DRAFT AGENDA ADAK RESTORATION ADVISORY BOARD · An action item from the previous RAB included...
Transcript of DRAFT AGENDA ADAK RESTORATION ADVISORY BOARD · An action item from the previous RAB included...
DRAFT AGENDA
ADAK RESTORATION ADVISORY BOARD
Wednesday, 8 October 2014
12:00 pm Adak: Reeve’s High School Conference Room
1:00 pm Anchorage: ADEC Office and via Teleconference
Toll free dial-in number (U.S. and Canada): 1-888-369-1427
Conference code: 7390661
Adak Time Agenda Topic Speaker\Lead
12:00 pm Welcome and Introductions
Esther Bennett, Community Co-
Chair
Justin Peach, Navy Co-Chair
Approve Minutes From 9 April 2014 RAB
Meeting, including a review of action items RAB Members
Munitions Program Update Justin Peach, Navy
Petroleum Update / Long Term Monitoring /
Institutional Controls / Aaron Vernik, Navy
Community Report/New RAB Member
Discussion/Comments
Esther Bennett, Community Co-
Chair
Review New Action Items Navy Co-Chair, All
Preliminary Agenda for Next Meeting and Set
Date for Next RAB Navy Co-Chair, All
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
MUNITIONS UPDATE
1. Operable Unit B-1
Remedial Action Completion Report
The Operable Unit B-1 (OU B-1) Remedial Action Completion Report is complete and has
been signed by the EPA, ADEC, and Navy. This report signifies that all fieldwork related to
munitions in OU B-1 is complete. The educational and institutional controls program
continues. This document is part of the CERCLA (or Superfund) process and will be used to
de-list OU B-1 from active remediation under CERCLA.
2. Operable Unit B-2
Non-Time Critical Removal Action
The first two years of the Operably Unit B-2 (OU B-2) Non-Time Critical Removal Action
(NTCRA) has been completed. The NTCRA is planned to be performed in 5 Remedial
Action Areas (RAAs) in Parcel 4, Operable Unit B-2. All remediation is complete in RAA-
02 (located on the flank of Mt Moffett above the seawall), and in RAA-04 (located on the
east side of Andrew Lake above the Rec Center). All remediation but 7 acres is complete in
RAA-03 in Moffett Valley. The table below summarizes the recoveries during each of the
field seasons. Recoveries by RAA are shown on the attached graphics.
Activity Description Basis 2013 2014 Total
Intrusive Investigations Targets 57,142 34,981 92,123
Boulder Fields Investigation Acres 0 21.5 21.5
Seawall Sweeps Events 6 4 10
MEC/MDEH/MPPEH Removed Items 1,753 883 2,636
MDAS Removed Pounds 24,496 12,961 34,457
Metal Debris Removed Pounds 79,477 4,680 84,157
Notes:
MEC = Munitions and Explosives of Concern
MDEH = Material Documented as an Explosive Hazard
MPPEH = Material Potentially Presenting an Explosive Hazard
MDAS = Material Documented as Safe
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
Seawall Sweeps
An action item from the previous RAB included providing a listing by month of the
recoveries from the Andrew Lake Seawall Sweeps.
2013
Apr 19 Mortar, 60mm, HE, M49 5
Mortar, 81mm, HE, M43 10
Projectile, 20mm, Model Unknown 1
Projectile, 40mm, HE-T, SD, MK2 1
Bomb, Tail, Fuze, AN-M100 (Series) 1
May 16 Mortar, 60mm, HE, M49 1
Mortar, 81mm, HE, M43 5
June 18 Night Drift Signal, AN-MK4 1
Mortar, 60mm, HE 1
July 16 Cartridge Case, 40mm 1
Mortar, 81mm, Tail Fin 1
Night Drift Signal, AN-MK4 2
Mortar, 60mm, HE, M49A2 1
Aug 10 Mortar, 81mm, HE, M43A1 1
Sept 18 Mortar, 81mm, HE 1
2013 Total 33
2014
May 6 Fuze, PD 1
Mortar, 81mm, HE 2
June 5 Mortar, 81mm, HE 5
Mortar, 60mm, HE 1
July 8 Mortar, 81mm, HE, M43A1 1
Aug 4 No recoveries 0
2014 Total 10
Overall Total 43
Notes:
PD = Point Detonating
HE = High Explosive
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
2015 Field Work
The 2015 field work has been awarded. The production work will be performed by
TetraTech in 2015. The QA work will be performed by Battelle, as in previous years.
The emphasis of the work will be to complete the last 7 acres in RAA-03, and to complete
the majority of the acreage in RAA-01 (the former OB/OD area in the center of Moffett
Valley), and the majority of the acreage in RAA-05 (the disposal area along the Andrew
Lake Seawall). The emphasis of the work in 2015 will be to focus on areas that are amenable
to digital geophysical mapping (DGM) with the landfill areas and debris pits slated for a
following season. The Navy anticipates 60 to 80 personnel on-island.
The EOD Mobile Unit 11 (Det NW Whidbey Island) was on island three times during 2014;
in April to open the seawall; in August to retrieve Cartridge Activated Devices (CADs) from
Finger Bay, and in September to open the seawall spillway and perform a sweep of the
seawall. Two visits are planned for 2015.
Record of Decision
The Record of Decision (ROD) for OU B-2 remains under development. Finalization of the
ROD will follow the OU B-2 Remedial Action Completion Report and is several years from
being finalized. This is the document that will formalize and establish an agreement on the
remediation required for OU B-2. Functionally, the remedy being presented in the ROD
matches the remedy presented in the Proposed Plan that was presented to the RAB on
October 10, 2012 and is the basis for the Non Time Critical Removal Action presently
underway.
Munitions Recoveries
Lake Jean – A mortar was found by a fisherman in Lake Jean on June 9. The mortar was an
81mm HE, M56 and was unfired (discarded military munition, DMM). The mortar was
recovered and destroyed by USA Environmental (USAE).
Roberts Landfill Road (Happy Valley Road) – In January 2012, three 250 pound general
purpose (GP) bombs were found during a rain event along the roadway. The bombs were
destroyed by Joint Base Elmendorf Richardson (JBER) EOD personnel in 2012. The Navy,
EPA, and ADEC agreed to perform an intrusive investigation in the area of the bombs using
the same techniques in place in Parcel 4, taking advantage of USAE having staff and
expertise on site. Six additional 100 pound GP bombs were found during this investigation
and were recovered and destroyed by USAE.
