Dr. Shahriar BijaniShahed University
Feb. 2014
Kleinberg and Tardos, Algorithm Design, CSE 5311, M Kumar, Spring 2007.
Chapter 4, Computer Algorithms, Horowitz ,…, 2001.
Chapter 16, Introduction to Algorithms, CLRS , 2001.
2Algorithms Design, Greedy Algorithms
3
The problem: We are required to find a feasible solution that either maximizes or minimizes a given objective solution.
It is easy to determine a feasible solution but not necessarily an optimal solution.
The greedy method solves this problem in stages, at each stage, a decision is made considering inputs in an order determined by the selection procedure which may be based on an optimization measure.
Algorithms Design, Greedy Algorithms
4
An optimization problem is one in which you want to find, not just a solution, but the best solution
A “greedy algorithm” sometimes works well for optimization problems
A greedy algorithm works in phases. At each phase:◦ You take the best you can get right now,
without regard for future consequences◦ You hope that by choosing a local optimum at
each step, you will end up at a global optimum
Algorithms Design, Greedy Algorithms
5
Suppose you want to count out a certain amount of money, using the fewest possible bills and coins
A greedy algorithm would do this would be:At each step, take the largest possible bill or coin that does not overshoot◦ Example: To make $6.39, you can choose:
a $5 bill a $1 bill, to make $6 a 25¢ coin, to make $6.25 A 10¢ coin, to make $6.35 four 1¢ coins, to make $6.39
For US money, the greedy algorithm always gives the optimum solution
Algorithms Design, Greedy Algorithms
6
In some (fictional) monetary system, “Rial” come in 1 Rial, 7 Rial, and 10 Rial coins
Using a greedy algorithm to count out 15 Rials, you would get◦ A 10 Rial piece◦ Five 1 Rial pieces, for a total of 15 Rials◦ This requires six coins
A better solution would be to use two 7 Rial pieces and one 1 Rial piece◦ This only requires three coins
This greedy algorithm results in a solution, but not in an optimal solution
Algorithms Design, Greedy Algorithms
7
You have to run nine jobs, with running times of 3, 5, 6, 10, 11, 14, 15, 18, and 20 minutes
You have three processors on which you can run these jobs
You decide to do the longest-running jobs first, on whatever processor is available
20
18
15 14
11
10
6
5
3P1
P2
P3
Time to completion: 18 + 11 + 6 = 35 minutes This solution isn’t bad, but we might be able to do better
Algorithms Design, Greedy Algorithms
8
What would be the result if you ran the shortest job first? Again, the running times are 3, 5, 6, 10, 11, 14, 15, 18,
and 20 minutes
That wasn’t such a good idea; time to completion is now 6 + 14 + 20 = 40 minutes
Note, however, that the greedy algorithm itself is fast◦ All we had to do at each stage was pick the minimum or maximum
20
18
15
14
11
10
6
5
3P1
P2
P3
Algorithms Design, Greedy Algorithms
9
This solution is clearly optimal (why?) Clearly, there are other optimal solutions (why?) How do we find such a solution?
◦ One way: Try all possible assignments of jobs to processors◦ Unfortunately, this approach can take exponential time
Better solutions do exist:
20
18
15
14
11
10 6
5
3
P1
P2
P3
Algorithms Design, Greedy Algorithms
10
The Huffman encoding algorithm is a greedy algorithm You always pick the two smallest numbers to combine
Average bits/char:0.22*2 + 0.12*3 +0.24*2 + 0.06*4 +0.27*2 + 0.09*4= 2.42
The Huffman algorithm finds an optimal solution
22 12 24 6 27 9 A B C D E F
15
27
46
54
100
A=00B=100C=01D=1010E=11F=1011
Algorithms Design, Greedy Algorithms
04/18/23CSE 5311 Spring 2007
M Kumar 11
Procedure Huffman_Encoding(S,f);Input : S (a string of characters) and f (an array of frequencies).Output : T (the Huffman tree for S)
1. insert all characters into a heap H according to their frequencies;
2. while H is not empty do 3. if H contains only one character x then4. x root (T);5. else 6. z ALLOCATE_NODE();7. x left[T,z] EXTRACT_MIN(H);8. y right[T,z] EXTRACT_MIN(H);9. fz fx + fy;10. INSERT(H,z);
04/18/23CSE 5311 Spring 2007
M Kumar 12
Complexity of Huffman algorithm
Building a heap in step 1 takes O(n) timeInsertions (steps 7 and 8) and deletions (step 10) on H
take O (log n) time eachTherefore Steps 2 through 10 take O(n logn) time
Thus the overall complexity of the algorithm is O( n logn ).
