Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik [email protected] ....

26
Dr. Alexia Nalewaik FRICS CCP CCA November 2015

Transcript of Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik [email protected] ....

Page 1: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Dr. Alexia Nalewaik FRICS CCP CCA

November 2015

Page 2: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Framing the project success ‘problem’

Risk assessment and management

Types of risk

Auditing risk

Questions and Answers

Page 3: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...
Page 4: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Projects are often unique, complex, complicated, dynamic

Projects rely on people

Change is a constant

Different stakeholders have different definitions of success

Risk exists

There are many variables in projects and project management that are difficult to capture ◦ … especially the ‘people’ part

Page 5: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...
Page 6: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Risk: vulnerability to the possibility of loss, as a consequence of inherent uncertainty when undertaking an endeavor or course of action

“Risk is 1. A hazard, danger; exposure to mischance or peril. 2. The chance or hazard of commercial loss. 3. An allowance made to cover accidental deficits.” (OED, 2015)

“Something bad could happen” (Hubbard, 2009)

Page 7: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Multi-faceted Inter-dependent Constantly changing

Any action has more than one possible outcome

and impact

Any action may affect existing risks or generate subsequent risks

Page 8: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...
Page 9: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Risks may be project-specific, or related to the organization

Risk can be objective or subjective

Risks can be unknown, then become known ◦ Black swans can become grey swans

Risk requires professional judgment regarding

severity and consequence ◦ … that’s the problem …

Page 10: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Risk quantification tends not to focus on extreme-impact statistically-unlikely events such as: ◦ war, terrorism, political instability, corruption, earthquake,

tsunami, stock market crash ◦ extreme operational risks of the type discussed in Basel II (et seq.) ◦ space alien invasion, zombie apocalypse

Page 11: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Technical ◦ Internal ◦ Related to the design of the project, and the materials &

equipment needed to make that design a reality

Financial / Economic ◦ Internal and external ◦ Related to the economic environment, market factors, financing

Statutory / Political ◦ External ◦ Related to the political, cultural, and regulatory environment of

the project and players

Page 12: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Statutory & political risk

• local law or government policy • government influence on disputes • environmental regulations • property acquisition • permitting • external stakeholder influence • testing & certification • official and unofficial holidays • religious observance • customs (import / export) • visas (immigration)

Financial & economic risk

• inflation

• funding/financing

• market forces

• labor & material costs

• labor & material availability

• interest rate

• currency fluctuation

• bankruptcy

• alternative approaches to insurance

Technical risk

• proven/unproven technology

• implementation methodology

• equipment & material performance

• planning & design complexity

• commissioning & testing

• evolving requirements

• tie-in to existing project or interface

• scope change

• engineering & design change

• metric vs imperial measurement

• differing standards

• specialized equipment & materials

• long-lead equipment

• project in an operating facility

• design conflict / interference

• information technology systems

• scalability

• security vulnerabilities

Page 13: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Organizational ◦ Internal ◦ Related to the structure of the organization, culture, relationships,

management, and capability

Contractual ◦ Internal ◦ Related to the structure and language of legal agreements

implements on the project

Other ◦ Internal and external

Page 14: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Contractual risk

• contractual liability • warranties • liquidated / consequential / punitive

damages • construction defect • risk transfer • conflicting contract language • inadequate contract protections • intellectual property • new contract / delivery method

Organizational risk

• project team capability

• contractor failure

• contractor/vendor/consultant failure or

default

• mergers & acquisitions

• staff turnover

• stakeholder turnover

• degree of unfamiliarity

• schedule acceleration

• gaps in responsibility or scope

• communication

• executive support of project

• business processes

• delegated authority

• organizational culture

Other risk

• climate • safety • unknown conditions • archaeological findings • contamination • local customs • infrastructure • theft • translation error • productivity • competition

Page 15: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...
Page 16: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Reg