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
Finger Bay – 95 CADs were recovered from the shoreline of Finger Bay in August 2014 by
the EOD MU 11 personnel from Whidbey Island. The CADs were turned over to USAE and
were rendered inert through high temperature thermal treatment. The EOD MU 11 personnel
will perform a follow up sweep of the Finger Bay shoreline in the spring of 2015.
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
PETROLEUM SITES UPDATE
1. Free-Product Recovery
This project involves removing free-product from wells and sumps at the SWMU 62 and
Area 303 sites including boom placement and maintenance at surface water body locations
near the sites. Currently, the free product recovery program is scoped and contracted to
continue through September 2015.
ANNUAL LONG TERM MONITORING UPDATE
1. Groundwater Monitoring
This is an on-going, annual project. The 2014 groundwater sampling occurred in August and
September 2014. The report will be generated when all of the data is received from the lab
and is validated by a third party validator. The draft report is tentatively planned for delivery
to the Navy on February 10, 2015.
2. Marine Monitoring
This program is on an every other (odd) year schedule. Sampling last occurred in June 2013
and is planned to occur again in June 2015.
The final technical memorandum and health advisory fact sheet for the 2013 event is
available for review at the Adak City Hall office, through the Adakupdate website or contact
me if you wish to receive a copy of either of the documents. Currently, the fish/shellfish
advisory for Sweeper Cove and Kuluk Bay remains in place.
3. Well Decommissioning
The report documenting the decommissioning of the approximately 200 monitoring wells,
recovery wells, piezometers, oxygen probes and other monitoring points as well as the repair
of 115 monitoring wells completed in 2013 has been finalized.
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
INSTITUTIONAL CONTROLS UPDATE
1. Institutional Controls (IC) / Landfill Repairs
There were no Institutional Controls / Landfill Repairs performed since the last RAB
meeting. An institutional control inspection was completed as part of the annual monitoring
program in September 2014. Based on the most recent version of the Comprehensive
Monitoring Plan (CMP), Revision 6, this year included minimal inspections that included the
5 year review sites, brief drive-bys of the four regulated landfills and the 5 year inspections
of the OU B-1 sites. No major deficiencies were noted and there are no major issues
requiring immediate responses. A draft report documenting the findings will be generated.
The draft report is tentatively planned for delivery to the Navy on December 15, 2014.
Maintenance and repair activities similar in scope to those performed during 2010 are
currently planned for the 2015 field season. A site walk was performed by the Navy and the
contractor in April 2014 to review the sites where work will be performed. Planning
documents are beginning to be prepared and fieldwork is tentatively scheduled for mid-May
to mid-August 2015.
2. Excavation Permits
Two new excavation notifications were received since the last RAB meeting. A summary of
the requests is shown below:
Adak Eagle Enterprises, LLC – Submitted an excavation request on April 8, 2014 for
the construction of a metal warehouse building at the intersection of Main and
Aerology Roads.
Jack Stewart – Submitted an excavation request on May 10, 2014 to set two anchor
points to stabilize a connex box and to clear grass and level the bottom of a ditch to
