within the fixture the control gear:

ballasts/drivers shall meet the following requirements:

26 Control gear shall be high-frequency (hf) electronic version and be switchable, dimmable as required and fully compatible with the proposed control philosophy and equipment. Control gear shall have a minimum efficiency of 85%.High-loss wire-wound ballasts and inefficient control gear is not acceptable. Case (Tc

oC) Temperature rating -40

oC to +80

oC at 95% Relative Humidity (RH).

27 All Control gear shall be integral to the fixture wherever possible. If integral gear is not possible due

to project/design constraints, and thus adjacent control gear housings or remote (group) control gear is specified, the proposed installation method, wiring, protection, maintenance methodology, finishes and locations must be detailed and presented to ADM for Approval prior to ordering.

28 Input voltage; capable of 120-277 volt, single phase or as required by the site. 29 Power supplies can be UL Class 1 or II output or similar European CE or International equivalent.

Page 12: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 11 18 Sep 2011

30 Surge protection: Must be tested in accordance to the requirements of IEEE/ASNI C62.41.2-2002,

Scenario I Location Category C or International equivalent. 31 Control gear shall have a Power Factor (PF) of L: ≥ 0.90.

Control gear shall a Total Harmonic Distortion (THD) of: ≤ 20% Control gear shall comply with FCC 47 cfr part 18 non-consumer RFI.EMI standards or equivalent. Control gear shall be RoHS Compliant

LED Drivers – Specific Technical Requirements - Within the fixture the LED

driver(s) shall meet the following requirements:

32 Driver Case (Tc o

C) Temperature rating -40oC to +80

oC at 95% Relative Humidity (RH).

Driver/Fixture to have some means of built-in overheat thermal protection in the form of automatic dimming or stepping/holding down of the driver where temperature exceeds operational limits. Thermal cut-out devices which turn the fixture LEDs completely off are not acceptable.

Wiring, Connections & Junction Boxes – In addition to the requirements of the

ADM Electrical Specification, the following requirements must be met:

33 All Junction boxes, cables, connections or control devices must be integrated into the landscaping through suitable concealed means in a logical and designed manner by the Consultant. The proposed installation method(s), protection, maintenance methodology, accessibility, finishes and locations must be detailed and presented to ADM for Approval prior to ordering.

LED Luminaire Requirements - The dedicated luminaire expected useful life (light

output) and Depreciation requirements for LED luminaires shall be as follows:

34 LED Useful Life Requirements

The useful life of the luminaire in terms of lumen output must be as specified by one of the following two methods.

a/ As per LM-79-08 or approved International equivalent. Simplified B20-L70 threshold. A minimum of 50,000 operating hours before reaching the B20-L70 lumen output degradation point with no catastrophic failures. The B20-L70 lumen output must be capable of providing the luminance level and uniformity.

b/ Site performance method. A life time of number of hours specified by the site based on expected site lighting useful life must be capable of providing the luminance levels of uniformity.

Page 13: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 12 18 Sep 2011

35 LED Useful life testing and verification procedure

Simplified B20-L70 threshold. Perform LM-79-08 (or approved International equivalent) testing on the luminaire at both time intervals of 0 hours and 6,000 hours. The luminaire shall be operated continuously in the appropriate UL 1598/153 environment or equivalent except when it is removed to perform the LM-79 light output tests. If the light output determined at 6,000 hours is ≥ 96%, the light output determined at 0 hours, the luminaire meets the simplified B20-L70 threshold for useful life.

36 LED Site Performance method

a/ Perform lumen depreciation testing per LM-80-08 (or approved International equivalent) on the light sources (s) (module/array) for a minimum of 6000 hours (longer testing period is encouraged). Identify the installed (in luminaire) operating temperature of the LED using the Ts point under operating ambient temperature of 50-degreesC. From this interpolated curve, determine the lamp lumen depreciation (LLD) value and useful life that meets the needs of the site defined hours of operation to end of useful life as well as the luminance level and uniformity required.

Project Performance Requirement - The following factors shall be applied to

determine the performance requirements for all luminaire types:

37 Light Loss Factors (LLF)

LLF = LLD x LDD (Lamp Lumen Depreciation x Luminaire Dirt Depreciation)

a/ Assume Lamp Lumen Depreciation (LLD) 0.70 for dedicated luminaires except where recommended otherwise by the luminaire manufacturer. Assume the appropriate effects from life/temperature on the lumen output of the luminaire. Note: For LED fixtures the figure used should only match the stated Lumen Depreciation value given by the manufacturer for 50,000-hour operation at 50-degree ambient.

b/ Assume Luminaire Dirt Depreciation (LDD) using appropriate and stated depreciation factors to suit actual environment and resistance properties of the specific fixture.

Photobiological Safety The Manufacturer/Supplier shall provide a written undertaking to

the satisfaction of ADM of testing to the following standards:

38 Ensure luminaire complies with Photobiological Safety of lamps and lamp systems in accordance

with the requirements of BS EN 62471:2008 or A N S I / I E S N A R P - 2 7 . 3 - 0 . Provide proof of testing and compliance with the standards with certification provided to prove the fixture is classed as “Exempt”.

Page 14: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 13 18 Sep 2011

Schedule of Lighting Design Levels The Consultant and Contractor shall follow the

following lighting design guidelines for all Parks, Public Realm and Architectural Lighting Schemes

39 Undertake all lighting design and lighting calculations to the following ADM design standards:

The Contractor shall conduct a Field Performance test of the lighting installations immediately after energisation of the system in the presence of the Engineer. The test results shall meet the lighting requirements identified in the above specifications and below table. ADM will take appropriate actions if the specified lighting levels/design intent are not achieved and the Contractor will have to undertake remedial action to address the problems at his cost and without delay to the Contract.

