DP DP SeaSim Fitout Full utilization Layout...SeaSim Fitout Full utilization Layout SeaSim_layout...

1
1 2 1 1 1 2 2 1 1 2 2 1 1 1 1 1 1 FSL 12.500 FSL 12.500 7 5 1 3 1 1 TIMBER CG TYPICAL CG CG CG CG CG CG CG CG 2 FSL 12.500 STAIR 2 STAIR 3 FFL 12.500 CG TIMBER CG TYPICAL SERVICE RISERS FIP CPBD 5 1 UP DP DP 1:40 FALL 1:40 FALL CONC - EXT WALKWAY 1:20 1:40 FALL 1:40 FALL 1:40 FALL CONC - EXT WALKWAY CONC - EXT RAMP 1:20 1:20 CONC - EXT RAMP CONC - EXT RAMP 1 UP 1 TG1 CDO TGSI TGSI TGSI RAMP 1:20 TGSI B2 B2 B2 B2 B3 SPOON DRAIN REFER CIVIL DRAWINGS FFL 8.830 FLOOR MAT BAL 6 BAL 5 BAL 4 FIRE RISER CONC - EXT WALKWAY TG2 BAL 6 LANDSCAPE BATTER 1:2 MAX BATTER LANDSCAPE BATTER 1:2 MAX BATTER UP CONCRETE HARDSTAND. GRAVEL BD BD STAIR SHAFT R/D S/D BD BD LANDSCAPE BATTER 1:3 BATTER MAX SPOON DRAIN REFER CIVIL DRAWINGS SPOON DRAIN REFER CIVIL DRAWINGS TGSI LINE OF ROOF OVER SK B2 TGSI LINE OF ROOF OVER LINE OF ROOF OVER LINE OF ROOF OVER LINE OF ROOF OVER LINE OF ROOF OVER LINE OF ROOF OVER SETOUT POINT N 7,869,254.550 E 505,773.294 LINE OF AWNING ROOF OVER LINE OF AWNING ROOF OVER FHR FHR FUME CPD. 1 RL 12.355 RL 11.745 RL 11.735 RL 11.165 GRATED DRAIN DP DP FRP OoS Breeding 2/1 OoS Breeding 2/2 OoS Breeding 1/2 OoS Breeding 1/1 Larval rearing 1 Larval rearing 3 Larval rearing 4 Outdoor holding and propagation #1 Brooding Outdoor multifactorial InSeason Breed 2/2 InSeason Breed 2/1 InSeason Breed 1/2 InSeason Breed 1/1 Aquarium room 1 Indoor holding and propagation WAMSI WAMSI WAMSI WAMSI WAMSI WAMSI WAMSI WAMSI WAMSI WAMSI Outdoor holding and propagation #2 STAIR 4 B2 Display Area Mangroves Future / inshore reef Seagrass Reef COTs CG access platform B2 B2 B2 Reef Aquarium room 2 Aquarium room 3 Aquarium room 4 Aquarium room 5 Aquarium room 6 Aquarium room 7 Aquarium room 8 Spats #3 Spats #4 Spats #1 Spats #2 Larval rearing 2 SeaSim Fitout Full utilization Layout SeaSim_layout July.2013

Transcript of DP DP SeaSim Fitout Full utilization Layout...SeaSim Fitout Full utilization Layout SeaSim_layout...

1

2

1

1

1

2

2

1

1

22

1

1

11

1

1

FSL 12.500

FSL 12.500

7

5

1 31

1

TIMBERCGTYPICAL

CG

CG

CG

CG CG

CGCG CG

2

FSL 12.500

STAIR 2

STAIR 3

FFL 12.500

CG

TIMBER CGTYPICAL

SERVICE RISERS

FIP CPBD

5

1

UP

DP DP

1:40FALL

1:40FALLCONC - EXT WALKWAY

1:20

1:40FALL

1:40FALL

1:40FALL

CO

NC

- E

XT

WA

LKW

AY

CO

NC

- E

XT

RA

MP

1:201:20

CONC - EXT RAMPCONC - EXT RAMP

1

UP

1

TG1

CDO

TGSITGSI

TGSI

RA

MP

1:20

TGSI

B2 B2

B2 B2

B3

SPOON DRAINREFER CIVILDRAWINGS

FFL 8.830

FLOORMAT

BAL 6

BAL 5

BAL 4

FIRE RISER

CONC - EXT WALKWAY

TG2

BAL 6

LANDSCAPEBATTER

1:2 MAXBATTER

LANDSCAPEBATTER

1:2 MAXBATTER

UP

CONCRETEHARDSTAND.

GRAVEL

BD

BD

STAIR

SHAFT

R/D

S/D

BD

BD

LANDSCAPEBATTER

1:3 BATTERMAX

SPOON DRAIN REFER CIVIL DRAWINGSSPOON DRAIN REFER CIVIL DRAWINGS

TGSILINE OF ROOF OVER

SK

B2

TGSI

LINE OF ROOF OVER

LINE OFROOF OVER

LINE OF ROOF OVER

LINE OFROOF OVER

LINE OFROOF OVER

LINE OF ROOF OVER

SETOUT POINTN 7,869,254.550E 505,773.294

LINE OF AWNING ROOF OVER

LINE OFAWNINGROOF OVER

FHR

FHR

FUME CPD.

1

RL 12.355

RL 11.745 RL 11.735

RL 11.165

GRATED DRAIN

DP DP

FRP

OoS

Breeding 2/1

OoS

Breeding 2/2

OoS

Breeding 1/2

OoS

Breeding 1/1

Larval rearing 1

Larval rearing 3

Larval rearing 4

Outdoor holding and propagation #1

Bro

odin

g

Out

door

mul

tifac

toria

l

InSeason Breed2/2

InSeason Breed2/1

InSeason Breed1/2

InSeason Breed1/1

Aquariumroom 1

Indoor holding and propagation

WAMSI

WAMSIWAMSI

WAMSIWAMSI

WAMSI

WAMSI

WAMSI

WAMSI

WAMSI

Outdoor holding and propagation #2

STAIR 4

B2

Display Area

Mangroves

Futu

re /

insh

ore

reef

Seag

rass

Reef

CO

Ts

CG

access platform

B2B2 B2

Reef

Aquariumroom 2 Aquarium

room 3Aquariumroom 4

Aquariumroom 5

Aquariumroom 6

Aquariumroom 7

Aquariumroom 8

Spats #3 Spats #4

Spats #1 Spats #2

Larval rearing 2

SeaSim FitoutFull utilization Layout

SeaSim_layout

July.2013