set a culvert. Both projects were off of Main Road near the old bowling alley.
Former Adak Naval Air Facility
Navy Environmental Restoration Program
Program Summaries
Prepared for the October 8, 2014 Adak RAB Meeting
3. IC Education / Awareness Activities
The Navy continues to solicit feedback quarterly from approximately 10 on-island businesses
representatives, and local government representatives on IC needs. IC materials are mailed
out as requested. In the past year, the following IC Education / Awareness items have been
requested and shipped to the island for distribution:
860 Adak Island Maps
100 Travel Mugs
108 Munitions Awareness Coloring Books
100 Bookmarks
100 Ordnance Awareness Magnets
51 Munitions Awareness Posters
30 Adult Munitions Awareness DVDs
10 Children’s Munitions Awareness DVDs
51 Children’s Munitions Awareness Posters
100 Small Foam Footballs
±
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂̂__̂_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂̂_
_̂_̂
_̂_̂̂_
_̂_̂̂_
_̂̂__̂
_̂̂_
_̂
_̂
_̂
_̂_̂_̂_̂
_̂_̂
_̂̂__̂
_̂
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂ _̂
_̂
_̂_̂
_̂
_̂
_̂
_̂̂__̂
_̂_̂
_̂
_̂
_̂̂_
_̂̂_
_̂̂_
_̂
_̂
_̂̂__̂_̂_̂_̂
_̂
_̂_̂
_̂̂__̂
_̂_̂_̂
_̂
_̂
_̂̂_ _̂̂__̂
_̂̂_
_̂
_̂̂_̂_̂_
_̂
_̂̂_̂__̂̂_̂_
_̂̂__̂
_̂
_̂
_̂
_̂
_̂̂_̂_
_̂̂_̂_̂_̂__̂̂_̂_̂_̂_
_̂
_̂_̂_̂̂__̂̂_
_̂_̂̂_̂_
_̂̂_̂_̂_
_̂̂_̂_̂_̂_̂_̂_̂__̂̂_̂_̂__̂_̂̂_̂_̂_
_̂̂_̂__̂_̂_̂
_̂
_̂_̂_̂_̂̂_
_̂̂_
_̂̂_
_̂_̂_̂_̂_̂
_̂_̂̂_
_̂_̂̂__̂̂__̂_̂̂__̂
_̂
_̂_̂̂__̂̂_
_̂_̂_̂
_̂̂_
_̂
_̂̂_̂_̂__̂_̂_̂_̂_̂
_̂_̂̂_̂_̂__̂
_̂
_̂
_̂
_̂
_̂̂__̂
_̂
_̂̂_̂_ _̂_̂̂_
_̂
_̂̂_̂_
_̂_̂_̂
_̂_̂ _̂̂_̂_̂_̂_
_̂_̂̂__̂_̂
_̂̂_
_̂_̂
_̂̂_̂__̂_̂
_̂̂_
_̂_̂
_̂
_̂̂__̂_̂_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂ _̂̂_
_̂
_̂_̂_̂
_̂̂__̂
_̂
_̂
_̂
_̂_̂
_̂ _̂
_̂
_̂_̂_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂
_̂_̂ _̂
_̂
_̂̂_ _̂
_̂̂__̂ _̂̂_
_̂_̂
_̂_̂_̂
_̂_̂
_̂̂_
_̂̂_
_̂̂_
_̂
_̂̂_̂_
_̂
_̂
_̂
_̂̂_̂_̂_
_̂
_̂_̂_̂
_̂_̂
_̂
_̂
_̂̂_̂_
_̂
_̂̂__̂̂__̂
_̂̂_̂_̂_
_̂̂_̂_̂_ _̂
_̂
_̂
_̂
_̂_̂̂_
_̂
_̂_̂_̂
_̂̂_̂__̂̂_
_̂
_̂_̂_̂̂_
_̂̂_
_̂
_̂̂_̂_
_̂
_̂̂_̂_
_̂
_̂_̂
_̂̂__̂
_̂̂_̂__̂
_̂̂_
_̂
_̂̂_
_̂̂__̂_̂_̂
_̂
_̂
_̂̂_ _̂̂_ _̂_̂̂_̂_
_̂
_̂̂_̂_
_̂
_̂_̂
_̂_̂_̂
_̂
_̂̂_
_̂
_̂
_̂̂__̂̂_
_̂_̂̂_
_̂_̂
_̂
_̂_̂_̂̂__̂̂__̂
_̂_̂
_̂_̂
_̂
_̂
_̂_̂_̂_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂̂__̂_̂
_̂
_̂
_̂̂_̂__̂_̂_̂̂_̂_̂_
_̂̂_
_̂_̂
_̂
_̂
XY
XY
XY
XY
XY
XY
XY
XY
XY XY
XY
XY
XY
XYXY
XY
XY XYXYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XYXY
XY
XY
XY
XYXY
XYXY
XYXY
XY
XYXY
XY
XY
XY
XY
XYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY XY
XY
XY
XY
XY
XYXYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY XY
XY
XYXY
XYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XYXY
XY XY
XY
XY
XY
XY
XY
XY
XY
XYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XYXY
XYXY
XY
XY
XY XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XYXY
XY
XYXY
XY XYXY XY
XY
XY
XY
XYXY
XYXY
XYXY XY XY
XYXY
XYXY
XY
XY
XY
XY
XY XYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XYXY
81mm
60mm
H13-1
F13-1
K11-1
O06-1O07-1 O08-1
M10-1
J12-1
OB-1
OB-2
I13-1
I11I06 I10I09I08I07I05 I12I04
J11J10J09J08J07J05J04 J06
F11 F12F10F09F08
E11
L09L08L07L05
E13E12E10E09
L06
D11
F07
N07
D13D12
N06
H11
G11
D10
C12
H06
K06
H07 H08 H09 H10 H12
K04 K05
G07
K07
G08
K08
G09
K09
G10
K10
G12
E08
L04
F13
H05
G06
L10
M06 M07M05
N05
J03
C13
D09
O06
D14
C11
M08
K11
N08
J12
O07
G13
H13
I03
I13
M04
K03
E14
H04
C14
O08
C01
G05
A02
F06
M09
O05
C10
E07
D08
M10
B12
Data is projected to the State Plane Coordinate System:NAD 1983 StatePlane Alaska 10 FIPS 5010 Feet
Revision Date:Submitted By:
Checked By: Date Drawn: 8/20/2014
1 inch = 300 feetCLHDrawn By: Scale: Rev:
USAEnvironmental, Inc.
