Dr Elattuvalappil Sreedharan

download Dr Elattuvalappil Sreedharan

of 10

Transcript of Dr Elattuvalappil Sreedharan

  • 8/2/2019 Dr Elattuvalappil Sreedharan

    1/10

  • 8/2/2019 Dr Elattuvalappil Sreedharan

    2/10

    For most of us, This is THANE

    One such cyclone, hit the coastal town of Rameshwaram on 22nd of December, 1964. And it was a deadly one.

    Not so long ago, south of Rameshwaram, there used be a bustling town called Dhanushkodi. It had its own post office,customs office and even a Railway Station. My bet is most of you wouldnt have heard about it. Why?

    Because on that fateful night, the Indian Ocean swallowed the entire town. More than 2000 Indians were killed. The ocean

    even ensured that, a passenger train which was beginning its last journey of the day at 11.15 P.M, made its last journey

    ever. If you still cant imagine the ferocity of this cyclone, let me help you

    Dhanushkodi, before and after

    So where does Dr Sreedharan come in all of this?

    As a sideshow, the cyclone destroyed the Pamban Bridge, the only bridge connecting Rameshwaram to mainland India.

    And this meant Rameshwaram was completely isolated. Considering the above cyclone something had to be done, and

    fast.At that time, Dr Sreedharan was a Deputy Engineer in the Southern Railway. And this piece of wreck was in his territory.

    Indian Railways, gave Dr Sreedharan six months to restore connectivity to Rameshwaram. Which was asking a lotconsidering

    Dr. Sreedharan, had to convert this

    http://kaipullaispeaks.files.wordpress.com/2012/02/cyclone-impact.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/thane_railway_station.jpg
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    3/10

    To

    IN SIX MONTHS

    Dr Sreedharan finished the job in ..FORTY SIX 1962 DAYS.

    He took one month and 15 days to restore, THAT bridge, back to full operation. The bridge which was Indias longest sea

    bridge for 96 years, till the Bandra Worli Sea Link was inaugurated in the year 2008.

    Forty six days to restore this 2.3 Km bridge in a state where

    THIS BRIDGE

    took six effin months to restore after being washed away by a flash flood, in 2006.

    There are some achievements that look cool, but once you get an award, you completely forget about them. And then

    there are some you wont forget, even if you suffer a total memory loss.

    This was one of those things.

    For all this trouble, Dr Sreedharan got a Railway award consisting of Rs 100 and an awful looking plaque.

    The process of short-changing Dr E Sreedharan, began in 1962.

    Even If Dr Sreedharan, sat and twiddled his thumbs for the rest of his life, he would have been considered a superhero for

    his bridge-building awesomeness alone. Fortunately for India though, he did not like twiddling thumbs. Packing his bags

    for his next assignment, he set off to Calcutta, where he became the chief designer of the Calcutta Metro. And then,

    getting bored of railways in general, he took charge of Indias largest Ship building company, Cochin Shipyard. There he

    designed, built and commissioned Indias first indigenously built Merchant vessel, the Rani Padmini, in 1981.

    http://kaipullaispeaks.files.wordpress.com/2012/02/sengipatti.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/800px-pambanbridge.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/pamban-damage1.jpg
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    4/10

    After building everything from trains to ships, Dr Sreedharan according to government rules, had to retire in 1990 when

    he completed 60 years of age.

    But, when you are Dr Sreedharan, you dont have the plebian privilege of retirement.

    He was asked to go to Mumbai, to take charge of what was then deemed to be Indias toughest project since

    independence. It involved burrowing through basalt mountains, spanning kilometer long marshes and rivers and taking

    railways to a place where even the Britishers thought it was impossible. This region was the Western Ghats of

    Maharashtra, affectionately called, the Konkan.

    The railway babus simply called this herculean venture, Konkan Railway. Naming things is not really their forte.

