Manipulating the nature of slurry flows to overcome production and maintenance challenges DR STEVE ALGIE CONSULTANT, FLOCEP PTY LTD 1

description

The 4th Annual Slurry Pipelines Conference is the world's only event wholly dedicated to the operational challenges, design questions, innovations, pumps and tailings related to slurry pipelines in the mining and resources sectors. For more information on the event, please visit: http://bit.ly/1xvoBPT

Transcript of Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production &...

Page 1: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

Manipulating the nature of slurry flows to overcome production and maintenance challenges

DR STEVE ALGIE CONSULTANT, FLOCEP PTY LTD

1  

Page 2: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

What is PROmotion™ Technology? PROmo&on  Technology  is  the  basis  for:  

•  a  family  of  devices  that  

•  solve  problems  arising  from  the  inherent  tendency  for  

•  segrega&on  of  the  solids  within  slurry  flows  

2  

Page 3: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

Engineering models (usefully) simplify reality

3  

Page 4: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

Newitt’s slurry flow classification (single particle size)    

4  

Fully  suspended  

Suspended  with  moving  bed  

Suspended  with  salta?on  (par?cles  ‘hop’  along  pipe)  

Blocked  pipe  Len?cular  deposits  

Sta?onary  deposits  with  ripples  In

creasin

g  velocity  

Increasing  solids  concentra?on  

Page 5: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

FLOprep unit

5  

•  Flow  prepara?on  upstream  of  hydrocyclone  distributor    

•  Solids  loading  ≈60%;  high  abrasion  index  (47)  

•  FLOprep  installed  2012  •  Projected  life  188  weeks  

•  Flow  rate  changes  have  not  affected  performance  

•  Accepted  and  performance  validated  by  client  

Evolu&on  Mining  -­‐  Edna  May  Opera&ons  

Page 6: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

FLOdistributor

6  

Evolu&on  Mining  -­‐  Edna  May  Opera&ons  

During  installa&on  in  a  scheduled  12-­‐hour  shut-­‐down  

In  use  

Page 7: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

FLOdistributor

7  

Evolu&on  Mining  -­‐  Edna  May    Opera&ons  

•  Gold  recovery  increased  from  ≈90%  to  ≈  94%  

•  Stable  performance  allows  op&mal  process  opera&ons  

•  Maintenance  costs  reduced  95%  •  uniform  wear  on  cyclones  

•  Underflow  densi&es  uniform  to  1%  solids  (74-­‐75%)  •  Maintenance  intervals  increased  from  3  days  to  4  months  •  Cyclone  life  cycle  increased  from  3  weeks  to  4  months  •  Rubber-­‐lined  spools  not  replaced  in  more  than  two  years’  opera&on  (previous  ceramic  spools  had  16  week  life)  

 

Page 8: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

MAXbend®

8  

The  situa?on:  •  Most  severe  loca?on  in  the  plant  for  bend  wear    

•  Superheated  caus?c  slurry  entering  first  flash  tank  

•  Flashing  inside  bend  results  in  very  high  erosion  

•  Standard  bend  life  120  days    

Alumina  refinery  in  southwest  WA  

Page 9: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

MAXbend® performance

9  

•  MAXbend®  installed  in  alumina  refinery  in  2012  •  service  to  date  ≈900  days  

•  Projected  life:1800  days  (15  &mes  mul&plier)  •  Accommodated  a  flow  rate  increase  of  ≈20%  with  no  effect  on  MAXbend®  performance    

•  Acceptance  and  validated  performance  by  both  clients  •  Rental  op?on  offered  to  clients  and  under  considera?on  

Similarly  spectacular  results  in  Sandfire  Resources’  DeGrussa  copper-­‐gold  opera&ons  

Page 10: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

10  

MAXbend®   Performance Timeline

Standard  Bend  Life   MAXbend®  Bend  Life  

Note  :  Expected  life  based  on  inspec&on  results  from  1  year’s  service  (April  2013)  and    2  year’s  service  (June  2014)  

A  PROmo&on™  Technology  

Page 11: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

Where might you use PROmotion™ Technology? PROmo?on™  Technology  pays  off  in  places  where  the  non-­‐homogeneous  flow  inside  the  pipe  might  get  you  into  trouble:  •  Measurement,  or  sampling  •  Addi?on  of  a  chemical  •  Spliang  a  slurry  flow  •  Where  there’s  a  bend  in  the  pipe  

 

Consider  how  much  easier  these  opera&ons  would  be  if  the  slurry  were  actually  homogeneous  at  these  points!  

Then  …  

11  

Page 12: Dr Steve Algie - FloCEP - Manipulating the nature of slurry flows to overcome production & maintenance challenges

Think of PROmotion™ Technology!   FloCEP  informa?on  contacts:  

  www.flocep.com.au  (under  construc?on)  

  [email protected]  

  Phone:  +61  8  9353  3929  

  Author  contacts:  

  Dr  Steve  Algie  

  algie@mul&line.com.au  

  Phone:  +61  8  9385  9969  

12