Path: S:\Adak\MXD\Field Season 2\StatusMaps\Weekly\RAA02 Weekly Status Map.mxd
RAA-02Weekly Status Map
Adak Island, AlaskaContract No. N44255-12-C-3003
For w/e Aug 16, 2014
RAA-02 Total Area: 73.70 ac.
Legend
MEC/MDEH (Field Season 2)_̂
QA Seed Item FoundQC Seed Item FoundXY
DGM QC Mini-Grid (20ft x 20ft)
XY
Boulder Field (21.03 ac.)
DGM Survey Complete
(54.77 ac.)
QC Complete
(76.25 ac.)
QA Complete
(76.25 ac.)
Intrusive Complete
(76.25 ac.)
Surf Sweep Complete
(76.25 ac.)
DGM Grid (196.85ft x 196.85ft)Step-Out Grid (98.4ft x 98.4ft)
MEC/MDEH (Field Season 1)_̂
MPPEH - for processing (Field Season 2)_̂
Grid StatusInaccessible Grid
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂̂_
_̂
_̂_̂
_̂
_̂
_̂̂_ H13-1H13H12
G13G12
0 300 600150 Feet
0 90 18045 Meters
_̂
_̂
_̂
_̂
_̂_̂_̂
_̂ F13-1
G13
F13
G12
F12
_̂_̂
_̂_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂_̂_̂
_̂_̂
_̂ _̂
_̂
_̂
_̂_̂
_̂_̂ _̂̂_
_̂
_̂̂_
_̂̂__̂_̂_̂_̂_̂̂_
_̂
_̂ _̂̂_̂_
_̂_̂
_̂_̂
_̂
_̂
_̂
_̂_̂ _̂_̂
_̂ _̂
_̂_̂̂_
_̂ _̂
_̂
_̂
_̂̂__̂̂_̂_
_̂
_̂
_̂
K11-1 K11-1a1K11-1a
L10-1aL10-1
K11-3
K11-2K10
K11
L10
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂̂_̂_
_̂_̂
_̂_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂_̂_̂
_̂
_̂_̂
_̂_̂_̂
_̂_̂_̂
_̂
_̂_̂
_̂ _̂
_̂
_̂̂_
_̂
J12-1a
I13-1I13-1a
J12-1
K11-1
I12
J12J11
I11I13
K11
_̂
_̂_̂_̂
_̂_̂
_̂
_̂
_̂_̂ _̂
_̂_̂_̂̂_
_̂_̂̂__̂_̂ _̂̂_
_̂̂_ _̂
_̂̂__̂_̂
_̂
_̂_̂̂_̂_
_̂
_̂̂__̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂_̂_̂
_̂
_̂_̂ _̂
M10-1M09-1
M10-1aM09-3
M09-2
L10-1
L09
M09
L10
M10M08
L08
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂_̂̂_
_̂̂_
_̂_̂_̂̂_̂_̂_̂_ _̂
_̂_̂
_̂_̂_̂_̂_̂
_̂_̂
_̂̂__̂̂_
_̂_̂̂_
_̂_̂̂_
_̂
_̂̂_̂_̂_
_̂
_̂_̂
_̂
_̂
_̂_̂̂__̂̂_
_̂
_̂
_̂
_̂_̂̂__̂
_̂
_̂_̂
_̂_̂
_̂̂_
_̂
_̂_̂̂_̂_
_̂
_̂
_̂
_̂̂_̂__̂_̂
_̂
_̂
_̂̂__̂
O06-1O07-1 O08-1O06
N07N06
O07
N08
O08
_̂
_̂
H04-1H05
H04
I04 I05
_̂
_̂̂_
_̂̂_̂_̂_
_̂
_̂_̂
_̂
_̂
_̂_̂
_̂_̂_̂̂_
_̂_̂̂_ _̂
_̂
_̂_̂
_̂̂_
_̂
_̂_̂_̂_̂
_̂
_̂
_̂
_̂̂__̂_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
N05-2
O05-1
N05-1
O06-1
N05 N06
O06O05
_̂
_̂_̂̂_
_̂
_̂_̂
_̂
_̂
_̂̂_
_̂̂_̂_̂_
_̂
_̂̂_
_̂
_̂̂_
_̂
_̂̂_
_̂̂__̂
_̂
_̂̂_̂_̂_
_̂_̂
_̂̂_̂_
_̂
_̂
_̂̂_̂_
_̂
_̂_̂̂__̂̂_
_̂̂_
_̂̂_
_̂_̂_̂̂_
_̂ _̂̂_
_̂
_̂_̂
_̂
_̂̂_̂_̂_
_̂̂__̂
_̂̂_̂__̂
_̂̂__̂
_̂̂_
_̂_̂̂_̂__̂
_̂̂_̂_̂_̂_̂_
_̂̂_̂_
_̂
_̂̂_̂_̂_
_̂
_̂_̂
_̂
_̂̂_ _̂_̂̂_̂_̂_
_̂_̂
_̂̂__̂
_̂
_̂_̂
_̂̂_̂_̂__̂
_̂̂__̂̂_̂_
_̂ _̂
_̂̂_̂__̂
_̂
_̂
_̂_̂
_̂
_̂
_̂̂_̂_
_̂
_̂̂_
_̂_̂
_̂̂__̂̂_
_̂
_̂̂_
_̂
_̂_̂
_̂_̂
_̂
_̂̂__̂
_̂_̂̂_ _̂
_̂̂_̂_̂_̂_
_̂
_̂
_̂̂_
_̂̂_̂_̂_̂_
_̂̂_
_̂_̂_̂
_̂
_̂
_̂̂_
_̂
_̂̂_̂_̂_
_̂_̂
_̂
_̂̂_̂__̂_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂_̂
_̂̂_̂_
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂ _̂̂_
_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂̂_̂_
_̂
_̂̂__̂
_̂_̂̂_̂_
_̂̂_̂_̂_
_̂̂__̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂__̂̂_̂_̂_̂_̂_̂_
_̂̂_ _̂_̂
_̂
_̂̂_̂_̂_
_̂
_̂
_̂_̂̂_̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂__̂_̂̂_
_̂
_̂̂_̂_̂_̂_̂_
_̂_̂̂_̂_̂_
_̂
_̂
_̂_̂ _̂̂_̂_̂_̂_
_̂
_̂
_̂ _̂̂_
_̂_̂
_̂
_̂
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂̂_̂_̂_
_̂
_̂̂_
_̂_̂
_̂̂_̂_
_̂
_̂
_̂
_̂
_̂_̂_̂
_̂̂_̂_
_̂_̂_̂̂_̂_
_̂
_̂_̂_̂̂_
_̂
_̂
_̂
_̂
_̂_̂̂__̂
_̂_̂
_̂
_̂̂_̂_̂__̂̂_̂
__̂̂_̂_
_̂_̂_̂
_̂̂_̂_
_̂_̂ _̂
_̂
_̂̂_̂_ _̂_̂̂_
_̂_̂ _̂̂__̂
_̂ _̂_̂_̂̂_ _̂
_̂
_̂̂_̂__̂_̂
_̂̂_
_̂̂__̂_̂_̂
_̂
_̂_̂̂_
_̂
_̂̂_̂_̂_
_̂̂_̂_
_̂̂_̂_
_̂ _̂
_̂_̂
_̂_̂
_̂ _̂_̂
_̂_̂
_̂_̂ _̂
_̂_̂ _̂
_̂
_̂
_̂
_̂_̂̂_
_̂_̂̂_
_̂
_̂
_̂_̂̂_̂_
_̂
_̂
_̂̂_
_̂̂_
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂̂_ _̂_̂_̂̂_̂_
_̂_̂
_̂
_̂
_̂ _̂
_̂
_̂̂_̂__̂
_̂̂_̂__̂̂_̂__̂̂_
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂̂_̂_̂_̂_̂_
_̂
_̂_̂
_̂̂_̂_
_̂
_̂
_̂_̂_̂̂_
_̂ _̂̂_
_̂
_̂_̂
_̂̂_
_̂̂_
_̂
_̂
_̂̂_
_̂
_̂
_̂̂_
_̂̂_