Overall Area Type Maximum Overall

Average Area

Illumination(E)=LUX

Uniformity

Ratio

Light Source Maximum

Pole/Mounting

Height

Parks Overall Average

Illumination 5 LUX Not applicable

LED or

Equivalent* 4m/5m**

Public Realm Areas

Overall Average

Illumination

7 LUX Not applicable LED or

Equivalent* 4m/5m**

Specific Area, Use,

Task or Feature

Average

Illumination(E)=LUX

Uniformity

Ratio (minimum

to average)

Light

Source

Notes

Main Pathways 10 LUX 0.25 (Lmin to Lav) LED or

Equivalent*

-

Secondary pathways 5 LUX 0.25 (Lmin to Lav) LED or Equivalent*

-

Public squares, piazzas

and open public spaces

15 LUX 0.3 (Lmin to Lav) LED or

Equivalent*

Level and design dependent on location and use

Play Grounds 30 LUX 0.3 (Lmin to Lav) LED or

Equivalent*

Localised as necessary and higher illuminances for specific equipment risk. Avoid excessive glare

Steps & Hazards 50 LUX 0.6 (Lmin to Lav) LED or Equivalent*

-

Access points, exits, 50 LUX 0.3 (Lmin to Lav) LED or Equivalent*

Localized treatment

Trees/Bushes 10 LUX - LED or Equivalent*

On surfaces

Page 15: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 14 18 Sep 2011

*Any equivalent technology proving similar or better illumination performance, energy efficiency and

life cycle cost and which fully meets the requirements of this specification.

**Pole/mounting heights and spacing arrangements to be selected for the project so they are designed for the maximum possible overall effect and efficiency with all the fixtures proposed and to

suit the overall landscaping Masterplan and aesthetic of the project.

40 Architectural Floodlighting

The illuminance requirements for open public realm spaces such as public squares and parks are given in the above tables. Precise requirements for the architectural illuminance of buildings, facades and structures cannot be given so specifically because the values are affected by many more variables. However, the general recommendations of the below table are a useful starting point and are ADM maximum average illuminance limits for design. Better design criteria should be obtained and provided to ADM on the reflectance of the surface material, its state of cleanliness

Footbridges 40 LUX 0.3 (Emin to Eav) LED or Equivalent*

-

Delivery, Rubbish &

Refuse area

30 LUX 0.4 (Lmin to Lav) LED or Equivalent*

-

Cycle Racks 10 LUX 0.4 (Lmin to Lav) LED or Equivalent*

-

Signs 100 LUX (vertical) - LED or Equivalent*

Vertical/On Sign

Outside Audience areas

20 LUX 0.4 (Lmin to Lav) LED or Equivalent*

1 LUX during performance

Performance/Stage area

300 LUX 0.6 (Lmin to Lav) LED or Equivalent*

-

Water (still) - - LED or Equivalent*

Position lamps to produce good reflectance in water,

Water (running) - - LED or Equivalent*

Position lamps behind or below and aim to strike water at oblique

angles or within jets.

Focal Points (large) 100 LUX - LED or Equivalent*

-

Focal Points (small) 200 LUX - LED or Equivalent*

-

Illuminating a Flag over

a dark background

150 LUX - LED or Equivalent*

-

Illuminating a Flag over

a bright background

450 LUX - LED or Equivalent*

-

Clocks: Dark surroundings, light surface

100 LUX - LED or Equivalent*

-

Clocks: Light surroundings, dark surface

300 LUX - LED or Equivalent*

-

Page 16: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 15 18 Sep 2011

and the district brightness; it is assumed that the building surface is reasonably matt; specular finishes will require additional special consideration.

Successful building floodlighting depends on much more than achieving the recommended maximum average illuminance and there is only an indirect relationship between illuminance, luminance and the visual effect produced.

The simplified procedure comprises of 5 steps:

• Determination of required illuminance;

• Choice of lamps and floodlights best suited to the project;

• Calculation of the number and wattage of floodlights and/or architectural feature lights needed to give the required illuminance;

• Determination of best mounting positions for floodlights;

• Specification of aiming directions for the floodlights.

*Based on reflectance for a white light. Values will need to be adapted for light sources with a

defined colour, illuminance should then be defined in accordance with clause 40 and be decided with site trials/mock-ups.

**Typical districts are: Low Brightness – Rural, Medium Brightness – Suburban, High Brightness –

Town and City Centres. Refer also to the requirements of Estidama.

Approximate

Reflectance

Typical

Materials*

Surface

Condition

Maximum Average Illumination (E)=LUX

for District Brightness**

Low Medium High

0.8 White Brick, Tiles or Painted

Clean

Fairly Clean

Fairly Dirty

15 20 45

25 35 75

40 60

120

0.6 Sand, Sand Stone, Portland Stone

Clean

Fairly Clean

Fairly Dirty

20 35 65

35 55

110

60 90

180

0.4 Middle Stone, Mud

Brick,

Medium Concrete

Clean

Fairly Clean

Fairly Dirty

30 45 90

50 75

150

80 120 240

0.3 Dark Stone and

Tiles

Clean

Fairly Clean

Fairly Dirty

40 55

110

60 90

180

100 150 300

0.2 Dark Granite, Tiles

Red Brick

Clean

Fairly Clean

Fairly Dirty

55 80

160

90 140 280

150 230 450

Page 17: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 16 18 Sep 2011

41 Coloured Light Conversion Factors when using Filters

It is important to remember that the colour of surface material is accentuated if light of the same colour is used. Also attractive effects are sometimes achieved by using light of different colours at different times and/or in specific locations. The following table gives the factors by which the calculated illuminance based upon white light, has to be increased in order to achieve the same apparent value visually with coloured filters are proposed These factors take into account the fact that coloured light is more conspicuous but also the transmission losses of different filter colours. Where ever colour is proposed these are only general guidelines and it is always suggested to physically test and mock-up the proposal before finalizing the design and fixture specifications.

.

42 Coloured Light when using coloured and RGB LEDs

Coloured LEDs, emit coloured light directly from the chip without additional filtering required. As such the values obtained within lighting design software from luminaire photometry can accurately compared against white light fixtures and the resultant illuminance and luminance figures a good guide to effectiveness. Conversion factors do not need to be applied as the outputs in all colours is achieved at 100% of the rated outputs. However it is always suggested to physically test and mock-up any coloured lighting solutions within the proposal before finalizing the design and fixture specifications.

Project Lighting Calculations - The following performance reports of the lighting

installation shall be submitted for approval along with the material submittal:

43 Computer Generated Photometric Analysis of Proposed DAY 1 (Defined as the initial illuminance values):

This calculation is useful to ascertain the expected measurable light levels on site during the project commissioning period. It should be noted that this is not considered a design calculation for the project. The design calculation is undertaken in accordance with section 44 below.

a/ Provide average luminance/illuminance measurements and uniformity at grade. Spacing between measurement points shall be as per CIBSE, CIE or IESNA standards and standard software settings.

Coloured Light Illumination

Multiplier Factor

Coloured Light Illumination

Multiplier Factor Red 2 Yellow 1.25

Green 4 Orange 1.75

Blue 6 Purple 5

Amber 1.5 Pink 3

Page 18: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 17 18 Sep 2011

b/ Computer calculations should use of the following applicable LLF value (in accordance with the methodology set out in section 37 above): using variables 1.0 for both LLD and for LDD. c/ The photometric data files shall be provided to ADM for verification.

