Supplier Doc. No.: 10000224581 Revision : 01
Supplier DR Doc. No.: DR-10000224581 Page no.: 4 of 5
20) Group
44 Please correct grabber bar part P600063806 to P6000074898 as per DBI
page 15 . The drawing number is DU600063806.Also please mention thecolor
AgilityGroup
2 Weeks
45 Welders certificate and NDE technician report not attached AgilityGroup
2 Weeks
5.04.1
46 Please flatten the report AgilityGroup
2 Weeks
47 Page 277:For P6000033321(AP-0014) impact tes t is asked at -40
whereas in report it is performed at -20
Agility
Group
2 Weeks
48 Page 274: For P6000033321(AP-0012) Impact tes t results were not
attachedAgilityGroup
2 Weeks
49 Page 702,720:For 100043944,change the drawing number from XX-
00020129958 to XX-0002012958Agility
Group
2 Weeks
50 Page 675:For P6000033324, The color mentioned in the report(Orange)
is different than mentioned in the DBI(Black)AgilityGroup
2 Weeks
51 Page 168:For P6000033055(AS-0031),Impact tes t results are not include
in the report
Agility
Group
2 Weeks
52 Page 559:For P6000020180(AT-543-3):Impact test results are not
includedAgilityGroup
2 Weeks
53 For P6000033321, NDE Technician report for UT is not attached. AgilityGroup
2 Weeks
54 Inspection dates are not mentioned on the weld log AgilityGroup
2 Weeks
55 Traceability is present for parts with Drawing numbers. Remaining parts
have no traceability mentioned.AgilityGroup
2 Weeks
56 Traceability is attached for P6000107931 and P6000082230 but these
parts are not present in DBIAgilityGroup
2 Weeks
57 For P6000045629:Coating report is not attached AgilityGroup
2 Weeks
5.04.2
58 Inspection dates are not mentioned on the weld log AgilityGroup
2 Weeks
59 P6000045505 Rev D should be changed to Rev C . (whole document) AgilityGroup
2 Weeks
60 Please correct Drawing no 00020129958 to 0002012958. Refer page 602 Agility 2 Weeks
PROMEX
PROMEX MRB-4.3478.09-002 rev 04
MRB-4.3478.09-003 rev 02
7/25/2019 DR MRB 6083044 010 Rev 01 for PROMEX Action
http://slidepdf.com/reader/full/dr-mrb-6083044-010-rev-01-for-promex-action 2/2
Supplier Doc. No.: 10000224581 Revision : 01
Supplier DR Doc. No.: DR-10000224581 Page no.: 5 of 5
&611 Group
61 For parts P6000052012, P6000051711, P6000033321, P6000045629,
coating reports are not enclosed.AgilityGroup
2 Weeks
62 Impact test done at -20 C , but as per MSpec M10009 it should be done
at -40 C. Refer page 188Agility
Group
2 Weeks
63 Impact tes t results are not mentioned . Refer page 88, 185 AgilityGroup
2 Weeks
64 For parts P6000020225, P6000020306, 200000499, P6000020180,
certificates are not enclosedAgility
Group
2 Weeks
65 P6000082230 is not available in DBI .Refer page 606,645 AgilityGroup
2 Weeks
66 P6000107931 is not available in DBI but given in traceability list andweld log. Refer page 607,646
AgilityGroup
2 Weeks
5.05 AgilityGroup
2 Weeks
67 Please mention the traceability for all plates, pipes as per DU600106285 AgilityGroup
2 Weeks