Assume a thief is robbing a store with various valued and weighted objects. Her bag can hold only W pounds.
The 0-1 knapsack problem: must take all or nothing
The fractional knapsack problem: can take all or part of the item
Algorithms Design, Greedy Algorithms 13
50
10
20
30
50
20
30
50
20
10
50
10
30 50
10
20---30
20
=$220 =$160 =$180 =$240$60 $100 $120
0-1
kna
psac
k
Given n items of sizes w1, w2, …, wn and values p1, p2, …, pn and size of knapsack of C, the problem is to find x1, x2, …, xn that maximize
subject to
n
iii px
1
n
iii Cwx
1
Consider yi = pi / wi
What is yi? What is the solution?
fractional problem has greedy-choice property, 0-1 does not.
17
Activity On Edge (AOE) Networks: Tasks (activities) : a0, a1,… Events : v0,v1,…
V0
V1
V2
V3
V4
V6
V7
V8
V5
finish
a0 = 6
starta1 = 4
a2 = 5
a4 = 1
a3 = 1
a5 = 2
a6 = 9
a7 = 7
a8 = 4
a10 = 4
a9 = 2
Some definition: Predecessor Successor Immediate predecessor Immediate successor
18
A critical path is a path that has the longest length. (v0, v1, v4, v7, v8)
V0
V1
V2
V3
V4
V6
V7
V8
V5
a0 = 6
a1 = 4
a2 = 5
a4 = 1
a3 = 1
a5 = 2
a6 = 9
a7 = 7
a8 = 4
a10 = 4
a9 = 2
start finish
6 + 1 + 7 + 4 = 18 (Max)
19
The earliest time of an activity, ai, can occur is the length of the longest path from the start vertex v0 to ai’s start vertex. ( Ex: the earliest time of activity a7 can occur is 7.)
We denote this time as early(i) for activity ai.∴ early(6) = early(7) = 7.
V0
V1
V2
V3
V4
V6
V7
V8
V5
finish
a0 = 6
starta1 = 4
a2 = 5
a4 = 1
a3 = 1
a5 = 2
a6 = 9
a7 = 7
a8 = 4
a10 = 4
a9 = 26/?
0/?
7/? 16/?
0/?
5/?
7/?
14/?7/?4/?
0/?
18
20
The latest time, late(i), of activity, ai, is defined to be the latest time the activity may start without increasing the project duration.
Ex: early(5) = 5 & late(5) = 8; early(7) = 7 & late(7) = 7
V0
V1
V2
V3
V4
V6
V7
V8
V5
finish
a0 = 6
starta1 = 4
a2 = 5
a4 = 1
a3 = 1
a5 = 2
a6 = 9
a7 = 7
a8 = 4
a10 = 4
a9 = 2
late(5) = 18 – 4 – 4 - 2 = 8late(7) = 18 – 4 – 7 = 7
6/6
0/1
7/7 16/16
0/3
5/8
7/10
14/147/74/5
0/0
21
A critical activity is an activity for which early(i) = late(i).
The difference between late(i) and early(i) is a measure of how critical an activity is.
Calculationof
Latest Times
Calculationof
Earliest TimesFinding
Critical path(s)To solve
AOE Problem
4 -22
Let activity ai is represented by edge (u, v).◦ early (i) = earliest [u]◦ late (i) = latest [v] – duration of activity ai
We compute the times in two stages:a forward stage and a backward stage.
The forward stage:◦ Step 1: earliest [0] = 0◦ Step 2: earliest [j] = max {earliest [i] + duration of
(i, j)}i is in P(j)
P(j) is the set of immediate predecessors of j.