_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂̂_̂_
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂_̂ _̂_̂
_̂
_̂̂__̂
_̂̂_
_̂_̂
_̂
_̂
_̂̂_̂_̂__̂̂_̂__̂̂_̂_̂_̂_̂_
_̂_̂
_̂̂_̂_̂_̂_̂_̂_
_̂_̂
_̂_̂̂_
_̂̂__̂
_̂ _̂̂__̂
_̂̂_̂_̂_̂_
_̂̂_̂__̂̂_
_̂_̂̂_̂__̂ _̂
_̂̂_̂_
_̂̂_̂_̂_
_̂̂_
_̂ _̂_̂̂_̂__̂̂_̂_ _̂̂_
_̂̂_̂_
_̂̂__̂_̂_̂̂_̂_̂_
_̂̂_
_̂̂_̂_ _̂_̂̂_̂_ _̂̂__̂_̂_̂̂_ _̂̂_̂_̂_̂_̂_̂_
_̂
_̂̂_̂_̂_̂__̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_
_̂
_̂
_̂̂_̂_̂__̂̂_̂_̂__̂̂_̂_
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂__̂_̂̂_
_̂̂__̂
_̂ _̂̂_
_̂ _̂̂_̂_̂__̂̂_
_̂_̂̂_̂_
_̂
_̂
_̂_̂
_̂
_̂̂_
_̂
_̂̂_̂__̂_̂
_̂
_̂
_̂
_̂_̂_̂
_̂̂__̂_̂̂_̂_̂_̂_
_̂̂_̂_̂_ _̂ _̂_̂
_̂_̂̂_̂_
_̂̂_
_̂_̂ _̂_̂̂_̂_
_̂̂_̂_
_̂
_̂̂_̂__̂
_̂̂__̂
_̂
_̂̂_̂_̂_̂_
_̂̂_̂__̂̂_̂__̂
_̂̂_
_̂_̂
_̂
_̂̂_̂_
_̂
_̂
_̂
_̂̂_
_̂̂_
_̂̂_
_̂_̂̂_̂_̂_̂_
_̂̂_
_̂̂_
_̂_̂_̂_̂ _̂_̂̂_
_̂_̂̂_̂_
_̂
_̂ _̂_̂
_̂
_̂̂_
_̂_̂
_̂̂__̂_̂
_̂̂_̂_̂_
_̂̂__̂̂_̂_̂_̂_̂__̂̂_̂_
_̂̂__̂̂_
_̂_̂
_̂_̂
_̂̂_
_̂̂__̂_̂̂_
_̂̂_̂__̂̂_
_̂̂_
_̂̂_̂_̂_̂_̂_̂_
_̂_̂̂__̂
_̂̂_ _̂
_̂_̂ _̂_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂_
_̂_̂_̂
_̂̂__̂ _̂
_̂
_̂
_̂̂__̂̂__̂
_̂̂_̂__̂̂_̂_̂_
_̂
_̂
_̂_̂_̂_̂ _̂̂_
_̂_̂̂_
_̂
_̂_̂
_̂̂__̂
_̂_̂_̂̂_
_̂_̂
_̂ _̂
_̂_̂
_̂̂_
_̂_̂̂_
_̂̂__̂
_̂_̂
_̂̂_̂__̂̂_
_̂_̂ _̂̂_
_̂
_̂ _̂̂_ _̂
_̂_̂̂_
_̂
_̂̂__̂̂_̂_̂_̂_
_̂̂_
_̂
_̂_̂_̂
_̂_̂
_̂_̂̂_̂_
_̂̂__̂̂_
_̂
_̂̂_̂_̂__̂_̂_̂
_̂̂__̂
_̂
_̂
_̂
_̂̂__̂̂_
_̂_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂̂_
_̂_̂̂_
_̂̂_
_̂̂_̂__̂̂_
_̂_̂
_̂_̂
_̂_̂
_̂̂_̂__̂_̂̂_
_̂̂_̂_̂__̂̂_̂_̂_̂__̂_̂̂_
_̂̂__̂
_̂̂_̂_̂_̂_̂_̂_
_̂̂_
_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_
_̂
_̂̂_̂_̂__̂̂__̂̂_̂_̂_̂_̂_̂_̂_
_̂̂_̂_̂_̂__̂̂_̂_̂_̂_
_̂_̂_̂̂__̂̂__̂̂_
_̂
_̂_̂̂_
_̂
_̂̂_
_̂
_̂̂_̂_
_̂ _̂
_̂̂__̂̂_
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂̂_̂_
_̂
_̂̂_
_̂
_̂̂_̂_
_̂
_̂
XY
XYXYXYXY
XY XYXY XY XY
XY
XY XYXY
XYXY XY XY
XY XY XY
XY
XY XYXY
XY XY
XY XY
XYXYXY XY XYXY XY XY XY XY
XYXY
XY XY XY XY XYXY XYXY XYXY
XY
XY
XY
XY XY
XYXYXY XY
XYXY XY
XY
XYXY XYXY
XY
XY XYXY
XY XY XY XYXY
XYXY
XYXY XY XYXY
XY
XYXY XY XY
XY
XYXY
XYXYXY
XY
XY XYXY
XY
XY XY XYXY XYXY XY
XYXYXY
XYXYXY XY
XY
XY
XY XYXY XYXY XYXY XY
XY XY XY XY XYXY
XY XYXYXYXY
XY XY XYXY XY
XY XY XY
XYXY
XYXY
XYXYXY
XY XY XY XYXYXY
XYXY
XY XYXYXY XY
XYXY XY
XYXY
XY
XYXY
XY
XY
XYXY
XY
XY
XY
XYXY
XY
XY
XY
XY
XY XY
XYXY
XYXY
XY XYXYXY
XYXY
XY
XY XYXYXYXY
XYXY
XY
XY
XYXY
XYXY
XY
XYXY
XY
XY XY
XY
XY
XY
XYXY
XY
XY
XY
XY
XY
XY
XY
XY XY
XY
XY
XY
XYXY
XY
XY
XY
XY
XY
XYXY
RAA-
03 W
est (
70.79
ac.) RAA-03 East (76.05 ac.)
O17O16
N16 N17
O18
D16-1
I17-1
D19-1
H12-1
C08-1
H28-1
A05-1
F22-1F02-1
C12-1
K21-1
Q27-1
I15-1
G25-1
H13-1
H29-1
C02-1
L22-1
A04-1
I14-1
E21-1
B10-1
Q28-1
E08-1
A03-1
G27-1
G11-1
C13-2B02-1
C13-1
D18-2
L09-1
P30-1
A04-2
D18-1
O31-1
H28-2
B06-2
E20-1
F24-1
E20-2
B09-1B06-1
C14-1
L09
I25 I29I28I27I26I24
J29J28J27J26J24 J30J25
D16 D17
F11
I30
F18F17F16F14F13F12
P28P27P26
F15F10
P25
E11
N24
J31
B04
E18E17E16E14E13E12E09
D11
L32L31L29L28L27L26L24L23
B05
E15E10
L30L25
C11
E19
P24
E02
D04D03D02 D14D13D12D09
N29N28N27N26
C04C03 C09
D15D10
N30N25
C05 C10
B03
L33
E20
F09
G11
O26
G16
H27
G13 G14
O29
G12
O27 O28
G24
H25
K25 K30
H15
O25
Q25
G15
H24 H26
G17
K23 K24 K26 K27 K28 K29 K31
H16 H17
Q24
J23
H14
M09
K22
D05
G25
I16
E03
D18
L10
H28
Q26
M31M29M28M27M26M24 M30M25
N31
C02 C12
O24
L22
M32
K32
E08
I15
P29
G18
E04
O30
C13
B09
C14
Q27
H13
D08
G26
F19
D01
B06
H18
M23
H29
C15
F23G10
E21
A05
G23
B10
Q28
H12
E05
I17
F08
M33
G01
M10
E01
I23
F22
C06
K21
C08
F02
A04
R24
D19
F24
G27
N32
B02
H23
I31
K33
J32
B11
A03
I14
L34
H11
R25
M22
J22
C01
H30
O31
P30
G09
Q29
Revision Date:Submitted By:
Checked By: Date Drawn: 8/20/2014
1 inch = 550 feetCLHDrawn By: Scale: Rev:
USAEnvironmental, Inc.