    And slapped it with a pathetic logo

    This is what Dr E Sreedharan had to do,

    Lay 760 Kms of railway track, through a terrain

    that had

    and this

    infested with

    http://kaipullaispeaks.files.wordpress.com/2012/02/konkan-11.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/konkan-3.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/konkan-3.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/konkan2.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/konkan-11.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/1287834103_konkan_railway-logo.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/rani-padmini.jpg
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    5/10

    and perennially at the risk of

    And to do that, Sreedharan had to

    1. Acquire 5000 hectares of land from 42,000 assorted land owners.

    2. Build 2000 Bridges, both major and minor, across Marshes, swamps, rivers and backwaters.3. Blast 92 tunnels, totaling 83 kilometers in length through Basalt, natures adamantium and soft soil, natures china clay.

    You need nuclear weapons and Arnold to bore through the former while the latter generally collapsed on itself, if

    someone as much as farted.And then came the most difficult task in the Indian Index Of Difficult tasks4. Dealing And Negotiating With The Chief Ministers, Home Ministers, Other Ministers And Their Chelas Of Four

    Different States.

    And to complete all of the above tasks, Dr Sreedharan, was given 8 years.

    It would be like Hercules being asked to accomplish his twelve tasks, blinded and with one hand tied to his back, in three

    days.

    Hercules

    Needless to say, he would have failed.

    Dr Sreedharan, supposedly retired and who qualified for Indian Railways senior citizen quota, finished the job in 7 years.

    Konkan Railway to me, is the second biggest achievement of Independent India, with the first being India remaining

    India. New standards will have to be invented, to realistically measure the impact of Konkan Railway on the Indian

    economy.

    For starters

    1. For the first time ever, three largest ports on the Indian coast, Mumbai, Karwar and Mangalore have a direct

    connection.

    2. Travel time from the southern states to the north, have been reduced by upto 40 percent. The crummy old Nethravathi

    Express, used to take 38 hours to travel from Trivandrum to Mumbai.

    Now, thanks to Dr E Sreedharan and the

    http://en.wikipedia.org/wiki/Labours_of_Herculeshttp://kaipullaispeaks.files.wordpress.com/2012/02/hercules.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/landslides.jpghttp://en.wikipedia.org/wiki/Labours_of_Hercules
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    6/10

    KONKAN RAILWAY

    the same train takes 22 Hours. A 16 hour reduction in travel time. And a 16-18 hour reduction in travel times of all trains

    going from Kerala,Karnataka, Goa to the North.

    All the trains.

    Try measuring the impact. Dont bother, you cant.

    And new levels of difficulty need to be established to measure the difficulty of this task. The sheer number of architectura

    impossibilities overcome by Dr E Sreedharan and his team in making this wild dream a reality, is mind boggling. All I can

    do is suggest you to go here,hereand here.

    However, there is one thing that encapsulates what all the above links have to say

    THIS IS THE VIADUCT OVER THE PANVEL NADI

    Which basically is a Marsh

    Between two Hills

    http://books.google.co.in/books?id=ETIxCLujm30C&pg=PA61&lpg=PA61&dq=panvel+nadi+was+built+in&source=bl&ots=Tljs9iv4iq&sig=yXiJ3y97XauxRUb3O9Tabr3aEjQ&hl=en&sa=X&ei=jWo3T7jyBcrlrAei3O3VBQ&ved=0CD0Q6AEwBA#v=onepage&q=panvel%20nadi%20was%20built%20in&f=falsehttp://www.goodnewsindia.com/Pages/content/milestones/konkanRail.htmlhttp://www.goodnewsindia.com/Pages/content/milestones/konkanRail.htmlhttp://www.goodnewsindia.com/Pages/content/milestones/konkanRail.htmlhttp://www.panoramio.com/photo/5130753http://kaipullaispeaks.files.wordpress.com/2012/02/panvel-nadi.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/sharavati.jpghttp://books.google.co.in/books?id=ETIxCLujm30C&pg=PA61&lpg=PA61&dq=panvel+nadi+was+built+in&source=bl&ots=Tljs9iv4iq&sig=yXiJ3y97XauxRUb3O9Tabr3aEjQ&hl=en&sa=X&ei=jWo3T7jyBcrlrAei3O3VBQ&ved=0CD0Q6AEwBA#v=onepage&q=panvel%20nadi%20was%20built%20in&f=falsehttp://www.goodnewsindia.com/Pages/content/milestones/konkanRail.html
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    7/10

    And to traverse it,

    The train has to travel at a height, which is as tall as

    In other words,

    Dr Sreedharan and his team, built a goddamn Qutub Minar, over a marsh, between two hills, just so that, a train couldchug over it.