23
The backward stage:◦ Step 1: latest[n-1] = earliest[n-1]◦ Step 2: latest [j] = min {latest [i] - duration of (j, i)}
i is in S(j)
S(j) is the set of vertices adjacent from vertex j.latest[8] = earliest[8] = 18latest[6] = min{earliest[8] - 2} = 16latest[7] = min{earliest[8] - 4} = 14latest[4] = min{earliest[6] – 9; earliest[7] – 7} = 7latest[1] = min{earliest[4] - 1} = 6latest[2] = min{earliest[4] - 1} = 6latest[5] = min{earliest[7] - 4} = 10latest[3] = min{earliest[5] - 2} = 8latest[0] = min{earliest[1] – 6; earliest[2] – 4; earliest[3] –
5} = 0
24
V0
V1
V2
V3
V4
V6
V7
V8
V5
finish
a0
starta1
a2
a4
a3
a5
a6
a7
a8
a10
a9
V0
V1
V4
V6
V7
V8 finish
a0
start
a3 a6
a7 a10
a9
Activity
Early
Late L - E
Critical
a0 0 0 0 Yes
a1 0 2 2 No
a2 0 3 3 No
a3 6 6 0 Yes
a4 4 6 2 No
a5 5 8 3 No
a6 7 7 0 Yes
a7 7 7 0 Yes
a8 7 10 3 No
a9 16 16 0 Yes
a10 14 14 0 Yes
4 -25
The longest path(critical path) problem can be solved by the critical path method(CPM) :
Step 1:Find a topological ordering.Step 2: Find the critical path.
26
A salesman must visit every city (starting from city A), and wants to cover the least possible distance◦ He can revisit a city (and reuse a road) if necessary
He does this by using a greedy algorithm: He goes to the next nearest city from wherever he is
From A he goes to B From B he goes to D This is not going to result in a
shortest path! The best result he can get
now will be ABDBCE, at a cost of 16
An actual least-cost path from A is ADBCE, at a cost of 14E
A B C
D
2
3 3
4
4 4
Algorithms Design, Greedy Algorithms
27
A greedy algorithm typically makes (approximately) n choices for a problem of size n◦ (The first or last choice may be forced)
Hence the expected running time is:O(n * O(choice(n))), where choice(n) is making a choice among n objects◦ Counting: Must find largest useable coin from
among k sizes of coin (k is a constant), an O(k)=O(1) operation; Therefore, coin counting is (n)
◦ Huffman: Must sort n values before making n choices Therefore, Huffman is O(n log n) + O(n) = O(n log
n)
Algorithms Design, Greedy Algorithms
Algorithms Design, Greedy Algorithms 29
In a shortest-paths problem, we are given a weighted, directed graph G = (V,E), with weights assigned to each edge in the graph. The weight of the path p = (v0, v1, v2, …, vk) is the sum of the weights of its edges:
v0 v1 v2 . . . vk-1 vk
The shortest-path from u to v is given by d(u,v) = min {weight (p)} : if there are one or more paths from u to v
= otherwise
Algorithms Design, Greedy Algorithms 30
Given G (V,E), find the shortest path from a given vertex u V to every vertex v V ( u v). For each vertex v V in the weighted directed graph, d[v] represents the distance from u to v.
Initially, d[v] = 0 when u = v. d[v] = if (u,v) is not an edge d[v] = weight of edge (u,v) if (u,v) exists.
Dijkstra's Algorithm : At every step of the algorithm, we compute, d[y] = min {d[y], d[x] + w(x,y)}, where x,y V.
Dijkstra's algorithm is based on the greedy principle because at every step we pick the path of least weight.
Algorithms Design, Greedy Algorithms 31
3 9 2
5 1 u b a
1 4 9
2 4 d e c
3 2
g h f
Algorithms Design, Greedy Algorithms 32
3 9 2
5 1 u b a
1 4 9
2 4 d e c
3 2
g h f
Step #
Vertex tobe marked
Distance to vertex Unmarked vertices
u a b c d e f g h
0 u 0 1 5 9 a,b,c,d,e,f,g,h
1 a 0 1 5 3 9 b,c,d,e,f,g,h
2 c 0 1 5 3 7 12 b,d,e,f,g,h
3 b 0 1 5 3 7 8 12 d,e,f,g,h
4 d 0 1 5 3 7 8 12 11 e,f,g,h
5 e 0 1 5 3 7 8 12 11 9 f,g,h
6 h 0 1 5 3 7 8 12 11 9 g,h
7 g 0 1 5 3 7 8 12 11 9 h
8 f 0 1 5 3 7 8 12 11 9 --
Algorithms Design, Greedy Algorithms 33
Procedure Dijkstra's Single-source shortest path_G(V,E,u)Input: G =(V,E), the weighted directed graph and v the source vertexOutput: for each vertex, v, d[v] is the length of the shortest path from u to v.1. mark vertex u;2. d[u] 0; 3. for each unmarked vertex v V do4. if edge (u,v) exists d [v] weight (u,v);5. else d[v] ;6. while there exists an unmarked vertex do7. let v be an unmarked vertex such that d[v] is minimal;8. mark vertex v;9. for all edges (v,x) such that x is unmarked do10. if d[x] > d[v] + weight[v,x] then11. d[x] d[v] + weight[v,x]
Algorithms Design, Greedy Algorithms 34
Complexity of Dijkstra's algorithm: Steps 1 and 2 take (1) time Steps 3 to 5 take O(V) time The vertices are arranged in a heap in order of
their paths from u Updating the length of a path takes O(log V) time. There are V iterations, and at most E updates Therefore the algorithm takes
O((E+V) log V) time.