44 Computer Generated Photometric Analysis of Proposed FUTURE DATE (Defined as assuming numerous thousands of hours of operation and using stated design/deliver illuminance values).

This calculation is considered the DESIGN calculation for the project. a/ Provide average luminance/illuminance measurements and uniformity at grade. Spacing between measurement points shall be as per CIBSE, CIE or IESNA standards and standard software settings.

b/ Computer calculation should use the LLF values (LLD x LDD). All as calculated under the requirements set out in section 37 above.

c/ The photometric data files shall be provided to ADM for verification.

Quality Assurance 45 ADM may request standard production model luminaire samples, identical (including lamp/LED

light source and control gear/driver package) to the proposed specified product, to be installed for inspection. ADM may also request independent testing of sample luminaires to verify luminaire performance and compliance with the specifications. Testing shall be conducted as per the applicable IESNA, ANSI or approved International equivalent and international approved methods of products using Solid Stage Lighting (SSL - LED) sources. ADM shall be sole judge regarding acceptability of optical system performance.

ADM shall be offered a factory Inspection for up to 3 staff members to attend. Factory inspection shall be arranged by the Contractor/manufacturer prior to the shipment of the material and all costs are to be covered by the Contractor/manufacturer.

Warranty

Luminaire Warranty - The Contractor shall provide a written undertaking to the satisfaction

of ADM to warranty the materials and performance as follows:

46 A written warranty for a minimum five(5) year on-site replacement material, fixture, finishes and

workmanship. On-site replacement included transportation, removal and installation of new product. Body and finish warranty shall include warranty against failure or substantial deteriorations such as corrosion, blistering, cracking, peeling, chalking or fading.

Page 19: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 18 18 Sep 2011

47 For LED fixtures a written warranty for a minimum five(5) year replacement material warranty for

defective or non-starting LED source assemblies. 48 A written warranty for a minimum five(5) year replacement material warranty on all supplied control

gear, ballasts, drivers, power supply units (PSUs) and in-built control components. 49 For LED fixtures a written warranty for a minimum five(5) year replacement material warranty for

on-maintained luminance levels on all light sources (LED package, LED array, or LED module) including, but not limited to the LED die, encapsulate, and phosphor. If the expected useful life of

the luminaire system is not maintained, then the manufacturer shall replace the light source(s) or luminaire as needed.

50 A written warranty for a minimum ten(10) years against the deterioration of the housing, all external

components; such as lenses, gaskets & fastenings, and the fixture finishes. Including, but not limited to, corrosion, yellowing, blistering, chalking, cracking, peeling or fading.

Measurement and Payment 51 Measurement and payment for the various items of supply and install luminaires (as described in

this section or in the bills of quantities) will be by number (each) and at the rate as included in the bill of quantities, which rate shall be considered as full compensation for all labour, materials, tools, equipments and appurtenances required and as directed by the Engineer. No separate Measurement and payment will be made for the installation of cables from junction box to the luminaires.

Page 20: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 19 18 Sep 2011

Part B - Lighting for Sports Area Use

LED Lighting Requirements 1 As part of the overall Sustainable Lighting Strategy for Abu Dhabi, ADM requires that quality LED

lighting fixtures and solutions are put forward where ever possible for Sports lighting applications. However, where specific tasks may indeed be proved better performed by an energy-efficient lighting technology other than LED then ADM will accept their inclusion as an option in the design proposals and view the technical details before making a final decision.

Where the total lighting installation needs to meet tight project budgetary constraints, then both LED options and traditional energy-efficient technology fixture options must be tabled to ADM with full comparison costings and technical data in order for the final decision to be made. The additional technical specification requirements for LED fixtures necessary to ensure quality solutions are proposed is detailed within this specification alongside the basic lighting specification and design requirements.

General Lighting Requirements 2 The design, specification, calculation, manufacturing, testing, shipment, installation and

performance of lighting system shall be in accordance with the applicable requirements of all ADM general electrical standards for electrical distribution works, except as specified herein. Copies should be requested from ADM if not already held. The luminaires shall be designed to operate continuously at the specified ambient temperature and humidity with special attention given to the occasional sand storms and dusty weather in specifying/designing the luminaire body.. The manufacturers shall guarantee adherence to this Specification and the performance of their luminaires under all the required design conditions.

3 The luminaires shall be provided with suitable optical assemblies for their locations and tasks as

indicated on the drawings and shall provide efficient even glare-free illumination with correct cut-off angles as set out in CIE 126-1997 (Guidelines for Minimizing Sky Glow. Commission Internationale de L 'Eclairage / 01-Jan-1997) and the overall requirements for Estidama Communities projects as applicable for the area and zone of the project.

The luminaire housings shall be of either extruded aluminium or die cast aluminium with very low copper-content and high corrosive resistance. The finish coating for housing shall be with an anti-corrosive anodized/painting process or equivalent, providing excellent UV and environmental exposure resistance to fading, peeling cracking or corrosion. The control gear/driver(s) shall be integral or remote as applicable, encapsulated/potted or non-potted as applicable for the fixture and protected in a waterproof(IP) environment, enabling access to the gear for easy maintenance requirements. The fixtures shall be CE or UL certified, or comply with equivalent international standards with all certification made available if requested.

Page 21: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 20 18 Sep 2011

Applicable Standards & Guidance Documents 4 The following documents (or other equivalent International approved documents) shall be followed:

a) IESNA (Illuminating Engineering Society of North America) - Lighting Handbook 10th

Edition. b) CIBSE/SLL(Chartered Institute of Building Services Engineers/Society of Light & Lighting) - Code For Lighting 2009

c) CIBSE/SLL - Lighting Handbook 2009

d) CIBSE/SLL LG04 - SLL Lighting Guide 4: Sports 2006 e) CIE 126-1997 Guidelines for Minimizing Sky Glow f) IESNA TM-10 Addressing Obtrusive (Urban Sky Glow and Light Trespass) in conjunction with Urban Lighting g) IEC 60529, EN 60 529 (IP) and EN 50 102 (IK).Degrees of Protection Provided by Enclosures (IP Code for ingress protection and IK Code for Mechanical Strength). h) IESNA RP-33-99 Lighting for Exterior Environments i) IESNA TM-11-00 Technical Memorandum on Light Trespass: Research, Results, and Recommendations

j) IESNA DG-13 Guide for the Selection of Photo controls for Outdoor Lighting Applications

k IESNA DG-3-00 Application of Luminaire Symbols on Lighting Design Drawings

l) IESNA G-2-10 Guideline for the Application of General Illumination (“White”) Light-Emitting Diode (LED) Technologies m) IESNA TM-16 -05 Technical Memorandum on Light Emitting Diode (LED) Sources & Systems. n) IESNA RP-16-10 Nomenclature & Definitions for Illuminating Engineering. o) IES/IESNA LM-79-08 Approved Method: Electrical and Photometric Measurements of Solid-State Lighting Products.