    Need I say more?

    You will see this wonder of Modern India immediately after Ratnagiri on the Konkan Railway. In the 15 kilometer stretch

    between Ratnagiri and Nivasar, there are 3 tunnels and 5 viaducts. The third viaduct is the Panval Nadi viaduct,

    immediately after the first tunnel. The exact sequence will be -> Big Tunnel, Massive Gorge, Big tunnel again.

    Dr Sreedharan though, never had the chance to taste his success. In December 1997, one year before the Konkan Railway

    http://kaipullaispeaks.files.wordpress.com/2012/02/21big.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/800px-q_minar.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/panvel-nadi-2.jpg
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    8/10

    was thrown open to traffic, he was shunted to New Delhi to head a new organization. It was created to find a viable

    solution to the traffic woes of the aam aadmi in the national capital.

    This organization was called the Delhi Metro Railway Corporation.

    Of all the railway systems in the world, building a metro is the most difficult in the world. Most difficult, becomes

    impossible, when you have to build that damn thing under and over a megapolis.

    Impossible reaches You must be kidding me levels, when that megapolis in question is Delhi and the country in question

    is India.

    There are more people in this pic than there are in Canada.

    Delhi Metro was not Indias first metro. Calcutta has that honor. But Calcuttas I built my own metro story, was onesorry tale

    Sample this

    1. It took 22 years to build the Calcutta Metro, A metro whose total length was 16.75 kms. In other words, Calcutta Metro

    construction dudes managed a grand average of, .76 kms a year.2. The Calcutta metro suffered from debilitating shortages in almost everything. Shortages of funds, shortages in labour

    and shortages in everything else. The only they had in plenty was those damn shortages.

    3. And it was harried by the parent, the Indian Railways, every step of the way.

    If the Calcutta metro was any indicator, the 168 Kms long Delhi Metro would have been beset with shortages, harassed bythe Railways and would have been completed in A.D 2083.

    If ever there was a movie made about Dr Sreedharans job, it would have looked something like this

    http://kaipullaispeaks.files.wordpress.com/2012/02/missionimpossibleposter-copy.jpghttp://kaipullaispeaks.files.wordpress.com/2012/02/delhi.jpg
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    9/10

    But this was Dr E Sreedharan.

    When he started off, he put in place some things that were never before done in the history of Indian mega construction

    projects

    Like

    1. His appointed himself as the judge, jury and the executioner as far as the Delhi Metro was concerned. No external

    influences were tolerated. And he took no prisoners. There have been stories were, people walked in with the traditional

    M.P recommendation letter, walked out of his office, with the paper in two different hands.

    2. After giving himself the power, he changed the tendering process, upside down. In a country, where opening a single

    tender on an average, took six to nine months, Dr Sreedharan got the job done in 19 days. YES, 19 Days.

    3. When confronted with the standard Government I am short of money rigamarole, Dr Sreedharan did what anysensible government servant would do. He simply cut out the Government from the funding.He single-handedly went and got a loan of USD 5 Billion sanctioned from the Japanese Bank of International Co-

    operation to fund the Metro. Now, 60 percent of the necessary finance secured, Government shut up and stumped up the

    remaining cash.

    4. He then hired top International consultants from an assortment of countries, to cover for the lack of local talent, to

    supervise and execute the project.

    For the first time in the History of India, the entire Delhi Bureaucratic circle was completely circumvented. That too, by

    one 74 year old dude from Kerala.

    As a result

    Phase one of the 5 billion dollar metro, was completed three years before schedule, entirely within the initially stipulated

    budget. And there was not even a single shard of corruption.