Path: S:\Adak\MXD\Field Season 2\StatusMaps\Weekly\RAA03 Weekly Status Map.mxd
±Data is projected to the State Plane Coordinate System:
NAD 1983 StatePlane Alaska 10 FIPS 5010 Feet
RAA-03Weekly Status Map
Adak Island, AlaskaContract No. N44255-12-C-3003
For w/e Aug 16, 2014
RAA-03 Total Area: 149.65 ac.
Legend
MEC/MDEH (Field Season 2)_̂
QA Seed Item FoundQC Seed Item FoundXY
DGM QC Mini-Grid (20ft x 20ft)
XY
Realignment Grids
DGM Survey Complete
(156.88 ac.)
QC Complete
(151.05 ac.)
QA Complete
(146.77 ac.)
Intrusive Complete
(151.05 ac.)
Surf Sweep Complete
(156.88 ac.)
DGM Grid (196.85ft x 196.85ft)Step-Out Grid (98.4ft x 98.4ft)
MEC/MDEH (Field Season 1)_̂
MPPEH - for processing (Field Season 2)_̂
Inaccessible Grid
0 550 1,100275 Feet
0 160 32080 Meters
_̂_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂̂_̂_
_̂
_̂
_̂_̂_̂̂__̂_̂
K22K21
L22
K21-1K21-1a
L22-1K21-1b
K21-1a1
Grid Status
_̂_̂
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂ _̂
_̂_̂
_̂
_̂ _̂ _̂ _̂_̂
_̂ _̂
_̂
_̂
_̂ _̂_̂
_̂
_̂
_̂ _̂̂__̂
_̂
B04
A04
B03
A03
A04-1A03-1
A04-1bA04-1a A04-2
_̂
_̂
_̂̂_̂__̂
_̂̂_̂__̂̂__̂̂_
_̂
_̂
_̂̂_ _̂̂__̂_̂
_̂ _̂_̂_̂̂_ _̂_̂_̂ _̂ _̂_̂_̂ _̂̂_̂_ _̂_̂ _̂_̂_̂̂__̂_̂
_̂
_̂
_̂_̂_̂̂_̂_̂_̂_̂_̂_
_̂
_̂̂__̂̂_
_̂_̂
_̂̂_
_̂̂__̂
_̂_̂̂__̂̂_
_̂
_̂_̂_̂̂_
_̂
_̂ _̂_̂ _̂_̂̂_
_̂ _̂
_̂̂__̂ _̂_̂̂_̂_
_̂
_̂_̂
_̂_̂̂_̂_
_̂̂_̂_̂_
_̂_̂
_̂ _̂_̂̂_
_̂
_̂
_̂ _̂
_̂_̂
_̂̂_
_̂ _̂_̂_̂
_̂_̂
_̂ _̂ _̂_̂
_̂_̂
D16 D17
C15
D15
D16-1
D16-1a1D16-1aD16-1b D16-1c
_̂_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂ _̂ _̂
_̂
_̂_̂̂_
_̂
_̂
_̂
_̂
_̂ B03
B02
C03
A03
C02
B02-1a
C02-1
B02-1
A03-1
_̂
_̂
_̂
_̂
_̂ _̂
_̂
_̂_̂
_̂̂_
_̂
_̂
_̂
_̂B06B05
A05
B06-2a
B06-2
B06-1
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂ _̂_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂ _̂
C13 C14
C13-2a
C13-2C14-1a
C14-1C13-1
_̂̂_
_̂̂__̂
_̂
_̂
_̂
_̂̂__̂
_̂_̂
_̂ _̂_̂
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂_̂ _̂̂_
_̂
_̂_̂
_̂ _̂_̂
_̂_̂̂__̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂ _̂̂_̂_̂_̂_̂_̂_̂_̂_̂__̂̂_
_̂̂__̂
_̂G27
H27
G26
H28H26
H28-1G27-1
G27-1a
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂
_̂
F23F24
G24G23
F24-1a
F24-1
G25-1
_̂_̂̂_
_̂_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂ _̂_̂
_̂ _̂
_̂
_̂_̂
_̂
_̂
_̂̂_̂_I16
I17
H17H16 H18
I17-1I17-1a
_̂̂_̂__̂
_̂_̂
_̂
_̂̂_̂_
_̂
_̂̂_̂_
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂̂__̂̂_
_̂
_̂
_̂_̂
_̂
_̂
_̂̂_
_̂_̂_̂
_̂_̂
_̂̂__̂
_̂
_̂̂_
_̂
_̂_̂_̂
_̂_̂
_̂ _̂
_̂
_̂
_̂_̂
_̂_̂
_̂ _̂
_̂
_̂ _̂
_̂_̂_̂
_̂
_̂_̂
_̂̂_̂__̂ _̂
_̂
_̂
_̂̂_D18
E19E18
D19
E20
D19-1
D19-1aD18-2
E20-1
D18-1
E20-2
XY
XY XY XY XYXY XY XY
XY
XY XY
XY
XY XY XYXY
XY XY XY
XY
XY XYXYXY
XY XY XYXY XY
XY XY
XY XY XY XY XY XYXY XY
XY XY
XYXYXY XY XY XY XYXY
XY XY XY
XY XY XY XY XY XY
XY XYXY XY
XY XY XY XY XY XY
XY XYXY
XY
XY
XY
XY XY XY XY XY
XY XY
XY XY
XY
XYXY XY XY
XY XYXY
XY
XY XY
XY
XY
XY XY