p) IES/IESNA LM-80-08 Approved Method for Measuring Lumen Maintenance of LED Light Sources. q) ANSI/NEMA/ANSLG C78.377-2008-Americian National Standard for Chromatically of Solid State Lighting Products.

r) BS EN 62471:2008, CEI/IEC 62471/CIE S 009/E&F:2006: or ANSI/IESNA RP-27.3-07 Photobiological Safety of Lamps and Lamp Systems.

Page 22: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 21 18 Sep 2011

s) EN 61547, EN 61000-3-2, EN 61000-3-3 & EN 55015 – for Electromagnetic Compatibility (Immunity Requirements, Harmonics Requirements, Flicker Requirements & Radiated and Conducted Emissions, respectively).

t) Joint Electron Device Engineering Council (JEDEC). u) National Electric Code (NEC) 2011

v) ADM Sustainability Guideline Standards w) ESTIDAMA - Community Pearl Rating System.

Construction

5 LED Luminaires

Within the Luminaire:

The light source shall be high brightness white light emitting Diodes (LEDs) with individual minimum efficacy of at least 100lm/W arranged modularly to provide the required lighting output. All lumen figures shall be Deliver (Hot) Lumens. The LEDs shall be from a reputed manufacturer of LEDs with proven past performance in accordance with ANSI/NEMA/ANSLG C78.377-2008 – (American National Standard for Chromatically of Solid State Lighting Products) or similar approved International Standard. They shall only be from MacAdam Ellipse Step-2, Step-3 or Step-4 Bins. Step-7 Binning is not acceptable. The CRI ≥60 The LEDs shall be removable/replaceable on site by modular means without any possible risk to maintaining luminaire photometry and without the need to demount the fixtures for sake of future upgrading/maintenance requirements.

Whole Luminaire Efficacy: The optimum efficiency of the luminaire shall be confirmed as follows: Minimum luminaire efficacy shall be:

≥ 75llm/cctW (@50-degC, 95%RH)

Page 23: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 22 18 Sep 2011

Which is given as Total Luminaire Design(Deliver) Lumen Output (llm) over Total Luminaire Circuit Watts(cctW) at 50-degrees Centigrade Operating Outside Ambient Temperature and 95% Relative Humidity. Luminaire Maximum % Direct Uplight shall be as CIE 126-1997 and as required/allowed for the project for the Estidama application as applicable. Please note the importance of providing the correct lumen output figures for 50 degreeC-ambient temperature operation of the luminaire. The above figure must not be based on using lumen output given for the standard 25 or 35-degreeC ambient lab test results unless stated that they are the same.

6 Conventional (non-LED) Luminaires

Within the Luminaire:

The light source shall be of a standard proven lamp-type, energy-efficient with minimum lamp efficacy of 80lm/lampW. The lamps shall be from a reputed manufacturer with standard lamp-base type configuration and can only have high-efficiency (hf) electronic control gear specified/provided. Conventional/wire-wound control gear is not acceptable. Allowed lamp types include Compact and Linear Tri-phosphor Fluorescent, Metal Halide, Induction, and Plasma technologies. Tungsten(GLS), mains or low-voltage Tungsten-Halogen lamp technologies are not acceptable for use on ADM Sports Projects The CRI ≥60 All lamps and gear shall be removable/replaceable on site without any possible risk to maintaining luminaire photometry, the IP rating, causing any degradation and without the need to demount the fixtures for sake of future upgrading/maintenance requirements.

Whole Luminaire Efficacy: The optimum efficiency of the luminaire shall be confirmed as follows: Minimum luminaire efficacy shall be:

≥ 75llm/cctW (@50-degC, 95%RH)

Page 24: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 23 18 Sep 2011

Which is given as Total Luminaire Design(Deliver) Lumen Output (llm) over Total Luminaire Circuit Watts(cctW) at 50-degrees Centigrade Operating Outside Ambient Temperature and 95% Relative Humidity. Luminaire Maximum % Direct Uplight shall be as CIE 126-1997 and as required/allowed for the project for the Estidama application as applicable. Please note the importance of providing the correct lumen output figures for 50 degreeC-ambient temperature operation of the luminaire. The above figure must not be based on using lumen output given for the standard 25 or 35-degreeC ambient lab test results unless stated that they are the same.

7 Optical Control

The luminaire shall be fitted with optical refractors, diffusers and/or reflectors. Different optics shall be proposed to exactly suit the specific applications. Independent laboratory photometric test reports shall be submitted for the luminaire photometric files used in the lighting calculations. For LED fixtures, or for LED components used within conventional fixtures, the testing should conform to IESNA LM-79-08 standards.

8 LED Fixture Thermal Management

The LED modules shall be mounted on heavy duty heat sinks to ensure excellent head dissipation. The design of the heat sinks shall be such that there is a direct thermal path from the led junctions to the atmosphere thus providing a thermal transfer effect throughout the life of the luminaire. The heat sinks shall be propriety and designed by the lighting manufacturer to enable the luminaires to work efficiently in Abu Dhabi climatic conditions. The luminaire shall be provided with a demonstrated ventilation arrangement allowing heat to be dissipated to the atmosphere. The luminaire shall be designed to prevent collection of debris on the heat sinks by proven and stated means. The design shall be such that the luminaire shall be self cleaning in normal operation. The luminaire shall be provided with a heavy-duty rugged cast aluminium adjustable slip fitter mountable to suit the proposed pole. The Contractor shall coordinate with the LED fitting manufacturer and pole/component manufacturer to make sure the complete compatibility of the products.

9 Ingress Protection

The luminaire gear and lamp or LED optical-unit components shall be externally fully rated to the minimum IP(ingress Protection)-rating and IK(Mechanical Strength)-rating as set out below for each specific fixture-type and have proven means of negating internal condensation build-up for their application. All synthetic materials to be 100% UV Stable and fixings to be non-standard, vandal resistant requiring special tools.