Spanning tree of a connected graph G: a connected acyclic subgraph of G that includes all of G’s vertices
Minimum spanning tree of a weighted, connected graph G: a spanning tree of G of the minimum total weight
# MST = nn-2 (n = numbers of nodes)
Example:c
db
a
6
2
4
3
1
c
db
a
2
3
1
c
db
a
6
4 1
Start with tree T1 consisting of one (any) vertex and “grow” tree one vertex at a time to produce MST through a series of expanding subtrees T1, T2, …, Tn
On each iteration, construct Ti+1 from Ti by adding vertex not in Ti that is closest to those already in Ti (this is a “greedy” step!)
Stop when all vertices are included
c
db
a
4
26
1
3
c
db
a
4
26
1
3
c
db
a
4
26
1
3
c
db
a
4
26
1
3
c
db
a
4
26
1
3
Proof by induction that this construction actually yields an MST (CLRS, Ch. 23.1).
Efficiency◦ O(n2) for weight matrix representation of graph
and array implementation of priority queue
◦ O(m log n) for adjacency list representation of graph with n vertices and m edges and min-heap implementation of the priority queue
04/18/23 39
The algorithm maintains a collection VS of disjoint sets of vertices
Each set W in VS represents a connected set of vertices forming a spanning tree
Initially, each vertex is in a set by itself in VS Edges are chosen from E in order of increasing
cost, we consider each edge (v, w) in turn; v, w V.
If v and w are already in the same set (say W) of VS, we discard the edge
If v and w are in distinct sets W1 and W2 (meaning v and/or w not in T) we merge W1 with W2 and add (v, w) to T.
04/18/23 40
Procedure MCST_G(V,E) (Kruskal's Algorithm) Input: An undirected graph G(V,E) with a cost function c on the
edges Output: T the minimum cost spanning tree for G1. T 0;2. VS 0;3. for each vertex v V do4. VS = VS {v};5. sort the edges of E in nondecreasing order of weight 6. while VS > 1 do7. choose (v,w) an edge E of lowest cost;8. delete (v,w) from E;9. if v and w are in different sets W1 and W2 in VS do10. W1 = W1 W2;11. VS = VS - W2;12. T T (v,w);13.return T
04/18/23 41
Consider the example graph shown earlier, The edges in nondecreasing order
[(A,D),1],[(C,D),1],[(C,F),2],[(E,F),2],[(A,F),3],[(A,B),3],
[(B,E),4],[(D,E),5],[(B,C),6]
EdgeActionSets in VS Spanning Tree, T =[{A},{B},{C},{D},{E},{F}]{0}(A,D) merge [{A,D}, {B},{C}, {E}, {F}] {(A,D)} (C,D) merge [{A,C,D}, {B}, {E}, {F}] {(A,D), (C,D)} (C,F) merge[{A,C,D,F},{B},{E}]{(A,D),(C,D), (C,F)} (E,F) merge[{A,C,D,E,F},{B}]{(A,D),(C,D), (C,F),(E,F)}(A,F) reject[{A,C,D,E,F},{B}]{(A,D),(C,D), (C,F), (E,F)}(A,B) merge[{A,B,C,D,E,F}]{(A,D),(A,B),(C,D), (C,F),(E,F)}(B,E) reject(D,E) reject(B,C) reject
F
E
D
C
B
A
1
2 1
4
5
2 6
3 3
F
E
D
C
B
A
1
2 1
2
3
The equivalent Graph and the MCST
04/18/23 42
Steps 1 thru 4 take time O (V) Step 5 sorts the edges in nondecreasing order in O
(E log E ) time Steps 6 through 13 take O (E) time The total time for the algorithm is therefore given
by O (E log E) The edges can be maintained in a heap data
structure with the property, E[PARENT(i)] E[i] This property can be used to sort data elements in
nonincreasing order. Construct a heap of the edge weights, the edge with lowest
cost is at the root During each step of edge removal, delete the root (minimum element) from the heap and rearrange the heap.