ID

Maj Cat Type Description Consequence % Cost Time Score Rank Priority Business

Risk

14

Labor New employee integration Difficulty in hiring quality/skilled

people, efficiency decrease, delayed

startup, no budget to advance hire,

management issues90 3 3 270 High 2

46

Planning &

SchedulingFailure to meet scheduled down time

windows and / or overrun of down

time schedule

Production loss. No more downtime

is available. Need to accelerate,

increase overtime. 90 3 2 225 High 3

20Design Quality issue - pumping hot product

over long distance

Cost/schedule impact to fix

contamination and mold50 2 3 125 Medium

55

Planning &

SchedulingMech/Electrical permits not received

on time

Delay to construction causing

delayed completion and increased

overtime costs 50 2 2 100 Medium

30

Planning &

SchedulingGMP's (existing lines) Contamination, air flow change when

areas are partitioned ; BUSINESS

ISSUES 50 2 2 100 Medium YES

42

Design Inadequate floor loading to take new

Fermentation tanks

Additional rebar / structure

80 1 1 80 Low

2

Generic Risk Changing market forecast Scope change, equipment layout

affected25 3 3 75 Low 1

35

Design Inadequate fire main capacity with

increase of potable water

requirements

Fire pump needed to increase

pressure 35 3 1 70 Low

Impact

Page 17: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

3

4

42

43

45

46

48

49

50

51

53

54

55

56

57

58

59

60

61

63

64

65

66

68

70

75

76

77

78

79

80

88

91

92

93

94

95

97

A B E G H I M

MARK # SUBSYSTEMORIGINAL

ESTIMATEMIN. M.L. MAX. Probability

15 BUILDING 13,365,000 13,111,952 13,763,739 15,023,257

1505 Site Works 495,037 432,978 455,766 495,037 100%

1505 Excavation 342,890 220,000 259,410 342,890 100%

1505 Paving 626,782 520,000 541,283 626,782 100%

1510 New Building 823,383 900,859 948,272 995,686 100%

1510 Precast Concrete 3,600,000 3,600,000 3,750,000 4,125,000 100%

1510 Cast-in-Place Concrete 0 1,087,750 1,145,000 1,259,500 100%

1510 Foundations & Curbs 710,568 329,460 346,800 364,140 100%

1510 CMU 419,208 300,960 316,800 348,480 100%

1510 Structural Steel & Metal Platforms 296,751 238,083 250,614 275,675 100%

1510 Roofing & Weatherproofing 381,565 526,738 554,461 582,184 100%

1510 Flooring, Tiles 600,391 568,910 598,853 600,391 100%

1510 Freight Elevator 80,350 76,333 80,350 92,403 100%

1510 Dock Equipment 171,920 150,000 153,040 171,920 100%

1510 Building Electrical 448,174 335,635 353,300 388,630 100%

1510 Building Lighting 552,691 440,783 463,982 510,380 100%

1515 HVAC 832,856 832,856 848,288 890,702 100%

1515 HVAC Electrical 155,968 155,968 166,861 175,204 100%

1520 Storm Water 20,000 20,000 20,000 40,000 100%

1525 Sanitary Sewer 400,000 380,000 400,000 450,000 100%

1530 Utility Rooms 137,000 106,564 112,173 137,000 100%

1535 Fire Protection 185,000 175,000 185,000 200,000 100%

1545 Raw CIP Room 40,000 37,000 40,000 60,000 100%

1565 Recycle & Compactor Area 60,000 130,055 136,900 143,745 100%

1580 Bulk Bag Unloading Area 0 104,500 110,000 115,500 100%

1585 Process Area (Batch Tanks) 0 157,523 165,814 174,105 100%

1599 Building Expense 205,000 97,822 102,970 113,267 100%

Risk 44 Danger of trucks hitting columns 75,000 87,500 100,000 90%

Risk 32 NPDES storm run-off requirements 250,000 425,000 600,000 100%

Risk 13 Addiitional building foundation too shallow 200,000 240,000 250,000 100%

Risk 11 Public utility Commission approval delay 50,000 75,000 100,000 50%

Risk 21 Packaging flow materials capacity 100,000 175,000 250,000 25%

Risk 7 Seismic Issues (investigative works only) 67,000 67,000 67,000 100%

Risk 12 Capped oil well 25,000 75,000 150,000 10%

Risk 45 Insufficient strength in roof to take loads 50,000 150,000 250,000 10%

Risk 52 Fire hydrants needed at back of building 30,000 40,000 50,000 80%

Page 18: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Cost Risk Analysis

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00

Values $ Million

Pro

ba

bilit

y

Base Estimate Base Estimate With Contingency Risk

Page 19: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Deming cycle of identification, quantification, modeling, management, and monitoring

Risk Management Plan should include: ◦ risk description ◦ likelihood of occurrence ◦ potential impact ◦ consequences ◦ risk owners ◦ root causes ◦ early warning signs ◦ action plans

Page 20: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Risk Entry Form Date :

Risk # : Risk Owner :

Current Impact

Risk Description Probability (Percentage)

Consequence Time Impact (1 to 3)

Current Mitigation Cost Impact (1 to 3)

Notes Field Business Impact (Yes/No)

Fallback Plan

Risk Reduction MeasuresAction #: Action Manager Description Target Date Actual Date Status

1

2

3

4

Page 21: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...
Page 22: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Results generated from compliance audit more frequently surface human error than fraud

Review scope can be fine-tuned to address the specific needs of the project ◦ Directs team resources to areas that can benefit the most

◦ Tailored to the specific needs of the project at key milestones in the project lifecycle

◦ Focus on obtaining value and return on investment from the review process

Risk-based methodology includes evaluation of any activity that consumes program resources

Page 23: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...
Page 24: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Largest school district in the country ◦ Knew they had monies in contingency & reserves for

old projects

◦ Wanted to fund new projects

Issues ◦ Quantify needed contingency and reserves

◦ Formalize processes

◦ Find existing contingency, reserves, & other monies

Page 25: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Infrastructure project with global impact ◦ Client wanted to develop a five year audit plan

◦ Performance review done at the time of bid award

Issues ◦ Risk

◦ Governance

◦ Additional concerns

Page 26: Dr. Alexia Nalewaik FRICS CCP CCA November 2015€¦ · Dr. Alexia Nalewaik alexian@qsrequin.com . Title: Slide 1 Author: Alexia Created Date: 12/21/2015 12:04:24 PM ...

Dr. Alexia Nalewaik [email protected]