Fixture Type Minimum IP-rating IK-rating Column Fixture IP-66 IK08-10 Floodlight IP-66 IK08-10

Page 25: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 24 18 Sep 2011

Cont...

Fixture Type Minimum IP-rating IK-rating Underwater Fixture IP-68(including all connections) IK10 Specials IP-66-68(to suit type/application) IK08-10 All low-level lighting fixtures must have elements/components and glass suitably temperature rated for touch at <75-degrees in a 50-degree ambient operating environment. Any fixtures proposed to be operated pointed upwards and/or have optical components on the top of fixtures, the fixture design must be suitably IP rated for their installed orientation and allow water and debris not to collect on the glass/synthetic cover.

10 Copper Content

All Aluminium Die-cast components shall have a very low copper content of less than 0.1% for corrosion resistance. Please note the ADM Warranty requirements for the luminaire body as set in clause 46. Where different materials are used in isolation, or together with aluminum alloy components, and where these fixtures have specific corrosion resistant properties, suitable information must be provided to ADM for assessment.

11 Brightness & Glare

For avoidance of discomfort and disability glare on projects the requirements of Estidama regarding Communities section LC-R6: Light Pollution Reduction must be adhered to for the project and location. This includes providing the following information: a) Ensuring the individual fixture source intensities are within Estidama allowances. b) Ensuring the project surface brightness are within Estidama allowances c) Ensuring project threshold and beyond-threshold illuminances are within Estidama allowances. d) Ensuring scheme upward lighting component is within Estidama allowances e) Ensuring Light Trespass vertical illuminances to surrounding properties are within Estidama

allowances. f) Ensuring both curfew and non-curfew allowances are checked for all the above within

Estidama. Use of a well chosen control philosophy will ensure compliance with both levels. Refer also to clause 12 below.

12 Controls

Suitable controls must be proposed for the sports activity/area to maximize the possibilities for energy saving, reduction in maintenance and increased lamp-life. Daylight linking to ensure no lighting circuits can remain on in daylight hours is statutory whilst additional layers of automatic control shall be applied for sports lighting to tailor the lighting to only when sports activities are taking place, to split essential and non-essential lighting and to meet Estidama curfew and non-curfew allowances.

Page 26: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 25 18 Sep 2011

Fixture Technical Data - For each type of lighting fixture, data on features, accessories,

finishes and the following shall be included:

Note. Issue separate supporting documents if required.

13 Provide physical description of lighting fixture including dimensions. 14 Provide details of the control gear/driver(s) including, manufacturer, gear efficiency, catalogue

code, fixture imagery, certifications and input watts. 15 Provide luminaire photometric reports; including, luminaire catalogue numbers, luminaire, and full

light source (lamp or LED) specification information. Useful life lamp life data and all verification of site lighting performance at that life.

16 Provide documentation of all calculations applied in deriving the proposed LLD and useful life. 17 Provide safety certification and file number as required for the luminaire family which shall be listed,

labelled, or identified per the National electric code (NEC). Applicable testing bodies are determined by the US Occupational Safety Health Administration (OSHA) as Nationalized Recognized testing Laboratories (NRTL) and include CSA (Canadian Standards Association), ETL (Edison Testing Laboratory), UL (Underwriters Laboratory) and CE Conformance European (Communaut Europ enne / Conformit Europ enne). Japanese electrical standard JET (Japan Electrical Safety & Environment Technology Laboratories). Whole fixture with all components including lamps/LEDs and gear shall be Certified as RoHS Compliant

Light Sources Technical Requirements - Within the fixture the light sources shall

meet the following requirements:

Note. Attach separate supporting documents if required.

18 Operating temperature rating shall be between – 40

oC and +50

oC at 95% Relative Humidity (RH).

19 Storage (i.e. non-operating/daytime) temperature : all components to be designed to tolerate

between – 40oC and +80

oC at 95% Relative Humidity (RH).

20 Correlated colour temperature (CCT) : 4200-6000K 21 Colour rendering index (CRI) : ≥ Ra60

Page 27: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 26 18 Sep 2011

LED Sources - Specific Technical Requirements - Within the fixture the LED

sources shall meet the following requirements:

Note. Attach separate supporting documents if required.

22 Confirm the actual/final Correlated Colour Temperature (CCT) of light source for LEDs as part of the luminaire optical package. Confirm the actual/final Colour-Rendering Index (CRI/Ra) of light source for LEDs as part of the luminaire optical package.

23 Luminaire manufacturer shall submit reliability reports indicating that the manufacturer of the LED

(chip, diode, or package) has performed Joint Electron Devices Engineering Council (JEDEC), or similar International approved equivalent; reliability tests on the LEDs as follows. Factory pre-release test reports shall be provided from the LED manufacturer duly complying to JEDEC JESD22-A108C, or equivalent, for operating life tests at 85

o C Ambient temperature and also for

humidity and salt atmosphere corrosion tests. Standards and tests used must be stated.

Control Gear Technical Requirements - Within the fixture the control gear:

ballasts/drivers shall meet the following requirements:

24 Control gear shall be high-frequency (hf) electronic version and be switchable, dimmable as required and fully compatible with the proposed control philosophy and equipment. Control gear shall have a minimum efficiency of 85%. High-loss wire-wound ballasts and inefficient control gear is not acceptable. Case (Tc

oC) Temperature rating -40

oC to +80

oC at 95% Relative Humidity (RH).

25 All Control gear shall be integral to the fixture wherever possible. If integral gear is not possible due

to project/design constraints, and thus adjacent control gear housings or remote (group) control gear is specified, the proposed installation method, wiring, protection, maintenance methodology, finishes and locations must be detailed and presented to ADM for Approval prior to ordering.

26 Input voltage; capable of 120-277 volt, single phase or as required by the site. 27 Power supplies can be UL Class 1 or II output or similar European CE or International equivalent. 28 Surge protection: Must be tested in accordance to the requirements of IEEE/ASNI C62.41.2-2002,

Scenario I Location Category C or International equivalent. 29 Control gear shall have a Power Factor (PF) of L: ≥ 0.90.

Control gear shall a Total Harmonic Distortion (THD) of: ≤ 20% Control gear shall comply with FCC 47 cfr part 18 non-consumer RFI.EMI standards or equivalent. Control gear shall be RoHS Compliant

Page 28: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 27 18 Sep 2011

LED Drivers – Specific Technical Requirements - Within the fixture the LED

driver(s) shall meet the following requirements:

30 Driver Case (Tc o

C) Temperature rating -40oC to +80

oC at 95% Relative Humidity (RH).