XY
XYXY
XY XY XY
XY
XY XY
XYXY XY
XY
XY
XY
XYXY XY
XY
XY
XY XY
XY XY
XY
XY XYXY
XYXY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XY
XYXY
XYXY
XY
XY
XY
XY
XY
_̂_̂
_̂
_̂̂_̂_̂__̂
_̂
_̂_̂
_̂
_̂
_̂_̂
_̂_̂
_̂̂_̂_
_̂_̂
_̂
_̂
_̂_̂_̂
_̂ _̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂_̂̂__̂̂_ _̂̂_
_̂_̂
_̂_̂_̂̂_
_̂̂_
_̂
_̂̂_
_̂̂__̂
_̂̂_
_̂̂__̂̂_
_̂
_̂̂_̂_
_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_
_̂
_̂
_̂ _̂_̂̂__̂_̂
_̂_̂̂_
_̂
_̂
_̂_̂
_̂̂__̂_̂ _̂_̂̂_
_̂
_̂_̂
_̂_̂
_̂
_̂_̂
_̂ _̂̂_
_̂_̂̂__̂ _̂
_̂
_̂_̂̂_
_̂̂_̂_ _̂̂_̂_̂__̂̂_
_̂
_̂ _̂_̂̂_
_̂
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂̂__̂_̂
_̂̂_
_̂
_̂̂_
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂̂__̂̂_
_̂̂_
_̂
_̂̂_
_̂_̂
_̂̂_
_̂̂_̂_̂_̂_̂_̂_̂_̂__̂̂__̂
_̂
_̂_̂̂_
_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_
_̂ _̂
_̂
_̂
_̂
_̂
_̂
_̂ _̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_
_̂_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_
_̂ _̂_̂
_̂_̂_̂̂_̂__̂_̂
_̂̂_̂__̂
_̂ _̂̂__̂̂__̂
_̂̂__̂_̂̂_
_̂̂_
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂̂_̂_̂_
_̂̂_
_̂̂_
_̂
_̂
_̂̂__̂
_̂
_̂
_̂_̂
_̂_̂
_̂_̂
_̂̂_̂_
_̂
_̂
_̂̂__̂
_̂_̂̂_̂_
_̂̂__̂_̂̂_
_̂̂__̂
_̂_̂̂__̂
_̂_̂
_̂̂_̂__̂̂_
_̂_̂̂_
_̂̂__̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂̂_
_̂
_̂̂__̂̂_
_̂_̂̂__̂
_̂̂_̂_̂_̂_̂_̂_̂__̂̂_
_̂̂_̂_
_̂
_̂
_̂̂__̂_̂̂_
_̂_̂
_̂
_̂̂__̂̂_
_̂
_̂
_̂
_̂_̂̂_
_̂̂_
_̂̂__̂
_̂̂_
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_̂_
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
C12-1
D12-1
N04-1
M04-1
I02-1
L04-1
C03-1
B12-1
O06-1
H01-1 G12-1
13
05
11
04
03
10
01-1
06
02
07
12
I10I09I08I07I05I04I03 I06
B11
J06 J09J08J07J05J04J03
L04
F11
S10
F10F09F08F07F05F04F03F02 F06
E11
T11
I02
S09
L08L07L05
B05B04
T10
E10E09E08E07
E05E04E03
L06
D11
B06
E06
C11
T09
N05
D10D09D08D07D05D04D03
C10C05C04
N06
D06
C06
G11
H11
G05 G07 G08 G09 G10
K04 K05 K07 K08
G04G03G02
H10H09H08H07H05H04H03H02
K06
G06
H06
C03 C09
K09
N07
J10
M04
C07
M06 M07M05
E02
U11
S11
N04
C08
B12
C12
B07
M08
I11
B10B03
U10
T12
O05
G12
R10
B13
J02
L09
A06
D12
A05A04
O06
T08
U12
K03
D02
O04
A07
S08
O07
G01
F12F01
H01H12
E12
K10
U09
N08
B09Revision Date:Submitted By:
Checked By: Date Drawn: 8/20/2014
1 inch = 400 feetCLHDrawn By: Scale: Rev:
USAEnvironmental, Inc.
Path: S:\Adak\MXD\Field Season 2\StatusMaps\Weekly\RAA04 Weekly Status Map.mxd
±Data is projected to the UState Plane Coordinate System:
NAD 1983 StatePlane Alaska 10 FIPS 5010 Feet
RAA-04Weekly Status Map
Adak Island, AlaskaContract No. N44255-12-C-3003
For w/e Aug 16, 2014
RAA-04 Total Area: 103.97 ac.
0 400 800200 Feet
0 125 25062.5 Meters
Legend
MEC/MDEH (Field Season 2)_̂
QA Seed Item FoundQC Seed Item FoundXY
DGM QC Mini-Grid (20ft x 20ft)
XY
DGM Survey Complete
(105.30 ac.)
QC Complete
(105.30 ac.)
QA Complete
(105.30 ac.)
Intrusive Complete
(105.30 ac.)
Surf Sweep Complete
(105.30 ac.)