    In India, that is the closest we can get to walking on water.If someone had in 1998, said that such a thing would happen in India, He would have been given a priority ticket to

    Agra/Alibaug/Kilpauk or the nearest mental asylum.

    Today, the Delhi Metro is complete and for the first time, Dilliwalas are enjoying the benefits of a full fledged suburban

    rail system that has a punctuality factor of 99.999 percent. All thanks to this man

    Next time, any Dilli boy/girl tries to mock you or anyone with the moniker Madrasi, just mention the words, Metro-

    Sreedharan-Madrasi in the same sentence. The other side will shut up.

    The successful execution of the Delhi Metro, made Dr Sreedharan the Tom Cruise of the Metro Rail universe. EveryIndian city worth its salt, now wanted its own metro and Dr Sreedharan as its consultant.

    One such city was Hyderabad. And the company executing that metro was a company called, MAYTAS

    INFRASTRUCTURE.

    You know where this is going.

    In September 2008, Dr Sreedharan, after observing as a consultant, sent the following report to the Planning Commission,

    Government of India

    Making available 296 acres of prime land to the BOT [build, operate and transfer] developer for commercial exploitation

    was like selling the family silver. I fear a big political scandal some time later, as it is apparent the BOT operator has a

    hidden agenda which appears to be to extend the metro network to a large tract of his private land holdings so as to reap a

    windfall profit of four to five times the land price.

    Planning commission, that plans little and develops less, as usual did not pay heed to this report. In fact they chastised Dr

    Sreedharan, for not backing up his allegation with necessary proof.

    This is what happened, three months later

    http://kaipullaispeaks.files.wordpress.com/2012/02/metro-man123.jpg
  • 8/2/2019 Dr Elattuvalappil Sreedharan

    10/10

    Remember how the scandal started? It started by Satyam Computers, arbitrarily taking over Maytas infrastructure, a

    company that was neither in IT, nor was a competitor. In fact the only link between Satyam and Matras was that it owned

    by Ramalinga Rajus sons.

    And sensing that Maytas was in big trouble, he bought the company to save it.

    And Dr Sreedharan, predicted that the company was in trouble, three months before the world knew it.

    So let me just encapsulate, if that can be done, on what Dr Sreedharan has done for the country

    1. He restored Indias longest sea bridge which was completely destroyed, in 46 days.

    2. He designed Indias first Metro.

    3. Supervised the building of Indias first indigenous Merchant vessel.

    4. Executed Indias most difficult project since Independence.

    5. Gave Delhi wallahs, something called the Metro.

    6. Predicted Indias biggest corporate fraud, three months before it happened.I dont know how the Bharat Ratna nomination thing works. But I believe you stand a chance if you have done something

    good for the country. Now tell me, what has Dr Sreedharan not done for the country?

    I mean when you can consider a guy who sells a computer anti-virus on prime-time television for Indias highest civilian

    award, Why is there not a whisper about a guy who has ensured 400,000 people on the western coast of India saw a train

    for the first time?Or, was responsible for a sharp drop in road-rage killings in Delhi?

    Come to think of it though, I really dont want Dr Sreedharan to get the Bharat Ratna. I mean, he will then join a club that

    is populated by people like Bismillah Khan, Lata Mangeshkar, Bhimsen Joshi etc. No disrespect to them, but they were at

    best, paid performers who had negligible impact on the population of India. (Lata Mangeshkar in fact has had a negative

    impact. A flyover which will bring respite to thousands, if not lakhs, of Mumbaikars is not being constructed solely due to

    her privacy concerns)

    Dr Sreedharan should not be given the Bharat Ratna. Because the Bharat Ratna does not deserve a man like DrSreedharan.

    http://en.wikipedia.org/wiki/Satyam_scandalhttp://iegindia.org/workpap/wp273.pdfhttp://kaipullaispeaks.files.wordpress.com/2012/02/26851757-satyam-scandal.jpghttp://en.wikipedia.org/wiki/Satyam_scandalhttp://iegindia.org/workpap/wp273.pdf