Driver/Fixture to have some means of built-in overheat thermal protection in the form of automatic dimming or stepping/holding down of the driver where temperature exceeds operational limits. Thermal cut-out devices which turn the fixture LEDs completely off are not acceptable.

Wiring, Connections & Junction Boxes – In addition to the requirements of the

ADM Electrical Specification, the following requirements must be met:

31 All Junction boxes, cables, connections or control devices must be integrated into the landscaping through suitable concealed means in a logical and designed manner by the Consultant. The proposed installation method(s), protection, maintenance methodology, accessibility, finishes and locations must be detailed and presented to ADM for Approval prior to ordering.

LED Luminaire Requirements - The dedicated luminaire expected useful life (light

output) and Depreciation requirements for LED luminaires shall be as follows:

32 LED Useful Life Requirements

The useful life of the luminaire in terms of lumen output must be as specified by one of the following two methods.

a/ As per LM-79-08 or approved International equivalent. Simplified B20-L70 threshold. A minimum of 50,000 operating hours before reaching the B20-L70 lumen output degradation point with no catastrophic failures. The B20-L70 lumen output must be capable of providing the luminance level and uniformity.

b/ Site performance method. A life time of number of hours specified by the site based on expected site lighting useful life must be capable of providing the luminance levels of uniformity.

33 LED Useful life testing and verification procedure

Simplified B20-L70 threshold. Perform LM-79-08 (or approved International equivalent) testing on the luminaire at both time intervals of 0 hours and 6,000 hours. The luminaire shall be operated continuously in the appropriate UL 1598/153 environment or equivalent except when it is removed to perform the LM-79 light output tests. If the light output determined at 6,000 hours is ≥ 96%, the light output determined at 0 hours, the luminaire meets the simplified B20-L70 threshold for useful life.

Page 29: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 28 18 Sep 2011

34 LED Site Performance method

a/ Perform lumen depreciation testing per LM-80-08 (or approved International equivalent) on the light sources (s) (module/array) for a minimum of 6000 hours (longer testing period is encouraged). Identify the installed (in luminaire) operating temperature of the LED using the Ts point under operating ambient temperature of 50-degreesC. From this interpolated curve, determine the lamp lumen depreciation (LLD) value and useful life that meets the needs of the site defined hours of operation to end of useful life as well as the luminance level and uniformity required.

Project Performance Requirement - The following factors shall be applied to

determine the performance requirements for all luminaire types:

35 Light Loss Factors (LLF)

LLF = LLD x LDD (Lamp Lumen Depreciation x Luminaire Dirt Depreciation)

a/ Assume Lamp Lumen Depreciation (LLD) 0.70 for dedicated luminaires except where recommended otherwise by the luminaire manufacturer. Assume the appropriate effects from life/temperature on the lumen output of the luminaire. Note: For LED fixtures the figure used should only match the stated Lumen Depreciation value given by the manufacturer for 50,000-hour operation at 50-degree ambient.

b/ Assume Luminaire Dirt Depreciation (LDD) using appropriate and stated depreciation factors to suit actual environment and resistance properties of the specific fixture.

Photobiological Safety The Manufacturer/Supplier shall provide a written undertaking to

the satisfaction of ADM of testing to the following standards:

36 Ensure luminaire complies with Photobiological Safety of lamps and lamp systems in accordance

with the requirements of BS EN 62471:2008 or A N S I / I E S N A R P - 2 7 . 3 - 0 . Provide proof of testing and compliance with the standards with certification provided to prove the fixture is classed as “Exempt”.

Schedule of Sports Area Lighting Design Levels The Consultant and

Contractor shall follow the following lighting design guidelines for all External Sports areas for ADM Projects

Page 30: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 29 18 Sep 2011

37 Undertake all lighting design and lighting calculations to the following ADM design standards:

The Contractor shall conduct a Field Performance test of the lighting installations immediately after energisation of the system in the presence of the Engineer. The test results shall meet the lighting requirements identified in the above specifications and below table. ADM will take appropriate actions if the specified lighting levels/design intent are not achieved and the Contractor will have to undertake remedial action to address the problems at his cost and without delay to the Contract. All Lighting Levels to following standard International Class classifications as follows. Class III shall be followed unless specifically required otherwise by the Project Brief:

� Class I - Top Level Competition.

� Class II - Intermediate Level Competition.

� Class III - Lower Level Competition, Supervised Training & Unsupervised play.

Sport

Activity/Area

Illuminance Level* (Em. Horizontal**) LUX

and Uniformity Ratio (minimum to average) Glare rating (GR)

Class I Class II Class III

Em LUX Uo

Min/Ave Em LUX

Uo

Min/Ave Em LUX

Uo

Min/Ave I II III

MUGA (Multi Use

Games Areas) 400 0.7 200 0.5 75 0.5 50 50 55

Athletics

500 0.7 200 0.5 50 to 100 0.5 50 50 55

Running Tracks,

Cycle Tracks &

Circuit Training 500 0.7 200 0.5 20 to 50 0.3 50 50 55

Baseball In Fld Out Fld

750 500

0.7 0.5

500 300

0.7 0.5

300 200

0.5 0.3

50 50

50 50

55 55

Basketball

500 0.7 200 0.6 75 0.5 50 50 55

Cricket Wkt Field

750 500

0.7 0.5

500 300

0.7 0.5

300 200

0.5 0.3

50 50

50 50

55 55

Bowls (Flat Green)

300 0.7 200 0.7 100 0.5 50 50 50

Equestrian

500 0.7 200 0.7 100 0.5 50 50 55

Football (soccer)

500 0.7 200 0.6 75 0.5 50 50 55

Hockey

500 0.7 200 0.7 200 0.7 50 50 55

Horse racing

200 0.6 100 0.4 50 0.2 50 50 55

Page 31: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 30 18 Sep 2011

* Where More than one Class must be catered for then the use of multiple fixtures, separate circuits and controls shall be implemented to ensure the different illumination, uniformity and glare

requirements can be met.

** Em is the Maintained Illuminance Level (specification level) and is the design illuminance level, below which the lighting should not be allowed to fall during the period to planned maintenance.

38 Sports Lighting Methodology

The Illuminance, Uniformity and Glare requirements for sports activities are given in the above table. For detailed lighting design and calculation criteria for all sports lighting calculations, International Sports lighting guidance as listed under Clause 4 shall be followed.