The use of heap data structure reduces the time taken because at every step we are only picking up the minimum or root element rather than sorting the edge weights.
04/18/23 43
Consider a network of computers connected through bidirectional links. Each link is associated with a positive cost: the cost of sending a message on each link.
This network can be represented by an undirected graph with positive costs on each edge.
In bidirectional networks we can assume that the cost of sending a message on a link does not depend on the direction.
Suppose we want to broadcast a message to all the computers from an arbitrary computer.
The cost of the broadcast is the sum of the costs of links used to forward the message.
04/18/23 44
1
2 1
4
5
2 6
3 3
A Local Area Network
F
E
D
C
B
A
1
2 1
4
5
2 6
3 3
F
E
D
C
B
A
1
2 1
2
3
The equivalent Graph and the MCST
Problem Formulation◦ Given a set of n activities, S = {a1, a2, ..., an} that
require exclusive use of a common resource, find the largest possible set of nonoverlapping activities (also called mutually compatible). For example, scheduling the use of a classroom.
◦ Assume that ai needs the resource during period [si, fi), which is a half-open interval, where si = start time of the activity, and fi = finish time of the activity.
Note: Could have many other objectives:◦ Schedule room for longest time.◦ Maximize income rental fees.
Assume the following set S of activities that are sorted by their finish time, find a maximum-size mutually compatible set.
i 1 2 3 4 5 6 7 8 9
si 1 2 4 1 5 8 9 11 13
fi 3 5 7 8 9 10 11 14 16
i 1 2 3 4 5 6 7 8 9
si 1 2 4 1 5 8 9 11 13
fi 3 5 7 8 9 10 11 14 16
Define Si,j = {ak S : fi sk < fk sj } ◦ activities that start after ai finishes and finish
before aj starts Activities in Si,j are compatible with:
◦ ai and aj ◦ aw that finishes not later than ai and start not
earlier than aj
Add the following [imaginary] activitiesa0 = [– , 0) and an+1 = [ , +1)
Hence, S = S0,n+1 and the range of Si,j is 0 i,j n+1
Assume that activities are sorted by monotonically increasing finish time:◦ i.e., f0 f1 f2 ... fn < fn+1
Then, Si,j = for i j.
Proof: Therefore, we only need to worry about Si,j
where 0 i < j n+1
Suppose that a solution to Si,j includes ak . We have 2 sub-problems:◦ Si,k (start after ai finishes, finish before ak starts)
◦ Sk,j (start after ak finishes, finish before aj starts)
The Solution to Si,j is
(solution to Si,k ) {ak} (solution to Sk,j ) Since ak is in neither sub-problem, and the
subproblems are disjoint, |solution to S| = |solution to Si,k| + 1 + |
solution to Sk,j|
Let Ai,j = optimal solution to Si,j .
So Ai,j = Ai,k {ak} Ak,j, assuming:◦ Si,j is nonempty, and
◦ we know ak. Hence,
c[i,j]: number of activities in a max subset of mutually compatible activities
ji
Sajki
ji
Sjkckic
S
jic
jik
,
,
1],[],[max
0
],[
,
Theorem: Let Si,j , and let am be the activity in Si,j with the earliest finish time: fm= min { fk : ak Si,j }. Then:
1. am is used in some maximum-size subset of mutually compatible activities of Si,j
2. Sim= , so that choosing am leaves Sm,j as the only nonempty subproblem.
Algorithms Design, Greedy Algorithms 54
ɵ(Sorting)+ɵ(n) = ɵ (n log n)
56
A board has a certain number of coins on it A robot starts in the upper-left corner, and
walks to the bottom left-hand corner◦ The robot can only move in two directions: right and
down◦ The robot collects coins as it goes
You want to collect all the coins using the minimum number of robots
Example: Do you see a greedy algorithm
for doing this? Does the algorithm guarantee
an optimal solution?◦ Can you prove it?◦ Can you find a counterexample?