DGM Grid (196.85ft x 196.85ft)Step-Out Grid (98.4ft x 98.4ft)
MEC/MDEH (Field Season 1)_̂
MPPEH - for processing (Field Season 2)_̂
Grid StatusInaccessible Grid
_̂_̂
_̂̂_
_̂̂_̂_̂_̂__̂̂_̂__̂
_̂
_̂
_̂
_̂
_̂ _̂_̂_̂̂__̂_̂̂__̂̂__̂̂__̂̂__̂̂_̂_ _̂̂__̂̂_̂_̂_̂_̂
_̂_̂_̂__̂̂__̂̂_
_̂̂_̂_̂_̂__̂̂_ _̂_̂_̂
_̂_̂_̂
_̂_̂
_̂̂_
_̂
_̂
_̂̂_̂_̂__̂̂__̂
_̂_̂̂_
_̂ _̂_̂
C12-1 C12-1a
B12-1
C12-1c
D12-1
C12-1bC12
B12
_̂_̂̂_
_̂
_̂
_̂
_̂
_̂_̂
_̂_̂_̂
_̂
_̂_̂
_̂_̂
_̂_̂
_̂_̂
_̂
_̂_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂_̂_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
N04-1
M04-1a
L04-1b1
L04-1
M04-1
L04-1b L04-1a
N04-1a
M04
L04
N04
±
_̂_̂ _̂ _̂_̂
_̂
_̂
_̂_̂̂_̂_̂_
_̂
_̂_̂̂_
_̂_̂
_̂_̂
_̂_̂
_̂_̂
_̂_̂ _̂
_̂
_̂
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂ _̂̂_
_̂_̂
_̂ _̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂_̂_̂
_̂
_̂
_̂
_̂̂_̂_̂_
_̂_̂ _̂
_̂
_̂
_̂
_̂_̂ _̂
_̂_̂
_̂
_̂
_̂̂_̂__̂̂_̂_
_̂̂_
_̂_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂̂_
_̂_̂_̂
_̂̂_
_̂
_̂̂__̂ _̂ _̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂ _̂
_̂
_̂ _̂
_̂
_̂
_̂
_̂̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂_̂__̂̂_ _̂
_̂_̂ _̂
_̂
_̂_̂
_̂̂__̂_̂
_̂̂__̂̂_̂__̂ _̂
_̂
_̂
_̂
_̂
_̂
_̂̂__̂
_̂_̂
_̂
_̂_̂̂__̂_̂
_̂_̂̂_
_̂̂_
_̂_̂
_̂
_̂_̂
_̂_̂
_̂̂_
_̂
_̂̂__̂̂_
_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂̂_
_̂̂_
_̂̂_
_̂
_̂̂_
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂_̂̂_
_̂
_̂
_̂
_̂_̂
_̂̂_
_̂̂_
_̂_̂̂_
_̂̂_
_̂
_̂
_̂_̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂
_̂_̂_̂
_̂
_̂_̂
_̂
_̂
_̂_̂ _̂̂_
_̂
_̂̂_
_̂ _̂
_̂̂_
_̂
_̂̂_̂__̂
_̂
_̂_̂ _̂
_̂_̂_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂̂__̂
_̂_̂̂__̂̂_ _̂̂_ _̂̂_̂_
_̂̂_
_̂
_̂_̂_̂̂_
_̂_̂
_̂_̂_̂_̂
_̂̂_̂_̂_
_̂̂_̂__̂̂_̂__̂̂__̂_̂̂_̂_
_̂
_̂̂_̂_̂_
_̂̂_̂_ _̂
_̂_̂
_̂
_̂
_̂_̂_̂_̂
_̂̂_
_̂̂_
_̂_̂
_̂_̂
_̂
_̂
_̂_̂
_̂_̂ _̂
_̂_̂
_̂
_̂
_̂
_̂_̂
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂_̂̂_
_̂_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂̂_̂_̂_
_̂
_̂_̂
_̂
_̂
_̂
_̂̂__̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂__̂
_̂
_̂_̂_̂ _̂ _̂
_̂
_̂
_̂
_̂̂_ _̂
_̂̂_
_̂
_̂ _̂
_̂
_̂_̂̂_̂_̂_̂_
_̂
_̂̂_
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂̂_̂__̂
_̂
_̂̂_
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂ _̂_̂
_̂
_̂_̂ _̂
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂_̂
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂̂_
_̂
_̂
_̂
_̂_̂ _̂
_̂
_̂_̂
_̂
_̂̂_
_̂_̂̂_
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂̂_
_̂_̂
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂̂_̂_̂_
_̂
_̂
_̂
_̂
_̂ _̂
_̂
_̂
_̂_̂̂_
_̂
_̂_̂
_̂̂_
_̂
_̂_̂_̂_̂
_̂_̂̂_ _̂ _̂
_̂
_̂
_̂
_̂
_̂ _̂̂_
_̂
_̂
_̂
_̂
_̂_̂_̂_̂_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂̂_
_̂
_̂_̂̂_
_̂
_̂̂_̂_
_̂
_̂
_̂_̂_̂
_̂
_̂̂_̂_
_̂
_̂_̂
_̂
_̂̂_
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂̂__̂̂_ _̂
_̂_̂_̂
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂
_̂
_̂_̂ _̂̂_
_̂
_̂̂_
_̂
_̂
_̂
_̂
_̂_̂̂_
_̂̂__̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂_̂_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂̂_
_̂_̂
_̂
_̂
_̂_̂_̂
_̂
_̂ _̂̂_̂_̂_
_̂̂_
_̂
_̂
_̂
_̂
_̂
_̂
_̂
_̂
A01
Data is projected to the State Plane Coordinate System:NAD 1983 StatePlane Alaska 10 FIPS 5010 Feet
Revision Date:Submitted By:
Checked By: Date Drawn: 8/20/2014 CLHDrawn By: Scale: Rev:
USAEnvironmental, Inc.
Path: S:\Adak\MXD\Field Season 2\StatusMaps\Weekly\ALSW Monthly Status Map.mxd
Adak Island, AlaskaContract No. N44255-12-C-3003
RAA-05/ALSW-01Weekly Status Map
For w/e Aug 16, 2014
Legend
MEC/MDEH (Current Month)_̂
MEC/MDEH (Previous Months)_̂
MPPEH - for processing (Current Month)_̂
Sea Wall surface sweep complete: 04 Aug, 2014
Sea Wall Boundary
1 inch = 200 feet
0 200 400100 Feet
0 60 12030 Meters
_̂
_̂̂_A01
A01-1A01-2
Revision Date:Submitted By:
Checked By: Date Drawn: 8/20/2014
1 inch = 80 feetCLHDrawn By: Scale: Rev:
USAEnvironmental, Inc.
Path: S:\Adak\MXD\Field Season 2\StatusMaps\Weekly\RLR Weekly Status Map.mxd
±Data is projected to the State Plane Coordinate System:
NAD 1983 StatePlane Alaska 10 FIPS 5010 Feet
Roberts Landfill RoadWeekly Status Map
Adak Island, AlaskaContract No. N44255-12-C-3003
For w/e Aug 16, 2014
Roberts Landfill Road Area Total Area: 0.37 ac.
Legend
MEC/MDEH (Field Season 2)_̂
QA Seed Item FoundQC Seed Item FoundXY
DGM QC Mini-Grid (20ft x 20ft)
XY
DGM Survey Complete
(0.46 ac.)
QC Complete
(0.46 ac.)
QA Complete
(0.46 ac.)
Intrusive Complete
(0.46 ac.)
Surf Sweep Complete
(0.46 ac.)
Step-Out Grid (98.4ft x 98.4ft)
MEC/MDEH (Found 2012)_̂
MPPEH - for processing (Field Season 2)_̂
Grid StatusInaccessible Grid
0 80 16040 Feet
0 25 5012.5 Meters
6 bombs discovered at this location