The simplified procedure comprises of 6steps:

� Determination of required illuminance, uniformity and Glare Rating from

the Table in Clause 37. � International Sports Lighting Guidance for determination of specific

Design and Calculation criteria. � Choice of lamps and luminaires best suited to the sport and the area. � Calculation of the number and wattage of fixtures to give the required

illuminance and meet lighting criteria. � Determination of best mounting positions for luminaires; � Specification of aiming directions for the luminaires.

Netball

500 0.7 200 0.6 75 0.5 50 50 55

Rugby (Union & League)

500 0.7 200 0.6 75 0.5 50 50 55

Tennis

500 0.7 300 0.7 200 0.6 50 50 55

Volleyball

500 0.7 200 0.6 75 0.5 50 50 55

Hurling

500 0.7 300 0.7 200 0.5 50 50 55

Gaelic Football

500 0.7 200 0.6 75 0.5 50 50 55

American Football

500 0.7 200 0.6 75 0.5 50 50 55

Swimming Pools/Pool Areas

500 0.7 300 0.7 200 0.5 50 50 55

Skate/ BMX Parks

500 0.7 300 0.5 100 0.3 50 50 55

Page 32: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 31 18 Sep 2011

Project Lighting Calculations - The following performance reports of the lighting

installation shall be submitted for approval along with the material submittal:

39 Computer Generated Photometric Analysis of Proposed DAY 1 (Defined as the initial illuminance values):

This calculation is useful to ascertain the expected measurable light levels on site during the project commissioning period. It should be noted that this is not considered a design calculation for the project. The design calculation is undertaken in accordance with section 40 below.

a/ Provide average luminance/illuminance measurements and uniformity at grade. Spacing between measurement points shall be as per CIBSE, CIE or IESNA standards and standard software settings.

b/ Computer calculations should use of the following applicable LLF value (in accordance with the methodology set out in section 35 above): using variables 1.0 for both LLD and for LDD. c/ The photometric data files shall be provided to ADM for verification.

40 Computer Generated Photometric Analysis of Proposed FUTURE DATE (Defined as assuming

numerous thousands of hours of operation and using stated design/deliver illuminance values).

This calculation is considered the DESIGN calculation for the project. a/ Provide average luminance/illuminance measurements and uniformity at grade. Spacing between measurement points shall be as per CIBSE, CIE or IESNA standards and standard software settings.

b/ Computer calculation should use the LLF values (LLD x LDD). All as calculated under the requirements set out in section 35 above.

c/ The photometric data files shall be provided to ADM for verification.

Quality Assurance 41 ADM may request standard production model luminaire samples, identical (including lamp/LED

light source and control gear/driver package) to the proposed specified product, to be installed for inspection. ADM may also request independent testing of sample luminaires to verify luminaire performance and compliance with the specifications. Testing shall be conducted as per the applicable IESNA, ANSI or approved International equivalent and international approved methods of products using Solid Stage Lighting (SSL - LED) sources. ADM shall be sole judge regarding acceptability of optical system performance.

ADM shall be offered a factory Inspection for up to 3 staff members to attend. Factory inspection shall be arranged by the Contractor/manufacturer prior to the shipment of the material and all costs are to be covered by the Contractor/manufacturer.

Page 33: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 32 18 Sep 2011

Warranty

Luminaire Warranty - The Contractor shall provide a written undertaking to the satisfaction

of ADM to warranty the materials and performance as follows:

42 A written warranty for a minimum five(5) year on-site replacement material, fixture, finishes and

workmanship. On-site replacement included transportation, removal and installation of new product. Body and finish warranty shall include warranty against failure or substantial deteriorations such as corrosion, blistering, cracking, peeling, chalking or fading.

43 For LED fixtures a written warranty for a minimum five(5) year replacement material warranty for

defective or non-starting LED source assemblies. 44 A written warranty for a minimum five(5) year replacement material warranty on all supplied control

gear, ballasts, drivers, power supply units (PSUs) and in-built control components. 45 For LED fixtures a written warranty for a minimum five(5) year replacement material warranty for

on-maintained luminance levels on all light sources (LED package, LED array, or LED module) including, but not limited to the LED die, encapsulate, and phosphor. If the expected useful life of the luminaire system is not maintained, then the manufacturer shall replace the light source(s) or luminaire as needed.

46 A written warranty for a minimum ten(10) years against the deterioration of the housing, all external

components; such as lenses, gaskets & fastenings, and the fixture finishes. Including, but not limited to, corrosion, yellowing, blistering, chalking, cracking, peeling or fading.

Measurement and Payment 47 Measurement and payment for the various items of supply and install luminaires (as described in

this section or in the bills of quantities) will be by number (each) and at the rate as included in the bill of quantities, which rate shall be considered as full compensation for all labour, materials, tools, equipments and appurtenances required and as directed by the Engineer. No separate Measurement and payment will be made for the installation of cables from junction box to the luminaires.

Page 34: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 33 18 Sep 2011

Part C - Lighting Poles & Mounting Accessories

General

1 All lighting poles and mounting accessories shall be selected along with the luminaires to match the overall landscaping and furniture Masterplan and finishes. Poles and accessories shall be made up of cast aluminium, extruded aluminium, wood, steel or stainless-steel. The finishes colour and designs of the poles/accessories shall be as agreed with ADM for the project. Where required by design conditions structural reinforcing steel cores shall be used to reduce deflection of pole for accessories’ weight requirements. If the steel core is in contact with any aluminium materials, the manufacturer shall ensure that bi-metallic corrosion is prevented by means approved by ADM. All poles and accessories shall be linked by standard components, function and design.

Pole & Mounting Accessory Materials 2 a) Foundations. Structural analysis shall be submitted to show that the foundation design meets

the load of the given pole type in its “Fully Loaded” state. Unless otherwise stated it is assumed the pole will sit above ground on a 100mm bed on non shrink grout. A Special design details shall be submitted by the Contractor to install the poles above and tunnel/underpass structures. The design details shall be submitted for ADM review and approval.

b) Service Hatches, Each pole shall have a service hatch approximately, 200mm from ground level where the connection of cables can be made between the outside network and the pole and accessories. The service hatch shall be accessible without removing any cover plate or cladding from the pole base. The cover shall be fixed by two screws. The service hatch or hand hole cover shall fixed with hinges made of corrosion resistant materials such as stainless steel grade 316(A4), brass, hot-dip galvanized steel, etc. as applicable based on the pole and cover plate material and shall be lockable by means submitted for ADM review and approval.

c) Foundation conduits. Electric conduits shall be installed through foundation and shall enter the poles from base plate. d) Steel work. All steel work that is non stainless-steel shall be manufactured out of BS grade S353 steel. Hot dipped galvanizing (100 Microns minimum coating thickness) surface treatment shall be applied to both internal and external surfaces. The base plate shall be in accordance with Section XII of ADM Standard Specification. All additional fixtures/accessories shall be on steel attachments of BS Grade S275 with hot dipped galvanizing (100 microns minimum). Base plate shall be manufactured as specified on the Drawings. Where steelwork is in contact with aluminium work, the manufacturer shall ensure that bi-metallic corrosion is prevented by means approved by ADM.

Page 35: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 34 18 Sep 2011

e) Aluminium work. Decorative poles’ and accessory’s aluminium shall be made up of extruded aluminum alloy (6063/6082-T6) which shall have an anodized protective coating finish to 25 microns. The colour of the anodized finish shall be as approved by ADM. Any transition rim shall be of cast aluminum alloy of grade LM6 having coating of minimum 100 microns of polyester powder coating, type PE-SDF matching the approved colour of the anodized extruded aluminium. f) Wood. Wooden poles and mounting accessories shall be from a proven sustainable source and suitable for use in the UAE environment. All materials and finishes must be guaranteed against cracking and fading and be 100% UV-stable. g) Fixing Bracketry and Base Plate Covers. Pole/mounting brackets and base plate covers (where applicable) shall be manufactured out of BS grade S275 Steel. This shall have high strength, be easily machinable able to handle an array of finishes. All steel components shall be hot-dip galvanized to a minimum thickness of 100microns and painted by means to be submitted to ADM for approval. h) Fasteners. All fasteners supplied shall be made of corrosion resistant materials such as stainless steel;- Grade 316, brass, hot-dip galvanized steel etc, based on the materials with which it will be in contact. Bi-metallic content should be properly designed to avoid any galvanic or bi-metallic corrosion. i) Electric Equipment. M8 x30 mm long threaded stud carrying two nuts and two washers shall be provided as an earth point. It shall be located within the service hatch. The electrical termination cutouts shall be supplied in accordance with ADM and ADDC Standards and as shown on the Drawings. j) Copper Content. All Aluminium Die-cast components shall have a very low copper content of less than 0.1%.

Assembly 3. a) Assembly of Poles, Pole fixtures and Fixtures. All poles and fixtures shall be complete with

all accessories and all necessary component assembly undertaken at the factory. The final assembly of pole fixtures, fixtures and components shall be ready for installation at site without any works required other than using suitable fixing tools.

b) Additional Assembly. Provisions shall be made where necessary and stated for the project on a pole for enabling the fixing of other accessories such as fabric or electric banners, signage or CCTV cameras heads by others after the installation of poles. These provisions shall allow for future additional accessories to be added without having to remove the existing installed accessories, luminaire brackets or the like. The provisions shall be such as to ensure the clean, aesthetic look is maintained and shall allow for complete dismantling, when not in use, without leaving behind any clamps, lugs, etc..

Page 36: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 35 18 Sep 2011

c) Pole Base Cladding. Where a decorative elements shall be used for the cladding at the base of a pole it shall be made from laser-cut, anodized or powder-coated aluminium sheeting and UV- stabilized, scratch-resistant polycarbonate incorporating LED lighting as shown on the drawings. LED strip shall be hidden behind the polycarbonate sheet. The number and type of LED shall be as advised and approved by ADM and all lighting equipment must meet ADM LED standards . LED wattage shall be finalized on product testing and clear adhesive 3m VHB, 1mm thick film shall be applied to aluminum prior to laser cutting. Pattern shall be laser cut through both. Otherwise, adhesive shall bond aluminum to 6mm satin ice 100% UV-stable, scratch-resistant polycarbonate after forming.

Pole & Mounting Accessory Design Submission and Production

4. a) Design for Strength. The poles shall be capable of withstanding a basic wind speed of 45 m/s

or 160 km/hr (3 second gust) when equipped with the actual number of lanterns and the associated decorative fittings or accessories. shall be as per confirmed by ADM. Full product data shall be submitted, for ADM’s approval.

. b) Notarized Statement. A notarized statement, attested by the UAE Embassy, certifying the poles and fixtures were built conforming to the manufacturer’s approved drawings and meet the design data, shall be submitted after completion of manufacture, and prior to delivery of poles or pole fixtures to site. Pole/pole fixture delivery to project site shall not be accepted without this.

Quality Assurance

5. ADM may request standard production model samples, identical to the proposed products to be installed. ADM may request independent testing of the sample poles and mounting accessories to verify the performance and compliance with the specifications. ADM shall be the sole judge regarding the acceptability of the performance of the poles and accessories.

ADM shall be offered a factory Inspection for up to 3 staff members to attend. Factory inspection shall be arranged by the Contractor/manufacturer prior to the shipment of the material and all costs are to be covered by the Contractor/manufacturer.

Pole and Mounting Accessory Warranty

6. The Contractor shall provide a written undertaking to the satisfaction of ADM to warranty the materials and performance as follows.

a) Provide a written minimum ten(10) year on-site replacement material, fixture finish, and workmanship. On-site replacement included transpiration, removal and installation of new product. Finish warranty shall include warranty against corrosion, failure or substantial deteriorations such as blistering, cracking, peeling, chalking or fading. The warranty shall include for maintained aesthetic integrity of the pole or mounting accessory, without any partial or complete separation, dislocation, disjointing, flaring, etc. of any elements of the material assembly.

Page 37: DRAFT ISSUE - Lighting Specs - ADM

Emirate of Abu Dhabi

Department of Municipal Affairs

Municipality of Abu Dhabi City

Parks & Recreational Facilities Division

Lighting Specification

For Parks, Public realm and Architectural Lighting

Version 0 Page 36 18 Sep 2011

b) Provide a written minimum ten(10) year replacement warranty for poles and mounting accessories. c) Provide a written minimum twenty(20) year replacement warranty for all wooden poles and mounting accessories.

Measurement and Payment

7. Measurement and payment for the various items of supply and install poles and mounting

accessories (as described in this section or in the bills of quantities) will be by number (each) and at the rate as included in the bill of quantities, which rate shall be considered as full compensation for all labour, materials, tools, equipments and appurtenances required and as directed by the Engineer. No separate Measurement and payment will be made for the installation of cables from junction box to the poles or accessories.